36C24419B0040-0002004.pdf
PDF 135 KB Posted
- Attached to
- Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
- Solicitation number
- 36C24419B0040
About this file
36C24419B0040 0002 M-601.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0185-000.docx | DOCX document | |
| 36C24419B0040-0002001.pdf | ||
| 36C24419B0040-0002005.pdf | ||
| 36C24419B0040-0002000.docx | DOCX document | |
| 36C24419B0040-0002002.pdf | ||
| 36C24419B0040-0002003.pdf | ||
| 36C24419B0040-0001000.docx | DOCX document | |
| 36C24419B0040-0001001.pdf | ||
| 36C24419B0040-008.pdf | ||
| 36C24419B0040-006.pdf | ||
| 36C24419B0040-003.pdf | ||
| 36C24419B0040-007.pdf | ||
| 36C24419B0040-002.pdf | ||
| 36C24419B0040-004.pdf | ||
| 36C24419B0040-005.pdf | ||
| 36C24419B0040-001.docx | DOCX document | |
| 36C24419B0040-000.docx | DOCX document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER:
Date Checked Drawn
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
7/
/2
3:
:1
P
M
M-601
MECHANICAL SCHEDULES
22 23PLH PLH
RENOVATE MECHANICAL
ROOMS & EQUIPMENT
PHASE 1
1400 BLACKHORSE HILL RD
COATESVILLE, PA 19320
MAY 1, 2019
100% CONSTRUCTION DOCUMENTS
542-18-10517-251
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. 100% REDUNDANT STANDBY HEAT EXCHANGER.
3. PACKAGED, STEAM-TO-WATER ZERO-FLASH DOMESTIC WATER HEATER, COMPLETE WITH SHELL-AND-TUBE HEAT EXCHANGER (WATER IN SHELL, STEAM IN TUBES), ELECTRONIC CONTROLLER, MODULATING STEAM CONTROL VALVE (100:1 TURNDOWN), FLOAT & THERMOSTATIC STEAM
TRAP, TEMPERATURE AND PRESSURE GAUGES, RELIEF VALVES, SOLENOID DUMP VALVE, RECIRCULATION PUMP, VACUUM BREAKER, AND CARBON STEEL STAND. FULLY FACTORY ASSEMBLED AND TESTED.
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. VALVE SHALL BE PILOT OPERATED WITH AN ELECTRIC PILOT OVERRIDE. POWER CONNECTION SHALL BE 115VAC
3. PRESSURE REDUCING VALVES SHALL BE INSTALLED IN A 1/3-2/3 ARRANGEMENT.
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. PROVIDE WITH ELECTRIC MODULATING ACTUATOR, 24 VAC ACTUATOR.
3. VALVE SHALL HAVE HAND WHEEL MANUAL OVERRIDE.
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. THE SECOND PUMP IN THE DUPLEX ARRANGEMENT IS 100% REDUNDANT STANDBY. ONLY ONE PUMP SHALL OPERATE AT A TIME.
3. PROVIDE THE FOLLOWING: NEAM 1 ELECTRICAL ENCLOSURES AND OPEN DRIP PROOF MOTORS, RECEIVER-MOUNTED CONTROL PANEL WITH DISCONNECT SWITCH (WITH COVER INTERLOCK), FUSE BLOCKS WITH FUSES, MAGNETIC STARTERS WITH 3rd LEG OVERLOAD PROTECTION, H-O-A SELECTOR SWITCHES, FUSED CONTROL CIRCUIT TRANSFORMER, HIGH ALARM WITH SILENCING SWITCH AND NUMBERED TERMINAL STRIP, GROUNDING
LUG, AND SMART RELAY.
4. PROVIDE HIGH TEMPERATURE PUMP.
9-CP-1 BUILDING 9 MER BLDG 9 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
8-CP-1 BUILDING 8 MER BLDG 8 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
7-CP-1 BUILDING 7 MER BLDG 7 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
6-CP-1 BUILDING 6 MER BLDG 6 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
4-CP-1 BUILDING 4 MER BLDG 4 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3
GPM PSIG GAL HP
NOMINAL POWER EACH
PHASE VOLT RPM
MARK LOCATION SYSTEM AND/OR SERVICE TYPE UNIT
FLOW EACH PUMP DISCHARGE PRESSURE MIN RECEIVER SIZE
MOTOR
BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS
STEAM CONDENSATE PUMP SCHEDULE
9-TC... BUILDING 9... 9-HX-2 (2/3) 1355 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
9-TCV-3 BUILDING 9 MER 9-HX-2 (1/3) 680 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
9-TCV-2 BUILDING 9 MER 9-HX-1 (2/3) 1355 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
9-TCV-1 BUILDING 9 MER 9-HX-1 (1/3) 680 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
7-TCV-4 BUILDING 7 MER 7-HX-2 (2/3) 1460 2-1/2 CAST IRON 73 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
7-TCV-3 BUILDING 7 MER 7-HX-2 (1/3) 730 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
7-TCV-2 BUILDING 7 MER 7-HX-1 (2/3) 1460 2-1/2 CAST IRON 73 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
7-TCV-1 BUILDING 7 MER 7-HX-1 (1/3) 730 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
4-TCV-4 BUILDING 4 MER 4-HX-2 (2/3) 1590 3 CAST IRON 116 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
4-TCV-3 BUILDING 4 MER 4-HX-2 (1/3) 795 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
4-TCV-2 BUILDING 4 MER 4-HX-1 (2/3) 1590 3 CAST IRON 116 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
4-TCV-1 BUILDING 4 MER 4-HX-1 (1/3) 795 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5
SPIRAX SARCO
SPIRA-TROL
1, 2, 3
LBS/HR IN PSIG PSIG
SIZE
BODY MATERIAL RATED Cv MODEL TRIM
IN OUTMARK LOCATION SYSTEM AND/OR SERVICE
FLOW RATE
VALVE BODY (TWO-PORT VALVE) PRESSURE
BASIS OF DESIGN REMARKS
TEMPERATURE CONTROL VALVE (STEAM) SCHEDULE
9-PRV... BUILDING 9... BUILDING 9 STEAM - 2/3 1900 3500 2 50 15 SPIRAX SARCO 25P 1, 2, 3
9-PRV... BUILDING 9... BUILDING 9 STEAM - 1/3 950 1400 1-1/4 50 15 SPIRAX SARCO 25P 1, 2, 3
7-PRV... BUILDING 7... BUILDING 7 STEAM - 2/3 2100 3500 2 50 15 SPIRAX SARCO 25P 1, 2, 3
7-PRV... BUILDING 7... BUILDING 7 STEAM - 1/3 1050 1400 1-1/4 50 15 SPIRAX SARCO 25P 1, 2, 3
4-PRV... BUILDING 4... BUILDING 4 STEAM - 2/3 2190 3500 2 50 15 SPIRAX SARCO 25P 1, 2, 3
4-PRV... BUILDING 4... BUILDING 4 STEAM - 1/3 1095 1400 1-1/4 50 15 SPIRAX SARCO 25P 1, 2, 3
LBS/HR LBS/HR IN PSIG PSIG
IN OUTMARK LOCATION SYSTEM AND/OR SERVICE
REQUIRED CAPACITY MAX FLOW WIDE OPEN VALVE VALVE SIZE
PRESSURE
BASIS OF DESIGN REMARKS
STEAM PRESSURE REDUCING VALVE SCHEDULE
9-HX-2 BUILDING 9 MER BUILDING 9 HEATING WATER
SHELL &
TUBE
260 174.5 190 2.1 20 5 2030 10 3 9-ST-2 4060 ARMSTRONG WS-3H-1003-200E-4 1, 2
9-HX-1 BUILDING 9 MER BUILDING 9 HEATING WATER
SHELL &
TUBE
260 174.5 190 2.1 20 5 2030 10 3 9-ST-1 4060 ARMSTRONG WS-3H-1003-200E-4 1
9-DHX-1 BUILDING 9 MER BUILDING 9 DOMESTIC WATER PACKAGED 40 50 140 --- 50 2 1857 8 4 --- 3714 THERMAFLO TH750ZX-8-48DW 1, 3
8-DHX-1 BUILDING 8 MER BUILDING 8 DOMESTIC WATER PACKAGED 35 50 140 --- 50 2 1624 8 3 --- 3248 THERMAFLO TH750ZX-8-36DW 1, 3
7-HX-2 BUILDING 7 MER BUILDING 7 HEATING WATER
SHELL &
TUBE
280 174.5 190 3 20 5 2190 10 4 7-ST-2 4580 ARMSTRONG WS-3H-1004-200E-4 1, 2
7-HX-1 BUILDING 7 MER BUILDING 7 HEATING WATER
SHELL &
TUBE
280 174.5 190 3 20 5 2190 10 4 7-ST-1 4580 ARMSTRONG WS-3H-1004-200E-4 1
7-DHX-1 BUILDING 7 MER BUILDING 7 DOMESTIC WATER PACKAGED 35 50 140 --- 50 2 1624 8 3 --- 3248 THERMAFLO TH750ZX-8-36DW 1, 3
6-DHX-1 BUILDING 6 MER BUILDING 6 DOMESTIC WATER PACKAGED 35 50 140 --- 50 2 1624 8 3 --- 3248 THERMAFLO TH750ZX-8-36DW 1, 3
4-HX-2 BUILDING 4 MER BUILDING 4 HEATING WATER
SHELL &
TUBE
305 174.5 190 14.0 20 5 2380 12 3 4-ST-2 4760 ARMSTRONG WS-3H-1203-200E-4 1, 2
4-HX-1 BUILDING 4 MER BUILDING 4 HEATING WATER
SHELL &
TUBE
305 174.5 190 14.0 20 5 2380 12 3 4-ST-1 4760 ARMSTRONG WS-3H-1203-200E-4 1
4-DHX-1 BUILDING 4 MER BUILDING 4 DOMESTIC WATER PACKAGED 30 40 140 --- 50 2 1393 8 3 --- 2786 THERMAFLO TH750ZX-8-36DW 1, 3
2-DHX-1 BUILDING 2 MER BUILDING 2 DOMESTIC WATER PACKAGED 42 50 140 --- 50 2 1950 8 4 --- 3900 THERMAFLO TH750ZX-8-48DW 1, 3
GPM °F °F FT PSIG PSIG LBS/HR IN FEET LBS/HR
FLOW EWT LWT WPD ENT CONTROL VALVE ENT HEAT EXCHANGER
TRAP #
CAPACITYMARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE
WATER CONDITIONS STEAM PRESSURE
CONTROL VALVE SHELL DIAMETER TUBE LENGTH
TRAP
BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS
STEAM TO WATER HEAT EXCHANGER SCHEDULE
--- ALL BLDGS LPS DRIPS 665 1 20 INVERTED BUCKET 1/2-3/4 SPIRAX SARCO B1H-15 1
--- ALL BLDGS MPS DRIPS 905 10 60 INVERTED BUCKET 1/2-3/4 SPIRAX SARCO B1H-75 1
9-ST-3 BUILDING 9 9-HX-2 4060 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1
9-ST-2 BUILDING 9 9-HX-1 4060 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1
7-ST-2 BUILDING 7 7-HX-2 4580 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1
7-ST-1 BUILDING 7 7-HX-1 4580 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1
4-ST-2 BUILDING 4 4-HX-2 4760 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1
4-ST-1 BUILDING 4 4-HX-1 4760 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1
LBS/HR PSI PSI IN
MARK LOCATION SYSTEM AND/OR SERVICE
TRAP CAPACITY SIZING ∆P MAX INLET PRESS
TRAP TYPE
TRAP SIZE
BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS
STEAM TRAP SCHEDULE
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. INSTALL ON NEW POURED-IN-PLACE CONCRETE PAD AND 1" DEFLECTION SPRING ISOLATORS.
2. PROVIDE END SUCTION DIFFUSER WITH REMOVABLE BRONZE STRAINER.
3. PROVIDE INVERTER DUTY PREMIUM EFFICIENCY MOTOR. PROVIDE VFD WITH BYPASS.
4. 100% REDUNDANT STANDBY PUMP.
9-HWP-2 BUILDING 9 MER BUILDING 9 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 260 50 17.9 1 63 7.5 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2BD 1, 2, 3, 4
9-HWP-1 BUILDING 9 MER BUILDING 9 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 260 50 17.9 1 63 7.5 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2BD 1, 2, 3
9-CWP-2 BUILDING 9 MER BUILDING 9 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 260 70 7.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4
9-CWP-1 BUILDING 9 MER BUILDING 9 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 260 70 7.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3
7-HWP-2 BUILDING 7 MER BUILDING 7 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 280 85 11.9 1 72 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2EB 1, 2, 3, 4
7-HWP-1 BUILDING 7 MER BUILDING 7 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 280 85 11.9 1 72 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2EB 1, 2, 3
7-CWP-2 BUILDING 7 MER BUILDING 7 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 295 100 14 1 66 15 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2GB 1, 2, 3, 4
7-CWP-1 BUILDING 7 MER BUILDING 7 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 295 100 14 1 66 15 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2GB 1, 2, 3
4-HWP-2 BUILDING 4 MER BUILDING 4 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 305 71 8.65 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4
4-HWP-1 BUILDING 4 MER BUILDING 4 HEATING WATER
BASE MOUNTED END
SUCTION
WATER 305 71 8.65 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3
4-CWP-2 BUILDING 4 MER BUILDING 4 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 325 77 9.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4
4-CWP-1 BUILDING 4 MER BUILDING 4 CHILLED WATER
BASE MOUNTED END
SUCTION
WATER 325 77 9.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3
GPM FT FT HP
FLUID
FLOW HEAD NPSH REQUIRED
SP GR
NOMINAL POWER
PHASE VOLT MAX RPM SPEED CONTROL
MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE
CIRCULATING FLUID
MIN % EFF
ELECTRICAL MOTOR
BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS
HYDRONIC PUMP SCHEDULE
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. MAXIMUM WORKING PRESSURE IS AT 200 DEGREES F. WORKING PRESSURE.
3. INITIAL FILTER USED FOR CLEANING SYSTEM SHALL BE A 20 MICRON PLEATED FILTER. AFTER SYSTEM IS CLEAN, INSTALL
A 5 MICRON PLEATED FILTER FOR USE DURING SYSTEM OPERATION.
9-CF-2 BUILDING 9 MER CHILLED WATER
CARTRIDGE FILTER
FEEDER
5 300 NEPTUNE VTFC-5-1 1, 2, 3
9-CF-1 BUILDING 9 MER CHILLED WATER
CARTRIDGE FILTER
FEEDER
5 300 NEPTUNE VTFC-5-1 1, 2, 3
7-CF-2 BUILDING 7 MER HEATING WATER
CARTRIDGE FILTER
FEEDER
5 300 NEPTUNE VTFC-5-1 1, 2, 3
7-CF-1 BUILDING 7 MER CHILLED WATER
CARTRIDGE FILTER
FEEDER
5 300 NEPTUNE VTFC-5-1 1, 2, 3
4-CF-2 BUILDING 4 MER HEATING WATER
CARTRIDGE FILTER
FEEDER
5 300 NEPTUNE VTFC-5-1 1, 2, 3
4-CF-1 BUILDING 4 MER CHILLED WATER
CARTRIDGE FILTER
FEEDER
5 300 NEPTUNE VTFC-5-1 1, 2, 3
GALLONS PSIG
MARK LOCATION SYSTEM AND/OR SERVICE TYPE
CAPACITY MAX PRESSURE
BASIS OF DESIGN REMARKS
BYPASS CHEMICAL FEEDER SCHEDULE
9-BFP-2 BLDG 9 MER BLDG 9 HEATING WATER MAKEUP
REDUCED PRESSURE
PRINCIPLE
3/4 3/4
ZURN WILKINS MODEL
975XL2
9-BFP-1 BLDG 9 MER BLDG 9 CHILLED WATER MAKEUP
REDUCED PRESSURE
PRINCIPLE
3/4 3/4
ZURN WILKINS MODEL
975XL2
7-BFP-3 BLDG 7 MER BLDG 7 HEATING WATER MAKEUP
REDUCED PRESSURE
PRINCIPLE
3/4 3/4
ZURN WILKINS MODEL
975XL2
7-BFP-2 BLDG 7 MER BLDG 7 CHILLED WATER MAKEUP
REDUCED PRESSURE
PRINCIPLE
3/4 3/4
ZURN WILKINS MODEL
975XL2
7-BFP-1 BLDG 7 MER BLDG 7 DOMESTIC COLD WATER
REDUCED PRESSURE
PRINCIPLE
3 3 ZURN WILKINS MODEL 375 1
4-BFP-3 BLDG 4 MER BLDG 4 HEATING WATER MAKEUP
REDUCED PRESSURE
PRINCIPLE
3/4 3/4
ZURN WILKINS MODEL
975XL2
4-BFP-2 BLDG 4 MER BLDG 4 CHILLED WATER MAKEUP
REDUCED PRESSURE
PRINCIPLE
3/4 3/4
ZURN WILKINS MODEL
975XL2
4-BFP-1 BLDG 4 MER BLDG 4 DOMESTIC COLD WATER
REDUCED PRESSURE
PRINCIPLE
3 3 ZURN WILKINS MODEL 375 1
PSIG IN PSIG IN
MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE
INLET PRESSURE INLET SIZE OUTLET PRESSURE OUTLET SIZE
BASIS OF DESIGN
REMARKS
BACKFLOW PREVENTER SCHEDULE
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
9-FT-1 BUILDING 9 MER BUILDING 9 250 36 8 ARMSTRONG HAFT-8 1, 2
7-FT-1 BUILDING 7 MER BUILDING 7 300 36 8 ARMSTRONG HAFT-8 1, 2
6-FT-1 BUILDING 6 MER BUILDING 6 275 36 8 ARMSTRONG HAFT-8 1, 2
4-FT-1 BUILDING 4 MER BUILDING 4 300 36 8 ARMSTRONG HAFT-8 1, 2
LBS/HR IN IN
LENGTH WIDTHMARK LOCATION SYSTEM AND/OR SERVICE
EST FLASH STEAM
DIMENSIONS
BASIS OF DESIGN REMARKS
FLASH TANK SCHEDULE
REMARKS:
1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
2. TANK SHALL BE ASME STAMPED TO 150 PSIG.
4 Progress Issuance 4 Date 4
| Sheets |
| M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS |
| M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS |
| M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS |
| M-601 - MECHANICAL SCHEDULES |
| MD102 - BUILDING 4 DEMOLITION PLANS |