36C24618R0839-009.pdf
PDF 7 MB Posted
- Attached to
- Project 659-16-103, Replace Campus Fire Alarm System Federal contract opportunity
- Solicitation number
- 36C24618R0839
About this file
36C24618R0839 CONTRACT ATTACHMENT A - DRAWINGS FILE 8 - 08-Sheets_FA125-FA135.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24618R0839-0003002.pdf | ||
| 36C24618R0839-0003001.pdf | ||
| 36C24618R0839-0003000.docx | DOCX document | |
| 36C24618R0839-0002001.pdf | ||
| 36C24618R0839-0002000.docx | DOCX document | |
| 36C24618R0839-004.pdf | ||
| 36C24618R0839-013.docx | DOCX document | |
| 36C24618R0839-008.pdf | ||
| 36C24618R0839-012.pdf | ||
| 36C24618R0839-001.docx | DOCX document | |
| 36C24618R0839-014.pdf | ||
| 36C24618R0839-002.pdf | ||
| 36C24618R0839-006.pdf | ||
| 36C24618R0839-005.pdf | ||
| 36C24618R0839-003.pdf | ||
| 36C24618R0839-010.pdf | ||
| 36C24618R0839-007.pdf | ||
| 36C24618R0839-011.pdf | ||
| 36C24618R0839-000.docx | DOCX document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPDN
DN
DOUBLE
PATIENT ROOM
A229
TV AREA
A228
SCREENED
PORCH 1
A209
PATIENT ROOM
A211
BATHROOM 1
A211A
SINGLE
PATIENT ROOM
A213
BATHROOM 2
A213A DOUBLE
PATIENT ROOM
A215
BATHROOM 3
A215A
TV AREA
A217
DOUBLE
PATIENT ROOM
A218
BATHROOM 4
A218A
SINGLE
PATIENT ROOM
A216
BATHROOM 5
A216A
SINGLE
PATIENT ROOM
A214
BATHROOM 6
A214A
BARIATRIC
PATIENT ROOM
A212
BARIATRIC
BATHROOM 7
A212A
Clean Linen A210
Nourish A208
GROUP ROOM
A221
GROUP ROOM
CLOSET
A221A
SUB PORCH
(GROUP)
A221B
SCREENED
PORCH 2
A223
PATIENT ROOM
A225
SINGLE
PATIENT ROOM
A227
BATHROOM 9
A227A
BATHROOM 8
A225A
BATHROOM 10
A229A
BATHROOM 11
A226A
DOUBLE
PATIENT ROOM
A226
SINGLE
PATIENT ROOM
A224
BATHROOM 12
A224A
BATHROOM 13
A222A
SINGLE
PATIENT ROOM
A222
TLT
A231B
ANTE ROOM
A231A
SECLUSION
A231DOUBLE
PATIENT ROOM
A233
BATHROOM 14
A233A
BATHROOM 15
A234A
PATIENT ROOM
A234
ELECTRICAL 3
A246
SOILED UTILITY
A245
SHOWER
A232
HAC
A243
QUIET ROOM
A230
STAFF
LOCKERS
A244
STAFF BREAK
A254
OFFICE 12
A253
OFFICE 11
A252
OFFICE 10
A251
OFFICE 9
A250
CLEAN
STORAGE
A242
TEAM ROOM
A241 WORK ROOM
A220B
WARD CLERK
A220C
MEDICATION
A220A
ST TLT
A244B
ST TLT
A244A
NURSING
STATION
A220
OFFICE 1
A255
OFFICE 2
A256 OFFICE 8
A257
PATIENT
PROPERTY
A263
OFFICE 7
A258
OFFICE 6
A262
OFFICE 3
A259
OFFICE 4
A260
OFFICE 5
A261 FAMILY
CONFERENCE
A202
CONSULT 1
A204
CONSULT 2
A206
SERVING
A205
EXAM
A203
SECURE
VESTIBULE
A201
COMM
A271
AIR HANDLER
ROOM
A272
DAY
AC202B
DINING
AC202A
DINING
AC203A
DAY
AC203B
PATIENT
CORRIDOR
AC202
LAUNDRY
A207
PATIENT
CORRIDOR
AC203
HALL
AC207
HALL
AC208
HALL
AC210
HALL
AC209
CORRIDOR
AC204
CORRIDOR
AC204A
HALL
AC205 CLEAN LINEN
A240
SERVICE
CORRIDOR
AC206
ELEVATOR
VESTIBULE
A275
STORAGE
A276
STORAGE
A273A
FEMALE PUBLIC
TOILET
A277
STAIR 1
AS201
EXIST.
ELEVATOR 2
P2
EXIST.
ELEVATOR 1
P1
MALE PUBLIC
TOILET
A278
GROUP ROOM
A273
PUBLIC
CORRIDOR
AC211
ELEVATOR
VESTIBULE
A274
EXIST ELEV
S1
EXIST ELEV
S2
STAIR 2
AS202
HAC
A280PUBLIC
CORRIDOR
AC212
A205-A
OPEN TO BELOW
OPEN TO BELOW
FUTURE
CONFERENCE
ROOM
A279
UPDN
DN
DOUBLE
PATIENT ROOM
A229
TV AREA
A228
SCREENED
PORCH 1
A209
PATIENT ROOM
A211
BATHROOM 1
A211A
SINGLE
PATIENT ROOM
A213
BATHROOM 2
A213A DOUBLE
PATIENT ROOM
A215
BATHROOM 3
A215A
TV AREA
A217
DOUBLE
PATIENT ROOM
A218
BATHROOM 4
A218A
SINGLE
PATIENT ROOM
A216
BATHROOM 5
A216A
SINGLE
PATIENT ROOM
A214
BATHROOM 6
A214A
BARIATRIC
PATIENT ROOM
A212
BARIATRIC
BATHROOM 7
A212A
Clean Linen A210
Nourish A208
GROUP ROOM
A221
GROUP ROOM
CLOSET
A221A
SUB PORCH
(GROUP)
A221B
SCREENED
PORCH 2
A223
PATIENT ROOM
A225
SINGLE
PATIENT ROOM
A227
BATHROOM 9
A227A
BATHROOM 8
A225A
BATHROOM 10
A229A
BATHROOM 11
A226A
DOUBLE
PATIENT ROOM
A226
SINGLE
PATIENT ROOM
A224
BATHROOM 12
A224A
BATHROOM 13
A222A
SINGLE
PATIENT ROOM
A222
TLT
A231B
ANTE ROOM
A231A
SECLUSION
A231DOUBLE
PATIENT ROOM
A233
BATHROOM 14
A233A
BATHROOM 15
A234A
PATIENT ROOM
A234
ELECTRICAL 3
A246
SOILED UTILITY
A245
SHOWER
A232
HAC
A243
QUIET ROOM
A230
STAFF
LOCKERS
A244
STAFF BREAK
A254
OFFICE 12
A253
OFFICE 11
A252
OFFICE 10
A251
OFFICE 9
A250
CLEAN
STORAGE
A242
TEAM ROOM
A241 WORK ROOM
A220B
WARD CLERK
A220C
MEDICATION
A220A
ST TLT
A244B
ST TLT
A244A
NURSING
STATION
A220
OFFICE 1
A255
OFFICE 2
A256 OFFICE 8
A257
PATIENT
PROPERTY
A263
OFFICE 7
A258
OFFICE 6
A262
OFFICE 3
A259
OFFICE 4
A260
OFFICE 5
A261 FAMILY
CONFERENCE
A202
CONSULT 1
A204
CONSULT 2
A206
SERVING
A205
EXAM
A203
SECURE
VESTIBULE
A201
COMM
A271
AIR HANDLER
ROOM
A272
DAY
AC202B
DINING
AC202A
DINING
AC203A
DAY
AC203B
PATIENT
CORRIDOR
AC202
LAUNDRY
A207
PATIENT
CORRIDOR
AC203
HALL
AC207
HALL
AC208
HALL
AC210
HALL
AC209
CORRIDOR
AC204
CORRIDOR
AC204A
HALL
AC205 CLEAN LINEN
A240
SERVICE
CORRIDOR
AC206
ELEVATOR
VESTIBULE
A275
STORAGE
A276
STORAGE
A273A
FEMALE PUBLIC
TOILET
A277
STAIR 1
AS201
EXIST.
ELEVATOR 2
P2
EXIST.
ELEVATOR 1
P1
MALE PUBLIC
TOILET
A278
GROUP ROOM
A273
PUBLIC
CORRIDOR
AC211
ELEVATOR
VESTIBULE
A274
EXIST ELEV
S1
EXIST ELEV
S2
STAIR 2
AS202
HAC
A280PUBLIC
CORRIDOR
AC212
A205-A
OPEN TO BELOW
OPEN TO BELOW
FUTURE
CONFERENCE
ROOM
A279
FF
F S
F
F S
F S
F S
F S
F S
F S
F S
F
SF
S F S
F S
F S
F S
F S
F S
F S F
S
F S
F S
F
SF
S F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S F
S
F S
F
F
F
F
F
F
F
F F
F F
F
F
F
F
F
F
F
F
F F
F
FF
F
F
F
F
F S
F S
F S
F S
F S
F S
F S
F S
FF
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F S
F
F S
F
F S
FC
F
F
N A
C
1. NO NEW WORK SHOWN ON THIS SHEET.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA125
BLDG 8 SECOND FLOOR
1 BLDG 8 SECOND FLOOR
3/32" = 1'
HEALTH CARE OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
DocuSign Envelope ID: 94B147EA-25A3-4143-9BDC-8EC43B57B4A8
6/25/2018
SINGLE
PATIENT ROOM
A316
BATHROOM 5
A316A
SINGLE
PATIENT ROOM
A314
BATHROOM 6
A314A
BARIATRIC
PATIENT ROOM
A312
PAT TLT
A310
CLEAN
LINEN
A308
GROUP ROOM
CLOSET
A321A
EXERCISE
ROOM
A323
PATIENT ROOM
A325
SINGLE
PATIENT ROOM
A322
TLT
A331B
ANTE ROOM
A331A
QUIET ROOM
A330
OFFICE 9
A350
TEAM ROOM
A341 WORK ROOM
A320B
MEDICATION
A320A
DAY
AC302B
WARD CLERK
A320C
GROUP ROOM
A321
BARIATRIC
BATHROOM
A312A
DINING
AC302A
CLEAN LINEN
A340
DINING
AC303A
NURSE
STATION
A320
PATIENT
CORRIDOR
AC303
SECLUSION
A331
DN
AIR HANDLER
ROOM
A372
STORAGE
A373A
MALE PUBLIC
TOILET
A378
GROUP ROOM
A373
EXIST
ELEVATOR 1
P1
EXIST.
ELEVATOR 2
P2
ELEVATOR
VESTIBULE
A374
PUBLIC
CORRIDOR
AC312
STAIR 2
AS302
HAC
A380
FEMALE TOILET
A377
EXIST ELEV
S1
EXIST ELEV
S2
DOUBLE
PATIENT ROOM
A329
TV AREA
A328
SCREENED
PORCH 1
A309
PATIENT ROOM
A311
BATHROOM 1
A311A
SINGLE
PATIENT ROOM
A313
BATHROOM 2
A313A DOUBLE
PATIENT ROOM
A315
BATHROOM 3
A315A
TV AREA
A317
DOUBLE
PATIENT ROOM
A318
BATHROOM 4
A318A
SINGLE
PATIENT ROOM
A327
BATHROOM 9
A327A
BATHROOM 8
A325A
BATHROOM 10
A329A
BATHROOM 11
A326A
DOUBLE
PATIENT ROOM
A326
SINGLE
PATIENT ROOM
A324
BATHROOM 12
A324A
BATHROOM 13
A322A
DOUBLE
PATIENT ROOM
A333
BATHROOM 14
A333A
BATHROOM 15
A334A
ELECTRICAL 3
A346
SOILED UTILITY
A345
SHOWER
A332
HAC
A343
STAFF
LOCKERS
A344
STAFF BREAK
A354
OFFICE 12
A353
OFFICE 11
A352
OFFICE 10
A351
CLEAN
STORAGE
A342
ST TLT
A344B
ST TLT
A344A
OFFICE 1
A355
OFFICE 2
A356 OFFICE 8
A357
PATIENT
PROPERTY
A363
OFFICE 7
A358
OFFICE 6
A362
OFFICE 3
A359
OFFICE 4
A360
OFFICE 5
A361 FAMILY
CONFERENCE
A302
CONSULT 1
A304
CONSULT 2
A306
EXAM
A303
LAUNDRY
A307
HALL
AC307
HALL
AC308
HALL
AC310
HALL
AC309
CORRIDOR
AC304A
HALL
AC305
SERVICE
CORRIDOR
AC306
ELEVATOR
VESTIBULE
A375
PATIENT ROOM
A334
PUBLIC
CORRIDOR
AC311
STAIR 1
AS301
COMM
A371
SECURE
VESTIBULE
A301
SERVING
A305
CORRIDOR
AC304
DAY
AC303B
PATIENT
CORRIDOR
AC302
A305-A
SINGLE
PATIENT ROOM
A316
BATHROOM 5
A316A
SINGLE
PATIENT ROOM
A314
BATHROOM 6
A314A
BARIATRIC
PATIENT ROOM
A312
PAT TLT
A310
CLEAN
LINEN
A308
GROUP ROOM
CLOSET
A321A
EXERCISE
ROOM
A323
PATIENT ROOM
A325
SINGLE
PATIENT ROOM
A322
TLT
A331B
ANTE ROOM
A331A
QUIET ROOM
A330
OFFICE 9
A350
TEAM ROOM
A341 WORK ROOM
A320B
MEDICATION
A320A
DAY
AC302B
WARD CLERK
A320C
GROUP ROOM
A321
BARIATRIC
BATHROOM
A312A
DINING
AC302A
CLEAN LINEN
A340
DINING
AC303A
NURSE
STATION
A320
PATIENT
CORRIDOR
AC303
SECLUSION
A331
DN
AIR HANDLER
ROOM
A372
STORAGE
A373A
MALE PUBLIC
TOILET
A378
GROUP ROOM
A373
EXIST
ELEVATOR 1
P1
EXIST.
ELEVATOR 2
P2
ELEVATOR
VESTIBULE
A374
PUBLIC
CORRIDOR
AC312
STAIR 2
AS302
HAC
A380
FEMALE TOILET
A377
EXIST ELEV
S1
EXIST ELEV
S2
DOUBLE
PATIENT ROOM
A329
TV AREA
A328
SCREENED
PORCH 1
A309
PATIENT ROOM
A311
BATHROOM 1
A311A
SINGLE
PATIENT ROOM
A313
BATHROOM 2
A313A DOUBLE
PATIENT ROOM
A315
BATHROOM 3
A315A
TV AREA
A317
DOUBLE
PATIENT ROOM
A318
BATHROOM 4
A318A
SINGLE
PATIENT ROOM
A327
BATHROOM 9
A327A
BATHROOM 8
A325A
BATHROOM 10
A329A
BATHROOM 11
A326A
DOUBLE
PATIENT ROOM
A326
SINGLE
PATIENT ROOM
A324
BATHROOM 12
A324A
BATHROOM 13
A322A
DOUBLE
PATIENT ROOM
A333
BATHROOM 14
A333A
BATHROOM 15
A334A
ELECTRICAL 3
A346
SOILED UTILITY
A345
SHOWER
A332
HAC
A343
STAFF
LOCKERS
A344
STAFF BREAK
A354
OFFICE 12
A353
OFFICE 11
A352
OFFICE 10
A351
CLEAN
STORAGE
A342
ST TLT
A344B
ST TLT
A344A
OFFICE 1
A355
OFFICE 2
A356 OFFICE 8
A357
PATIENT
PROPERTY
A363
OFFICE 7
A358
OFFICE 6
A362
OFFICE 3
A359
OFFICE 4
A360
OFFICE 5
A361 FAMILY
CONFERENCE
A302
CONSULT 1
A304
CONSULT 2
A306
EXAM
A303
LAUNDRY
A307
HALL
AC307
HALL
AC308
HALL
AC310
HALL
AC309
CORRIDOR
AC304A
HALL
AC305
SERVICE
CORRIDOR
AC306
ELEVATOR
VESTIBULE
A375
PATIENT ROOM
A334
PUBLIC
CORRIDOR
AC311
STAIR 1
AS301
COMM
A371
SECURE
VESTIBULE
A301
SERVING
A305
CORRIDOR
AC304
DAY
AC303B
PATIENT
CORRIDOR
AC302
A305-A
F S
F
F S
F S
F
SF
S F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F
FC
F S
F S
F S
F S
F S
F S
F S
F S
F S F
S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F S
F
SF
S
F S
F S
F S
F S
F S
F S
F S
F
SF
S F S
F S
F S
F
F
F
F
F
F
F
F
F
F
F
F
F F
F S
F
F
F
F
F F
F
F
F
F
F F
F
F
F
F
F S
F
F
F
F S
F
F F
F
F
F
FF
F
F
F
F
F S
F
F F
F F
F
F F
F
F
F F
N A
C
1. NO NEW WORK SHOWN ON THIS SHEET.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA126
BLDG 8 THIRD FLOOR
1 BLDG 8 THIRD FLOOR
3/32" = 1'
HEALTH CARE OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
G03
LARGE CLASSROOM
G14B
M. TOILET
G17
OPEN OFFICE
G17A
STORAGE
G18
MECH ROOM
G18A
MECH
G19
MECHANICAL EQUIPMENT
G12
OFFICE
G11
OFFICE
130G10
OFFICE
G09
OFFICE
G06
OFFICE
G01
OFFICE/DINING
G02
KITCHEN
G07 Office
G05 Bathrm
G14
WAITING
G13
OFFICE
G14A
F. TOILET
G21
ENG
G20
ENG
G08
CORRIDOR
G22
CORRIDOR
G15
FAC
G16
STAIR
G04
CORRIDOR
G26
BREAK/OFFICE
G25
MECHANICAL RM
G16A
STORAGE
G03B
SPRINKLER RM
ENTRY
VESTIBULE
G001
CORRIDOR
G002G002
DN
MAIN
ELEC
G-40 Crawl
Space
Crawl 2
TO BUILDING 11A VIA
NEW HAND HOLE #12
TO BLDG 8
FIBER IN 3" CONDUIT
EX PANEL '11EM1'
F
F
FACP
F F S
FB
F S
F S
F
FA
A
PF
NACP
DAA
F S
F S
F
F
F
F
F
F
F F
F S
F
F F S
F S F
F S
F S
FA124
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. WHERE NEW DEVICES ARE SHOWN, LOCATE THE
NEAREST JUNCTION BOX WITH THE SLC, NAC, OR
SPEAKER CIRCUIT AND INTERCEPT AND EXTEND
CIRCUIT TO THE NEW DEVICE LOCATION.
3. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
4. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
1. ROUTE FIBER THROUGH CRAWLSPACE. DIRECTIONAL
BORE SHALL STUB UP DIRECTLY INTO CRAWLSPACE.
2. FACP IS EXISTING-TO-REMAIN. PROVIDE NEW FIBER
PATCH PANEL.
3. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501 FOR
MORE INFO.
1. EXISTING FACP AND AATP ARE CIRCUITED FROM
EXISTING '11EM1'-3 (WESTINGHOUSE WEB, 125A). NEW
FACP, NACP, AND DAA SHALL BE CIRCUITED FROM
SAME CIRCUIT.
2. PANEL '11EM1' PEAK LOAD INCREASE: 3A.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA127
BLDG 11 GROUND FLOOR
1 BLDG 11 GROUND FLOOR
3/32" = 1'
BUSINESS OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
#KEYED NOTES
ELECTRICAL POWER NOTES
RESIDENT
ROOM
A103
RESIDENT
ROOM
A102
RESIDENT
BATHROOM
A104
RESIDENT
BATHROOM
A105
RESIDENT
ROOM
A107
RESIDENT
ROOM (2)
A106
RESIDENT
ROOM
A108
RESIDENT
ROOM
A109
RESIDENT
BATHROOM
A111
RESIDENT
BATHROOM
A110
OFFICE -
AT(2)
A112
STAFF
WORK
AREA
A114
NUTRITION
A133
LAUNDRY
A135
RESIDENT
BATHROOM
A138
RESIDENT
ROOM (2)
A140
RESIDENT
ROOM
A142
RESIDENT
BATHROOM
A144
RESIDENT
ROOM
A146
RESIDENT
ROOM
A147
RESIDENT
BATHROOM
A145
RESIDENT
ROOM
A143
RESIDENT
ROOM
A141
RESIDENT
BATHROOM
A139
RESIDENT
ROOM
A137
REC
B108
WOMEN'S
TOILET
A117MEN'S
TOILET
A116
TELECOM
A115
RESIDENT
ROOM
A113
PHONE
ROOM
A136
NURSE
MGR.
B106
OFFICE
B107
VESTIBULE
A131
VESTIBULE
A131
GROUP
B110
DINING
B117
KITCHEN
B114
PANTRY
B116
OFFICE -
PA
B125
EXAM
B124
STAFF
WORK
AREA
B126
MEDS
B127
ELEVATOR
B128
STAIR
B131
STORAGE
B132
WAITING
B146
RECEPTION
B145
SHOWER
B144
EXAM
B141
OFFICE -
DR
B140
FAMILY
ROOM
B150
FAMILY
ROOM
B151
PEDS
FAMILY
ROOM
B152
WOMEN'S
TOILET
B134
MEN'S
TOILET
B136
WOMEN'S
TOILET
B137
WOMEN'S
LOUNGE
B138
ELEC
B130
CODE
SUPPLY
B129
ADMIT
NURSE
B118
OFFICE
B120
SMALL
GROUP
B122
OFFICE -
MANAGER
B123
GROUP
B153
GROUP
B154
FITNESS
CENTER
B155
CONFERENCE
B160
JANITOR
B115
STAFF
WOMEN'S
TOILET
B112
STAFF
MEN'S
TOILET
B111
BREAK
B113
VESTIBULE
B121
TOILET
B143
TOILET
B142
MEN'S
TOILET
B133
WC
STORAGE
B135
OFFICE -
SW
B166
OFFICE -
SW
B165
OFFICE -
SW
B164
TELECOM
B162
STORAGE
B163
GROUP
B109
ELEVATOR
LOBBY
B147
MEN'S
TOILET
C115
WOMEN'S
TOILET
C116
TELECOM
C114
RESIDENT
ROOM
C112
RESIDENT
BATHROOM
C110
RESIDENT
ROOM
C108
RESIDENT
ROOM (2)
C106
RESIDENT
BATHROOM
C104
RESIDENT
ROOM
C102 RESIDENT
ROOM
C103
RESIDENT
BATHROOM
C105
RESIDENT
ROOM
C107
RESIDENT
ROOM
C109
RESIDENT
BATHROOM
C111
OFFICE -
AT (2)
C113
STAFF
WORK
AREA
C117
DEN
C120
LIBRARY
C119
ELEC
C124
SOILED
UTILITY &
LINEN
C122
CLEAN
SUPPLY
C123
RESIDENT
ROOM
C126
RESIDENT
BATHROOM
C128
RESIDENT
ROOM
C130
RESIDENT
ROOM
C129
RESIDENT
BATHROOM
C127
RESIDENT
ROOM
C125
VESTIBULE
C131
CLEAN
LINEN
C149
H.A.C.
C150
OFFICE
C151
RESIDENT
ROOM
C155
RESIDENT
BATHROOM
C157
RESIDENT
ROOM
C159
OFFICE
C152
RESIDENT
BATHROOM
C153
RESIDENT
ROOM
C154
RESIDENT
ROOM
C156
RESIDENT
BATHROOM
C158
RESIDENT
ROOM
C160
RESIDENT
ROOM
C162
RESIDENT
BATHROOM
C164
RESIDENT
ROOM
C166
RESIDENT
ROOM
C165
RESIDENT
BATHROOM
C163
RESIDENT
ROOM
C161
RESIDENT
ROOM
C146
RESIDENT
BATHROOM
C144
RESIDENT
ROOM
C142
RESIDENT
ROOM (2)
C140
RESIDENT
BATHROOM
C138
LAUNDRY
C135
NUTRITION
C133
LIVING
ROOM
C134
PHONE
ROOM
C136
RESIDENT
ROOM
C137
RESIDENT
BATHROOM
C139
RESIDENT
ROOM
C141
RESIDENT
ROOM
C143
RESIDENT
BATHROOM
C145
RESIDENT
ROOM
C147
STORAGE
B156
STAFF
BREAK
B157
MEN'S
STAFF
TOILET
B158
WOMEN'S
STAFF
TOILET
B159
OFFICE -
SW
B167
DN
ELEC
AXXX
F
F
F F
F
FFF
F
F
F
F
F F
F
F
F
F
F F
F
F
F F
F
F F
F F
F F
F F
FF
F
F
F
F F
F
F F
F
F
F F F
F
F F
F
F F
F
F
F
F F
F
F
F F
F
F
F
F
F
F
F
FF
F
F
F
F
F
F F
FF
F
F F
F
F
F
F F
F F
F
F
F
F
F
F F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
FF
F F F F
F
F F
FFF
FF
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
RL
F
FF
F
F F
F
F
F F
F F FF
F
F
F
F
F
F
F
F
F FA
A
P
F
F
F
F F
F
F F
F F
FACP
F
F
F
F
F
F
EC
M A
TC
H
LI
N
E
LIBRARY
A119
DEN
A120
LIVING
ROOM
A134
CONFERENCE ROOM
F F F
F
F
F
F
F
F
M A
TC
H
LI
N
E
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA128
BLDG 11 FIRST FLOOR
1 BLDG 11 FIRST FLOOR (ALL DEVICES ARE EXISTING)
3/32" = 1'
BUSINESS OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
1. REPLACE ALL EXISTING DUCT DETECTORS AND
ASSOCIATED KEY SWITCHES. NEW KEY SWITCH
LOCATIONS SHALL BE ACCESSIBLE, WITH
HEIGHT ACCORDING TO NOTES AND
SPECIFICATIONS.
2. VERIFY ALL CEILING TYPES BEFORE WORK.
REPLACE ANY CEILING DAMAGE AND PAINT TO
MATCH EXISTING.
3. ALL EXISTING DEVICES TO REMAIN. PROVIDE
NEW DEVICES AS SHOWN. CONNECT OLD
CIRCUITS AND NEW CIRCUITS TO NEW FACP.
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
GROUP ROOM
GROUP ROOM
BREAK RM
93 101
BATHROOM
BATHROOM
HOUSE KEEPING
ELEC
OFFICE
WAITING ROOM
RECEPTION
OFFICE
OFFICE
STAFF BATH
STAFF BATH
2 4
F
F
R R R R R R
RRRRRR
R
R
R R
R
R
F
F
F
F
F F
F
F
FA
C
P
F
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
GROUP ROOM
GROUP ROOM
BREAK RM
BATHROOM
BATHROOM
EMS
ELEC
OFFICE
WAITING ROOM
RECEPTION
OFFICE
OFFICE
STAFF BATH
STAFF BATH
R R R R
R
F F
F
F S
F
FF
F
F
F
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CALL CENTER
GROUP ROOM
Med/Inject
BATHROOM
BATHROOM
EMS
ELEC
BREAK RM
WAITING ROOM
RECEPTION
OFFICE
OFFICE
STAFF BATH
STAFF BATH
CORRIDOR
F F
F
F
F S
F S
F S
F
F
F
1. EXISTING 24"x36" TIER 8 HAND HOLE TO REMAIN.
2. PROVIDE NEW 24"x36" POLYMER CONCRETE HAND
HOLE. TIER 5 MINIMUM. INSTALL PER DETAILS.
3. PROVIDE NEW DIRECTIONAL BORE TO BLDG 11.
ROUTE FOR FIBER CABLE. STUB UP WITHIN NEW
HAND HOLE PER DETAILS.
4. CORE THROUGH THE SIDE OF EACH BOX AND
PROVIDE 3" NIPPLE.
5. EXISTING 4" CONDUIT UNDERGROUND AND
THROUGH CRAWLSPACE BETWEEN HANDHOLE AND
BLDG 11C. ROUTE FOR SLC CIRCUIT (BLDG 11C
SHALL BE MONITORED BY BLDG 11A FACP).
6. EXISTING 3" CONDUIT UNDERGROUND AND
THROUGH CRAWLSPACE BETWEEN HAND HOLE AND
BLDG 11B. ROUTE FOR SLC CIRCUIT (BLDB 11B SHALL
BE MONITORED BY BLDG 11A FACP).
7. PROVIDE TWO NEW 1-1/2" CONDUITS UNDERGROUND
AND THROUGH CRAWLSPACE TO TELCO ROOM.
ROUTE FOR FIBER TO BLDG 15 AND TO BLDG 11 AND
FOR SLC LOOPS TO BLDGS 11A AND B.
8. REUSE EXISTING 3-1/2" CONDUIT TO BLDG 15. ROUTE
FOR NEW FIBER CABLE.
9. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501
FOR MORE INFO.
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. EACH BUILDING HAS ACCESSIBLE CRAWLSPACE.
3. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
4. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA129
BLDG 11A, BLDG 11B, BLDG 11C
11A, 11B, 11C
1 BLDG 11A
1/8" = 1' 2 BLDG 11B
1/8" = 1' 3 BLDG 11C
1/8" = 1'
BUSINESS OCCUPANCY - NOT SPRINKLERED
GENERAL NOTES
#KEYED NOTES
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
GROUP ROOM
GROUP ROOM
BREAK RM
93 101
BATHROOM
BATHROOM
HOUSE KEEPING
ELEC
OFFICE
WAITING ROOM
RECEPTION
OFFICE
OFFICE
STAFF BATH
STAFF BATH
FA
C
P D
A A
2 4
N A
C P
F
F
F
F S
F F F S
F S
F S
F S
F S
F
F F
F S
FF
F
FS
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORRIDOR
GROUP ROOM
GROUP ROOM
BREAK RM
BATHROOM
BATHROOM
EMS
ELEC
OFFICE
WAITING ROOM
RECEPTION
OFFICE
OFFICE
STAFF BATH
STAFF BATH
N A
C P
D A
A
F F
F S
F S
F S
F S
F S
F F
F F
F S
FF
F S
FS
F
F
F
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CALL CENTER
GROUP ROOM
Med/Inject
BATHROOM
BATHROOM
EMS
ELEC
BREAK RM
WAITING ROOM
RECEPTION
OFFICE
OFFICE
STAFF BATH
STAFF BATH
CORRIDOR
N A
C P
D A
A
F
SF F
F S
F S
F
S FF
F S
F S
F F
F
F
F S
FS
F
1. EXISTING 24"x36" TIER 8 HAND HOLE TO REMAIN.
2. PROVIDE NEW 24"x36" POLYMER CONCRETE HAND
HOLE. TIER 5 MINIMUM. INSTALL PER DETAILS.
3. PROVIDE NEW DIRECTIONAL BORE TO BLDG 11.
ROUTE FOR FIBER CABLE. STUB UP WITHIN NEW
HAND HOLE PER DETAILS.
4. CORE THROUGH THE SIDE OF EACH BOX AND
PROVIDE 3" NIPPLE.
5. EXISTING 4" CONDUIT UNDERGROUND AND
THROUGH CRAWLSPACE BETWEEN HANDHOLE AND
BLDG 11C. ROUTE FOR SLC CIRCUIT (BLDG 11C
SHALL BE MONITORED BY BLDG 11A FACP).
6. EXISTING 3" CONDUIT UNDERGROUND AND
THROUGH CRAWLSPACE BETWEEN HAND HOLE AND
BLDG 11B. ROUTE FOR SLC CIRCUIT (BLDB 11B SHALL
BE MONITORED BY BLDG 11A FACP).
7. PROVIDE TWO NEW 1-1/2" CONDUITS UNDERGROUND
AND THROUGH CRAWLSPACE TO TELCO ROOM.
ROUTE FOR FIBER TO BLDG 15 AND TO BLDG 11 AND
FOR SLC LOOPS TO BLDGS 11A AND B.
8. REUSE EXISTING 3-1/2 CONDUIT TO BLDG 15. ROUTE
FOR NEW FIBER CABLE.
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. EACH BUILDING HAS ACCESSIBLE CRAWLSPACE.
1. EXISTING BLDG 11A FACP IS CIRCUITED FROM 'A1'-8
(SIEMENS BMW, 150A). REUSE EXISTING CIRCUIT FOR
NEW FACP.
2. PROVIDE NEW CIRCUIT BREAKER IN EXISTING PANEL
'A' (CUTLER HAMMER B4242EFH, 200A) FOR NEW
NACP AND DAA IN BLDGS 11B AND 11C.
3. BLDG 11A PANEL '1A' PEAK LOAD INCREASE: 6A.
4. BLDG 11B AND 11C PANEL 'A' PEAK LOAD INCREASE:
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA129A
BLDG 11A, BLDG 11B, BLDG 11C
11A, 11B, 11C
1 BLDG 11A
1/8" = 1' 2 BLDG 11B
1/8" = 1' 3 BLDG 11C
1/8" = 1'
BUSINESS OCCUPANCY - NOT SPRINKLERED
GENERAL NOTES
#KEYED NOTES
ELECTRICAL POWER NOTES
CONFERENCE ROOM
KITCHEN
ELECTRICAL 109
HW TANK
ARMORY
SECRETARY
HALLWAY
HALLWAY
COMMUNICATION
102B
KITCHEN
CLOS.
TOILET
CLOS.
STAIRS
102A
HALLWAY
NACP
CRAWLSPACE
ACCESS
FANA
TO BLDG 9
TO BLDG 14E
TOUGH MH#11
EX PANEL 'A'
LCD
F S
F
F F S
F F
F
F
F
F
OFFICE
OFFICE
OFFICE
BATH
BATH
CLOSET
CLOSET
OFFICE
LOCKERS
CLOS
CLOSET
CLOSET
CORRIDOR
STAIRS
F S
F
F
F
F
F
F
F
FF
F
F
FA
C
P CONFERENCE
KITCHEN
DINING
BEDROOM
JANITOR
ADA TOILET
FEMALE
TOILET
HALL
118 OFFICE
ADA TOILET
LIVING
MECH.
LAUNDRY
COMPUTER
LOBBY
STAIR
MECH.
IT
119SCREENED
PORCH
CRAWLSPACE
ACCESS
FS
F S
F S
FS
F S
FS
F S
TO
14 W
EXISTING MH#11
TO BLDG 1
VIA MH#10
EXISTING TO
REMAIN
F
DN
BEDROOM
BEDROOM
BEDROOM
FEMALE
BEDROOM
TOILET
BEDROOM
BEDROOM
TOILET
TOILET
STORAGE
TOILET
BEDROOM
TOILET
STORAGE
LAUNDRY
HALL
217F S
F S
F
F
CONFERENCE RM
CONFERENCE RM
KITCHEN
KITCHEN
LAUNDRY
LAUNDRY
VESTIBULE
KENNEL
STORAGE
VESTIBULE
TOILET
106A
TOILET
CLOSET
CLOSET
U P
U P
CRAWLSPACE
ACCESS
FF
F SFS
F S
F S
F F
F
F
FF
F F
N A
C P
TO MH#11 - BLDG 14E
M LOCKER RM.
M. BEDROOM
OFFICE
OFFICE
OFFICE
W. BEDROOM / LOCKER
BATH
BATH
PASSAGE
PASSAGE
D N
D N
F S
F S
F
F
F
F
1. EXISTING 3" CONDUIT BETWEEN BLDG 14E AND
MANHOLE BY BLDG 14W. ROUTE FOR FIBER FOR FANA
AND SLC LOOP (BLDG 12 IS MONITORED BY BLDG 14E
FACP).
2. PROVIDE NEW UNDERGROUND CONDUIT BY
DIRECTIONAL BORE TO BLDG 9. SEE FIBER SITE PLAN.
ROUTE ARMORED FIBER THROUGH CRAWLSPACE.
(EXTENT OF CRAWLSPACE BENEATH BUILDING
UNKNOWN. CONTRACTOR MAY STUB UP BENEATH
FANA IF POSSIBLE.)
3. PROVIDE FIRE ALARM NETWORK ANNUNCIATOR WITH
GRAPHICAL DISPLAY FOR POLICE MONITORING.
4. EXISTING MANHOLE #11 TO REMAIN.
5. EXISTING CONDUIT TO BLDG 14E. ROUTE FOR FIBER.
6. EXISTING 3-1/2" CONDUIT TO BLDG 1. ROUTE FOR
FIBER.
7. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501 FOR
MORE INFO.
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. BUILDINGS 12 AND 14W SHALL BE MONITORED BY
BUILDING 14E FACP.
3. BUILDING 14W IS CURRENTLY UNDER
CONSTRUCTION. EXACT FLOOR PLAN AND
ELECTRICAL SYSTEM UNKNOWN. PLAN IS
REPRESENTATIVE ONLY. EXACT FLOOR PLAN SHALL
BE VERIFIED IN SHOP DRAWINGS.
4. BUILDING 14E FIRE ALARM SYSTEM IS EXISTING TO
REMAIN. THE EXISTING FACP SHALL BE CONNECTED
TO THE NEW FIBER LOOP. BUILDINGS 14W AND 12
SHALL BE ADDED TO THE SLC LOOP.
5. SYSTEMS FOR BLDGS 14W AND BLDG 12 SHALL BE
ENTIRELY NEW.
6. FOR BLDG 14E, LOCATE NEW SPEAKER STROBES
SHOWN IN THE SAME BACKBOXES AS THE
PREVIOUSLY DEMOLISHED STROBE AND PROVIDE
AND NEW WIRING PER MANUFACTURES
RECOMMENDATIONS.
7. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
8. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
1. CONTRACTOR SHALL PROVIDE TWO NEW BREAKERS
IN PANEL 'A' (EATON PRL1A), ONE FOR NEW NACP,
ONE FOR DEDICATED RECEPTACLE FOR NEW FANA
WITH DISPLAY.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA130
BLDG 12, BLDG 14W, BLDG 14E
12, 14E, 14W
1 BLDG 12 FIRST FLOOR
1/8" = 1'
2 BLDG 12 SECOND FLOOR
1/8" = 1'
3 BLDG 14E FIRST FLOOR
1/8" = 1'
4 BLDG 14E SECOND FLOOR
1/8" = 1'
5 BLDG 14W FIRST FLOOR
1/8" = 1'
6 BLDG 14W SECOND FLOOR
1/8" = 1' RESIDENTIAL OCCUPANCY
FULLY SPRINKLERED
RESIDENTIAL OCCUPANCY
FULLY SPRINKLERED
RESIDENTIAL OCCUPANCY
FULLY SPRINKLERED
RESIDENTIAL OCCUPANCY
FULLY SPRINKLERED
BUSINESS OCCUPANCY
FULLY SPRINKLERED
BUSINESS OCCUPANCY
FULLY SPRINKLERED
GENERAL NOTES
#KEYED NOTES
ELECTRICAL POWER NOTES
BID ALTERNATE NOTES
(DEDUCT ALTERNATE ITEM NO. 2): PROVIDE ALL WORK
PER ALTERNATE NO. 1 ABOVE EXCEPT: DELETE NEW
FIRE ALARM WORK IN BUILDING 12. (CONDUIT FOR FIBER
LOOP, FIBER CABLE, PATCH PANELS, PATCH CORDS,
FIBER BOXES, TERMINATIONS, CONNECTIONS TO NEW
FIRE ALARM FIBER LOOP, BORING SHALL REMAIN IN
BASE BID). ALL WORK SHALL INCLUDE FINAL CLEANUP,
COMPLETION OF ANY PUNCH LIST ITEMS, TESTING AND
TRAINING.
B01
MECH. ROOM
B02
TRANSFORMER RM
B01
MECH. ROOM
B02
TRANSFORMER RM
96 F
F
E P
FF
BEDROOM
BATH
CORRIDOR
STAIRWELL
BEDROOM
CLOSET
BATH
BEDROOM
BEDROOM
BATH
47 216
STORAGE
LA/ OIT
ELECTRIC CLOSET
TELE CLST
BATH
BEDROOM
BATH
BEDROOM
210 203
BEDROOM
BATH
STAIRS
TOILET
BEDROOM
BATH
CLOSET
BEDROOM
LAUNDRY
BEDROOM
KITCHEN
BATH
BEDROOM
BEDROOM
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
BEDROOM
BATH
CORRIDOR
STAIRWELL
BEDROOM
CLOSET
BATH
BEDROOM
BEDROOM
BATH
47 216
STORAGE
LA/ OIT
ELECTRIC CLOSET
TELE CLST
BATH
BEDROOM
BATH
BEDROOM
210 203
BEDROOM
BATH
STAIRS
TOILET
BEDROOM
BATH
CLOSET
BEDROOM
LAUNDRY
BEDROOM
KITCHEN
BATH
BEDROOM
BEDROOM
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
F F F F
F
F F F
F
F
F
FF
F
F
F
FF
F
F F
F
F
F
F
F
F
FF
NACP
1. ROUTE ARMORED FIBER THROUGH CRAWLSPACE TO
FACP.
2. DIRECTIONAL BORE SHALL STUB UP WITHIN
CRAWLSPACE.
3. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501 FOR
MORE INFO.
4. EXISTING FAAP TO REMAIN.
B01
MECH. ROOM
B02
TRANSFORMER RM
BEDROOM
BEDROOM
BEDROOM
ELECTRICAL ROOM
KITCHEN
LOUNGE
READING ROOM
LOBBY
UNISEX B/R
BEDROOM
LOBBY
LAUNDRY
BEDROOM
BEDROOM
132A
BEDROOM
BEDROOM
BEDROOM
BEDROOM
ENTRY
STAIRS
CLOSET
STAIRS
BATH
BATH
CLOSET
CLOSET
CLOSET
BATH
BATH
BATH
BATH
BATH
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
13 114
CLOSET
CLOSET
105A
CLOSET
149B
FEC
TO BLDG 4 BY DIRECTIONAL
BORE VIA MH#8
TO BLDG 21 BY
DIRECTIONAL BORE
B01
MECH. ROOM
B02
TRANSFORMER RM
BEDROOM
BEDROOM
BEDROOM
ELECTRICAL ROOM
KITCHEN
LOUNGE
READING ROOM
LOBBY
UNISEX B/R
BEDROOM
LOBBY
LAUNDRY
BEDROOM
BEDROOM
132A
BEDROOM
BEDROOM
BEDROOM
BEDROOM
ENTRY
STAIRS
CLOSET
STAIRS
BATH
BATH
CLOSET
CLOSET
CLOSET
BATH
BATH
BATH
BATH
BATH
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
13 114
CLOSET
CLOSET
105A
CLOSET
149B
FEC
F
F
F
F
F F F
F F
F
F
F
F F
F
F
F
F F
F
F
FFFF
FACPEP
F
FF F
F
F F
FB
FACP
F F
F
F
E P
FF
F
F
F D
A A
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. WHERE NEW DEVICES ARE SHOWN, LOCATE THE
NEAREST JUNCTION BOX WITH THE SLC, NAC, OR
SPEAKER CIRCUIT AND INTERCEPT AND EXTEND
CIRCUIT TO THE NEW DEVICE LOCATION.
3. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
4. ALL EXISTING DEVICES TO REMAIN.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA131
BLDG 13
2 BLDG 13 SECOND FLOOR
3/32" = 1'1 BLDG 13 FIRST FLOOR
3/32" = 1'
3 BLDG 13 BASEMENT
3/32" = 1'
RESIDENTIAL OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
#KEYED NOTES
TOILET
KITCHEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRS
CLOSET
HAC
FIRE HOSE
CLOSET
CLOSET
CLOSET
STAIRS
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CORRIDOR
OFFICE
TOILET
KITCHEN
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
STAIRS
CLOSET
HAC
FIRE HOSE
CLOSET
CLOSET
CLOSET
STAIRS
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CORRIDOR
F FF
F
F
F
F F S
F F
N A
C P
TO BLDG 18 THOUGH
MH#3, MH#2, AND MH#1
TO VIA NEW
MH#12 BLDG 11A
EX PANEL 'A2'
D A
A
F/A CLO
13 114
HAC
FIRE HOSE
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CLOSET
CORRIDOR
STAIRS
STAIRS
OFFICE
CLOSET
CLOSET
TOILET
WAITING/CONF
OFFICE
TOILET
TELCOM
80 110
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
F
F S
F
FB
EP
TC
FACP
F
F
F S
F
F
F
FA
A
P
4 4
CRAWLSPACE ACCESS
B01
MECH RM
F
FS
1. EXISTING 3-1/2" CONDUIT TO HAND HOLE BY BLDG
11A. ROUTE FOR FIBER CABLE.
2. EXISTING 2" CONDUIT TO MANHOLE BY BLDG 10 (SEE
FIBER PLANS) WITH SPACE FOR NEW FIBER CABLE.
ROUTE THROUGH EXISTING CONDUIT TO MANHOLE
AND ON TO BLDG 18. ROUTE NEW FIBER THROUGH
CRAWLSPACE TO TELCO ROOM.
3. EXISTING PENETRATION FOR EXISTING CABLING
FROM THE MANHOLE IS NOT SLEEVED IN CONDUIT
THROUGH THE FLOOR. DO NOT USE THIS EXISTING
PENETRATION. PROVIDE NEW PENETRATION WITH
MIN 2" RGS CONDUIT SLEEVE THROUGH FLOOR TO 3"
AFF FOR ROUTING OF NEW FIBER CABLING FROM
MANHOLE. (BUT USE EXISTING CONDUIT
PENETRATION FOR FIBER TO BLDG 11A.)
4. FIBER CABLE IN CRAWL SPACE.
5. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501
FOR MORE INFO.
1. EXISTING FACP IS CIRCUITED FROM 'A2'-19,
TOGETHER WITH RM 112 RECEPTACLES. DEMO
CIRCUIT TO FIRST SPLICE IN RECEPTACLE BOX.
2. PROVIDE NEW CIRCUIT FOR FIRE ALARM EQUIPMENT
FROM EXISTING SPARE 1P-20A BREAKER IN PANEL
'A2' (SQUARE D QO, 100A).
3. PANEL 'A2' PEAK LOAD INCREASE: 3A.
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. WHERE NEW DEVICES ARE SHOWN, LOCATE THE
NEAREST JUNCTION BOX WITH THE SLC, NAC, OR
SPEAKER CIRCUIT AND INTERCEPT AND EXTEND
CIRCUIT TO THE NEW DEVICE LOCATION.
3. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
4. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA132
BLDG 15
1 BLDG 15 FIRST FLOOR
3/32" = 1'2 BLDG 15 BASEMENT
3/32" = 1'
3 BLDG 15 SECOND FLOOR
3/32" = 1'
BUSINESS OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
#KEYED NOTES
ELECTRICAL POWER NOTES
BID ALTERNATE NOTES
(DEDUCT ALTERNATE ITEM NO. 3): PROVIDE ALL WORK
PER ALTERNATE NO. 2 ABOVE EXCEPT: DELETE NEW
FIRE ALARM WORK IN BUILDING 15. (CONDUIT FOR FIBER
LOOP, FIBER CABLE, PATCH PANELS, PATCH CORDS,
FIBER BOXES, TERMINATIONS, CONNECTIONS TO NEW
FIRE ALARM FIBER LOOP, BORING SHALL REMAIN IN
BASE BID). ALL WORK SHALL INCLUDE FINAL CLEANUP,
COMPLETION OF ANY PUNCH LIST ITEMS, TESTING AND
TRAINING.
B06
LOCKERS
B14
JAN. CLOSET
B04
MECH. RM.
B03
OFFICE
B02
OFFICE
B01
MECH. EQUIP.
B16
ENGINEERING STORAGE
B17
FAN ROOM
B13
CORRIDOR
B15
FAC
B05
M. TLT
B10
LOCKERS
B12
LOCKERS
B08
LOCKERS
B07
STORAGE
B09
STORAGE
B11
W. TLT
EX PULL BOX
B06
LOCKERS
B14
JAN. CLOSET
B04
MECH. RM.
B03
OFFICE
B02
OFFICE
B01
MECH. EQUIP.
B16
ENGINEERING STORAGE
B17
FAN ROOM
B13
CORRIDOR
B15
FAC
B05
M. TLT
B10
LOCKERS
B12
LOCKERS
B08
LOCKERS
B07
STORAGE
B09
STORAGE
B11
W. TLT
TC
F
F
F F
F
F
NACP
F
F
F
FF
F
F F
NACP
DAA
CONFERENCE RM
OFFICE
BREAK RM
OFFICE
OFFICE
OFFICE
OFFICE
CLEAN LINENS
CLOTHING/STORAGE
CORRIDOR
C O
R R
ID
O
R
DIRTY LINENS
111A
JANITOR
113A
RECEPTION
112A
REC. OFFICE
ENTRY VESTIBULE
FIRE CLOSET
F. TOILET
M. TOILET
117A
WEIGHT AREA
ELECTRICAL CLS
COMM.
CONFERENCE RM
OFFICE
BREAK RM
OFFICE
OFFICE
OFFICE
OFFICE
CLEAN LINENS
CLOTHING/STORAGE
CORRIDOR
C O
R R
ID
O
R
DIRTY LINENS
111A
JANITOR
113A
RECEPTION
112A
REC. OFFICE
ENTRY VESTIBULE
FIRE CLOSET
F. TOILET
M. TOILET
117A
WEIGHT AREA
ELECTRICAL CLS
COMM.
F
F
F F
F
F
F
F S
F S
F
F
F
F
F
F
F
1. EXISTING PULL BOX CONTAINS BOTH 208V POWER
CIRCUITS AND LOW VOLTAGE SIGNAL CONDUCTORS.
SLC LOOP CONDUCTOR INSULATION SHALL BE
RATED FOR MIN 300V.
2. EXISTING CONDUIT TO BLDG 17. ROUTE FOR SLC
LOOP FROM BLDG 18 (BLDG 16 SHALL BE MONITORED
BY BLDG 18 FACP).
3. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501
FOR MORE INFO.
4. EXTEND SLC FROM EXISTING NACP TO NEW NACP.
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. BUILDING 16 FIRE ALARM DEVICES SHALL BE
MONITORED BY BUILDING 18 FACP.
3. WHERE NEW DEVICES ARE SHOWN, LOCATE THE
NEAREST JUNCTION BOX WITH THE SLC, NAC, OR
SPEAKER CIRCUIT AND INTERCEPT AND EXTEND
CIRCUIT TO THE NEW DEVICE LOCATION.
4. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
5. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA133
BLDG 16
1 BLDG 16 FIRST FLOOR
1/8" = 1'
2 BLDG 16 GROUND FLOOR
1/8" = 1'
INDUSTRIAL OCCUPANCY - FULLY SPRINKLERED
GENERAL NOTES
#KEYED NOTES
STORAGE
TRANS. RM
OFFICE
TOILET
OFFICE
102A
BREAK ROOM
VEHICLE STOR.
REPAIR SHOP
WASH RM
VEHICLE STORAGE
116B
SHEETMETAL
426 116A
STORAGE
LOCKERS
109 114
STORAGE
M. TLT
STORAGE
SUPPLY STORAGE
OFFICE
STORAGE
STORAGE
128A
DRUG STORAGE
GROUNDS SHOP
B01
CONDENSATE PUMP RM
520 SF
128B
MAIL ROOM
SUPPLY STORAGE
M. TLT
STORAGE
TRANS. RM
OFFICE
TOILET
OFFICE
102A
BREAK ROOM
VEHICLE STOR.
REPAIR SHOP
WASH RM
VEHICLE STORAGE
116B
SHEETMETAL
426 116A
STORAGE
LOCKERS
109 114
STORAGE
M. TLT
STORAGE
SUPPLY STORAGE
OFFICE
STORAGE
STORAGE
128A
DRUG STORAGE
GROUNDS SHOP
B01
CONDENSATE PUMP RM
520 SF
128B
MAIL ROOM
SUPPLY STORAGE
M. TLT
F
F
F
F
F
F
F
F
F
F
F
F
F
TCNACP
F F
WP
F
WP
F
N A
C P
F
F
F
F
F F
F
F
F
TO BLDG
17 NACP
TO BLDG 29 AND
TO BLDG 16 NACP
TO BLDG 18
VIA MH#1
1. EXISTING UNDERGROUND CONDUIT TO MANHOLE
NEAR BLDG 18. ROUTE FOR SLC LOOP (BLDGS 16 AND
17 SHALL BE MONITORED BY BLDG 18 FACP).
2. EXISTING UNDERGROUND CONDUIT TO BLDG 16.
ROUTE FOR SLC LOOP.
3. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501 FOR
MORE INFO.
1. ALL WORK SHALL COMPLY WITH PROJECT
SPECIFICATIONS AND NOTES ON FI001.
2. BUILDINGS 17 AND 28 FIRE ALARM DEVICES ARE
MONITORED BY BUILDING 18 FACP.
3. VERIFY ALL CEILING TYPES BEFORE WORK. REPLACE
ANY CEILING DAMAGE AND PAINT TO MATCH
EXISTING.
4. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA134
BLDG 17, BLDG 28, BLDG 32, BLDG 33
17, 28, 32, 33
1 BLDG 17
3/32" = 1'
2 BLDG 28
3/32" = 1'
STORAGE OCCUPANCY
FULLY SPRINKLERED
INDUSTRIAL OCCUPANCY
FULLY SPRINKLERED
GENERAL NOTES
#KEYED NOTES
F
F
F
F
F
F F
F
F
FB
F
R
R
R
R
EP
BH2A
LOUNGE / KITCHEN
BH2
OFFICE
BH3
CONTROL RM
BH4
LOCKER RM
BH5
TOILET
BH8
PUMP ROOM
BH7
BOILER ROOM
BH6
ELECTRICAL EQUIP. RM
BH11
CLOSET
BH10
CLOSET
BH9
HEATER ROOM
BH1
VESTIBULE
FACP
NACP
FANA
XL
F F
F
F
F
F
F
F
EXISTING
MANHOLE #1
EXISTING
PULL BOX
STORAGE AREA
2310 SF
SAFETY STORAGE
885 SF
F
F F
STORAGE AREA
2310 SF
SAFETY STORAGE
885 SF
F
F F
TO BLDG 18
VIA PULL BOX
STORAGE AREA
2963 SF
OFFICE
ELECTRICAL
25 SF
SPRINKLER
25 SF
F
F
STORAGE AREA
2963 SF
OFFICE
ELECTRICAL
25 SF
SPRINKLER
25 SF
F
F
F
TO BLDG 18
VIA PULL BOX
Emer Storage
462 SF
Warehouse
2535 SF
Emer Storage
462 SF
Warehouse
2535 SF
F F
TO BLDG 18
VIA PULL BOX
Drawing Title
Approved for Design Concept:
Project Title
Date
Location
Checked:
Building Number
A/E Project Number
Drawing Number
Drawn:
Revisions: Date
ENGINEERS/ARCHITECT:
W.G. (BILL) HEFNER VAMC
B
A
C
D
E
F
1 2 3 4 5 6 7 9
F
E
D
C
B
A
97 8654321
OFFICE OF
FACILITIES
MANAGEMENT
VA Project Number
FACILITY MANAGEMENT
DIVISION MANAGER
659-16-103
Architect
PROJECT LEAD
Fire Alarm, Electrical Engineer
VAMC SALISBURY
1601 Brenner Ave, Salisbury, NC 28144
100% CONSTRUCTION DOCUMENTS
SCBRSB11 DEC 2017
15-447REPLACE/UPGRADE CAMPUS
FIRE ALARM SYSTEM
(919) 858-7420 Consulting Group, PA www.acg-pa.com
Raleigh, NC Indianapolis, IN Philadelphia, PA Pittsburgh, PA Virginia Beach, VA Fort Collins, CO GURLITZ
ARCHITECTURAL
23894
SEAL
FA135
BLDG 18, BLDG 17A, BLDG 17B, BLDG 17C
17A,17B,17C,18
1 BLDG 18 GROUND FLOOR
3/32" = 1'
2 BLDG 18 MEZZANINE
3/32" = 1'
3 BLDG 17A
3/32" = 1'
4 BLDG 17B
3/32" = 1'
5 BLDG 17C
3/32" = 1'
INDUSTRIAL OCCUPANCY
FULLY SPRINKLERED
INDUSTRIAL OCCUPANCY
FULLY SPRINKLERED
STORAGE OCCUPANCY
FULLY SPRINKLERED
STORAGE OCCUPANCY
FULLY SPRINKLERED
STORAGE OCCUPANCY
NOT SPRINKLERED
GENERAL NOTES
#KEYED NOTES
1. EXISTING TELCO MANHOLE TO REMAIN.
2. ROUTE NEW FIRE ALARM FIBER CABLE IN NEW
1-1/2" CONDUIT(EACH CABLE IN SEPARATE
CONDUIT) UNDERGROUND TO BUILDING.
TRANSITION TO RGS PRIOR TO RISING. ROUTE TO
NEW FACP. CONDUIT MAY TRANSITION TO EMT
WITHIN BUILDING. CONDUIT AND BOXES WITHIN
BUILDING SHALL BE FACTORY-PAINTED RED.
3. PROVIDE NEW 3" CONDUIT BY DIRECTIONAL BORE
TO NEXT MANHOLE, ONE RUN CONTINUING TO
BLDG 5, THE OTHER TO BLDG 15. FIBER CABLES
SHALL BE PULLED IN SEPARATE CONDUIT. SEE
FIBER SITE PLAN. (VIA MH#2 AND MH#3 AND PULL
BOX)
4. EXISTING 4" CONDUIT BETWEEN BLDG 18 AND
BLDG 17B. ROUTE FOR SLC LOOP (BLDG 17B SHALL
BE MONITORED BY BLDG 18 FACP). PROVIDE
SERVICE ENTRANCE AT EACH END PER
MANUFACTURERS RECOMMENDATIONS.
5. EXISTING 4" CONDUIT BETWEEN BLDG 18 AND
BLDG 17C. ROUTE FOR SLC LOOP (BLDG 17C SHALL
BE MONITORED BY BLDG 18 FACP).
6. EXISTING CONDUIT TO BLDG 17. ROUTE FOR SLC
LOOP (BLDGS 17, 16, AND 28 SHALL BE MONITORED
BY BLDG 18 FACP).
7. EXISTING PULL BOX WITH CONDUIT TO MANHOLE.
ROUTE FOR SLC LOOP TO BLDG 17. PROVIDE
SERVICE ENTRANCE AT EACH END PER
MANUFACTURERS RECOMMENDATIONS.
8. RELOCATE FANA. PROVIDE NEW FIBER PATCH
PANEL. REPLACE FIBER CARD IN FANA IF
REQUIRED FOR NEW FIBER TYPE.
9. EXTEND EXISTING SLC CIRCUITS TO NEW FACP
LOCATION.
10. PROVIDE 1" CONDUIT WITH CABLES FROM BLDG
17A DEVICE TO FIRE ALARM PANEL IN BLDG 18
THOUGHT THE EXISTING PULL BOX.
11. PROVIDE FIBER BOX, PATCH PANEL, PATCH CORDS
AND RELATED MATERIAL. SEE DETAILS ON FA501
FOR MORE INFO.
1. VERIFY ALL CEILING TYPES BEFORE WORK.
REPLACE ANY CEILING DAMAGE AND PAINT TO
MATCH EXISTING.
2. ALL EXISTING DEVICES TO REMAIN. PROVIDE NEW
DEVICES AS SHOWN. CONNECT OLD CIRCUITS AND
NEW CIRCUITS TO NEW FACP.
| 15-447-FA117 B04F3-FA117 |
| Sheets and Views |
| FA117 |
| 15-447-FA118 B04F4-FA118 |
| Sheets and Views |
| FA118 |
| 15-447-FA119 B05F0-FA119 |
| Sheets and Views |
| FA119 |
| 15-447-FA120 B05F1-FA120 |
| Sheets and Views |
| FA120 |
| 15-447-FA121 B06F0-FA121 |
| Sheets and Views |
| FA121 |
| 15-447-FA122 B06F1-FA122 |
| Sheets and Views |
| FA122 |
| 15-447-FA123 B07F1-FA123 |
| Sheets and Views |
| FA123 |
| 15-447-FA124 B08F0&1-FA124 |
| Sheets and Views |
| FA124 |
| 15-447-FA125 B08F2-FA125 |
| Sheets and Views |
| FA125 |
| 15-447-FA126 B08F3-FA126 |
| Sheets and Views |
| FA126 |
| 15-447-FA127 B11F0-FA127 |
| Sheets and Views |
| FA127 |
| 15-447-FA128 B11F1-FA128 |
| Sheets and Views |
| FA128 |
| 15-447-FA129 B11A,B,C-FA129 |
| Sheets and Views |
| FA129 |
| 15-447-FA129A B11A,B,C-FA129 |
| Sheets and Views |
| FA129 |
| 15-447-FA130 B12,14E,W-FA130 |
| Sheets and Views |
| FA130 |
| 15-447-FA132 B15-FA132.pdf |
| Sheets and Views |
| FA132 |
| 15-447-FA131 B13-FA131.pdf |
| Sheets and Views |
| FA131 |
| 15-447-FA135 B18, 17A,17B,17C-FA135.pdf |
| Sheets and Views |
| FA135 |
| 15-447-FA134 B17, 28, 32, 33-FA134.pdf |
| Sheets and Views |
| FA134 |
| 15-447-FA133 B16-FA133.pdf |
| Sheets and Views |
| FA133 |
| 2018-06-26T04:52:41-0700 | |
| DocuSign, Inc. | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it.