36C24419B0040-0002002.pdf

PDF 242 KB Posted

Attached to
Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
Solicitation number
36C24419B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0040 0002 M-103.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Mechanical Rooms, Project No. 542-18-105, newest first.
File Type Posted
36C24419C0185-000.docx DOCX document
36C24419B0040-0002005.pdf PDF
36C24419B0040-0002003.pdf PDF
36C24419B0040-0002004.pdf PDF
36C24419B0040-0002000.docx DOCX document
36C24419B0040-0002001.pdf PDF
36C24419B0040-0001000.docx DOCX document
36C24419B0040-0001001.pdf PDF
36C24419B0040-006.pdf PDF
36C24419B0040-003.pdf PDF
36C24419B0040-007.pdf PDF
36C24419B0040-002.pdf PDF
36C24419B0040-005.pdf PDF
36C24419B0040-001.docx DOCX document
36C24419B0040-004.pdf PDF
36C24419B0040-008.pdf PDF
36C24419B0040-000.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CORRIDOR

LOBBY

AIDES CLOSETHOUSEKEEPING

PIMS

SUPPORT

OFFICE

ELEVATOR

SERVICE

ROOM

STORAGE CLOSET

BANK

STORAGE

MECHANICAL

ROOM

OFFICE

CLOSET

OFFICE

PRIVACY

OFFICER

OFFICE

WORKSHOP

CORRIDOR

CLOSET

OFFICE

STORAGE

STAFF

MENS

BATHROOM

LOCKERS

STAFF

WOMENS

BATHROOM

WOMENS

SHIP/REC

ELECTRICAL

CLOSET

OFFICE

MECH ROOMSTORAGE

STORAGE

ELECTRICAL

PANELS

STORAGE

CUBICLES

CUBICLES

STORAGE

CHIEF

HIMS

OFFICE

CUBICLES

MECHANICAL

ROOM

CORRIDOR

ANTE

ROOM

DECONTAMINATION

ROOM

LOCKERS/

SUIT-UP

TOILET/

SHOWER

PROCESSING/

PREP/STERILIZATION

CLEAN

STORE ROOM

CLEAN

HOUSEKEEPING

CART

WASH

BUILDING

STAIR

B02 B07AB14A

B02B

B16A

B10 B09

B12

B12E

B12D

B12A

B12BB12C

B11

B17

B11BB11A

B14B

B08A

B08

B07H

B07K

B07G

B07F

B07

B06A

B05

B05A

B02A

B02F

B02E

B02C

B02

B01

B07M

B07L

BO7C

BO7B

BO7

B071

B07J

2"PC

6"CHS

4"CHR

6"CHR

4"CHR

6"CHS

1 1/2"HWR

1 1/2"HWS

2 1/2"CHR

2 1/2"CHS

TEMPORARY CHILLLED WATER

PUMP SET

EXISTING AHU SERVING SPS AREA

6" C

H R

6" C

H R

4" C

H S

4" C

H R

4" C

H S

4" C

H R

4" C

H R

4-EF-VFD

CORRIDOR

OFFICE

VEST

B07I

MECH.

B07K6x6

6x

24x24 LAY-IN CEILING GRILLE, 8x8 NECK

1.5-HOUR

FIRE DAMPER

8x

COVER OPEN END DUCT

WITH 1/2" WIRE MESH

## KEY NOTES:

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

7/

/2

3:

:0

P

M

M-103

BUILDING 4 MECHANICAL TEMPORARY

CHILLED WATER PUMPS AND OVERALL

BUILDING PLANS

10 23PLH SWR

RENOVATE MECHANICAL

ROOMS & EQUIPMENT

PHASE 1

1400 BLACKHORSE HILL RD

COATESVILLE, PA 19320

MAY 1, 2019

100% CONSTRUCTION DOCUMENTS

542-18-10517-251

1 COORDINATE ALL WORK WITH THE GENERAL

CONTRACTOR, OTHER TRADES AND THE COR TO

MINIMIZE DISRUPTION OF AREAS OUTSIDE OF THE

PROJECT LIMITS OF WORK.

2 WORK SHALL BE CARRIED OUT SEASONALLY SUCH

THAT THE HOT WATER SYSTEM IS DOWN WHEN THE

BUILDING IS DEMANDING COOLING, AND THE CHILLED

WATER SYSTEM IS DOWN WHEN THE BUILDING IS

DEMANDING HEATING. SUBMIT A DETAILED PHASING

PLAN FOR APPROVAL.

3 THE DOMESTIC WATER SERVICE SHALL REMAIN

OPERATIONAL DURING OCCUPIED HOURS. MOST

BUILDINGS HAVE DOWNTIME DURING WEEKENDS AND

AFTER BUILDING HOURS. BUILDING 7 MUST MAINTAIN

DOMESTIC HOT AND COLD WATER SERVICE DUE TO

PATIENTS RESIDING IN THE BUILDING.

4 FIELD VERIFY THE SIZES OF ALL EXISTING PIPING TO

REMAIN.

5 REPAIR OR REPLACE ALL DAMAGED DUCT AND PIPE

INSULATION DAMAGED DURING THE COURSE OF

WORK. INSULATE ALL UNINSULATED EXISTING PIPING

TO REMAIN PER SPECIFICATIONS.

6 THERE IS POTENTIAL FOR STERILE PROCESSING

SERVICE (SPS) REQUIRED ACCESS TO THE BUILDING

4 MECHANICAL ROOM DURING CONSTRUCTION.

ALLOW FOR COORDINATED ACCESS IF REQUIRED.

Scale: 1/16" = 1'-0"

BUILDING 4 CONDENSATE ROUTING AND IT ROOM

LOCATION

1 PUMPED CONDENSATE PIPING CONTINUED ON

2/MH102.

2 PROVIDE PUMPED CONDENSATE PIPING, HANGERS,

AND INSULATION COMPLETE. COORDINATE ROUTING

WITH EXISTING ABOVE-CEILING TRADES.

3 CONNECT PUMPED CONDENSATE PIPING TO

EXISTING CONDENSATE LINE IN STEAM PIT.

4 CONNECT TO EXISTING PIPING.

5 PROVIDE CHILLED WATER BYPASS WITH SHUTOFF

VALVE.

6 CHILLED WATER RETURN PIPING PAST THIS POINT IS

TEMPORARY, TO BE DEMOLISHED FOR NEW WORK.

REFER TO M-102 FOR COMPLETED DESIGN.

N

AREA OF WORK

SCOPE OUTLINE

BUILDING 4 KEY PLAN

SCALE: NO SCALE

Scale: 1/2" = 1'-0"

BUILDING 4 MECHANICAL YARD - TEMPORARY CHILLED

WATER PUMPING

0 1 2 4

NORTH

TRUE

0 8 16 32

NORTH

TRUE

Scale: 1/2" = 1'-0"

BUILDING 4 BASEMENT ENLARGED FLOOR PLAN -

DUCTWORK

4 Progress Issuance 4 Date 4

Sheets
M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS
M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS
M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS
M-601 - MECHANICAL SCHEDULES
MD102 - BUILDING 4 DEMOLITION PLANS

File details come from the government source that posted it.