36C24419B0040-0002004.pdf

PDF 135 KB Posted

Attached to
Replace Mechanical Rooms, Project No. 542-18-105 Federal contract opportunity
Solicitation number
36C24419B0040
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0040 0002 M-601.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Mechanical Rooms, Project No. 542-18-105, newest first.
File Type Posted
36C24419C0185-000.docx DOCX document
36C24419B0040-0002001.pdf PDF
36C24419B0040-0002005.pdf PDF
36C24419B0040-0002000.docx DOCX document
36C24419B0040-0002002.pdf PDF
36C24419B0040-0002003.pdf PDF
36C24419B0040-0001000.docx DOCX document
36C24419B0040-0001001.pdf PDF
36C24419B0040-008.pdf PDF
36C24419B0040-006.pdf PDF
36C24419B0040-003.pdf PDF
36C24419B0040-007.pdf PDF
36C24419B0040-002.pdf PDF
36C24419B0040-004.pdf PDF
36C24419B0040-005.pdf PDF
36C24419B0040-001.docx DOCX document
36C24419B0040-000.docx DOCX document
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revisions: Date

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

7/

/2

3:

:1

P

M

M-601

MECHANICAL SCHEDULES

22 23PLH PLH

RENOVATE MECHANICAL

ROOMS & EQUIPMENT

PHASE 1

1400 BLACKHORSE HILL RD

COATESVILLE, PA 19320

MAY 1, 2019

100% CONSTRUCTION DOCUMENTS

542-18-10517-251

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. 100% REDUNDANT STANDBY HEAT EXCHANGER.

3. PACKAGED, STEAM-TO-WATER ZERO-FLASH DOMESTIC WATER HEATER, COMPLETE WITH SHELL-AND-TUBE HEAT EXCHANGER (WATER IN SHELL, STEAM IN TUBES), ELECTRONIC CONTROLLER, MODULATING STEAM CONTROL VALVE (100:1 TURNDOWN), FLOAT & THERMOSTATIC STEAM

TRAP, TEMPERATURE AND PRESSURE GAUGES, RELIEF VALVES, SOLENOID DUMP VALVE, RECIRCULATION PUMP, VACUUM BREAKER, AND CARBON STEEL STAND. FULLY FACTORY ASSEMBLED AND TESTED.

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. VALVE SHALL BE PILOT OPERATED WITH AN ELECTRIC PILOT OVERRIDE. POWER CONNECTION SHALL BE 115VAC

3. PRESSURE REDUCING VALVES SHALL BE INSTALLED IN A 1/3-2/3 ARRANGEMENT.

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. PROVIDE WITH ELECTRIC MODULATING ACTUATOR, 24 VAC ACTUATOR.

3. VALVE SHALL HAVE HAND WHEEL MANUAL OVERRIDE.

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. THE SECOND PUMP IN THE DUPLEX ARRANGEMENT IS 100% REDUNDANT STANDBY. ONLY ONE PUMP SHALL OPERATE AT A TIME.

3. PROVIDE THE FOLLOWING: NEAM 1 ELECTRICAL ENCLOSURES AND OPEN DRIP PROOF MOTORS, RECEIVER-MOUNTED CONTROL PANEL WITH DISCONNECT SWITCH (WITH COVER INTERLOCK), FUSE BLOCKS WITH FUSES, MAGNETIC STARTERS WITH 3rd LEG OVERLOAD PROTECTION, H-O-A SELECTOR SWITCHES, FUSED CONTROL CIRCUIT TRANSFORMER, HIGH ALARM WITH SILENCING SWITCH AND NUMBERED TERMINAL STRIP, GROUNDING

LUG, AND SMART RELAY.

4. PROVIDE HIGH TEMPERATURE PUMP.

9-CP-1 BUILDING 9 MER BLDG 9 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3

8-CP-1 BUILDING 8 MER BLDG 8 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3

7-CP-1 BUILDING 7 MER BLDG 7 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3

6-CP-1 BUILDING 6 MER BLDG 6 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3

4-CP-1 BUILDING 4 MER BLDG 4 STEAM DUPLEX 22.5 20 21 1/2 3 208 3500 SPIRAX SARCO VNS152 1, 2, 3

GPM PSIG GAL HP

NOMINAL POWER EACH

PHASE VOLT RPM

MARK LOCATION SYSTEM AND/OR SERVICE TYPE UNIT

FLOW EACH PUMP DISCHARGE PRESSURE MIN RECEIVER SIZE

MOTOR

BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS

STEAM CONDENSATE PUMP SCHEDULE

9-TC... BUILDING 9... 9-HX-2 (2/3) 1355 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

9-TCV-3 BUILDING 9 MER 9-HX-2 (1/3) 680 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

9-TCV-2 BUILDING 9 MER 9-HX-1 (2/3) 1355 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

9-TCV-1 BUILDING 9 MER 9-HX-1 (1/3) 680 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

7-TCV-4 BUILDING 7 MER 7-HX-2 (2/3) 1460 2-1/2 CAST IRON 73 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

7-TCV-3 BUILDING 7 MER 7-HX-2 (1/3) 730 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

7-TCV-2 BUILDING 7 MER 7-HX-1 (2/3) 1460 2-1/2 CAST IRON 73 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

7-TCV-1 BUILDING 7 MER 7-HX-1 (1/3) 730 1-1/2 CAST IRON 29 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

4-TCV-4 BUILDING 4 MER 4-HX-2 (2/3) 1590 3 CAST IRON 116 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

4-TCV-3 BUILDING 4 MER 4-HX-2 (1/3) 795 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

4-TCV-2 BUILDING 4 MER 4-HX-1 (2/3) 1590 3 CAST IRON 116 LEA33PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

4-TCV-1 BUILDING 4 MER 4-HX-1 (1/3) 795 2 CAST IRON 42 LEA31PTSUSS.2 EQUAL % SOFT SEAT 15 5

SPIRAX SARCO

SPIRA-TROL

1, 2, 3

LBS/HR IN PSIG PSIG

SIZE

BODY MATERIAL RATED Cv MODEL TRIM

IN OUTMARK LOCATION SYSTEM AND/OR SERVICE

FLOW RATE

VALVE BODY (TWO-PORT VALVE) PRESSURE

BASIS OF DESIGN REMARKS

TEMPERATURE CONTROL VALVE (STEAM) SCHEDULE

9-PRV... BUILDING 9... BUILDING 9 STEAM - 2/3 1900 3500 2 50 15 SPIRAX SARCO 25P 1, 2, 3

9-PRV... BUILDING 9... BUILDING 9 STEAM - 1/3 950 1400 1-1/4 50 15 SPIRAX SARCO 25P 1, 2, 3

7-PRV... BUILDING 7... BUILDING 7 STEAM - 2/3 2100 3500 2 50 15 SPIRAX SARCO 25P 1, 2, 3

7-PRV... BUILDING 7... BUILDING 7 STEAM - 1/3 1050 1400 1-1/4 50 15 SPIRAX SARCO 25P 1, 2, 3

4-PRV... BUILDING 4... BUILDING 4 STEAM - 2/3 2190 3500 2 50 15 SPIRAX SARCO 25P 1, 2, 3

4-PRV... BUILDING 4... BUILDING 4 STEAM - 1/3 1095 1400 1-1/4 50 15 SPIRAX SARCO 25P 1, 2, 3

LBS/HR LBS/HR IN PSIG PSIG

IN OUTMARK LOCATION SYSTEM AND/OR SERVICE

REQUIRED CAPACITY MAX FLOW WIDE OPEN VALVE VALVE SIZE

PRESSURE

BASIS OF DESIGN REMARKS

STEAM PRESSURE REDUCING VALVE SCHEDULE

9-HX-2 BUILDING 9 MER BUILDING 9 HEATING WATER

SHELL &

TUBE

260 174.5 190 2.1 20 5 2030 10 3 9-ST-2 4060 ARMSTRONG WS-3H-1003-200E-4 1, 2

9-HX-1 BUILDING 9 MER BUILDING 9 HEATING WATER

SHELL &

TUBE

260 174.5 190 2.1 20 5 2030 10 3 9-ST-1 4060 ARMSTRONG WS-3H-1003-200E-4 1

9-DHX-1 BUILDING 9 MER BUILDING 9 DOMESTIC WATER PACKAGED 40 50 140 --- 50 2 1857 8 4 --- 3714 THERMAFLO TH750ZX-8-48DW 1, 3

8-DHX-1 BUILDING 8 MER BUILDING 8 DOMESTIC WATER PACKAGED 35 50 140 --- 50 2 1624 8 3 --- 3248 THERMAFLO TH750ZX-8-36DW 1, 3

7-HX-2 BUILDING 7 MER BUILDING 7 HEATING WATER

SHELL &

TUBE

280 174.5 190 3 20 5 2190 10 4 7-ST-2 4580 ARMSTRONG WS-3H-1004-200E-4 1, 2

7-HX-1 BUILDING 7 MER BUILDING 7 HEATING WATER

SHELL &

TUBE

280 174.5 190 3 20 5 2190 10 4 7-ST-1 4580 ARMSTRONG WS-3H-1004-200E-4 1

7-DHX-1 BUILDING 7 MER BUILDING 7 DOMESTIC WATER PACKAGED 35 50 140 --- 50 2 1624 8 3 --- 3248 THERMAFLO TH750ZX-8-36DW 1, 3

6-DHX-1 BUILDING 6 MER BUILDING 6 DOMESTIC WATER PACKAGED 35 50 140 --- 50 2 1624 8 3 --- 3248 THERMAFLO TH750ZX-8-36DW 1, 3

4-HX-2 BUILDING 4 MER BUILDING 4 HEATING WATER

SHELL &

TUBE

305 174.5 190 14.0 20 5 2380 12 3 4-ST-2 4760 ARMSTRONG WS-3H-1203-200E-4 1, 2

4-HX-1 BUILDING 4 MER BUILDING 4 HEATING WATER

SHELL &

TUBE

305 174.5 190 14.0 20 5 2380 12 3 4-ST-1 4760 ARMSTRONG WS-3H-1203-200E-4 1

4-DHX-1 BUILDING 4 MER BUILDING 4 DOMESTIC WATER PACKAGED 30 40 140 --- 50 2 1393 8 3 --- 2786 THERMAFLO TH750ZX-8-36DW 1, 3

2-DHX-1 BUILDING 2 MER BUILDING 2 DOMESTIC WATER PACKAGED 42 50 140 --- 50 2 1950 8 4 --- 3900 THERMAFLO TH750ZX-8-48DW 1, 3

GPM °F °F FT PSIG PSIG LBS/HR IN FEET LBS/HR

FLOW EWT LWT WPD ENT CONTROL VALVE ENT HEAT EXCHANGER

TRAP #

CAPACITYMARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE

WATER CONDITIONS STEAM PRESSURE

CONTROL VALVE SHELL DIAMETER TUBE LENGTH

TRAP

BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS

STEAM TO WATER HEAT EXCHANGER SCHEDULE

--- ALL BLDGS LPS DRIPS 665 1 20 INVERTED BUCKET 1/2-3/4 SPIRAX SARCO B1H-15 1

--- ALL BLDGS MPS DRIPS 905 10 60 INVERTED BUCKET 1/2-3/4 SPIRAX SARCO B1H-75 1

9-ST-3 BUILDING 9 9-HX-2 4060 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1

9-ST-2 BUILDING 9 9-HX-1 4060 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1

7-ST-2 BUILDING 7 7-HX-2 4580 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1

7-ST-1 BUILDING 7 7-HX-1 4580 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1

4-ST-2 BUILDING 4 4-HX-2 4760 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1

4-ST-1 BUILDING 4 4-HX-1 4760 2 20 FLOAT AND THERMOSTATIC 2 SPIRAX SARCO FT-15 1

LBS/HR PSI PSI IN

MARK LOCATION SYSTEM AND/OR SERVICE

TRAP CAPACITY SIZING ∆P MAX INLET PRESS

TRAP TYPE

TRAP SIZE

BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS

STEAM TRAP SCHEDULE

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS. INSTALL ON NEW POURED-IN-PLACE CONCRETE PAD AND 1" DEFLECTION SPRING ISOLATORS.

2. PROVIDE END SUCTION DIFFUSER WITH REMOVABLE BRONZE STRAINER.

3. PROVIDE INVERTER DUTY PREMIUM EFFICIENCY MOTOR. PROVIDE VFD WITH BYPASS.

4. 100% REDUNDANT STANDBY PUMP.

9-HWP-2 BUILDING 9 MER BUILDING 9 HEATING WATER

BASE MOUNTED END

SUCTION

WATER 260 50 17.9 1 63 7.5 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2BD 1, 2, 3, 4

9-HWP-1 BUILDING 9 MER BUILDING 9 HEATING WATER

BASE MOUNTED END

SUCTION

WATER 260 50 17.9 1 63 7.5 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2BD 1, 2, 3

9-CWP-2 BUILDING 9 MER BUILDING 9 CHILLED WATER

BASE MOUNTED END

SUCTION

WATER 260 70 7.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4

9-CWP-1 BUILDING 9 MER BUILDING 9 CHILLED WATER

BASE MOUNTED END

SUCTION

WATER 260 70 7.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3

7-HWP-2 BUILDING 7 MER BUILDING 7 HEATING WATER

BASE MOUNTED END

SUCTION

WATER 280 85 11.9 1 72 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2EB 1, 2, 3, 4

7-HWP-1 BUILDING 7 MER BUILDING 7 HEATING WATER

BASE MOUNTED END

SUCTION

WATER 280 85 11.9 1 72 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2EB 1, 2, 3

7-CWP-2 BUILDING 7 MER BUILDING 7 CHILLED WATER

BASE MOUNTED END

SUCTION

WATER 295 100 14 1 66 15 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2GB 1, 2, 3, 4

7-CWP-1 BUILDING 7 MER BUILDING 7 CHILLED WATER

BASE MOUNTED END

SUCTION

WATER 295 100 14 1 66 15 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2GB 1, 2, 3

4-HWP-2 BUILDING 4 MER BUILDING 4 HEATING WATER

BASE MOUNTED END

SUCTION

WATER 305 71 8.65 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4

4-HWP-1 BUILDING 4 MER BUILDING 4 HEATING WATER

BASE MOUNTED END

SUCTION

WATER 305 71 8.65 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3

4-CWP-2 BUILDING 4 MER BUILDING 4 CHILLED WATER

BASE MOUNTED END

SUCTION

WATER 325 77 9.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3, 4

4-CWP-1 BUILDING 4 MER BUILDING 4 CHILLED WATER

BASE MOUNTED END

SUCTION

WATER 325 77 9.4 1 77 10 3 208 1800 VARIABLE BELL & GOSSETT e-1510 2.5BB 1, 2, 3

GPM FT FT HP

FLUID

FLOW HEAD NPSH REQUIRED

SP GR

NOMINAL POWER

PHASE VOLT MAX RPM SPEED CONTROL

MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE

CIRCULATING FLUID

MIN % EFF

ELECTRICAL MOTOR

BASIS OF DESIGN MANUF. BASIS OF DESIGN MODEL NO. REMARKS

HYDRONIC PUMP SCHEDULE

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. MAXIMUM WORKING PRESSURE IS AT 200 DEGREES F. WORKING PRESSURE.

3. INITIAL FILTER USED FOR CLEANING SYSTEM SHALL BE A 20 MICRON PLEATED FILTER. AFTER SYSTEM IS CLEAN, INSTALL

A 5 MICRON PLEATED FILTER FOR USE DURING SYSTEM OPERATION.

9-CF-2 BUILDING 9 MER CHILLED WATER

CARTRIDGE FILTER

FEEDER

5 300 NEPTUNE VTFC-5-1 1, 2, 3

9-CF-1 BUILDING 9 MER CHILLED WATER

CARTRIDGE FILTER

FEEDER

5 300 NEPTUNE VTFC-5-1 1, 2, 3

7-CF-2 BUILDING 7 MER HEATING WATER

CARTRIDGE FILTER

FEEDER

5 300 NEPTUNE VTFC-5-1 1, 2, 3

7-CF-1 BUILDING 7 MER CHILLED WATER

CARTRIDGE FILTER

FEEDER

5 300 NEPTUNE VTFC-5-1 1, 2, 3

4-CF-2 BUILDING 4 MER HEATING WATER

CARTRIDGE FILTER

FEEDER

5 300 NEPTUNE VTFC-5-1 1, 2, 3

4-CF-1 BUILDING 4 MER CHILLED WATER

CARTRIDGE FILTER

FEEDER

5 300 NEPTUNE VTFC-5-1 1, 2, 3

GALLONS PSIG

MARK LOCATION SYSTEM AND/OR SERVICE TYPE

CAPACITY MAX PRESSURE

BASIS OF DESIGN REMARKS

BYPASS CHEMICAL FEEDER SCHEDULE

9-BFP-2 BLDG 9 MER BLDG 9 HEATING WATER MAKEUP

REDUCED PRESSURE

PRINCIPLE

3/4 3/4

ZURN WILKINS MODEL

975XL2

9-BFP-1 BLDG 9 MER BLDG 9 CHILLED WATER MAKEUP

REDUCED PRESSURE

PRINCIPLE

3/4 3/4

ZURN WILKINS MODEL

975XL2

7-BFP-3 BLDG 7 MER BLDG 7 HEATING WATER MAKEUP

REDUCED PRESSURE

PRINCIPLE

3/4 3/4

ZURN WILKINS MODEL

975XL2

7-BFP-2 BLDG 7 MER BLDG 7 CHILLED WATER MAKEUP

REDUCED PRESSURE

PRINCIPLE

3/4 3/4

ZURN WILKINS MODEL

975XL2

7-BFP-1 BLDG 7 MER BLDG 7 DOMESTIC COLD WATER

REDUCED PRESSURE

PRINCIPLE

3 3 ZURN WILKINS MODEL 375 1

4-BFP-3 BLDG 4 MER BLDG 4 HEATING WATER MAKEUP

REDUCED PRESSURE

PRINCIPLE

3/4 3/4

ZURN WILKINS MODEL

975XL2

4-BFP-2 BLDG 4 MER BLDG 4 CHILLED WATER MAKEUP

REDUCED PRESSURE

PRINCIPLE

3/4 3/4

ZURN WILKINS MODEL

975XL2

4-BFP-1 BLDG 4 MER BLDG 4 DOMESTIC COLD WATER

REDUCED PRESSURE

PRINCIPLE

3 3 ZURN WILKINS MODEL 375 1

PSIG IN PSIG IN

MARK LOCATION AREA AND/OR BLDG SERVED SYSTEM AND/OR SERVICE TYPE

INLET PRESSURE INLET SIZE OUTLET PRESSURE OUTLET SIZE

BASIS OF DESIGN

REMARKS

BACKFLOW PREVENTER SCHEDULE

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

9-FT-1 BUILDING 9 MER BUILDING 9 250 36 8 ARMSTRONG HAFT-8 1, 2

7-FT-1 BUILDING 7 MER BUILDING 7 300 36 8 ARMSTRONG HAFT-8 1, 2

6-FT-1 BUILDING 6 MER BUILDING 6 275 36 8 ARMSTRONG HAFT-8 1, 2

4-FT-1 BUILDING 4 MER BUILDING 4 300 36 8 ARMSTRONG HAFT-8 1, 2

LBS/HR IN IN

LENGTH WIDTHMARK LOCATION SYSTEM AND/OR SERVICE

EST FLASH STEAM

DIMENSIONS

BASIS OF DESIGN REMARKS

FLASH TANK SCHEDULE

REMARKS:

1. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.

2. TANK SHALL BE ASME STAMPED TO 150 PSIG.

4 Progress Issuance 4 Date 4

Sheets
M-102 - BUILDING 4 MECHANICAL ROOM NEW WORK PLANS
M-103 - BUILDING 4 MECHANICAL TEMPORARY CHILLED WATER PUMPS AND OVERALL BUILDING PLANS
M-107 - BUILDING 9 MECHANICAL ROOM NEW WORK PLANS
M-601 - MECHANICAL SCHEDULES
MD102 - BUILDING 4 DEMOLITION PLANS

File details come from the government source that posted it.