36C24419B0040-0002005.pdf
PDF 940 KB Posted
- Attached to
- Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
- Solicitation number
- 36C24419B0040
About this file
36C24419B0040 0002 MD102.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0185-000.docx | DOCX document | |
| 36C24419B0040-0002004.pdf | ||
| 36C24419B0040-0002000.docx | DOCX document | |
| 36C24419B0040-0002002.pdf | ||
| 36C24419B0040-0002003.pdf | ||
| 36C24419B0040-0002001.pdf | ||
| 36C24419B0040-0001000.docx | DOCX document | |
| 36C24419B0040-0001001.pdf | ||
| 36C24419B0040-004.pdf | ||
| 36C24419B0040-005.pdf | ||
| 36C24419B0040-001.docx | DOCX document | |
| 36C24419B0040-008.pdf | ||
| 36C24419B0040-006.pdf | ||
| 36C24419B0040-003.pdf | ||
| 36C24419B0040-007.pdf | ||
| 36C24419B0040-002.pdf | ||
| 36C24419B0040-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ETR MEDIUM PRESSURE STEAM PIPING.
ENSURE INTEGRITY OF EXISTING INSULATION EFFECTED
BY INDICATED ICRA BARRIER. REPAIR ANY DAMAGED INSULATION.
REFER TO AE-101 FOR MORE INFORMATION.
M-102
MD102
M D
_____MD102
ENSURE INTEGRITY OF EXISTING INSULATION EFFECTED
BY INDICATED ICRA BARRIER. REPAIR ANY DAMAGED INSULATION.
REFER TO AE-101 FOR MORE INFORMATION.
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
7/
/2
3:
:2
P
M
MD102
BUILDING 4 DEMOLITION PLANS
4 23PLH SWR
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
MAY 1, 2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
N
AREA OF WORK
SCOPE OUTLINE
BUILDING 4 KEY PLAN
SCALE: NO SCALE
1 COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE
PROJECT LIMITS OF WORK.
2 WORK SHALL BE CARRIED OUT SEASONALLY SUCH
THAT THE HOT WATER SYSTEM IS DOWN WHEN THE
BUILDING IS DEMANDING COOLING, AND THE CHILLED
WATER SYSTEM IS DOWN WHEN THE BUILDING IS
DEMANDING HEATING. SUBMIT A DETAILED PHASING
PLAN FOR APPROVAL.
3 THE DOMESTIC WATER SERVICE SHALL REMAIN
OPERATIONAL DURING OCCUPIED HOURS. MOST
BUILDINGS HAVE DOWNTIME DURING WEEKENDS AND
AFTER BUILDING HOURS. BUILDING 7 MUST MAINTAIN
DOMESTIC HOT AND COLD WATER SERVICE DUE TO
PATIENTS RESIDING IN THE BUILDING.
5 REPAIR OR REPLACE ALL DAMAGED DUCT AND PIPE
INSULATION DAMAGED DURING THE COURSE OF
WORK. INSULATE ALL UNINSULATED EXISTING PIPING
TO REMAIN PER SPECIFICATIONS.
6 FIELD VERIFY THE SIZES OF ALL EXISTING PIPING TO
REMAIN.
7 ABATE ALL ASBESTOS CONTAINING MATERIALS IN
THE WORK AREA. SUBMIT AN ABATEMENT PLAN FOR
APPROVAL.
8 THERE IS POTENTIAL FOR STERILE PROCESSING
SERVICE (SPS) REQUIRED ACCESS TO THE BUILDING
4 MECHANICAL ROOM DURING CONSTRUCTION.
ALLOW FOR COORDINATED ACCESS IF REQUIRED.
Scale: 1/2" = 1'-0"
BUILDING 4 MECHANICAL - DEMOLITION FROM 84" ABOVE
FLOOR TO DECK ABOVE
Scale: 1/2" = 1'-0"
BUILDING 4 MECHANICAL - DEMOLITION FROM FLOOR TO
84" ABOVE FLOOR
0 4 8 16
NORTH
TRUE
0 4 8 16
NORTH
TRUE
1 DEMOLISH PIPING TO WALL / CEILING AND
PREPARE FOR RECONNECTION PER NEW WORK.
2 CAP STEAM PIPING AT POINT SHOWN.
3 STERILIZERS SERVING SPS TO STAY
OPERATIONAL.
4 DEMOLISH EXPANSION TANK AND SUPPORTS
COMPLETE.
5 DEMOLISH SHELL AND TUBE HEAT EXCHANGERS
AND SUPPORTING STEEL DUNNAGE COMPLETE.
6 DEMOLISH HOT WATER PUMP COMPLETE.
7 DEMOLISH CHILLED WATER PUMP COMPLETE.
8 DEMOLISH SHELL AND TUBE DOMESTIC HOT
WATER HEAT EXCHANGER COMPLETE.
9 TEMPORARILY REMOVE THE STEAM GENERATOR
AND REINSTALL NEARBY, FOLLOWING
CONSTRUCTION. THE NEW LOCATION SHOULD BE
CLOSE TO THE EXISTING, BUT ADJUSTED TO
ALLOW FOR IMPROVED ACCESSIBILITY TO THE
STERILIZERS. COORDINATE WITH THE VA. EXTEND
CONNECTED PIPING ACCORDINGLY.
Scale: N.T.S.
3 BUILDING 4 ENTRY
Scale: N.T.S.
4 BUILDING 4 HOT WATER PUMPS
Scale: N.T.S.
5 BUILDING 4 STERILIZERS
4 Progress Issuance 4 Date 4
| Sheets |
| M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS |
| M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS |
| M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS |
| M-601 - MECHANICAL SCHEDULES |
| MD102 - BUILDING 4 DEMOLITION PLANS |
File details come from the government source that posted it.