36C24419B0040-0002001.pdf

PDF 904 KB Posted

Attached to
Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
Solicitation number
36C24419B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0040 0002 M-102.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Mechanical Rooms, Project No. 542-18-105, newest first.
File Type Posted
36C24419C0185-000.docx DOCX document
36C24419B0040-0002004.pdf PDF
36C24419B0040-0002000.docx DOCX document
36C24419B0040-0002002.pdf PDF
36C24419B0040-0002003.pdf PDF
36C24419B0040-0002005.pdf PDF
36C24419B0040-0001000.docx DOCX document
36C24419B0040-0001001.pdf PDF
36C24419B0040-008.pdf PDF
36C24419B0040-004.pdf PDF
36C24419B0040-005.pdf PDF
36C24419B0040-001.docx DOCX document
36C24419B0040-006.pdf PDF
36C24419B0040-003.pdf PDF
36C24419B0040-007.pdf PDF
36C24419B0040-002.pdf PDF
36C24419B0040-000.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P S I A T ° F

CERTIFIED BY:

M A X I M U M A L L O W A B L E W O R K I N G P R E S S U R E

° F A T P S I

M I N I M U M D E S I G N M E T A L T E M P E R A T U R E

M F G . S / N

Y E A R B U I L T

W

ASME

THERMAFLO INC

P S I A T ° F

CERTIFIED BY:

M A X I M U M A L L O W A B L E W O R K I N G P R E S S U R E

° F A T P S I

M I N I M U M D E S I G N M E T A L T E M P E R A T U R E

M F G . S / N

Y E A R B U I L T

W

ASME

THERMAFLO INC

3 3

4-ET-2

4-ET-1

4-AS-2

M-102

6"HWS

4"HW

S

4"HW

R

6"CHS

4"CHR 6"CHR

4"CHR

6"HWS

4"HWR

M-102

M-102

4-CWP-1

4-CWP-2

4-HWP-2

4-HWP-1

6"HWS

4" H

W S

4"HWR

4"HWR

6" H

W S

6" H

W S

6"CHS

4-CP-1

4-HX-1

4-HX-2

ENSURE INTEGRITY OF EXISTING INSULATION EFFECTED

BY INDICATED ICRA BARRIER. REPAIR ANY DAMAGED INSULATION.

REFER TO AE-101 FOR MORE INFORMATION.

4-EF-MECH

4-EF-VFD

4-DHX-1

DDC

CONTROLLER(S) ,

QUANTITY AS

REQUIRED

4-FT-1

6"HWS

6" H

W S

4-LV-1

INSULATED PLENUM BOX FULL SIZE OF

LOUVER, COVER OPEN END W/ 1/2" WIRE MESH

ROUTE COMMUNICATION LINE

FROM DDC CONTROLS IN

MECHANICAL ROOM TO ETHERNET

SWITCH IN DEDICATED ROOM.

COIL COMMUNICATION LINE AT THE

ROOM. VA PERSONNEL WILL

PERFORM FINAL TIE-IN TO THE

ETHERNET SWITCH. LOCATION OF

SWITCH WILL BE COMMUNICATED

TO AWARDED CONTRACTOR.

ALLOW FOR 100-FOOT RUN.

6" C

H S

4-AS-16"

C

H S

6"CHS

6"CHS

1"

1"

6"

6"

6x6

6x

1.5-HOUR

FIRE DAMPER

TURN DN

TURN DN,

TERMINATE 12"

AFF, COVER WITH

1/2" WIRE MESH

6" H

W S

6"HWS

6"HWR

6" H

W R

7/

8"

LP

R

6 7/8"LPR

4-HX-2

4-HX-1

4-CP-1

5"

LP

S

M-102

M-102

ENSURE INTEGRITY OF EXISTING INSULATION EFFECTED

BY INDICATED ICRA BARRIER. REPAIR ANY DAMAGED

INSULATION. REFER TO AE-101 FOR MORE INFORMATION.

2" V

4" V

4-FT-1

4"MPS

1 1/4"MPS1

1/

4" M

P S

1/

4" M

P S

3/ 4"

M P

S

4"MPS

4-DHX-1

1"MPR

2" P

C

1 1/4"MPS4"MPS

2"

LP

R

2"LPR2"LPR

CAPPED TEE FOR

FUTURE CONNECTION

2"PC

4" M

P S

2"

LP

R

5"

LP

S

5"LPS

4"

LP

S

5"LPS

4"MPS

2"PC

Level 1 0' - 0"

6"CHR

6"CHS6"CHR

6"CHS

5"

LP

S

PRESSURE REDUCING

STATION

BASEMENT LEVEL

0' - 0"

SECOND LEVEL

10' - 0"

STAIR

5' - 9 5/8"

GROUND LEVEL

6' - 8"

Level 1 0' - 0"

B1 Level 1 0' - 0"

B4 Level 1 0' - 0"3

M-102

4-PRS-1

4-EF-MECH

CHILLED WATER FLOW

METER (SEE

SPECIFICATION SECTION

23 09 23, 2.10, D)

4-FT-1

1"MPR

1"LPR

2"LPR

INSTALL FLASH

TANK BENEATH PRV

2"LPR

Level 1 0' - 0"

BASEMENT LEVEL

0' - 0"

SECOND LEVEL

10' - 0"

STAIR

5' - 9 5/8"

GROUND LEVEL

6' - 8"

B1 Level 1 0' - 0"

B4 Level 1 0' - 0"

M-102

2"DCW

5"

LP

S

4-CP-1

1"DCW

44-HWP-2

4-HWP-1

4-HX-2

4-DHX-1

1 1/2"PC

1"MPR1"MPR

Level 1 0' - 0"

BASEMENT LEVEL

0' - 0"

SECOND LEVEL

10' - 0"

STAIR

5' - 9 5/8"

GROUND LEVEL

6' - 8"

Level 1 0' - 0"

B1 Level 1 0' - 0"

B4 Level 1 0' - 0"

4-AS-113

14-CWP-1

6" C

H S

6" C

H S

6"CHS

6"CHS

6"CHS

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

APPLICABLE BID DEDUCTS:

7/

/2

3:

:0

P

M

M-102

BUILDING 4 MECHANICAL ROOM NEW

WORK PLANS

9 23PLH SWR

RENOVATE MECHANICAL

ROOMS & EQUIPMENT

PHASE 1

1400 BLACKHORSE HILL RD

COATESVILLE, PA 19320

MAY 1, 2019

100% CONSTRUCTION DOCUMENTS

542-18-10517-251

Scale: 1/2" = 1'-0"

1 BUILDING 4 MECHANICAL ROOM - HYDRONIC NEW WORK

Scale: 1/2" = 1'-0"

2 BUILDING 4 MECHANICAL ROOM - STEAM NEW WORK

1 REINSTALL CHILLED WATER PUMP AND SUPPORTS

COMPLETE. MAINTAIN MAINTENANCE CLEARANCE

AND ACCESS TO MAINTENANCE CLEARANCE.

2 PROVIDE EXPANSION TANK AND SUPPORTS

COMPLETE. MAINTAIN MAINTENANCE CLEARANCE

AND ACCESS TO MAINTENANCE CLEARANCE.

3 CONNECT TO EXISTING PIPING.

4 REINSTALL HOT WATER PUMP AND SUPPORTS

COMPLETE. MAINTAIN MAINTENANCE CLEARANCE

AND ACCESS TO MAINTENANCE CLEARANCE.

5 PROVIDE STEAM TO HOT WATER SHELL AND TUBE

HEAT EXCHANGER. DASHED LINES SHOWN IS THE

COIL PULL FOR THE HEAT EXCHANGER, MAINTAIN

CLEARANCE TO PULL COILS FROM HEAT

EXCHANGERS.

6 PROVIDE CHILLED WATER BYPASS WITH SHUTOFF

VALVE.

7 PROVIDE PRESSURE REDUCING STATION. MAINTAIN

MAINTENANCE CLEARANCE AND ACCESS TO

MAINTENANCE CLEARENCE.

8 PROVIDE STEAM TO HOT WATER SHELL AND TUBE

HEAT EXCHANGER. DASHED LINES SHOWN IS THE

COIL PULL FOR THE HEAT EXCHANGER, MAINTAIN

CLEARANCE TO PULL COILS FROM HEAT

EXCHANGERS.

9 PROVIDE STEAM TO DOMESTIC HOT WATER SHELL

AND TUBE HEAT EXCHANGER. DASHED LINES

SHOWN IS THE COIL PULL FOR THE HEAT

EXCHANGER, MAINTAIN CLEARANCE TO PULL COILS

FROM HEAT EXCHANGERS.

10 PROVIDE ELECTRIC CONDENSATE PUMP WITH

RECIEVER. MAINTAIN MAINTENANCE CLEARANCE

AND ACCESS TO MAINTENANCE CLEARENCE.

11 STERILYZERS SERVING THE SPS MUST REMAIN

OPERATIONAL DURING OPERATIONAL HOURS

THROUGHOUT PROJECT.

13 PROVIDE AIR SEPARATOR AND SUPPORTS

COMPLETE. MAINTAIN MAINTENANCE CLEARANCE

AND ACCESS TO MAINTENANCE CLEARANCE.

14 (4) VFDs FOR HEATING WATER AND CHILLED WATER

PUMPS, INSTALL IN ADJACENT CLOSET.

15 PROVIDE VENT PIPING FOR STEAM SAFETY VALVE

AND STEAM FLASH VENTILATION. RUN VENT PIPING

UP SIDE OF BUILDING AT LEAST 15'. DO NOT RUN

PIPING IN FRONT OF WINDOWS. TERMINATE VENT

PIPING EVEN WITH TOP OF WINDOW LINE.

16 PROVIDE STEAM TEE AND SHUTOFF VALVE FOR

FUTURE CONNECTION.

17 41"X21" LOUVER INSTALLED IN EXISTING OPENING.

CONFIRM SIZE OF EXISTING LOUVER AND WALL

OPENING PRIOR TO ORDERING LOUVER. NEW

LOUVER SIZE SHALL MATCH EXISTING.

18 INSTALL FAN IN EXISTING 34"W X 32"H OPENING

(CONFIRM SIZE IN FIELD). PROVIDE SHEET METAL

INSULATED BLANK-OFF PANELS IN UNUSED

PORTIONS OF OPENINGS.

19 MOTORIZED DAMPER (24 VAC ACTUATOR.)

20 TO 24 VAC ACTUATORS DAMPER AND VALVE

ACTUATORS.

21 TEMPORARILY REMOVE THE STEAM GENERATOR

AND REINSTALL NEARBY, FOLLOWIN

CONSTRUCTION. THE NEW LOCATION SHOULD BE

CLOSE TO THE EXISTING, BUT ADJUSTED TO ALLOW

FOR IMPROVED ACCESSIBILITY TO THE

STERILIZERS. COORDINATE WITH THE VA. EXTEND

CONNECTED PIPING ACCORDINGLY.

1 COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR TO

MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE

PROJECT LIMITS OF WORK.

2 WORK SHALL BE CARRIED OUT SEASONALLY SUCH

THAT THE HOT WATER SYSTEM IS DOWN WHEN THE

BUILDING IS DEMANDING COOLING, AND THE CHILLED

WATER SYSTEM IS DOWN WHEN THE BUILDING IS

DEMANDING HEATING. SUBMIT A DETAILED PHASING

PLAN FOR APPROVAL.

3 THE DOMESTIC WATER SERVICE SHALL REMAIN

OPERATIONAL DURING OCCUPIED HOURS. MOST

BUILDINGS HAVE DOWNTIME DURING WEEKENDS AND

AFTER BUILDING HOURS. BUILDING 7 MUST MAINTAIN

DOMESTIC HOT AND COLD WATER SERVICE DUE TO

PATIENTS RESIDING IN THE BUILDING.

4 FIELD VERIFY THE SIZES OF ALL EXISTING PIPING TO

REMAIN.

5 REPAIR OR REPLACE ALL DAMAGED DUCT AND PIPE

INSULATION DAMAGED DURING THE COURSE OF

WORK. INSULATE ALL UNINSULATED EXISTING PIPING

TO REMAIN PER SPECIFICATIONS.

6 THERE IS POTENTIAL FOR STERILE PROCESSING

SERVICE (SPS) REQUIRED ACCESS TO THE BUILDING

4 MECHANICAL ROOM DURING CONSTRUCTION.

ALLOW FOR COORDINATED ACCESS IF REQUIRED.

0 1 2 4

NORTH

TRUE

0 1 2 4

NORTH

TRUE

Scale: 1/2" = 1'-0"

4 BUILDING 4 CHILLED WATER NEW WORK SECTION

0 1 2 4

Scale: 1/2" = 1'-0"

5 BUILDING 4 HOT WATER SECTION

0 1 2 4

Scale: 1/2" = 1'-0"

6 BUILDING 4 CHILLED WATER SECTION

0 1 2 4

N

AREA OF WORK

SCOPE OUTLINE

BUILDING 4 KEY PLAN

SCALE: NO SCALE

BID DEDUCT #1: DDC CONTROLS (USE LOCAL

CONTROLLERS FOR INDIVIDUAL PIECES OF

EQUIPMENT ONLY).

BID DEDUCT #2: CHILLED WATER FLOW METERS.

4 Progress Issuance 4 Date 4

Sheets
M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS
M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS
M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS
M-601 - MECHANICAL SCHEDULES
MD102 - BUILDING 4 DEMOLITION PLANS