36C24419B0040-008.pdf
PDF 1 MB Posted
- Attached to
- Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
- Solicitation number
- 36C24419B0040
About this file
36C24419B0040 Electrical June 2019.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0185-000.docx | DOCX document | |
| 36C24419B0040-0002001.pdf | ||
| 36C24419B0040-0002004.pdf | ||
| 36C24419B0040-0002000.docx | DOCX document | |
| 36C24419B0040-0002002.pdf | ||
| 36C24419B0040-0002003.pdf | ||
| 36C24419B0040-0002005.pdf | ||
| 36C24419B0040-0001000.docx | DOCX document | |
| 36C24419B0040-0001001.pdf | ||
| 36C24419B0040-004.pdf | ||
| 36C24419B0040-005.pdf | ||
| 36C24419B0040-001.docx | DOCX document | |
| 36C24419B0040-006.pdf | ||
| 36C24419B0040-003.pdf | ||
| 36C24419B0040-007.pdf | ||
| 36C24419B0040-002.pdf | ||
| 36C24419B0040-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
L L
ELECTRICAL ABBREVIATIONS LIST
SS STAINLESS STEEL
SSW SELECTOR SWITCH
STD STANDARD
SURF SURFACE MOUNTED
SW SWITCH
SWBD SWITCHBOARD
SYM SYMMETRICAL
SYS SYSTEM
TC TIMECLOCK
TEL TELEPHONE
TEL/DATA TELEPHONE/DATA
TERM TERMINAL
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TR TAMPER RESISTANT
T-STAT THERMOSTAT
TTB TELEPHONE TERMINAL BOARD
TTC TELEPHONE TERMINAL
CABINET
TV TELEVISION
TYP TYPICAL
UC UNDER COUNTER
UE UNDERGROUND ELECTRICAL
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UT UNDERGROUND TELEPHONE
UTP UNSHIELDED TWISTED PAIR
UTIL UTILITY
UV UNIT VENTILATOR OR
ULTRAVIOLET
V VOLT
VA VOLT-AMPERES
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VOL VOLUME
W WATT
W/ WITH
WH WATER HEATER
W/O WITHOUT
WP WEATHERPROOF
XFMR TRANSFORMER
XFR TRANSFER
ANGLE
@ AT
DELTA
' FEET
" INCHES
# NUMBER
Φ PHASE
C CENTER LINE
P PLATE
MTS MANUAL TRANSFER SWITCH
MTR MOTOR, MOTORIZED
NA NOT APPLICABLE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NFDS NON-FUSED SAFETY DISCONNECT
SWITCH
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OL OVERLOAD
PA PUBLIC ADDRESS
PB PULL BOX OR PUSHBUTTON
PBPU PREFABRICATED BEDSIDE PATIENT
UNIT
PCB POLYCHLORINATED BYPHENYL
PC PHOTOELECTRIC CELL
PED PEDESTAL
PEND PENDANT
PF POWER FACTOR
PH PHASE
PIV POST INDICATING VALVE
PNL PANEL
POE POWER-OVER-ETHERNET
PR PAIR
PRI PRIMARY
PROJ PROJECTION
PRV POWER ROOF VENTILATOR
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE (CONDUIT)
PWR POWER
QTY QUANTITY
RCP REFLECTED CEILING PLAN
RCPT RECEPTACLE
REQD REQUIRED
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
RTU ROOF TOP UNIT
SC SURFACE CONDUIT
SEC SECONDARY
SF SQUARE FEET/FOOT
SHT SHEET
SI INTERNATIONAL SYSTEM OF UNITS
SIM SIMILAR
S/N SOLID NEUTRAL
SPEC SPECIFICATION
SPKR SPEAKER
SP SPARE
SR SURFACE RACEWAY
1P 1 POLE (2P, 3P, 4P, ETC.)
1PH 1 PHASE
2/C TWO-CONDUCTOR (3/C, 4/C, ETC.)
W2 TWO-WIRE (3W, 4W, ETC.)
3PH 3 PHASE
A AMPERE
AAP ALARM ANNUNCIATOR PANEL
AC ABOVE COUNTER
AIR CONDITIONER
ALTERNATING CURRENT
ACC ACCESSIBLE
ACLG ABOVE CEILING
ADO AUTOMATIC DOOR OPENER
A/E ARCHITECT/ENGINEER
AF AMP FRAME
AFC AVAILABLE FAULT CURRENT (KILOAMPS)
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFI ARC FAULT CIRCUIT INTERRUPTER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CAPACITY
AL ALUMINUM
ALT ALTERNATE
AMP AMPERE
APPROX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
AT AMP TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERY
BC BARE COPPER
BD BOARD
BFF BELOW FINISHED FLOOR
BLDG BUILDING
BMS BUILDING MANAGEMENT SYSTEM
BYP BYPASS
C CONDUIT
CAB CABINET
CALC CALCULATED
CAP CAPACITY
CAT CATALOG, CATEGORY
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCR CONTROL CONTACTOR
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CF CONTRACTOR-FURNISHED
CKT CIRCUIT
CLG CEILING
COAX COAXIAL CABLE
COMM COMMUNICATION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION OR CONTINUOUS
CONTR CONTRACTOR
COORDCOORDINATE
CPT CONTROL POWER TRANSFORMER
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CTV CABLE TELEVISION
CTR CENTER
CU COPPER
CU FT CUBIC FEET
dB DECIBEL
DB DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLISH/DEMOLITION
DEPT DEPARTMENT
DIA DIAMETER
DISC DISCONNECT
DIST DISTRIBUTION
DN DOWN
DS SAFETY DISCONNECT SWITCH
DT DOUBLE THROW
DWG DRAWING
EC ELECTRICAL CONTRACTOR
EG EQUIPMENT GROUND
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EM EMERGENCY
EMI ELECTROMAGNETIC INTERFERENCE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ESMT EASEMENT
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WALL HEATER
ELECTRIC WATER HEATER
EX EXISTING
EXP EXPLOSION PROOF
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FCU FAN COIL UNIT
FIXT FIXTURE
FLR FLOOR
FLUOR FLUORESCENT
FU FUSE
FUDS FUSED SAFETY DISCONNECT SWITCH
FVR FULL VOLTAGE REVERSING
FVNR FULL VOLTAGE NON-REVERSING
GAL GALLON
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERATOR
GFI GROUND FAULT CIRCUIT INTERRUPTER
GND GROUND
GRS GALVANIZED RIGID STEEL (CONDUIT)
GYP BDGYPSUM BOARD
HID HIGH-INTENSITY DISCHARGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HT HEIGHT
HTR HEATER
HV HIGH VOLTAGE
HVAC HEATING, VENTILATING AND AIR
CONDITIONING
IES ILLUMINATION ENGINEERING SOCIETY
IG ISOLATED GROUND
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
I/W INTERLOCK WITH
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
KV KILOVOLT
KVA KILOVOLT-AMPERE
KVAR KILOVOLT-AMPERE REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
LED LIGHT-EMITTING DIODE
LF LINEAR FEET/FOOT
LM LUMEN
LRA LOCKED ROTOR AMPS
LT LIGHT
LTG LIGHTING
LTNG LIGHTNING
LV LOW VOLTAGE
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MC MECHANICAL CONTRACTOR
METAL-CLAD (CONDUIT)
MCA MINIMUM CIRCUIT AMPACITY
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MFR MANUFACTURER
MFS MAIN FUSED DISCONNECT SWITCH
MH MANHOLE
MIC MICROPHONE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MOA MULTIOUTLET ASSEMBLY
MSBD MAIN SWITCHBOARD
MT MOUNT
A1 b
E1 c d
T1
'LPN'
ELECTRICAL SYMBOL NOTES
THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER
CASE LETTER AND NUMBER.
THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.
EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.
EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING
MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES
DIRECTIONAL ARROW ON ILLUMINATED FACE(S).
DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER
FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR
THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND
REQUIREMENTS.
PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING
SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR
DESIGNATION CODES.
SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE
NUMBER INDICATED IN THE HEXAGON.
HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT
DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL
SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE
A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
'LPN'-1,3,5
EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE
AND DIRECTIONAL ARROW.
EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE
FACE AND DIRECTIONAL ARROWS.
E2
EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS
CONTROLLED BY SWITCH 'c'.
EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.
EXAMPLE: TRANSFORMER TYPE 'T1'.
EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.
# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE
NOTE NUMBER INDICATED IN THE SQUARE.
GENERAL ELECTRICAL NOTES
1. ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED
PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND
WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA STANDARDS.
2. PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE
BUILDING CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
3. FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL
PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL ELECTRICAL CODE, UL LISTING REQUIREMENT AND
THE APPLICABLE BUILDING CODES.
4. VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED
MOUNTING HARDWARE TO SUIT THE PARTICULAR INSTALLATION.
5. PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
6. BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
7. COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO
AVOID CONFLICT DURING CONSTRUCTION.
8. ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR
SPARE, OR SPACE.
9. MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO
INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR
MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE
ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".
10. ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR
EQUIPMENT MANUFACTURER'S SPECIFICATIONS.
11. CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE
DEVICE'S SCREW TERMINALS.
12. MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT
UNLESS NOTED OTHERWISE.
13. ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
14. ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
15. ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND
CONDUIT OR WHERE CONCRETE-ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE,
LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR FINAL CONNECTIONS.
16. ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN
APPROVED THIRD PARTY TESTING AGENCY.
17. FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE
SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC
PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE
MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT
BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.
PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.
18. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE
BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS
DETERMINED BY THE GOVERNMENT, SHALL BE PROVIDED.
19. COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
20. LOCAL DISCONNECTS SHALL BE NEMA 3R.
SHORT CIRCUIT CURRENT CALCULATIONS WILL BE
PERFORMED ON THE ELECTRICAL SYSTEM USING A
BOLTED THREE PHASE FAULT CONDITION FOR
CALCULATIONS TO ACHIEVE MAXIMUM THERMAL AND
MECHANICAL STRESS TO THE SYSTEM FOR
CALCULATIONS PURPOSES. EXISTING SHORT CIRCUIT
VALUES WILL BE USED OUTSIDE THE WORK AREA, FOR
THE STARTING POINT OF THE CALCULATIONS.
METHOD OF SHORT CIRCUIT
CURRENT CALCULATIONS
USING OHM'S LAW AND THE KNOWN RESISTIVITY
CONSTANT OF CONDUCTOR METAL (CIRCULAR MIL-OHM
PER FOOT) FOR COPPER CONDUCTORS, OUR INTENT IS
TO CALCULATE THE REQUIRED WIRE SIZE NECESSARY SO
AS NOT TO EXCEED THE RECOMMENDED VOLTAGE DROP
OF 3% FOR BRANCH CIRCUIT CONDUCTORS.
METHOD OF VOLTAGE DROP
CALCULATIONS
ELECTRICAL SYMBOL LEGEND
120V DUPLEX RECEPTACLE
RECEPTACLE MODIFIERS:
AC: 3" ABOVE COUNTERTOP/BACKSPLASH
GFI: GROUND FAULT CURRENT INTERRUPTER
WP: WEATHERPROOF ENCLOSURE
DED: DEDICATED CIRCUIT
120V DUPLEX RECEPTACLE EMERGENCY OUTLET
AND COVER PLATE SHALL BE RED IN COLOR
120V QUADRUPLEX RECEPTACLE
120V QUADRUPLEX RECEPTACLE EMERGENCY
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
JUNCTION BOX, PURPOSE AS NOTED
DISCONNECT SWITCH NON-FUSED - NEMA 3R
DISCONNECT SWITCH FUSED - NEMA 3R
SYMBOL HEIGHT DESCRIPTION
18"
18"
18"
18"
AS
NOTED
MAX 72" TOP
MAX 72" TOP
MOTOR-RATED SWITCH
ALL HEIGHTS ARE TO CENTER OF DEVICE UNLESS NOTED OTHERWISE.
TOP: HEIGHT TO TOP OF DEVICE
ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE LISTED HERE.
SPECIAL RECEPTACLE
EQUIPMENT CONNECTION
AS
NOTED
E
208V DUPLEX RECEPTACLE18"
18"
120V DUPLEX RECEPTACLE FLOOR BOX
120V DUPLEX RECEPTACLE EMERGENCY FLOOR BOX
OUTLET AND COVER PLATE SHALL BE RED IN COLOR
120V QUADUPLEX RECEPTACLE FLOOR BOX
120V QUADUPLEX RECEPTACLE EMERGENCY
FLOOR BOX OUTLET AND COVER PLATE SHALL BE
RED IN COLOR
PUMP MOTOR
VFD VARIABLE FREQUENCY DRIVE
M
LIGHTING SYMBOL LEGEND
2' X 2' RECESSED DIRECT/INDIRECT TROFFER
2' X 4' RECESSED DIRECT/INDIRECT TROFFER
SYMBOL
HEIGHT
AFF * DESCRIPTION
--- 2' X 4' RECESSED FLAT PRISMATIC LENS TROFFER
WALL SCONCE
6'-0"
CENTER
6" DIAMETER RECESSED DOWNLIGHT---
EXIT SIGN - WALL MOUNTED
EXIT SIGN - CEILING MOUNTED---
7'-5"
BOTTOM
SINGLE POLE WALL SWITCH
SWITCH MODIFIERS:
OS: OCCUPANCY SENSOR, DUAL TECHNOLOGY
LV: LOW VOLTAGE
LVD: LOW VOLTAGE DIMMER
D: LINE VOLTAGE DIMMER
T: DIGITAL TIMER
K: KEYED
3: 3 WAY
48"
CENTER
OCCUPANCY SENSOR, DUAL
TECHNOLOGY - CEILING MOUNTED
--- LOW VOLTAGE LIGHTING CONTROL DEVICE
OCCUPANCY SENSOR, DUAL
TECHNOLOGY - WALL/CORNER MOUNTED
2' LINEAR - WALL MOUNTED
7'-0"
CENTER
EMERGENCY LIGHT BATTERY
OPERATED - WALL MOUNTED
7'-6"
CENTER
RC
* - ANY HEIGHTS INDICATED IN PLANS SHALL SUPERCEDE THOSE
LISTED HERE.
LIGHT LEVEL SENSOR, SINGLE ZONE
DIMMING CLOSED LOOP - CEILING MOUNTED
--- LOW VOLTAGE LIGHTING CONTROL
DEVICE WITH 0-10V DIMMING
RCD
4' LINEAR - WALL MOUNTED
7'-0"
CENTER
OS
OS
LS
--- 4' LED STRIP FIXTURE - GASKETED AND
APPROVED FOR WET LOCATION
BID DEDUCTS
1. DDC CONTROLS (USE LOCAL CONTROLLERS FOR INDIVIDUAL PIECES OF EQUIPMENT ONLY).
2. CHILLED WATER FLOW METERS.
3. ALL WORK ASSOCIATED WITH BUILDING 8.
4. ALL WORK ASSOCIATED WITH BUILDING 6.
5. ALL WORK ASSOCIATED WITH BUILDING 2.
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:3
P M
E-001
ELECTRICAL GENERAL NOTES,
SYMBOL LEGENDS, AND
ABBREVIATIONS
1 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
VFD VFD VFD
V F
D
CWP-1
CWP-2
HWP-1 HWP-2
B07G
MECH.
ROOM
EF-1
6 6
7 7
B14C
MECH.
ROOM
DHWCP-1
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:4
P M
ED101
BUILDINGS 2 & 4 ELECTRICAL
DEMOLITION PLAN
2 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
2, 4
1 PUMP TO BE DEMOLISHED, SEE MECHANICAL PLANS.
DEMOLISH CIRCUIT (SEE SHEET NOTE A) TO
RECIRCULATION PUMP. CIRCUIT SHALL BE REUSED
FOR NEW PUMP, SEE NEW WORK PLAN EP101.
2 DISCONNECTS SERVING CWP-1, CWP-2, HWP-1, AND
HWP-2 SHALL BE DEMOLISHED.
3 EXISTING BRANCH CIRCUITS SERVING CWP-1 AND
CWP-2 SHALL BE REMOVED. EXISTING BRANCH
CIRCUITS SERVING HWP-1 AND HWP-2 SHALL BE
REMOVED. CIRCUIT SHALL BE REUSED, SEE NEW
WORK PLAN EP101.
4 DEMOLISH CIRCUIT (SEE SHEET NOTE A) TO
VENTILATION FAN. CIRCUIT SHALL BE REUSED FOR
NEW FAN, SEE NEW WORK PLAN EP101.
5 DEMOLISH LIGHTS AND CIRCUIT. CIRCUIT SHALL BE
REUSED, SEE NEW WORK PLAN EP101. (TYP)
6 DEMOLISH FOUR CWP AND HWP VFD'S AND
CONDUCTORS COMPLETELY (SEE NOTE A).
7 DEMOLISH VFD CIRCUITS BACK TO PANEL 'FCU-4'
LOCATED IN IT CLOSET B09 COMPLETELY (SEE NOTE
A).
A. COMPLETELY DEMOLISH CONDUCTORS,
CONDUITS, AND J-BOXES BACK TO ELECTRICAL
PANEL.
B. COMPLETELY DEMOLISH ELECTRICAL DEVICES
SHOWN ON THIS PLAN.
Scale: 1/2" = 1'-0"
BUILDING 4 ELECTRICAL DEMOLITION PLAN
Scale: 1/2" = 1'-0"
BUILDING 2 ELECTRICAL DEMOLITION PLAN
N
AREA OF WORK
BUILDING 2 KEY PLAN
SCALE: NO SCALE
N
AREA OF WORK
BUILDING 4 KEY PLAN
SCALE: NO SCALE
MECHANICAL ROOM B01
(LOCATION OF PANEL 'FCU-4')
IT CLOSET B09
(LOCATION OF DDC
TERMINATION)0 1 2 4
NORTH
PLAN
0 1 2 4
N O
R T H
PLAN
VFD
F
D V
F D
V F
D
HWP-2 HWP-1
CWP-1
CWP-2
PANEL 'FCU-7'
PANEL
'MEP-7A'
MECH.
ROOM
(ETR)
(ETR)
PANEL LOCATED ON
LOWER LEVEL.
DEDICATED
WORKING SPACE
(TYP)
CP-1
B09
MECH.
ROOM
DHWCP-1
CP-1
MECH.
ROOM
EF-1
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:4
P M
ED102
BUILDINGS 6 & 7 ELECTRICAL
DEMOLITION PLAN
3 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
6, 7
Scale: 1/2" = 1'-0"
BUILDING 7 LOWER LEVEL ELECTRICAL DEMOLITION PLAN
1 PUMP TO BE DEMOLISHED, SEE MECHANICAL
PLANS. DEMOLISH CIRCUIT (SEE SHEET NOTE
A) TO RECIRCULATION PUMP. CIRCUIT SHALL
BE REUSED FOR NEW PUMP, SEE NEW WORK
PLAN EP102.
2 DEMOLISH CIRCUIT (SEE SHEET NOTE A) TO
CONDENSATE PUMP. CIRCUIT SHALL BE
REUSED FOR NEW PUMP, SEE NEW WORK
PLAN EP102.
3 DEMOLISH CONDUCTORS BETWEEN VFD AND
PUMP COMPLETELY (SEE SHEET NOTE A).
4 DISCONNECT AND REMOVE THE BRANCH
CIRCUIT CONDUCTORS, CONDUIT AND VFD'S
FROM PANEL 'MEP-7A' TO CHILL WATER
PUMPS CWP-1 AND CWP-2.
5 DISCONNECT AND REMOVE THE BRANCH
CIRCUIT CONDUCTORS, CONDUIT AND VFD'S
FROM PANEL 'MEP-7A' TO HOT WATER
RECIRCULATION PUMPS HWP-1 AND HWP-2.
6 DEMOLISH CIRCUIT (SEE SHEET NOTE A) TO
VENTILATION FAN. CIRCUIT SHALL BE
REUSED FOR NEW FAN, SEE NEW WORK
PLAN EP102.
7 DEMOLISH LIGHTS AND CIRCUIT. CIRCUIT
SHALL BE REUSED, SEE NEW WORK PLAN
EP102. (TYP)
8 DEMOLISH FOUR CWP AND HWP VFD'S AND
CONDUCTORS COMPLETELY (SEE SHEET
NOTE A).
Scale: 1/2" = 1'-0"
BUILDING 6 ELECTRICAL DEMOLITION PLAN
Scale: 1/2" = 1'-0"
BUILDING 7 UPPER LEVEL ELECTRICAL DEMOLITION PLAN
N
AREA OF WORK
BUILDING 6 KEY PLAN
SCALE: NO SCALE
N
AREA OF WORK
BUILDING 7 KEY PLAN
SCALE: NO SCALE
IT CLOSET B20
(LOCATION OF DDC
TERMINATION)0 1 2 4
N O
R T H
PLAN
0 1 2 4
NORTH
PLAN
0 1 2 4
N O
R T H
PLAN
A. COMPLETELY DEMOLISH CONDUCTORS,
CONDUITS, AND J-BOXES BACK TO ELECTRICAL
PANEL.
B. COMPLETELY DEMOLISH ELECTRICAL DEVICES
SHOWN ON THIS PLAN.
F
D V
F D
V F
D V
F D
9-HWP-2
9-HWP-1
9-CWP-2
9-CWP-1
PANEL
'ELP-9'
(ETR)
SWBD
(ETR)
PANEL
'MCP-9A'
PANEL
'FCU-9'
9-HWP-2
9-CWP-1
9-CWP-2
9-HWP-1
3 4
3 4
XFMR
ROOM
B10
MECH.
ROOM
EF-1
CP-1
B10
MECH.
ROOM
DHWCP-1
CP-1
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:4
P M
ED103
BUILDINGS 8 & 9 ELECTRICAL
DEMOLITION PLAN
4 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
8, 9
Scale: 3/8" = 1'-0"
BUILDING 9 ELECTRICAL DEMOLITION PLAN
1 PUMP TO BE DEMOLISHED, SEE MECHANICAL
PLANS. DEMOLISH CIRCUIT (SEE SHEET NOTE
A) TO CONDENSATE PUMP. CIRCUIT SHALL BE
REUSED FOR NEW PUMP, SEE NEW WORK
PLAN EP103.
2 IF PANEL 'MCP-9A' HAS NOT BEEN REPLACED
IN A PREVIOUS PROJECT, DEMOLISH PANEL.
PROTECT EXISTING FEEDER AND BRANCH
CIRCUIT WIRING FOR RECONNECTION TO NEW
EQUIPMENT.
3 DISCONNECT AND REMOVE THE BRANCH
CIRCUIT CONDUCTORS, CONDUIT AND VFD'S
FROM PANEL 'MEP-9A' TO CHILL WATER PUMPS
CWP-1 AND CWP-2.
4 DISCONNECT AND REMOVE THE BRANCH
CIRCUIT CONDUCTORS, CONDUIT AND VFD'S
FROM PANEL 'MEP-9A' TO HOT WATER
RECIRCULATION PUMPS HWP-1 AND HWP-2.
5 DEMOLISH CIRCUIT (SEE SHEET NOTE A) TO
RECIRCULATION PUMP. CIRCUIT SHALL BE
REUSED FOR NEW PUMP, SEE NEW WORK
PLAN EP103.
6 DEMOLISH CIRCUIT (SEE SHEET NOTE A) TO
VENTILATION FAN. CIRCUIT SHALL BE REUSED
FOR NEW FAN, SEE NEW WORK PLAN EP103.
7 DEMOLISH LOCAL PUMP/ MOTOR DISCONNECT.
8 DEMOLISH LIGHTS AND CIRCUIT. CIRCUIT
SHALL BE REUSED, SEE NEW WORK PLAN
EP103. (TYP)
Scale: 1/2" = 1'-0"
BUILDING 8 ELECTRICAL DEMOLITION PLAN
N
AREA OF WORK
BUILDING 8 KEY PLAN
SCALE: NO SCALE
N
AREA OF WORK
BUILDING 9 KEY PLAN
SCALE: NO SCALE
IT CLOSET B01B
(LOCATION OF DDC
TERMINATION)
0 1 2 4
NORTH
PLAN
0 21 4
N O
R T H
PLAN
A. COMPLETELY DEMOLISH CONDUCTORS,
CONDUITS, AND J-BOXES BACK TO ELECTRICAL
PANEL.
B. COMPLETELY DEMOLISH ELECTRICAL DEVICES
SHOWN ON THIS PLAN.
E
E E E
V F
D
VFD VFD VFD
P S I A T ° F
CERTIFIED BY:
M A X I M U M A L L O W A B L E W O R K I N G P R E S S U R E
° F A T P S I
M I N I M U M D E S I G N M E T A L T E M P E R A T U R E
M F G . S / N
Y E A R B U I L T
W
ASME
THERMAFLO INC
E E
M
E
M
MM
P S
I A
T
F
C E R T
IF
IE
D
B Y
M A
X I
M U
M
A
L O
W A
B
W O
R K
I N
G
P R
E S
S U
R E
F
A T
P S
I
M I
N I
M
D
S I
T
T
M
P E
R A
T U
R E
M F
S
N
Y E
B
I
L T
WA
S
M E
T H E R
M A F
LO
I N C
M M
A
A
A
A A A
A
4-CWP-1
4-CWP-2
4-HWP-2
4-HWP-1
'FCU-4'
2,4,6
2 4
DDC PANEL
4-CP-1
4-EF-MECH
2-12 AWG
1-12 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
3-12 AWG
1-12 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
'FCU-4'
26,28,30
'FCU-4' - 29
'FCU-4'
7,9,11
'FCU-4'
1,3,5
'FCU-4'
8,10,12
3-8 AWG
1-10 AWG EG
IN 3/4" C
'FCU-4' - 14
'FCU-4' - 14
4-DHWCP-1
B07G
MECH.
ROOM
3-8 AWG
1-10 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
'FCU-4' - 14
4-EF-VFD
2-12 AWG
1-12 AWG EG
IN 3/4" C
'FCU-4' - 14
'FCU-4' - 14
3-8 AWG
1-10 AWG EG
IN 3/4" C
4-TCV-1
2-12 AWG
1-12 AWG EG
IN 3/4" C
'PANEL'
EX CKT
B14C
MECH.
ROOM
2-DHWCP-1
2-TCV-1
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:5
P M
EP101
BUILDINGS 2 & 4 POWER PLAN
5 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
2, 4
0 1 2 4
NORTH
PLAN
1 RECONNECT NEW CIRCULATION PUMP TO
EXISTING CIRCUIT.
2 INSTALL UNISTRUT SUPPORT STRUCTURE TO
MOUNT SAFETY DISCONNECT SWITCH.
3 INSTALL NEW BRANCH CIRCUIT FROM VFD’S
TO SAFETY DISCONNECT SWITCHES AT
CWP-1 AND CWP-2 AND FROM DISCONNECTS
TO RELOCATED PUMPS.
4 INSTALL NEW BRANCH CIRCUIT FROM VFD’S
TO SAFETY DISCONNECT SWITCHES AT
HWP-1 AND HWP-2 AND FROM DISCONNECTS
TO RELOCATED PANELS.
5 INSTALL DISCONNECT AND BRANCH CIRCUIT
FROM PANEL 'FCU-4'. INSTALL NEW 15A-3P
BREAKER FOR DUPLEX CONDENSER PUMP –
SEE PANEL SCHEDULE.
6 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘FCU-4’ TO VENTILATION FAN.
7 CONNECT DDC PANEL TO RACK IN IT CLOSET
B09. COORDINATE WITH OIT AND DDC
CONTRACTOR.
8 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘FCU-4’ TO NEW DDC PANEL.
9 ADJUST LIGHT FIXTURE LOCATION AS
CEILING CONDITIONS PERMIT. ENSURE
UNIFORM ILLUMINATION THROUGHOUT
MECHANICAL ROOM. (TYP)
10 WATER HEATER CONTROL PANEL,
SINGLE-POINT CONNECTION.
Scale: 1/2" = 1'-0"
BUILDING 4 ELECTRICAL POWER PLAN
A. VFD'S SHOWN ARE SUPPLIED BY MECHANICAL
CONTRACTOR, INSTALLED BY ELECTRICAL
CONTRACTOR.
B. ELECTRICAL CONTRACTOR PROVIDED
DISCONNECTS SHALL BE INTERLOCKED WITH
VFD'S TO PREVENT RUNAWAY.
Scale: 1/2" = 1'-0"
BUILDING 2 ELECTRICAL POWER PLAN
EXISTING PANEL 'FCU-4'
(TOTAL KVA) X 1000 = TOTAL AMPS
VOLTS X 1.732 80
PANEL / FEEDER (TOTAL KVA) 28.65
TOTAL DEMAND AMPERES PER PHASE 90 76 73
NOTE: ALL MOTOR CIRCUIT BREAKERS SHALL BE HACR RATED. TOTAL KV... 9.55 8.21 7.79 10.81 9.13 8.71
LOCATION: SUB-BASEMENT B01 SIGN 0.00 0.00 0.00 125% 0.00 0.00 0.00
DEDICATED RECEPT 0.00 0.00 0.00 100% 0.00 0.00 0.00
NEUTRAL RATING 100% FIX. ELEC. SPACE HEAT 0.00 0.00 0.00 100% 0.00 0.00 0.00
BUS RATING 100A WATER HEATERS 0.00 0.00 0.00 125% 0.00 0.00 0.00
MCB RATING MLO ALL OTHERS 3.98 3.98 3.98 100% 3.98 3.98 3.98
MINIMUM AIC (K AMPS) 22 MOTORS AND
EQUIPMENT
LARGEST 3.69 3.69 3.69 125% 4.61 4.61 4.61
SERVICE ENTR. RATED YES X NO >10KVA@50% 0.00 0.00 0.00
MAIN CIRCUIT BREAKER YES X NO GENERAL USE
RECEPT
0.54 0.54 0.12
<=10 KVA@100% 0.54 0.54 0.12
ISOLATED GROUND BUS YES X NO GENERAL LIGHTING 1.34 0.00 0.00 125% 1.68 0.00 0.00
MOUNTING SURFACE A B C A B C
C/B TEMP. 75 C. RATING 120 208 V 3 PH 4 WIRE
LOAD TYPE
CONNECTED KVA NEC DEM
FACTOR
DEMAND KVA
16.93 15.59 15.17 TOTAL
SUB TOTAL 7.92 7.92 7.50 9.01 7.67 7.67 SUB TOTAL
NEW DDC PANEL --- --- 0.12 1P-20 29 30 --- --- 0.29
SPARE --- 0.00 --- 1P-20 27 28 --- 0.29 ---
SPARE 0.00 --- --- 1P-20 25 26
3P-15
0.29 --- ---
CONDENSATE PUMP 4-CP-1
SPARE --- --- 0.00 1P-20 23 24 1P-20 --- --- 0.00 SPARE
SPARE --- 0.00 --- 1P-20 21 22 1P-20 --- 0.00 --- SPARE
SPARE 0.00 --- --- 1P-20 19 20 1P-20 0.00 --- --- SPARE
SPARE --- --- 0.00 1P-20 17 18 1P-20 --- --- 0.00 SPARE
EXISTING CIRCUIT --- 0.54 --- 1P-20 15 16 1P-20 --- 0.00 --- SPARE
EXISTING CIRCUIT 0.54 --- --- 1P-20 13 14 1P-20 1.34 --- --- LIGHTING, 4-EF, 4-DHWCP-1
--- --- 3.69 11 12 --- --- 3.69
--- 3.69 --- 9 10 --- 3.69 ---CHILLED WATER PUMP 4-CWP-2
3.69 --- ---
3P-40
7 8
3P-40
3.69 --- ---
HOT WATER PUMP 4-HWP-2
--- --- 3.69 5 6 --- --- 3.69
--- 3.69 --- 3 4 --- 3.69 ---CHILLED WATER PUMP 4-CWP-1
3.69 --- ---
3P-40
1 2
3P-40
3.69 --- ---
HOT WATER PUMP 4-HWP-1
A B C A B C
LOAD SERVED KVA / Phase
CKT
BRKR
CKT
NO
NEUTRAL
A B C
CKT
NO
CKT
BRKR
KVA / Phase LOAD SERVED
0 1 2 4
N O
R T H
PLAN
N
AREA OF WORK
BUILDING 2 KEY PLAN
SCALE: NO SCALE
N
AREA OF WORK
BUILDING 4 KEY PLAN
SCALE: NO SCALE
MECHANICAL ROOM B01
(LOCATION OF PANEL 'FCU-4')
IT CLOSET B09
(LOCATION OF DDC
TERMINATION)
P S I A T ° F
CERTIFIED BY:
M A X I M U M A L L O W A B L E W O R K I N G P R E S S U R E
° F A T P S I
M I N I M U M D E S I G N M E T A L T E M P E R A T U R E
M F G . S / N
Y E A R B U I L T
W
ASME
THERMAFLO INC
M M
P S
I A
T
F
C E R T
IF
IE
D
B Y
M A
X I
M
L O
W A
B
R K
I
E S
S U
R E
F
A T
P S
I
M I
N I
M
S I
T
M
P E
R A
T U
R E
M F
N
Y E
I
L T
WA
S
M E
T H E R
M A F
LO
I N C
M M
E
M
M
E
V F
D V
F D
V F
D
VFD
E
E
E
E
A AA
A
PANEL 'FCU-7'
PANEL
'MEP-7A'
7-HWP-1 7-HWP-2
7-CWP-17-CWP-2
7-CP-1
DDC PANEL
MECH.
ROOM
TO VFD
TO VFD
'MEP-7A'
26,28,30
TO UPPER
LEVEL LIGHTS
3-12 AWG
1-12 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C'MEP-7A' - 14
2-DHWCP-1
2-TCV-1
3-6 AWG
1-10 AWG EG
IN 1" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
'MEP-7A' - 29
3-8 AWG
1-10 AWG EG
IN 1" C
3-6 AWG
1-10 AWG EG
IN 1" C
TO VFD
EP102
B09
MECH.
ROOM
2-12 AWG
1-12 AWG EG
IN 3/4" C
'PANEL'
EX CKT
6-DHWCP-16-TCV-1
6-CP-1
'PANEL'
EX CKT
3-12 AWG
1-12 AWG EG
IN 3/4" C
NEW STEEL GRATE
MEZZANINE FLOOR
AA
A A
2-12 AWG
1-12 AWG EG
IN 3/4" C
'MEP-7A' - 14
7-EF-MECH
'MEP-7A' - 14
TO LOWER
LEVEL LIGHTS
MECH.
ROOM
2-12 AWG
1-12 AWG EG
IN 3/4" C
TO HWP
DISCONNECT
TO HWP
DISCONNECT
3-8 AWG
1-10 AWG EG
IN 1" C
'MEP-7A'
2,4,6
'MEP-7A'
8,10,12
'MEP-7A'
7,9,11
2-12 AWG
1-12 AWG EG
IN 3/4" C
'MEP-7A' - 14
7-EF-VFD
3-6 AWG
1-10 AWG EG
IN 1" C
'MEP-7A'
1,3,5
TO CWP
DISCONNECTS
M A
X H
E
IG
H T
FLOOR
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:0
P M
EP102
BUILDINGS 6 & 7 POWER PLAN
6 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
6, 7
1 RECONNECT NEW CIRCULATION PUMP TO
EXISTING CIRCUIT.
2 CONNECT DDC PANEL TO RACK IN IT CLOSET
B20. COORDINATE WITH OIT AND DDC
CONTRACTOR.
3 INSTALL NEW BRANCH CIRCUIT FROM VFD’S
TO SAFETY DISCONNECT SWITCHES AT
CWP-1 AND CWP-2 AND FROM DISCONNECTS
TO RELOCATED PUMPS.
4 INSTALL NEW BRANCH CIRCUIT FROM VFD’S
TO SAFETY DISCONNECT SWITCHES AT
HWP-1 AND HWP-2 AND FROM DISCONNECTS
TO RELOCATED PANELS.
5 INSTALL BRANCH CIRCUIT FROM PANEL
'MEP-7A'. INSTALL NEW 15A-3P BREAKER FOR
DUPLEX CONDENSER PUMP – SEE PANEL
SCHEDULE.
6 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘MEP-7A’ TO VENTILATION FAN.
7 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘MEP-7A’ TO CIRCULATION
PUMP.
8 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘MEP-7A’ TO NEW DDC PANEL.
9 ADJUST LIGHT FIXTURE LOCATIONS BELOW
MEZZANINE AS CEILING CONDITIONS PERMIT.
ENSURE UNIFORM ILLUMINATION
THROUGHOUT MECHANICAL ROOM.
10 ADJUST LIGHT FIXTURE LOCATIONS ABOVE
MEZZANINE AS CEILING CONDITIONS PERMIT.
ENSURE UNIFORM ILLUMINATION
THROUGHOUT MECHANICAL ROOM.
11 WATER HEATER CONTROL PANEL,
SINGLE-POINT CONNECTION.
12 INSTALL UNISTRUT SUPPORT STRUCTURE TO
MOUNT SAFETY DISCONNECT SWITCH.
MOUNT DISCONNECTS STACKED VERTICALLY
ON STRUCTURAL BEAM WITH SAFETY
DISCONNECT HANDLES NOT TO EXCEED 6'-7"
AFF.
Scale: 1/2" = 1'-0"
BUILDING 7 LOWER LEVEL ELECTRICAL POWER PLAN
Scale: 1/2" = 1'-0"
BUILDING 6 ELECTRICAL POWER PLAN
Scale: 1/2" = 1'-0"
BUILDING 7 UPPER LEVEL ELECTRICAL POWER PLAN
N
AREA OF WORK
BUILDING 6 KEY PLAN
SCALE: NO SCALE
N
AREA OF WORK
BUILDING 7 KEY PLAN
SCALE: NO SCALE
EXISTING PANEL 'MEP-7A'
(TOTAL KVA) X 1000 = TOTAL AMPS
VOLTS X 1.732 99
PANEL / FEEDER (TOTAL KVA) 35.59
TOTAL DEMAND AMPERES PER PHASE 109 95 92
NOTE: ALL MOTOR CIRCUIT BREAKERS SHALL BE HACR RATED. TOTAL KV... 11.40 10.06 9.64 13.12 11.45 11.03
LOCATION: SUB-BASEMENT B01 SIGN 0.00 0.00 0.00 125% 0.00 0.00 0.00
DEDICATED RECEPT 0.00 0.00 0.00 100% 0.00 0.00 0.00
NEUTRAL RATING 100% FIX. ELEC. SPACE HEAT 0.00 0.00 0.00 100% 0.00 0.00 0.00
BUS RATING 100A WATER HEATERS 0.00 0.00 0.00 125% 0.00 0.00 0.00
MCB RATING MLO ALL OTHERS 3.98 3.98 3.98 100% 3.98 3.98 3.98
MINIMUM AIC (K AMPS) 22 MOTORS AND
EQUIPMENT
LARGEST 5.54 5.54 5.54 125% 6.93 6.93 6.93
SERVICE ENTR. RATED YES X NO >10KVA@50% 0.00 0.00 0.00
MAIN CIRCUIT BREAKER YES X NO GENERAL USE
RECEPT
0.54 0.54 0.12
<=10 KVA@100% 0.54 0.54 0.12
ISOLATED GROUND BUS YES X NO GENERAL LIGHTING 1.34 0.00 0.00 125% 1.68 0.00 0.00
MOUNTING SURFACE A B C A B C
C/B TEMP. 75 C. RATING 120 208 V 3 PH 4 WIRE
LOAD TYPE
CONNECTED KVA NEC DEM
FACTOR
DEMAND KVA
20.63 19.29 18.87 TOTAL
SUB TOTAL 11.62 11.62 11.20 9.01 7.67 7.67 SUB TOTAL
NEW DDC PANEL --- --- 0.12 1P-20 29 30 --- --- 0.29
SPARE --- 0.00 --- 1P-20 27 28 --- 0.29 ---
SPARE 0.00 --- --- 1P-20 25 26
3P-15
0.29 --- ---
CONDENSATE PUMP 7-CP-1
SPARE --- --- 0.00 1P-20 23 24 1P-20 --- --- 0.00 SPARE
SPARE --- 0.00 --- 1P-20 21 22 1P-20 --- 0.00 --- SPARE
SPARE 0.00 --- --- 1P-20 19 20 1P-20 0.00 --- --- SPARE
SPARE --- --- 0.00 1P-20 17 18 1P-20 --- --- 0.00 SPARE
EXISTING CIRCUIT --- 0.54 --- 1P-20 15 16 1P-20 --- 0.00 --- SPARE
EXISTING CIRCUIT 0.54 --- --- 1P-20 13 14 1P-20 1.34 --- --- LIGHTING, 7-EF, 7-DHWCP-1
--- --- 5.54 11 12 --- --- 3.69
--- 5.54 --- 9 10 --- 3.69 ---CHILLED WATER PUMP 7-CWP-2
5.54 --- ---
3P-60
7 8
3P-40
3.69 --- ---
HOT WATER PUMP 7-HWP-2
--- --- 5.54 5 6 --- --- 3.69
--- 5.54 --- 3 4 --- 3.69 ---CHILLED WATER PUMP 7-CWP-1
5.54 --- ---
3P-60
1 2
3P-40
3.69 --- ---
HOT WATER PUMP 7-HWP-1
A B C A B C
LOAD SERVED KVA / Phase
CKT
BRKR
CKT
NO
NEUTRAL
A B C
CKT
NO
CKT
BRKR
KVA / Phase LOAD SERVED
A. VFD'S SHOWN ARE SUPPLIED BY MECHANICAL
CONTRACTOR, INSTALLED BY ELECTRICAL
CONTRACTOR.
B. ELECTRICAL CONTRACTOR PROVIDED
DISCONNECTS SHALL BE INTERLOCKED WITH
VFD'S TO PREVENT RUNAWAY.
IT CLOSET B20
(LOCATION OF DDC
TERMINATION)0 1 2 4
N O
R T H
PLAN
0 1 2 4
NORTH
PLAN
0 1 2 4
N O
R T H
PLAN
Scale: No Scale
BUILDING 7 COLD WATER PUMP DISCONNECT ELEVATION
F
D V
F D
V F
D V
F D
PS
I
AT
°F
C E
R
TI
F
IE
D B
Y:
M
AX
IM
UM
A
LL
O W
AB
LE
RK
IN
PR
ES
SU
RE
°F
AT
PS
I
M I
N I
M
ES
IG
T
AL
T
EM
P
ER
AT
UR
E
M
FG
S
/N
YE
A
R B
UI
L
T
WA
S
M E
TH
E
R M
A
FL
O I
N C
M M
M
E
E
M
E
P S
I A
T
F
C E R T
IF
IE
D
B Y
M A
X I
M
L O
W A
B
R K
I
E S
S U
R E
F
A T
P S
I
M I
N I
M
S I
T
M
P E
R A
T U
R E
M F
N
Y E
I
L T
WA
S
M E
T H E R
M A F
LO
I N C
M M
9-HWP-29-HWP-1 9-CWP-2
9-CWP-1
A
A
A
A
SWBD
(ETR)
PANEL
'FCU-9'
PANEL
'MEP-9A'
PANEL
'ELP-9'
(ETR)
9-CP-1
2-12 AWG
1-12 AWG EG
IN 3/4" C
'MEP-9A' - 149-DHWCP-1
8-TCV-1
'MEP-9A'
26,28,30
3-12 AWG
1-12 AWG EG
IN 3/4" C
'MEP-9A' - 14
TO VFD
TO VFD
TO VFD
TO VFD
TO 9-HWP-2
DISCONNECT
TO 9-CWP-1
DISCONNECT
TO 9-CWP-2
DISCONNECT
TO 9-HWP-1
DISCONNECT
'MEP-9A'
1,3,5
'MEP-9A'
8,10,12
'MEP-9A'
7,9,11
'MEP-9A'
2,4,6
3-8 AWG
1-10 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
9-EF-MECH
'MEP-9A' - 14
3 4
DDC PANEL
2-12 AWG
1-12 AWG EG
IN 3/4" C
'MEP-9A' - 29
XFMR
ROOM
B10
MECH.
ROOM
2-12 AWG
1-12 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
3-10 AWG
1-10 AWG EG
IN 3/4" C
9-EF-VFD
'MEP-9A' - 14
2-12 AWG
1-12 AWG EG
IN 3/4" C
3-10 AWG
1-10 AWG EG
IN 3/4" C
3-8 AWG
1-10 AWG EG
IN 3/4" C
2-12 AWG
1-12 AWG EG
IN 3/4" C
'PANEL'
EX CKT
8-DHWCP-1
8-TCV-1
8-CP-1
'PANEL'
EX CKT
3-12 AWG
1-12 AWG EG
IN 3/4" C
B10
MECH.
ROOM
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:1
P M
EP103
BUILDINGS 8 & 9 POWER PLAN
7 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
8, 9
1 RECONNECT NEW CIRCULATION PUMP TO
EXISTING CIRCUIT.
2 IF PANEL 'MEP-9A' HAS BEEN INSTALLED IN
PREVIOUS PROJECT, PROVIDE VA WITH FULL
CREDIT. OTHERWISE, INSTALL NEW PANEL
'MEP-9A' AS SHOWN.
3 INSTALL NEW BRANCH CIRCUIT FROM VFD’S
TO SAFETY DISCONNECT SWITCHES AT
CWP-1 AND CWP-2 AND FROM DISCONNECTS
TO RELOCATED PUMPS.
4 INSTALL NEW BRANCH CIRCUIT FROM VFD’S
TO SAFETY DISCONNECT SWITCHES AT
HWP-1 AND HWP-2 AND FROM DISCONNECTS
TO RELOCATED PANELS.
5 INSTALL BRANCH CIRCUIT FROM PANEL
'MEP-9A'. INSTALL NEW 15A-3P BREAKER FOR
DUPLEX CONDENSER PUMP – SEE PANEL
SCHEDULE.
6 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘MEP-9A’ TO VENTILATION FAN.
7 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘MEP-9A’ TO CIRCULATION
PUMP.
8 INSTALL NEW 120V/20A BRANCH CIRCUIT
FROM PANEL ‘MEP-9A’ TO NEW DDC PANEL.
9 ADJUST LIGHT FIXTURE LOCATION AS
CEILING CONDITIONS PERMIT. ENSURE
UNIFORM ILLUMINATION THROUGHOUT
MECHANICAL ROOM.
10 CONNECT DDC PANEL TO RACK IN IT CLOSET
B01B. COORDINATE WITH OIT AND DDC
CONTRACTOR.
11 TEMPORARY CONSTRUCTION ENTRANCE
SHALL BE USED BY CONTRACTORS TO
ACCESS AREA OF WORK.
12 TEMPORARY RATED WALL TO ENCLOSE
OPENING IN MECHANICAL ROOM WALL FOR
CONSTRUCTION ENTRANCE.
13 WATER HEATER CONTROL PANEL,
SINGLE-POINT CONNECTION.
Scale: 3/8" = 1'-0"
BUILDING 9 ELECTRICAL POWER PLAN
Scale: 1/2" = 1'-0"
BUILDING 8 ELECTRICAL POWER PLAN 0 1 2 4
NORTH
PLAN
PANEL 'MEP-9A'
(TOTAL KVA) X 1000 = TOTAL AMPS
VOLTS X 1.732 73
PANEL / FEEDER (TOTAL KVA) 26.28
TOTAL DEMAND AMPERES PER PHASE 83 70 66
NOTE: ALL MOTOR CIRCUIT BREAKERS SHALL BE HACR RATED. TOTAL KV... 8.76 7.42 7.00 10.02 8.34 7.92
SIGN 0.00 0.00 0.00 125% 0.00 0.00 0.00
DEDICATED RECEPT 0.00 0.00 0.00 100% 0.00 0.00 0.00
NEUTRAL RATING 100% FIX. ELEC. SPACE HEAT 0.00 0.00 0.00 100% 0.00 0.00 0.00
BUS RATING 225A WATER HEATERS 0.00 0.00 0.00 125% 0.00 0.00 0.00
MCB RATING MLO ALL OTHERS 3.19 3.19 3.19 100% 3.19 3.19 3.19
MINIMUM AIC (K AMPS) 22,000 MOTORS AND
EQUIPMENT
LARGEST 3.69 3.69 3.69 125% 4.61 4.61 4.61
SERVICE ENTR. RATED YES X NO >10KVA@50% 0.00 0.00 0.00
MAIN CIRCUIT BREAKER YES X NO GENERAL USE
RECEPT
0.54 0.54 0.12
<=10 KVA@100% 0.54 0.54 0.12
ISOLATED GROUND BUS YES X NO GENERAL LIGHTING 1.34 0.00 0.00 125% 1.68 0.00 0.00
MOUNTING SURFACE A B C A B C
C/B TEMP. 75 C. RATING 120 208 V 3 PH 4 WIRE
LOAD TYPE
CONNECTED KVA NEC DEM
FACTOR
DEMAND KVA
15.35 14.01 13.59 TOTAL
SUB TOTAL 7.13 7.13 6.71 8.22 6.88 6.88 SUB TOTAL
NEW DDC PANEL --- --- 0.12 1P-20 29 30 --- --- 0.29
SPACE --- 0.00 --- 1P-20 27 28 --- 0.29 ---
SPACE 0.00 --- --- 1P-20 25 26
3P-15
0.29 --- ---
CONDENSATE PUMP 9-CP-1
SPACE --- --- 0.00 1P-20 23 24 1P-20 --- --- 0.00 SPACE
SPACE --- 0.00 --- 1P-20 21 22 1P-20 --- 0.00 --- SPACE
SPACE 0.00 --- --- 1P-20 19 20 1P-20 0.00 --- --- SPACE
SPACE --- --- 0.00 1P-20 17 18 1P-20 --- --- 0.00 SPACE
LCTP PANEL --- 0.54 --- 1P-20 15 16 1P-20 --- 0.00 --- SPACE
RECEPT - ROOM B10 0.54 --- --- 1P-15 13 14 1P-20 1.34 --- --- LIGHTING, 9-EF, 9-DHWCP-1
--- --- 2.90 11 12 --- --- 2.90
--- 2.90 --- 9 10 --- 2.90 ---HOT WATER PUMP 9-HWP-2
2.90 --- ---
3P-30
7 8
3P-30
2.90 --- ---
HOT WATER PUMP 9-HWP-1
--- --- 3.69 5 6 --- --- 3.69
--- 3.69 --- 3 4 --- 3.69 ---CHILLED WATER PUMP 9-CWP-2
3.69 --- ---
3P-40
1 2
3P-40
3.69 --- ---
CHILLED WATER PUMP 9-CWP-1
A B C A B C
LOAD SERVED KVA / Phase
CKT
BRKR
CKT
NO
NEUTRAL
A B C
CKT
NO
CKT
BRKR
KVA / Phase LOAD SERVED
N
AREA OF WORK
BUILDING 8 KEY PLAN
SCALE: NO SCALE
N
AREA OF WORK
BUILDING 9 KEY PLAN
SCALE: NO SCALE
A. VFD'S SHOWN ARE SUPPLIED BY MECHANICAL
CONTRACTOR, INSTALLED BY ELECTRICAL
CONTRACTOR.
B. ELECTRICAL CONTRACTOR PROVIDED
DISCONNECTS SHALL BE INTERLOCKED WITH
VFD'S TO PREVENT RUNAWAY.
IT CLOSET B01B
(LOCATION OF DDC
TERMINATION)
0 21 4
N O
R T H
PLAN
STRUCTURAL CEILING
SUSPENDED CEILINGLIGHT FIXTURE
WALL
ELECTRICAL
EQUIPMENT
EXCLUSIVE
DEDICATED
SPACE
FRONT EDGE PLAN
OF ELECTRICAL
EQUIPMENT
SEE T
ABLE 'A
CLEARANCE SHALL BE 30" OR WIDTH OF
EQUIPMENT IF EQUIPMENT IS WIDER THAN 30".
CLEARANCE DOES NOT HAVE TO BE CENTERED
WITH EQUIPMENT BUT AT MUST BE AT LEAST
EVEN WITH ONE EDGE. EQUIPMENT DOOR SHALL
BE ABLE TO OPEN AT LEAST 90 DEGREES.
NOTE:
THIS FIGURE ILLUSTRATES THE WORKING SPACE IN FRONT OF ELECTRICAL EQUIPMENT
REQUIRED BY NEC 110.16.
NOTE:
THIS FIGURE ILLUSTRATES THE EXCLUSIVE DEDICATED SPACE
REQUIRED ABOVE AND BELOW PANELBOARDS FOR ELECTRICAL
DISTRIBUTION TO AND FROM PANELBOARDS REQUIRED BY NEC.
ALL ELECTRICAL EQUIPMENT
PANELBOARDS
TABLE 'A' - WORKING CLEARANCE
STRUCTURAL CEILING
SUSPENDED CEILING
WALL
LIGHT FIXTURE
PANELBOARD
EXCLUSIVE
DEDICATED
SPACE
EXCLUSIVE
DEDICATED
SPACE
VOLTAGE TO GROUND
(NOMINAL)
MINIMUM CLEAR DISTANCE
0 - 150
150 - 600
3' - 0"
3' - 0"
3' - 0"
3' - 6"
3' - 0"
4' - 0"
CONDITION 1 CONDITION 2 CONDITION 3
GENERAL NOTES:
1. ELECTRICAL EQUIPMENT INCLUDES BUT IS NOT LIMITED TO PANELBOARDS, SAFETY
SWITCHES, MOTOR STARTERS, JUNCTION BOXES, AND OTHER ELECTRICAL
DISTRIBUTION AND CONTROLS EQUIPMENT.
2. PIPING, DUCTS OR EQUIPMENT FOREIGN TO THE ELECTRICAL EQUIPMENT OR
ARCHITECTURAL APPURTENANCES SHALL NOT BE PERMITTED TO BE INSTALLED IN,
ENTER, OR PASS THROUGH THE DEDICATED SPACES SHOWN ABOVE.
TABLE 'A' DEFINITIONS:
CONDITION 1:
CONDITION 2:
CONDITION 3:
EXPOSED LIVE PARTS ON ONE SIDE AND NO LIVE OR
GROUNDED PARTS ON THE OTHER SIDE OF THE WORKING
SPACE.
OR
EXPOSED LIVE PARTS ON BOTH SIDES EFFECTIVELY GUARDED
BY SUITABLE WOOD OR OTHER INSULATING MATERIALS.
EXPOSED LIVE PARTS ON ONE SIDE AND GROUNDED PARTS
ON THE OTHER SIDE.
EXPOSED LIVE PARTS ON BOTH SIDES OF THE WORKING
SPACE (NOT GUARDED AS PROVIDED IN CONDITION 1) WITH
THE OPERATOR BETWEEN.
INSULATED WIRE OR INSULATED BUSBARS OPERATING AT NOT OVER 300V
SHALL NOT BE CONSIDERED LIVE PARTS.
M
IN
IM
U
M
M
IN
IM
U
M
1. WALL ASSEMBLY - THE 1, 2, 3 OR 4 HR FIRE-RATED GYPSUM WALLBOARD/STUD WALL ASSEMBLY SHALL BE CONSTRUCTED OF THE MATERIALS AND IN THE MANNER DESCRIBED IN THE INDIVIDUAL U300 OR U400 SERIES WALL OR PARTITION DESIGNS IN THE UL FIRE RESISTANCE DIRECTORY AND SHALL INCLUDE THE FOLLOWING CONSTRUCTION FEATURES:
A. STUDS - WALL FRAMING MAY CONSIST OF EITHER WOOD STUDS (MAX 2 HR FIRE RATED ASSEMBLIES) OR STEEL CHANNEL STUDS. WOOD STUDS TO CONSIST OF NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER SPACED 16 IN. (406 MM) OC WITH NOM 2 BY 4 IN. (51 BY 102 MM) LUMBER END PLATES AND CROSS BRACES. STEEL STUDS TO BE MIN 3-5/8 IN. (92 MM)
WIDE BY 1-3/8 IN. (35 MM) DEEP CHANNELS SPACED MAX 24 IN. (610 MM) OC.
B. GYPSUM BOARD* - NOM 1/2 OR 5/8 IN. (13 OR 16 MM) THICK, 4 FT. (122 CM) WIDE WITH SQUARE OR TAPERED EDGES. THE GYPSUM WALLBOARD TYPE, THICKNESS, NUMBER OF LAYERS, FASTENER TYPE AND SHEET ORIENTATION SHALL BE AS SPECIFIED IN THE INDIVIDUAL U300 OR U400 SERIES DESIGN IN THE UL FIRE RESISTANCE DIRECTORY. MAX DIAM OF
OPENING IS 26 IN. (660 MM).
2. THROUGH PENETRANT - ONE METALLIC PIPE, CONDUIT OR TUBING INSTALLED EITHER CONCENTRICALLY OR ECCENTRICALLY WITHIN THE FIRESTOP SYSTEM. THE ANNULAR SPACE BETWEEN PIPE, CONDUIT OR TUBING AND PERIPHERY OF OPENING SHALL BE MIN OF 0 IN. (0 MM) (POINT CONTACT) TO MAX 2 IN. (51 MM). PIPE, CONDUIT OR TUBING TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF METALLIC PIPES, CONDUITS OR TUBING MAY BE USED:
A. STEEL PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SCHEDULE 10 (OR HEAVIER) STEEL PIPE.
B. IRON PIPE - NOM 24 IN. (610 MM) DIAM (OR SMALLER) SERVICE WEIGHT (OR HEAVIER) CAST IRON SOIL PIPE, NOM 12 IN.
(305 MM) DIAM (OR SMALLER) OR CLASS 50 (OR HEAVIER) DUCTILE IRON PRESSURE PIPE.
C. CONDUIT - NOM 6 IN. (152 MM) DIAM (OR SMALLER) STEEL CONDUIT OR NOM 4 IN. (102 MM) DIAM (OR SMALLER) STEEL
ELECTRICAL METALLIC TUBING
D. COPPER TUBING - NOM 6 IN. (152 MM) DIAM (OR SMALLER) TYPE L (OR HEAVIER) COPPER TUBING E. COPPER PIPE - NOM 6 IN. (152 MM) DIAM (OR SMALLER) REGULAR (OR HEAVIER) COPPER PIPE.
F. THROUGH PENETRATING PRODUCT* - FLEXIBLE METAL PIPING - THE FOLLOWING TYPES OF STEEL FLEXIBLE METAL GAS
PIPING MAY BE USED:
1. NOM 2 IN. (51 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY
NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
OMEGA FLEX INC
2. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY
NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
TITEFLEX CORP
A BUNDY CO
3. NOM 1 IN. (25 MM) DIAM (OR SMALLER) STEEL FLEXIBLE METAL GAS PIPING. PLASTIC COVERING ON PIPING MAY OR MAY
NOT BE REMOVED ON BOTH SIDES OF FLOOR OR WALL ASSEMBLY.
WARD MFG INC
3. FILL,VOID OR CAVITY MATERIAL* - CAULK OR SEALANT - MIN 5/8. 1-1/4,1-7/8 AND 2-1/2 IN. (16, 32, 48 AND 64 MM) THICKNESS OF CAULK FOR 1, 2, 3 AND 4 HR RATED ASSEMBLIES, RESPECTIVELY, APPLIED WITHIN ANNULUS, FLUSH WITH BOTH SURFACES OF WALL. MIN 1/4 IN. (6 MM) DIAM BEAD OF CAULK APPLIED TO GYPSUM BOARD/PENETRANT INTERFACE AT POINT CONTACT
LOCATION ON BOTH SIDES OF WALL.
THE HOURLY F RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN
WHICH IT IS INSTALLED, AS SHOWN IN THE FOLLOWING TABLE.
THE HOURLY T RATING OF THE FIRESTOP SYSTEM IS DEPENDENT UPON THE TYPE OR SIZE OF THE PIPE OR CONDUIT AND THE HOURLY FIRE RATING OF THE WALL ASSEMBLY IN WHICH IT IS INSTALLED, AS TABULATED BELOW:
+WHEN COPPER PIPE IS USED, T RATING IS 0 HR.
3M COMPANY - CP 25WB+ CAULK OR FB-3000 WT SEALANT,
*BEARING THE UL CLASSIFICATION MARKING
SYSTEM NO.W-L-1001
JUNE 15, 2005
F RATINGS - 1, 2, 3 AND 4 HR (SEE ITEMS 2 AND 3)
T RATINGS - 0, 1, 2, 3, AND 4 HR (SEE ITEM 3)
L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT
L RATING AT 400 F - LESS THAN 1 CFM/SQ FT
MAX PIPE OR
CONDUIT DIAM
IN. (mm)
1 (25)
1 (25)
4 (102)
6 (152)
12 (305)
F RATING
HR
1 OR 2
3 OR 4
1 OR 2
3 OR 4
1 OR 2
T RATING
HR
0+, 1 OR 2
3 OR 4
SECTION A-A
1B
1A
3A
A
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:3
P M
E-501
ELECTRICAL DETAILS
8 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
Scale: N.T.S.
DEDICATED WORKING SPACE REQUIREMENTS FOR ELECTRICAL EQUIPMENT
Scale: N.T.S.
UL PENETRATION DETAIL W-L-1001
LIGHTING FIXTURE SCHEDULE
A. MANUFACTURER AND CATALOG NUMBERS SHOWN ARE FOR BASIS OF DESIGN, DESCRIPTIVE AND QUALITY STANDARDS ONLY, NOT TO BE USED FOR ORDERING WITHOUT VERIFICATION AND APPROVAL. CONTRACTOR TO PROVIDE PRODUCT OR EQUAL FOR APPROVAL BY OWNER, ARCHITECT AND ENGINEER. ENGINEER SHALL NOT BE RESPONSIBLE
FOR MISMATCHED OR INACCURATE PART NUMBERS.
B. VERIFY ALL LIGHT FIXTURE MOUNTING TYPES AND COLORS WITH ARCHITECT.
C. FOR ALL LED FIXTURES, THE FIXTURE SHALL BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS. PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, SHALL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY. PROVIDE STATEMENT WITH THE FIXTURE
SUBMITTALS.
D. LIGHTING CONTROLS, INCLUDING CONTROL SCHEMATICS, DEVICES, SWITCHES, SENSORS AND GRAPHIC DISPLAYS/CONTROLLERS. THIS INFORMATION MUST BE SUBMITTED WITH
THE LIGHT FIXTURE SHOP DRAWINGS, FOR A COMPLETE REVIEW.
E. AMBIENT TEMPERATURE OPERATION IS -40oF UP TO +122oF.
GENERAL NOTES:
STEAM CONDENSATE PUMP SCHEDULE
MARK LOCATION
SYSTEM
AND/OR
SERVICE
TYPE UNIT
FLOW
EACH
PUMP
DISCHARGE
PRESSURE
MIN
RECEIVER
SIZE
MOTOR
BASIS OF DESIGN
MANUF.
BASIS OF DESIGN
MODEL NO.
REMARKSNOMINAL POWER
EACH
PHASE VOLT RPM
GPM PSIG GAL HP
4-CP-1 BUILDING 4 MER BLDG 4 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
6-CP-1 BUILDING 6 MER BLDG 6 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
7-CP-1 BUILDING 7 MER BLDG 7 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
8-CP-1 BUILDING 8 MER BLDG 8 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
9-CP-1 BUILDING 9 MER BLDG 9 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
FAN SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
AIR FLOW ESP TSP
FAN MOTOR
ELECTRICAL
CONTROL
SEQUENCE
REMARKS
TYPE WHEEL
DIAMETER
MIN %
EFF
DRIVE
FAN MAX
RPM
NOMINAL
POWER
PHASE VOLT RPM SPEED CONTROL
CFM IN W.G. IN W.G. IN BHP HP
4-EF-MECH BUILDING 4 MER BUILDING 4 MER 1,620 0.15 0.348 SIDEWALL PROPELLER AXIAL 14 40% DIRECT 1,502 0.22 1/3 1 115 1725 CONSTANT COOLING
THERMOSTAT
1, 2, 4, 5
4-EF-VFD
BUILDING 4 VFD
CLOSET
BUILDING 4 VFD
CLOSET
100 0.25 0.25 SQUARE INLINE CENTRIFUGAL 6 19% DIRECT 1,536 0.02 1/15 1 115 1725 CONSTANT COOLING
THERMOSTAT
7-EF-MECH BUILDING 7 MER BUILDING 7 MER 2,700 0.25 0.25 SQUARE INLINE CENTRIFUGAL 18 35% BELT 764 0.33 1/2 1 115 1725 CONSTANT COOLING
THERMOSTAT
1, 3, 4, 5
7-EF-VFD STORAGE B02 STORAGE B02 250 0.25 0.25 SQUARE INLINE CENTRIFUGAL 8 30% DIRECT 1,320 0.03 1/10 1 115 1725 CONSTANT COOLING
THERMOSTAT
9-EF-MECH BUILDING 9 MER BUILDING 9 MER 1,400 0.15 0.254 SIDEWALL PROPELLER AXIAL 16 31% DIRECT 1,036 0.18 1/4 1 115 1725 CONSTANT COOLING
THERMOSTAT
1, 2, 4, 5
9-EF-VFD TRANSFORMER
B12
TRANSFORMER
B12
350 0.25 0.25 SQUARE INLINE CENTRIFUGAL 9 40 DIRECT 1,239 0.03 1/10 1 115 1725 CONSTANT COOLING
THERMOSTAT
HYDRONIC PUMP SCHEDULE
MARK LOCATION
AREA AND/OR
BLDG SERVED
SYSTEM
AND/OR
SERVICE
TYPE
CIRCULATING
FLUID
MIN %
EFF
ELECTRICAL
MOTOR
BASIS OF
DESIGN
MANUF.
BASIS OF DESIGN
MODEL NO.
REMARKS
FLUID
FLOW HEAD NPSH
REQUIRED
SP GR
NOMINAL
POWER
PHASE VOLT MAX RPM SPEED CONTROL
GPM FT FT HP
4-CWP-1 BUILDING 4 MER BUILDING 4 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 325 77 9.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3
4-CWP-2 BUILDING 4 MER BUILDING 4 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 325 77 9.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4
4-HWP-1 BUILDING 4 MER BUILDING 4 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 305 71 8.65 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3
4-HWP-2 BUILDING 4 MER BUILDING 4 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 305 71 8.65 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4
7-CWP-1 BUILDING 7 MER BUILDING 7 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 295 100 14 1 66 15 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2GB 1, 2, 3
7-CWP-2 BUILDING 7 MER BUILDING 7 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 295 100 14 1 66 15 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2GB 1, 2, 3, 4
7-HWP-1 BUILDING 7 MER BUILDING 7 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 280 85 11.9 1 72 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2EB 1, 2, 3
7-HWP-2 BUILDING 7 MER BUILDING 7 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 280 85 11.9 1 72 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2EB 1, 2, 3, 4
9-CWP-1 BUILDING 9 MER BUILDING 9 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 260 70 7.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3
9-CWP-2 BUILDING 9 MER BUILDING 9 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 260 70 7.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4
9-HWP-1 BUILDING 9 MER BUILDING 9 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 260 50 17.9 1 63 7.5 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2BD 1, 2, 3
9-HWP-2 BUILDING 9 MER BUILDING 9 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 260 50 17.9 1 63 7.5 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2BD 1, 2, 3, 4
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/6
/2
:1
:3
P M
E-601
ELECTRICAL SCHEDULES
9 9CGS ABT
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
05/01/2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
TYPE MANUFACTURER CATALOG NUMBER LAMP DESCRIPTION VOLTAGE LOAD (VA) MOUNTING DESCRIPTION
A COLUMBIA LXEM4-40ML-RFP-EU LED; 4,760 LUMENS, 80 CRI;
4000K
4' INDUSTRIAL STRIP ENCLOSURE AND GASKETED WITH
RIBBED, FROSTED POLYCARBONATE LENS; WET
LOCATION.
120-277V 37.4 SUSPENDED
*FOR REFERENCE ONLY, SEE MECHANICAL DRAWINGS FOR REMARKS.
*FOR REFERENCE ONLY, SEE MECHANICAL DRAWINGS FOR REMARKS.
*FOR REFERENCE ONLY, SEE MECHANICAL DRAWINGS FOR REMARKS.
| Sheets |
| E-001 - ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS |
| ED101 - BUILDINGS 2 & 4 ELECTRICAL DEMOLITION PLAN |
| ED102 - BUILDINGS 6 & 7 ELECTRICAL DEMOLITION PLAN |
| ED103 - BUILDINGS 8 & 9 ELECTRICAL DEMOLITION PLAN |
| EP101 - BUILDINGS 2 & 4 POWER PLAN |
| EP102 - BUILDINGS 6 & 7 POWER PLAN |
| EP103 - BUILDINGS 8 & 9 POWER PLAN |
| E-501 - ELECTRICAL DETAILS |
| E-601 - ELECTRICAL SCHEDULES |
File details come from the government source that posted it.