36C24419B0040 0002 M-103.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0185-000.docx | DOCX document | |
| 36C24419B0040-0002005.pdf | ||
| 36C24419B0040-0002003.pdf | ||
| 36C24419B0040-0002004.pdf | ||
| 36C24419B0040-0002000.docx | DOCX document | |
| 36C24419B0040-0002001.pdf | ||
| 36C24419B0040-0001000.docx | DOCX document | |
| 36C24419B0040-0001001.pdf | ||
| 36C24419B0040-006.pdf | ||
| 36C24419B0040-003.pdf | ||
| 36C24419B0040-007.pdf | ||
| 36C24419B0040-002.pdf | ||
| 36C24419B0040-005.pdf | ||
| 36C24419B0040-001.docx | DOCX document | |
| 36C24419B0040-004.pdf | ||
| 36C24419B0040-008.pdf | ||
| 36C24419B0040-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CORRIDOR
LOBBY
AIDES CLOSETHOUSEKEEPING
PIMS
SUPPORT
OFFICE
ELEVATOR
SERVICE
ROOM
STORAGE CLOSET
BANK
STORAGE
MECHANICAL
ROOM
OFFICE
CLOSET
OFFICE
PRIVACY
OFFICER
OFFICE
WORKSHOP
CORRIDOR
CLOSET
OFFICE
STORAGE
STAFF
MENS
BATHROOM
LOCKERS
STAFF
WOMENS
BATHROOM
WOMENS
SHIP/REC
ELECTRICAL
CLOSET
OFFICE
MECH ROOMSTORAGE
STORAGE
ELECTRICAL
PANELS
STORAGE
CUBICLES
CUBICLES
STORAGE
CHIEF
HIMS
OFFICE
CUBICLES
MECHANICAL
ROOM
CORRIDOR
ANTE
ROOM
DECONTAMINATION
ROOM
LOCKERS/
SUIT-UP
TOILET/
SHOWER
PROCESSING/
PREP/STERILIZATION
CLEAN
STORE ROOM
CLEAN
HOUSEKEEPING
CART
WASH
BUILDING
STAIR
B02 B07AB14A
B02B
B16A
B10 B09
B12
B12E
B12D
B12A
B12BB12C
B11
B17
B11BB11A
B14B
B08A
B08
B07H
B07K
B07G
B07F
B07
B06A
B05
B05A
B02A
B02F
B02E
B02C
B02
B01
B07M
B07L
BO7C
BO7B
BO7
B071
B07J
2"PC
6"CHS
4"CHR
6"CHR
4"CHR
6"CHS
1 1/2"HWR
1 1/2"HWS
2 1/2"CHR
2 1/2"CHS
TEMPORARY CHILLLED WATER
PUMP SET
EXISTING AHU SERVING SPS AREA
6" C
H R
6" C
H R
4" C
H S
4" C
H R
4" C
H S
4" C
H R
4" C
H R
4-EF-VFD
CORRIDOR
OFFICE
VEST
B07I
MECH.
B07K6x6
6x
24x24 LAY-IN CEILING GRILLE, 8x8 NECK
1.5-HOUR
FIRE DAMPER
8x
COVER OPEN END DUCT
WITH 1/2" WIRE MESH
## KEY NOTES:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
7/
/2
3:
:0
P
M
M-103
BUILDING 4 MECHANICAL TEMPORARY
CHILLED WATER PUMPS AND OVERALL
BUILDING PLANS
10 23PLH SWR
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
MAY 1, 2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
1 COORDINATE ALL WORK WITH THE GENERAL
CONTRACTOR, OTHER TRADES AND THE COR TO
MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE
PROJECT LIMITS OF WORK.
2 WORK SHALL BE CARRIED OUT SEASONALLY SUCH
THAT THE HOT WATER SYSTEM IS DOWN WHEN THE
BUILDING IS DEMANDING COOLING, AND THE CHILLED
WATER SYSTEM IS DOWN WHEN THE BUILDING IS
DEMANDING HEATING. SUBMIT A DETAILED PHASING
PLAN FOR APPROVAL.
3 THE DOMESTIC WATER SERVICE SHALL REMAIN
OPERATIONAL DURING OCCUPIED HOURS. MOST
BUILDINGS HAVE DOWNTIME DURING WEEKENDS AND
AFTER BUILDING HOURS. BUILDING 7 MUST MAINTAIN
DOMESTIC HOT AND COLD WATER SERVICE DUE TO
PATIENTS RESIDING IN THE BUILDING.
4 FIELD VERIFY THE SIZES OF ALL EXISTING PIPING TO
REMAIN.
5 REPAIR OR REPLACE ALL DAMAGED DUCT AND PIPE
INSULATION DAMAGED DURING THE COURSE OF
WORK. INSULATE ALL UNINSULATED EXISTING PIPING
TO REMAIN PER SPECIFICATIONS.
6 THERE IS POTENTIAL FOR STERILE PROCESSING
SERVICE (SPS) REQUIRED ACCESS TO THE BUILDING
4 MECHANICAL ROOM DURING CONSTRUCTION.
ALLOW FOR COORDINATED ACCESS IF REQUIRED.
Scale: 1/16" = 1'-0"
BUILDING 4 CONDENSATE ROUTING AND IT ROOM
LOCATION
1 PUMPED CONDENSATE PIPING CONTINUED ON
2/MH102.
2 PROVIDE PUMPED CONDENSATE PIPING, HANGERS,
AND INSULATION COMPLETE. COORDINATE ROUTING
WITH EXISTING ABOVE-CEILING TRADES.
3 CONNECT PUMPED CONDENSATE PIPING TO
EXISTING CONDENSATE LINE IN STEAM PIT.
4 CONNECT TO EXISTING PIPING.
5 PROVIDE CHILLED WATER BYPASS WITH SHUTOFF
VALVE.
6 CHILLED WATER RETURN PIPING PAST THIS POINT IS
TEMPORARY, TO BE DEMOLISHED FOR NEW WORK.
REFER TO M-102 FOR COMPLETED DESIGN.
N
AREA OF WORK
SCOPE OUTLINE
BUILDING 4 KEY PLAN
SCALE: NO SCALE
Scale: 1/2" = 1'-0"
BUILDING 4 MECHANICAL YARD - TEMPORARY CHILLED
WATER PUMPING
0 1 2 4
NORTH
TRUE
0 8 16 32
NORTH
TRUE
Scale: 1/2" = 1'-0"
BUILDING 4 BASEMENT ENLARGED FLOOR PLAN -
DUCTWORK
4 Progress Issuance 4 Date 4
| Sheets |
| M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS |
| M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS |
| M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS |
| M-601 - MECHANICAL SCHEDULES |
| MD102 - BUILDING 4 DEMOLITION PLANS |