36C24419B0040-0002003.pdf
PDF 781 KB Posted
- Attached to
- Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
- Solicitation number
- 36C24419B0040
About this file
36C24419B0040 0002 M-107.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0185-000.docx | DOCX document | |
| 36C24419B0040-0002002.pdf | ||
| 36C24419B0040-0002004.pdf | ||
| 36C24419B0040-0002000.docx | DOCX document | |
| 36C24419B0040-0002001.pdf | ||
| 36C24419B0040-0002005.pdf | ||
| 36C24419B0040-0001000.docx | DOCX document | |
| 36C24419B0040-0001001.pdf | ||
| 36C24419B0040-005.pdf | ||
| 36C24419B0040-001.docx | DOCX document | |
| 36C24419B0040-004.pdf | ||
| 36C24419B0040-008.pdf | ||
| 36C24419B0040-006.pdf | ||
| 36C24419B0040-003.pdf | ||
| 36C24419B0040-007.pdf | ||
| 36C24419B0040-002.pdf | ||
| 36C24419B0040-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P S
I A
T
F
C E R T
IF
IE
D
B Y
M A
X I
M U
M
A L
L O
W A
B
E
W O
R K
I N
G
R
E S
S U
R E
F
A T
P S
I
M I
N I
M
D
S I
T
T
M
P E
R A
T U
R E
M F
N
Y E
B
I
L T
WA
S
M E
T H E R
M A F
LO
I N C
P S
I A
T
F
C E R T
IF
IE
D
B Y
M A
X I
M
L O
W A
B
W O
R K
I
E S
S U
R E
F
A T
P S
I
M I
N I
M
D
S I
T
T
M
P E
R A
T U
R E
M F
N
Y E
B
I
L T
WA
S
M E
T H E R
M A F
LO
I N C
A
9-HX-1
9-HX-2
3 3
4 9-HWP-1
9-HWP-2
9-ET-1
9-ET-2
9-AS-1
9-AS-2
9-CWP-2
9-CWP-1
M-107
6"CHS
6"HWS
3"HWS
4"CHS
4"CHR
4"CHR
4"CHS
3"HWS
4" H
W S
4" H
W R
4"HWS
4"HWR
6"HWS
1"HWS
6"CHR
6" C
H S
M-107
M-107
PROVIDE TEMPORARY CHILLED WATER PUMP.
4"HWR
6" C
H S
6" C
H R
A
9-CP-1
9-HX-1
9-HX-2
9 10
3"MPS
5"LPS
3"LPS
3"LPR
2 1/2"PC
M-107
M-107
9-EF-MECH
NEW 36"W X 36"H LOUVER FULL SIZE OF
EXISTING OPENING (CONFIRM SIZE IN FIELD
PRIOR TO ORDERING LOUVER)
36x36 OPEN END
PLENUM BOX ,
COVER DUCT
OPENING W/ 1/2"
WIRE MESH
T
9-FT-1
1"V
4"V
1"MPR
1"MPR
3"LPR
2"LPR1"V
9-DHX-1
3"MPS
1"MPR
1 1/2"PC
9-CP-1
3"LPS
AND 1"LPR
DDC CONTROLLER(S),
QUANTITY AS
REQUIRED
3"LPR
2"LPR
9-LV-1
ROUTE COMMUNICATION LINE FROM
DDC CONTROLS IN MECHANICAL ROOM
TO ETHERNET SWITCH IN DESIGNATED
ROOM. COIL COMMUNICATION LINE AT
THE ROOM. VA PERSONNEL WILL
PERFORM THE FINAL TIE-IN TO THE
ETHERNET SWITCH. LOCATION OF
SWITCH WILL BE COMMUNICATED TO
AWARDED CONTRACTOR. ALLOW FOR
100-FOOT RUN.
FIRST FLOOR
0' - 0"
Level 1 0' - 0"
Level 1 0' - 0"
Level 1 0' - 0"
6"CHS
6"CHR 6"CHS
6" C
H R
6" C
H S
6" C
H R
CHILLED WATER FLOW
METER (SEE
SPECIFICATION SECTION
23 09 23, 2.10, D)
FIRST FLOOR
0' - 0"
A
Level 1 0' - 0"
Level 1 0' - 0"
6" C
H S
6" C
H S
6" C
H S
6" C
H S
6"CHS
6"CHS 6"CHS
6"CHR
Level 1 0' - 0"
M-107
9-CWP-2 9-CWP-1
9-AS-1
3"HWS
1 1
Level 1 0' - 0"
Level 1 0' - 0"
6" H
W S
6" H
W S
5"LPS
9-HWP-2
9-AS-2
9-HX-2
9-HX-1 8
9-DHX-1
2"DHW
2"DCW
1 1/2"PC
6"HWS
6" H
W R
A
3"LPS
STAIRS
B11
TRANSFORMER
B12
CANTEEN
STOCK
ROOM
B13
9-EF-VFD
10x10
CONNECT
DUCT TO
LOUVER
FAN W/
INLET
GUARD
1.5-HOUR
FIRE DAMPER
14x8
OPEN END
DUCT W/ 1/2"
MESH
T
9-CWP-1
9-CWP-2
9-HWP-1
9-HWP-2
REFER TO ICRA DRAWINGS
TO TEMPORARY ACCESS TO
MECHANICAL ROOM DURING
CONSTRUCTION (THRU THIS
STAIRWELL)
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
APPLICABLE BID DEDUCTS:
7/
/2
3:
:1
P
M
M-107
BUILDING 9 MECHANICAL ROOM NEW
WORK PLANS
14 23PLH SWR
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
MAY 1, 2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
Scale: 1/2" = 1'-0"
1 BUILDING 9 MECHANICAL ROOM - HYDRONIC NEW WORK
Scale: 1/2" = 1'-0"
2 BUILDING 9 MECHANICAL ROOM - STEAM NEW WORK
1 PROVIDE CHILLED WATER PUMP AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
2 PROVIDE EXPANSION TANK AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
3 CONNECT TO EXISTING PIPING.
4 PROVIDE HOT WATER PUMP AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
5 PROVIDE VENT PIPING FOR STEAM SAFETY VALVE
AND STEAM FLASH VENTILATION. RUN VENT PIPING
UP SIDE OF BUILDING AT LEAST 15'. DO NOT RUN
PIPING IN FRONT OF WINDOWS. TERMINATE VENT
PIPING EVEN WITH TOP OF WINDOW LINE.
6 PROVIDE CHILLED WATER BYPASS WITH SHUTOFF
VALVE.
7 PROVIDE PRESSURE REDUCING STATION. MAINTAIN
MAINTENANCE CLEARANCE AND ACCESS TO
MAINTENANCE CLEARENCE.
8 PROVIDE STEAM TO HOT WATER SHELL AND TUBE
HEAT EXCHANGER. DASHED LINES SHOWN IS THE
COIL PULL FOR THE HEAT EXCHANGER, MAINTAIN
CLEARANCE TO PULL COILS FROM HEAT
EXCHANGERS.
9 PROVIDE STEAM TO DOMESTIC HOT WATER SHELL
AND TUBE HEAT EXCHANGER. DASHED LINES
SHOWN IS THE COIL PULL FOR THE HEAT
EXCHANGER, MAINTAIN CLEARANCE TO PULL COILS
FROM HEAT EXCHANGERS.
10 PROVIDE ELECTRIC CONDENSATE PUMP WITH
RECIEVER. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARENCE.
11 PROVIDE AIR SEPARATOR AND SUPPORTS
COMPLETE. MAINTAIN MAINTENANCE CLEARANCE
AND ACCESS TO MAINTENANCE CLEARANCE.
12 LOUVERED TRANSFER GRILLE, 24x24 LAY-IN, 14x14
DUCT CONNECTION. COORDINATE EXACT
LOCATION WITH CEILING GRID, LIGHTS, SPRINKLER
HEADS, AND OTHER CEILING DEVICES.
13 COORDINATE EXACT LOCATION OF WALL
PENETRATION WITH PANELS, SWITCHGEAR AND
OTHER ELECTRICAL EQUIPMENT TO ENSURE THAT
DUCT IS NOT ROUTED OVER ELECTRICAL
EQUIPMENT.
14 NEW EXHAUST FAN IN EXISTING 36'W X 36'H
OPENING (CONFIRM SIZE IN FIELD). PROVIDE
INSULATED SHEET METAL BLANK-OFFS IN UNUSED
PORTIONS OF OPENING.
15 VFD FOR NEW PUMP IN MECHANICAL ROOM,
INSTALLED BY ELECTRICAL CONTRACTOR,
PROVIDED BY MECHANICAL CONTRACTOR.
16 TO 24V DAMPER AND VALVE ACTUATORS.
17 MOTORIZED DAMPER (24V ACTUATOR).
18 CONSTRUCTION ACCESS TO THIS ROOM WILL BE
THROUGH A NEW 3' x 7' OPENING IN THIS WALL, VIA
THE STAIRWELL. SEE ARCHITECTURAL PLANS FOR
EXACT LOCATION.
1 COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE
PROJECT LIMITS OF WORK.
2 WORK SHALL BE CARRIED OUT SEASONALLY SUCH
THAT THE HOT WATER SYSTEM IS DOWN WHEN THE
BUILDING IS DEMANDING COOLING, AND THE CHILLED
WATER SYSTEM IS DOWN WHEN THE BUILDING IS
DEMANDING HEATING. SUBMIT A DETAILED PHASING
PLAN FOR APPROVAL.
3 THE DOMESTIC WATER SERVICE SHALL REMAIN
OPERATIONAL DURING OCCUPIED HOURS. MOST
BUILDINGS HAVE DOWNTIME DURING WEEKENDS AND
AFTER BUILDING HOURS. BUILDING 7 MUST MAINTAIN
DOMESTIC HOT AND COLD WATER SERVICE DUE TO
PATIENTS RESIDING IN THE BUILDING.
4 FIELD VERIFY THE SIZES OF ALL EXISTING PIPING TO
REMAIN.
5 REPAIR OR REPLACE ALL DAMAGED DUCT AND PIPE
INSULATION DAMAGED DURING THE COURSE OF
WORK. INSULATE ALL UNINSULATED EXISTING PIPING
TO REMAIN PER SPECIFICATIONS.
6 THERE IS POTENTIAL FOR STERILE PROCESSING
SERVICE (SPS) REQUIRED ACCESS TO THE BUILDING
4 MECHANICAL ROOM DURING CONSTRUCTION.
ALLOW FOR COORDINATED ACCESS IF REQUIRED.
0 2 4 8
N O
R
TH
TRUE
0 2 4 8
N O
R
TH
TRUE
Scale: 1/2" = 1'-0"
4 BUILDING 9 CHILLED WATER BYPASS SECTION
0 1 2 4
Scale: 1/2" = 1'-0"
5 BUILDING 9 CHILLED WATER SECTION
Scale: 1/2" = 1'-0"
6 BUILDING 9 CHILLED WATER SECTION1
0 1 2 4
0 1 2 4
N
AREA OF WORK
SCOPE OUTLINE
BUILDING 9 KEY PLAN
SCALE: NO SCALE
BID DEDUCT #1: DDC CONTROLS (USE LOCAL
CONTROLLERS FOR INDIVIDUAL PIECES OF
EQUIPMENT ONLY).
BID DEDUCT #2: CHILLED WATER FLOW METERS.
Scale: 1/4" = 1'-0"
3 BUILDING 9 - TRANSFORMER ROOM B12 PLAN
0 2 4 8
N O
R
TH
TRUE
| Sheets |
| M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS |
| M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS |
| M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS |
| M-601 - MECHANICAL SCHEDULES |
| MD102 - BUILDING 4 DEMOLITION PLANS |
File details come from the government source that posted it.