36C24618R0839-0003000.docx

DOCX document 18 KB Posted

Attached to
Project 659-16-103, Replace Campus Fire Alarm System Federal contract opportunity
Solicitation number
36C24618R0839
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24618R0839 0003 36C24618R0839 0003.docx

View the file

Other files for this federal contract opportunity

Other files attached to Project 659-16-103, Replace Campus Fire Alarm System, newest first.
File Type Posted
36C24618R0839-0003002.pdf PDF
36C24618R0839-0003001.pdf PDF
36C24618R0839-0002001.pdf PDF
36C24618R0839-0002000.docx DOCX document
36C24618R0839-002.pdf PDF
36C24618R0839-006.pdf PDF
36C24618R0839-004.pdf PDF
36C24618R0839-013.docx DOCX document
36C24618R0839-008.pdf PDF
36C24618R0839-012.pdf PDF
36C24618R0839-009.pdf PDF
36C24618R0839-001.docx DOCX document
36C24618R0839-014.pdf PDF
36C24618R0839-005.pdf PDF
36C24618R0839-003.pdf PDF
36C24618R0839-010.pdf PDF
36C24618R0839-007.pdf PDF
36C24618R0839-011.pdf PDF
36C24618R0839-000.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 1 of 08-13-2018 659-16-103 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 Department of Veterans Affairs Network Contracting Office 6 100 Emancipation Drive Hampton

VA

23667 To all Offerors/Bidders

36C24618R0839 07-12-2018

X X X The purpose of this Amendment is to (1.) provide responses to questions regarding the solicitation (attached), (2.)

provide the addendum on page 2 of this Amendment, (3.) provide Drawing FD132 (attached).

The due date for proposals is extended to Wednesday, 22 August 2018, at 10:00am.

The due date for subcontractor qualifications is extended to Friday, 24 August 2018, at 10:00am.

CONTINUATION SHEET

Amendment 0003 Bid Addendum;

Addendum items:

Drawing FA115, FA116, FA117 and FA118 Building 4: Change alternate bid # 7 to Alternate bid # 1 and shall read as follows:

(DEDUCT ALTERNATE ITEM NO. 1): Provide all work per BASE BID ABOVE EXCEPT: Delete work associated with new fire alarm work in building 4. (The Main Terminal equipment located in G022-4, conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to the new fire alarm fiber loop, boring shall remain in base bid). All work shall include final cleanup, completion of any punch list items, testing and training.

Drawings FA120 Building #5: Change alternate bid # 8 to alternate bid #5 and shall read as follows:

(DEDUCT ALTERNATE ITEM NO. 5): Provide all work per ALTERNATE NO. 4 ABOVE EXCEPT: Delete new fire alarm work in building 5.(Leave new head end in base with all conduit for fiber loop, fiber cable, patch panels, patch cords, fiber boxes, terminations, connections to new fire alarm fiber loop, boring shall remain in base bid) All work shall include final cleanup, completion of any punch list items, testing and training.

See attached document: RFP Questions and Answers - 659-16-103 Replace Campus Fire Alarm System.

See attached document: Amendment 3 - Drawing FD132.