36C24419B0040-0002001.pdf
PDF 904 KB Posted
- Attached to
- Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
- Solicitation number
- 36C24419B0040
About this file
36C24419B0040 0002 M-102.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0185-000.docx | DOCX document | |
| 36C24419B0040-0002004.pdf | ||
| 36C24419B0040-0002000.docx | DOCX document | |
| 36C24419B0040-0002002.pdf | ||
| 36C24419B0040-0002003.pdf | ||
| 36C24419B0040-0002005.pdf | ||
| 36C24419B0040-0001000.docx | DOCX document | |
| 36C24419B0040-0001001.pdf | ||
| 36C24419B0040-008.pdf | ||
| 36C24419B0040-004.pdf | ||
| 36C24419B0040-005.pdf | ||
| 36C24419B0040-001.docx | DOCX document | |
| 36C24419B0040-006.pdf | ||
| 36C24419B0040-003.pdf | ||
| 36C24419B0040-007.pdf | ||
| 36C24419B0040-002.pdf | ||
| 36C24419B0040-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P S I A T ° F
CERTIFIED BY:
M A X I M U M A L L O W A B L E W O R K I N G P R E S S U R E
° F A T P S I
M I N I M U M D E S I G N M E T A L T E M P E R A T U R E
M F G . S / N
Y E A R B U I L T
W
ASME
THERMAFLO INC
P S I A T ° F
CERTIFIED BY:
M A X I M U M A L L O W A B L E W O R K I N G P R E S S U R E
° F A T P S I
M I N I M U M D E S I G N M E T A L T E M P E R A T U R E
M F G . S / N
Y E A R B U I L T
W
ASME
THERMAFLO INC
3 3
4-ET-2
4-ET-1
4-AS-2
M-102
6"HWS
4"HW
S
4"HW
R
6"CHS
4"CHR 6"CHR
4"CHR
6"HWS
4"HWR
M-102
M-102
4-CWP-1
4-CWP-2
4-HWP-2
4-HWP-1
6"HWS
4" H
W S
4"HWR
4"HWR
6" H
W S
6" H
W S
6"CHS
4-CP-1
4-HX-1
4-HX-2
ENSURE INTEGRITY OF EXISTING INSULATION EFFECTED
BY INDICATED ICRA BARRIER. REPAIR ANY DAMAGED INSULATION.
REFER TO AE-101 FOR MORE INFORMATION.
4-EF-MECH
4-EF-VFD
4-DHX-1
DDC
CONTROLLER(S) ,
QUANTITY AS
REQUIRED
4-FT-1
6"HWS
6" H
W S
4-LV-1
INSULATED PLENUM BOX FULL SIZE OF
LOUVER, COVER OPEN END W/ 1/2" WIRE MESH
ROUTE COMMUNICATION LINE
FROM DDC CONTROLS IN
MECHANICAL ROOM TO ETHERNET
SWITCH IN DEDICATED ROOM.
COIL COMMUNICATION LINE AT THE
ROOM. VA PERSONNEL WILL
PERFORM FINAL TIE-IN TO THE
ETHERNET SWITCH. LOCATION OF
SWITCH WILL BE COMMUNICATED
TO AWARDED CONTRACTOR.
ALLOW FOR 100-FOOT RUN.
6" C
H S
4-AS-16"
C
H S
6"CHS
6"CHS
1"
1"
6"
6"
6x6
6x
1.5-HOUR
FIRE DAMPER
TURN DN
TURN DN,
TERMINATE 12"
AFF, COVER WITH
1/2" WIRE MESH
6" H
W S
6"HWS
6"HWR
6" H
W R
7/
8"
LP
R
6 7/8"LPR
4-HX-2
4-HX-1
4-CP-1
5"
LP
S
M-102
M-102
ENSURE INTEGRITY OF EXISTING INSULATION EFFECTED
BY INDICATED ICRA BARRIER. REPAIR ANY DAMAGED
INSULATION. REFER TO AE-101 FOR MORE INFORMATION.
2" V
4" V
4-FT-1
4"MPS
1 1/4"MPS1
1/
4" M
P S
1/
4" M
P S
3/ 4"
M P
S
4"MPS
4-DHX-1
1"MPR
2" P
C
1 1/4"MPS4"MPS
2"
LP
R
2"LPR2"LPR
CAPPED TEE FOR
FUTURE CONNECTION
2"PC
4" M
P S
2"
LP
R
5"
LP
S
5"LPS
4"
LP
S
5"LPS
4"MPS
2"PC
Level 1 0' - 0"
6"CHR
6"CHS6"CHR
6"CHS
5"
LP
S
PRESSURE REDUCING
STATION
BASEMENT LEVEL
0' - 0"
SECOND LEVEL
10' - 0"
STAIR
5' - 9 5/8"
GROUND LEVEL
6' - 8"
Level 1 0' - 0"
B1 Level 1 0' - 0"
B4 Level 1 0' - 0"3
M-102
4-PRS-1
4-EF-MECH
CHILLED WATER FLOW
METER (SEE
SPECIFICATION SECTION
23 09 23, 2.10, D)
4-FT-1
1"MPR
1"LPR
2"LPR
INSTALL FLASH
TANK BENEATH PRV
2"LPR
Level 1 0' - 0"
BASEMENT LEVEL
0' - 0"
SECOND LEVEL
10' - 0"
STAIR
5' - 9 5/8"
GROUND LEVEL
6' - 8"
B1 Level 1 0' - 0"
B4 Level 1 0' - 0"
M-102
2"DCW
5"
LP
S
4-CP-1
1"DCW
44-HWP-2
4-HWP-1
4-HX-2
4-DHX-1
1 1/2"PC
1"MPR1"MPR
Level 1 0' - 0"
BASEMENT LEVEL
0' - 0"
SECOND LEVEL
10' - 0"
STAIR
5' - 9 5/8"
GROUND LEVEL
6' - 8"
Level 1 0' - 0"
B1 Level 1 0' - 0"
B4 Level 1 0' - 0"
4-AS-113
14-CWP-1
6" C
H S
6" C
H S
6"CHS
6"CHS
6"CHS
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
APPLICABLE BID DEDUCTS:
7/
/2
3:
:0
P
M
M-102
BUILDING 4 MECHANICAL ROOM NEW
WORK PLANS
9 23PLH SWR
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
MAY 1, 2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
Scale: 1/2" = 1'-0"
1 BUILDING 4 MECHANICAL ROOM - HYDRONIC NEW WORK
Scale: 1/2" = 1'-0"
2 BUILDING 4 MECHANICAL ROOM - STEAM NEW WORK
1 REINSTALL CHILLED WATER PUMP AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
2 PROVIDE EXPANSION TANK AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
3 CONNECT TO EXISTING PIPING.
4 REINSTALL HOT WATER PUMP AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
5 PROVIDE STEAM TO HOT WATER SHELL AND TUBE
HEAT EXCHANGER. DASHED LINES SHOWN IS THE
COIL PULL FOR THE HEAT EXCHANGER, MAINTAIN
CLEARANCE TO PULL COILS FROM HEAT
EXCHANGERS.
6 PROVIDE CHILLED WATER BYPASS WITH SHUTOFF
VALVE.
7 PROVIDE PRESSURE REDUCING STATION. MAINTAIN
MAINTENANCE CLEARANCE AND ACCESS TO
MAINTENANCE CLEARENCE.
8 PROVIDE STEAM TO HOT WATER SHELL AND TUBE
HEAT EXCHANGER. DASHED LINES SHOWN IS THE
COIL PULL FOR THE HEAT EXCHANGER, MAINTAIN
CLEARANCE TO PULL COILS FROM HEAT
EXCHANGERS.
9 PROVIDE STEAM TO DOMESTIC HOT WATER SHELL
AND TUBE HEAT EXCHANGER. DASHED LINES
SHOWN IS THE COIL PULL FOR THE HEAT
EXCHANGER, MAINTAIN CLEARANCE TO PULL COILS
FROM HEAT EXCHANGERS.
10 PROVIDE ELECTRIC CONDENSATE PUMP WITH
RECIEVER. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARENCE.
11 STERILYZERS SERVING THE SPS MUST REMAIN
OPERATIONAL DURING OPERATIONAL HOURS
THROUGHOUT PROJECT.
13 PROVIDE AIR SEPARATOR AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
14 (4) VFDs FOR HEATING WATER AND CHILLED WATER
PUMPS, INSTALL IN ADJACENT CLOSET.
15 PROVIDE VENT PIPING FOR STEAM SAFETY VALVE
AND STEAM FLASH VENTILATION. RUN VENT PIPING
UP SIDE OF BUILDING AT LEAST 15'. DO NOT RUN
PIPING IN FRONT OF WINDOWS. TERMINATE VENT
PIPING EVEN WITH TOP OF WINDOW LINE.
16 PROVIDE STEAM TEE AND SHUTOFF VALVE FOR
FUTURE CONNECTION.
17 41"X21" LOUVER INSTALLED IN EXISTING OPENING.
CONFIRM SIZE OF EXISTING LOUVER AND WALL
OPENING PRIOR TO ORDERING LOUVER. NEW
LOUVER SIZE SHALL MATCH EXISTING.
18 INSTALL FAN IN EXISTING 34"W X 32"H OPENING
(CONFIRM SIZE IN FIELD). PROVIDE SHEET METAL
INSULATED BLANK-OFF PANELS IN UNUSED
PORTIONS OF OPENINGS.
19 MOTORIZED DAMPER (24 VAC ACTUATOR.)
20 TO 24 VAC ACTUATORS DAMPER AND VALVE
ACTUATORS.
21 TEMPORARILY REMOVE THE STEAM GENERATOR
AND REINSTALL NEARBY, FOLLOWIN
CONSTRUCTION. THE NEW LOCATION SHOULD BE
CLOSE TO THE EXISTING, BUT ADJUSTED TO ALLOW
FOR IMPROVED ACCESSIBILITY TO THE
STERILIZERS. COORDINATE WITH THE VA. EXTEND
CONNECTED PIPING ACCORDINGLY.
1 COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE
PROJECT LIMITS OF WORK.
2 WORK SHALL BE CARRIED OUT SEASONALLY SUCH
THAT THE HOT WATER SYSTEM IS DOWN WHEN THE
BUILDING IS DEMANDING COOLING, AND THE CHILLED
WATER SYSTEM IS DOWN WHEN THE BUILDING IS
DEMANDING HEATING. SUBMIT A DETAILED PHASING
PLAN FOR APPROVAL.
3 THE DOMESTIC WATER SERVICE SHALL REMAIN
OPERATIONAL DURING OCCUPIED HOURS. MOST
BUILDINGS HAVE DOWNTIME DURING WEEKENDS AND
AFTER BUILDING HOURS. BUILDING 7 MUST MAINTAIN
DOMESTIC HOT AND COLD WATER SERVICE DUE TO
PATIENTS RESIDING IN THE BUILDING.
4 FIELD VERIFY THE SIZES OF ALL EXISTING PIPING TO
REMAIN.
5 REPAIR OR REPLACE ALL DAMAGED DUCT AND PIPE
INSULATION DAMAGED DURING THE COURSE OF
WORK. INSULATE ALL UNINSULATED EXISTING PIPING
TO REMAIN PER SPECIFICATIONS.
6 THERE IS POTENTIAL FOR STERILE PROCESSING
SERVICE (SPS) REQUIRED ACCESS TO THE BUILDING
4 MECHANICAL ROOM DURING CONSTRUCTION.
ALLOW FOR COORDINATED ACCESS IF REQUIRED.
0 1 2 4
NORTH
TRUE
0 1 2 4
NORTH
TRUE
Scale: 1/2" = 1'-0"
4 BUILDING 4 CHILLED WATER NEW WORK SECTION
0 1 2 4
Scale: 1/2" = 1'-0"
5 BUILDING 4 HOT WATER SECTION
0 1 2 4
Scale: 1/2" = 1'-0"
6 BUILDING 4 CHILLED WATER SECTION
0 1 2 4
N
AREA OF WORK
SCOPE OUTLINE
BUILDING 4 KEY PLAN
SCALE: NO SCALE
BID DEDUCT #1: DDC CONTROLS (USE LOCAL
CONTROLLERS FOR INDIVIDUAL PIECES OF
EQUIPMENT ONLY).
BID DEDUCT #2: CHILLED WATER FLOW METERS.
4 Progress Issuance 4 Date 4
| Sheets |
| M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS |
| M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS |
| M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS |
| M-601 - MECHANICAL SCHEDULES |
| MD102 - BUILDING 4 DEMOLITION PLANS |
File details come from the government source that posted it.