36C24418B0585-004.pdf
PDF 12 MB Posted
- Solicitation number
- 36C24418B0585
About this file
36C24418B0585 503-15-205 - 100 PERCENT BID DRAWINGS.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419C0030-000.docx | DOCX document | |
| 36C24418B0585-0004001.pdf | ||
| 36C24418B0585-0004000.docx | DOCX document | |
| 36C24418B0585-0003001.pdf | ||
| 36C24418B0585-0003000.docx | DOCX document | |
| 36C24418B0585-0002002.pdf | ||
| 36C24418B0585-0002001.pdf | ||
| 36C24418B0585-0002000.docx | DOCX document | |
| 36C24418B0585-0001001.pdf | ||
| 36C24418B0585-0001005.pdf | ||
| 36C24418B0585-0001003.pdf | ||
| 36C24418B0585-0001004.pdf | ||
| 36C24418B0585-0001006.pdf | ||
| 36C24418B0585-0001002.pdf | ||
| 36C24418B0585-0001000.docx | DOCX document | |
| 36C24418B0585-003.docx | DOCX document | |
| 36C24418B0585-001.docx | DOCX document | |
| 36C24418B0585-006.docx | DOCX document | |
| 36C24418B0585-002.docx | DOCX document | |
| 36C24418B0585-005.pdf | ||
| 36C24418B0585-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
6/ 8/
:1
5:
A M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
JKG TP
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
G001
COVER SHEET
06/07/2018
17028
100% CONSTRUCTION DOCUMENTS
CORRECT RETRO-COMMISSIONING
DISCREPANCIES
JAMES E. VAN ZANDT VA MEDICAL CENTER
2907 PLEASANT VALLEY BLVD.
ALTOONA, PA 16602
VICINITY MAP
SITE
LOCATION MAP
SITE
PROJECT DIRECTORY
OWNER:
JAMES E. VAN ZANDT VA MEDICAL CENTER
2907 PLEASANT VALLEY BLVD.
ALTOONA, PA 16602
(814) 943-8164
CONTACT: ANDREW WALBECK
ARCHITECT/ENGINEER:
AE WORKS, LTD
209 SANDUSKY STREET
PITTSBURGH, PA 15206
(412) 287-7333
CONTACT: CHRIS CHAMPAGNE, PE
DRAWING INDEX
SHEET # SHEET NAME
GENERAL
G001 COVER SHEET
Building 1
STRUCTURAL
01-S100 DUNNAGE FRAMING PLANS AND DETAILS
ARCHITECTURAL
00-A001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
01-A002 BUILDING 1 - CONTRACTOR'S WORK PATH PLANS
01-A003 ARCHITECTURAL SITE PLAN
MECHANICAL
00-H001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
01-HD101 PARTIAL FIRST FLOOR HVAC DEMOLITION PLAN
01-HD102 PARTIAL FOURTH FLOOR HVAC DEMOLITION PLAN
01-HD100 PARTIAL BASEMENT HVAC DEMOLTION PLAN
01-H101-171 PARTIAL FIRST FLOOR HVAC PLAN - MECHANICAL ROOM 171
01-H102-453A PARTIAL FOURTH FLOOR HVAC PLAN - MECHANICAL ROOM 453 - AHU-3
01-H100-011 PARTIAL BASEMENT HVAC PLAN - MECHANICAL ROOM 11
01-H101-141 PARTIAL FIRST FLOOR HVAC PLAN - LAUNDRY 141
01-H102-453B PARTIAL FOURTH FLOOR HVAC PLAN - MECHANICAL ROOM 445 - AHU-5
01-H501 HVAC DETAILS
01-H502 HVAC DETAILS
01-H503 HVAC DETAILS
01-H601 CONTROLS DIAGRAMS
01-H602 CONTROLS DIAGRAMS
01-H700 HVAC SCHEDULES
FIRE PROTECTION
00-F001 FIRE PROTECTION SYMBOLS, DETAILS AND NOTES
01-FD101 FIRE PROTECTION DEMOLITION PLANS
01-FD102 FIRE PROTECTION DEMOLITION PLANS
01-F101 FIRE PROTECTION PLANS
01-F102 FIRE PROTECTION PLANS
ELECTRICAL
01-E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES
01-ED101 ELECTRICAL DEMOLITION PLAN
01-E101 ELECTRICAL NEW WORK PLAN
01-E701 ELECTRICAL SCHEDULES AND DETAILS
Building 3
ARCHITECTURAL
03-A103 BUILDING 3 - ROOF PLAN
Building 4
ARCHITECTURAL
04-A201 BUILDING 4 - EXTERIOR ELEVATIONS
MECHANICAL
04-H100 PARTIAL BASEMENT HVAC PLAN
Building 5
ARCHITECTURAL
05-A201 BUILDING 5 - EXTERIOR ELEVATIONS
MECHANICAL
05-H100 PARTIAL BASEMENT HVAC PLAN
ENGINEER
PROFESSIONAL
REGISTERED
PE-053914-E
BARBER & HOFFMAN, INC.
C O
M
M
ONWEA L T H
O F
P E
NNSY LVA N
I A
MICHAEL RAY MILLER
ABBREVIATIONS
@ At A.B. Anchor Bolt ARCH. Architect or Architectural BLDG. Building CLR. Clear COL. Column CONN. Connection CONTR. Contractor COORD. Coordinate DIA. or ø Diameter DWG. Drawing EL. Elevation EMBED. Embedment EX. Existing MAX. Maximum MECH. Mechanical MIN. Minimum REF. Reference REQD. Required SECT. Section SIM. Similar S.O.G. Slab on Ground STIFF. Stiffener or Stiffened T&B Top And Bottom T.O.S. Top of Steel TYP. Typical U.O.N. Unless Otherwise Noted W/ With
CODES AND STANDARDS
1. New construction has been designed to, and shall be constructed in accordance with the following building codes and standards:
A. Pennsylvania Uniform Construction Code B. 2009 International Building Code (IBC 2009) C. ASCE 7-05, Minimum Design Loads for Buildings and Other Structures
2. Unless explicitly modified in the Contract Drawings and Specifications, the Contractor shall comply wth provisions of:
A. AISC 360-05, Specification for Structural Steel Buildings B. AWS D1.1-10, Structural Welding Code - Steel
DESIGN LOADS (IBC 2009)
Floor live load
Typical floor ------------------------------------------------------------------------- 100 psf Mechanical room ------------------------------------------------------------------ 150 psf
DESIGN STRESSES
Structural steel W and S shapes (ASTM A992 or ASTM A572/50) ------------ Fy = 50,000 psi Structural steel other shapes (ASTM A36) ------------------------------------------- Fy = 36,000 psi Anchor rods (ASTM F1554, Grade 36) unless otherwise noted ---------------- Fy = 36,000 psi Steel pipe (ASTM A53, Grade B) ------------------------------------------------------- Fy = 35,000 psi Grout, non-shrink, non-metallic (ASTM C476) -------------------------------------- 3,000 psi
GENERAL
1. All new construction shall comply with the Contract Documents and the Building Code.
2. Typical details and general notes apply to all parts of the work except where specifically detailed or unless otherwise noted.
3. The structural drawings illustrate structural members. Refer to architectural, mechanical, and electrical drawings for non-structural items which require special provisions during the construction of the structural members.
4. Drawings are not to be scaled.
5. Refer to architectural plans for floor depressions, openings, slopes, drains, curbs, pads, embedded items, non-bearing partitions, etc. Refer to mechanical and electrical plans for sleeves, openings, and hangers for pipes, ducts, and equipment.
6. The Contractor shall verify and be responsible for all dimensions and conditions which impact the work. Field verify sizes, elevations, hole locations, etc. prior to fabrication.
7. The Contractor shall carefully review the drawings to identify the scope of work required, visit the site to relate the scope of work to existing conditions and determine the extent to which those conditions and physical surroundings will impact the work.
8. Existing conditions as shown on these plans are for reference only. The Contractor is required to field verify all existing conditions prior to construction.
9. The Contractor shall resolve any conflicts on the drawings or in the specifications with the Architect/Engineer before proceeding with the work.
10. Any deviation, modification, or substituion from the approved set of structural drawings shall be submitted to the Owner, Architect, and Engineer for review/approval prior to its use or inclusion on the shop drawings.
11. The Contractor shall provide means, method, techniques, sequence, and procedure of construction as required.
12. The Contractor shall protect all work, materials, and equipment from damage and shall provide proper storage facilities for materials and equipment during construction.
13. Site visits performed by the Architect/Engineer do not constitute inspections of means and methods of construction performed by the Contractor.
14. Structural observations performed by the Architect/Engineer during construction are not the continuous and special inspection services and do not waive the responsibility for the inspections required of the Building Department Inspector or the testing agency. Observations also do not guarantee the Contractor's performance and shall not be considered as supervision of construction.
15. The Contractor shall review shop drawings for completeness and compliance with contract documents. The Contractor shall stamp shop darwings prior to submission to the Architect and Engineer.
16. Review of the shop drawings by the Architect's Engineers shall not be construed as an authorization to deviate from the Contract Documents.
17. Shop drawings will not be processed if they are incomplete, lack coordination with relevant portion of contract documents, lack calculations if required, or if deviations, modifications, and substitutes are indicated without prior written approval from the Architect/Engineer
STEEL CONSTRUCTION
1. Steel detailing, fabrication, and erection shall conform to the AISC Specification for Structural Steel Buildings and Code of Standard Practice, and the AWS Structural Welding Code.
2. Stresses occurring during fabrication, shipment, and erection shall be temporary and not excessive. Stresses at all times shall be less than design and allowable stresses. The full design and load-carrying capacity of the steel work shall not be impaired due to fabrication, shipment, or erection procedures. Throughout the complete process, the stability of all individual members and assembles shall be maintained.
3. The Contractor shall be responsible for the control of all erection procedures and sequences with relation to temperature differentials and weld shrinkage.
4. All additional steel required for erection purposes shall be provided at no additional cost and shall be removed unless approved by the Owner in writing.
5. Connections - welded or high strength bolted:
A. High-strength bolts shall be installed in accordance with "Specifications for
Structural Joints Using ASTM A325 or A490 Bolts".
B. A325SC or A490SC with hardened washers: use for all moment connections, wind connections, hangers, and other connections as noted on drawings.
C. A325N or A490N with hardened washers: use for all connections other than slip critical connections.
D. Provide hardened washers under nuts at all high-strength bolts, except where plate washers are used per AISC Specifications.
E. Unless snug tight connections are noted on the drawings as being permitted, all bolts should be tightened to full pretensioning load.
F. Use standard holes with the following exceptions: oversize holes are permitted when bolts are loaded in tension; short slotted holes are permitted for shear loading perpendicular to the slot.
G. Where minimum AISC fillet weld thickness requirement exceeds welds shown on details, or weld size is not specified, provide minimum AISC weld.
H. Wherever possible, use framed beam connections as listed in Tables 10-1 to 10-3 of AISC Manual of Steel Construction, 13th edition. The length of connection shall not be less than one-half of the T distance of the beam web.
6. Welding electrodes shall be E70XX except where other electrodes are required for compatibility with material being welded.
7. All slip connections shall be provided with a means of preventing the nuts from unthreading.
8. Shop drawings are required and shall note type of electrodes, size of all welds, and type and size of all bolts. Shop drawings shall be prepared under the supervision of a professional engineer licensed in the jurisdiction where the project is located.
9. Primer, unless otherwise noted:
A. Clean surfaces to remove loose rust and mill scale and spatter, slag, or flux deposits. Prepare surfaces according to the following specifications and standards: SSPC-SP 2, "Hand Tool Cleaning" for all steel other than Architecturally Exposed Steel and steel to receive galvanizing; SSPC-SP 6/NACE No. 3, "Commercial Blast Cleaning" for Architecturally Exposed Steel.
B. Interior steel: Provide chemically active, modified alkyd primer at 2.5 mils dry thickness.
10. See all contract drawings for miscellaneous steel requirements.
11. All shop and field welding shall be performed by a recently certified welder.
12. All welding and high strength bolting must be inspected by a qualified testing laboratory. Laboratory shall be approved by the Architect and/or Engineer.
13. Provide fills at splices of parts differing by more than 1/8" in thickness.
14. Miscellaneous hanging loads such as stair stringers, pipes, mechanical units, etc., supported by steel members shall be applied in such a manner that no torsional forces are induced in the steel members, i.e., loads shall pass through the centerline of wide flange sections and through the shear center of channels.
STRUCTURAL STEEL WELDING
1. All welding shall be in strict conformance with the latest building code and AWS D1.1.
2. The Contractor shall provide welding procedure specification (WPS) and detailed sequence of welding sketch for review and approval prior to starting of fabrication.
The sequence of welding shall be planned to minimize locked-in stresses and distortion.
3. All welding electrodes (filler metal) shall be E70XX (70 ksi), unless otherwise noted.
4. Lengths of welds are effective lengths. Where length of weld is not shown, it shall be full length of joint. All butt welds shall be full penetration unless otherwise noted.
5. Welders shall be qualified and certified for the work they will be performing and shall have current certifications.
6. Faces of fillet welds exposed to view shall have as-welded surfaces that are reasonably smooth and uniform. No finishing or grinding shall be required, except where clearances or fit of other items may so necessitate.
7. Welds shall be terminated at the end of a joint in a manner that will ensure sound welds. Whenever necessary, this shall be done by the use of extension bars and run-off tabs.
8. To assure the proper amperage and voltage of the welding process, a hand-held calibrated amp and volt meter shall be used. This equipment shall be used by the fabricator, erector, and inspectors. Amperage and voltage shall be measured at the arc with this equipment. Travel speed and electrode stick out shall be verified to be in compliance with the electrode manufacturer's recommendations and with the approved WPS.
NOTE 2
EQ EQ EQ EQ EQ
PIPE 3 STD.
(TYP. 6 LOCATIONS)
NOTE 2
AHU-1
AHU-6
AHU-3
AHU-5
T Y
P
T Y
P
S100
S100
N O
T E
N O
T E
PIPE 3 STD.
(TYP. 8 LOCATIONS)
W x
W8x18
W x
W8x18
W x
W8x18
W x
W8x18 W8x18 W8x18
W x
W8x18
W x
W8x18
W x
W8x18 W8x18
NOTES:
1. REFERENCE ELEVATION (0'-0") AT FINISHED FLOOR.
TOP OF STEEL AT (+1'-4").
2. COORDINATE DIMENSIONS AND LOCATION OF ALL AIR
HANDLING UNITS WITH MECHANICAL DRAWINGS AND UNIT
SUPPLIER.
MECHANICAL
EQUIPMENT
(2)5/8"ø BOLTS
STEEL BEAM
(SEE PLAN)
PL.3/4x9x0'-9" W/ (4)5/8"ø HIT-HY
200 ADHESIVE ANCHORS
(3 3/4" EMBED.) ON 1/2" MIN.
GROUT BED
EX. CONC. SLAB OR
SLAB-ON-GROUND
STEEL BEAM
(SEE PLAN)
STEEL POST
(SEE PLAN)
3/8" STIFFENER PL.
EACH SIDE ALIGN W/
C OF POST BELOWL
1/4
3 SIDES
TYP.
1/4
EA. END
FINISHED FLOOR
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
KEY PLAN - MULTI FLOOR
1ST FLOOR
MECH RM
171 4TH FLOOR
MECH RM
1ST FLOOR
LAUNDRY
141D
BASEMENT
MECH ROOM
BASEMENT
MECH ROOM
Consulting Engineers
BARBER & HOFFMAN, INC.
215 Executive Drive, Suite 202 Cranberry Township, PA 16066 724-741-0848/ (F) 724-741-0849 barberhoffman.com
/8
/2
:0 :1
A
M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
BKL LDW
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
DUNNAGE FRAMING PLANS AND DETAILS
06/05/2018
1, 3, 4, 5
17028
NORTH
TRUE NORTH
PROJECT
1/4" = 1'-0"
DUNNAGE FRAMING PLANS
SECTION
3/4" = 1'-0"
JulieGood Snapshot
JulieGood Snapshot
SYMBOLS LEGEND
DESCRIPTION SYMBOL
DRAWING BLOCK TITLE MARK
ITEM SCALE
ITEM TITLE / DESCRIPTION
ITEM NUMBER / LETTER
WALL SECTION MARK
A101
SHEET NUMBER
SECTION IDENTIFIER
BUILDING SECTION MARK
A101
SHEET NUMBER
SECTION IDENTIFIER
DETAIL INDICATOR
A101
DETAIL IDENTIFIER
SHEET NUMBER
LEADER
DETAIL BOUNDARY
EXTERIOR ELEVATION MARK
A100
INTERIOR ELEVATION MARK
(SINGLE VIEW)
A100
INTERIOR ELEVATION MARK
(MULTIPLE VIEWS)
A100
ELEVATION IDENTIFIER
SHEET NUMBER
ELEVATION IDENTIFIER
SHEET NUMBER
ELEVATION IDENTIFIER
SHEET NUMBER
NORTH ARROW
NORTH
TRUE NORTH
PROJECT
ROOM NAME
ROOM NUMBER
ROOM NAME INDICATOR
COLUMN GRID IDENTIFICATION
GRID LINE IDENTICATION
COLUMN GRID LINE
DOOR IDENTIFICATION
1 DOOR NUMBER
W#WINDOW IDENTIFICATION WINDOW / CURTAINWALL TYPE
WALL TYPE IDENTIFICATION
M8 WALL TYPE INDICATOR
WALL
KEYED NOTE IDENTIFICATION
REVISION IDENTIFICATION
REVISION CLOUD
REVISION NUMBER
DATUM POINT IDENTIFICATION
LEVEL
10'-0"
ELEVATION RELATIVE TO
FIRST FLOOR TOP OF SLAB
WALL FINISH PT#
FINISH
EXTENT OF FINISH
ROOM NAME
DEMO PLAN - KEYED NOTE
PLAN - KEYED NOTE
WALL SECTION / EXTERIOR ELEVATION - KEYED NOTE
EARTH -
COMPACTED FILL
GRAVEL, CRUSHED STONE
SAND, GROUT, LIMESTONE
WOOD, FINISH
WOOD, FRAMING
THROUGH MEMBER
WOOD, FRAMING
INTERRUPTED MEMBER
PLYWOOD
ACOUSTIC TILE
RIGID INSULATION
TAPERED
INSULATION
BATT INSULATION
CONCRETE
BRICK
CONCRETE BLOCK
STEEL
GYPSUM BOARD, PLASTER
MATERIALS LEGEND :
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
6/ 7/
:0
6:
A M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
JKG TP
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
00-A001
ARCHITECTURAL SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES
06/07/2018
17028
100% CONSTRUCTION DOCUMENTS
ST PR STATIC PRESSURE
ST STL STAINLESS STEEL
STD STANDARD
STER STERILIZER
STL STEEL
STOR STORAGE
STR STRAINER
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL TOP
T TOP
TA THROWAWAY
TAN TANGENT
TC TELECOMMUNICATIONS
CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TDV TRIPLE DUTY VALVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROOVE
TH THERMOMETER
THRES THRESHOLD
TR TEMPERATURE RISE
TRANS TRANSITION
TRANSR TRANSFORMER
TSTAT THERMOSTAT
TV TURNING VANES OR TELEVISION
TYP TYPICAL
UC UNDER CABINET OR UNDER CUT
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VAL VALVE
VD VOLUME DAMPER
VENT VENTILATION
VERT VERTICAL
VFS VENTURI FLOW STATION
VIF VERIFY IN FIELD
VL VENT LINE
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
W WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WALL COVERING
WCL WATER CLOSET
WD WOOD
WF WIDE FLANGE
WFMD WATER FLOW MEASURING DEVICE
WG WALL GUARD OR WATER GAUGE
WHCH WHEEL CHAIR
WIN WINDOW
WMS WIRE MESH SCREEN
WP WEATHERPROOF
WPS WALL PROTECTION SYSTEM
WSCT WAINSCOT
WT WINDOW TREATMENT
WTD WATER TEMPERATURE DROP
WWF WELDED WIRE FABRIC
X DEMO
XN TO BE RELOCATED / NEW LOCATION
XR EXISTING TO REMAIN
ZVB ZONE VALVE BOX
ZVC ZONE VALVE CABINET
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LIN LINEAR
LOC LOCATION OR LOCATE
LPT LOW POINT
LSDC LINEAR SUPPLY DIFFUSER CEILING
LT LIGHT
LTG LIGHTING
LV LOW VOLTAGE
LVR LOUVER
LWB LEAVING WET BULB
LWC LINEAR WOOD CEILING
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MAT MIXED AIR TEMPERATURE
MATL MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH ONE THOUSAND BTU / HOUR
MC MECHANICAL CONTRACTOR
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MO MASONRY OPENING
MOD MOTOR OPERATED DAMPER
MONO MONOLITHIC
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MTL METAL
MTLH METAL HALIDE
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NUMBER OR NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OPER OPERATED
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PB PULL BOX
PC PLUMBING CONTRACTOR
PD PUMP DISCHARGE
PG PRESSURE GAUGE WITH COCK
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRD PRESSURE DIFFERENTIAL VALVE
PRELIM PRELIMINARY
PRT PRESSURE TAP
PRV PRESSURE REDUCING VALVE
PT PAINT OR POTENTIAL
TRANSFORMER
RO ROUGH OPENING
QT QUARRY TILE
R RADIUS
RA RETURN AIR / RELIEF AIR
RB RUBBER BASE
RC REMOVE COMPLETELY
RD ROOF DRAIN
RE RELOCATE EXISTING
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFL REFLECTOR
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
RET RETURN
REV REVISE
REX REMOVE EXISTING
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RGS RIGID GALVANIZED STEEL CONDUIT
RH ROOF HATCH
RM ROOM
RN REMOVE AND REPLACE WITH NEW
RR REMOVE AND REPLACE
RS RAPID START
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
SA SUPPLY AIR
SAN SANITARY SEWER ABOVE GROUND
SAN-BXR SANITARY SEWER - BURIED
EXISTING TO REMAIN
SAN-XR SANITARY SEWER ABOVE GROUND -
EXISTING TO REMAIN
SCHED SCHEDULE
SD SMOKE DAMPER OR SMOKE
DETECTOR
SDISP SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHT MTL SHEET METAL
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE OR STATIC PRESSURE
SPC SPECIMEN PASS-THRU CABINET
SPEC SPECIFICATIONS
SPS STATIC PRESSURE SENSOR
SR SERVICE RECEPTOR
SS SOIL STACK
EIFS EXTERIOR INSULATION AND
FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEC CAB ELECTRICAL CABINET
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
EO ELECTRICAL OUTLET
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWB ENTERING WET BULB
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXAUST AIR
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
XP EXPLOSION PROOF
F/S FIRE / SMOKE DAMPER
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAT FINAL AIR TEMPERATURE
FB FIRE BLANKET
FC FLEXIBLE CONNECTION OR
FOOTCANDLE
FD FLOOR DRAIN OR FIRE DAMPER
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HOSE
FHC FIRE HOSE CABINET
FHP FULL HEIGHT PARTITION
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLA FULL LOAD AMPERES
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG C FLANGE CONNECTION
FLR FLOOR
FLUOR FLUORESCENT
FP FIRE PROOFING
FRMG FRAMING
FS FLOOR SINK
FSTOP FIRESTOPPING
FT FOOT / FEET
FT HD FEET OF HEAD
FTC FOOTCANDLES
FTG FOOTING
FUR FURRING
G GAS OR ELECTRICAL GROUND
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERATOR
GENL GENERAL
GFCI GROUND FAULT CIRCUIT
INTERRUPTOR
GL GLASS
GLV GLOBE VALVE
GND GROUND
GPM GALLONS PER MINUTE
GR GRADE
GRAV GRAVITY
GRD BM GRADE BEAM
GV GATE VALVE
GWB GYPSUM BOARD
H HIGH
HB HOSE BIB
HC HEATING CONTRACTOR
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER
HPD HIGH PRESSURE DRIP
HPF HIGH POWER FACTOR
HR HANDRAIL
HSKP HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AIR
CONDITIONING
HW HOT WATER
HWD HARD WOOD
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND RETURN
HZ HERTZ
ID INSIDE DIAMETER
IER INVERTED ECCENTRIC REDUCER
IG ISOLATED GROUND
IME INSULATED METAL ENCLOSURE
IN INCH
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INTERL INTERLOCK
INV INVERT
ISO ISOLATION
IVS ISOLATED VALVE STATION
J-BOX JUNCTION BOX
JST JOIST
JT JOINT
KO KNOCK OUT
kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LB POUND
LDB LEAVING DRY BULB
& AND
A AIR (CLINICAL)
AAP ALARM ANNUNCIATOR PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABV ABOVE
ACC DR ACCESS DOOR
ACFL ACCESS
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICAN DISABILITIES ACT
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AFMD AIR FLOW MEASURING DEVICE
AHU AIR HANDLING UNIT
AL ALIGN
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AP ACCESS PANEL
APC ARCHITECTURAL PRECAST
CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASY ASYMMETRIC
ATC AUTOMATIC TEMPERATURE
CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWT AVERAGE WATER TEMPERATURE
BAT BATTERY
BC BALANCING COCK OR BARE
COPPER
BDD BACKDRAFT DAMPER
BFC BELOW FINISH CEILING
BFE BOTTOM FOOTING ELEVATION
BFG BELOW FINISHED GRADE
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT BORROWED LIGHT
BLW BELOW
BM BEAM
BO BY OWNER
BOF BY OWNER FUTURE
BOT BOTTOM
BR BRICK
BRG BEARING
BRKR BREAKER
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
C CONDUIT
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CATV CABLE TELEVISION
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CFH CUBIC FEET / HOUR
CFM CUBIC FEET / MINUTE
CH CHANNEL
CHK V CHECK VALVE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CHWS&R CHILLED WATER SUPPLY AND
RETURN
CJ CONTROL JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTERLINE
CLG CEILING
CLG MTD CEILING MOUNTED
CLR CLR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE / CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET OR CONTROL POWER
TRANSFORMER
CT CERAMIC TILE
CTR CENTER
CU COPPER
CV CONTROL VALVE
CW COLD WATER
D DEPTH OR DEEP
DB DRY BULB
dB DECIBEL
DCW DOMESTIC COLD WATER
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAILS
DF DRINKING FOUNTAIN
DHW DOMESTIC HOT WATER
DIA DIAMETER
DIAG DIAGONAL OR DIAGRAM
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DL DOWN LIGHT
DN DOWN
DP DISTRIBUTION PANEL
DPR DAMPER
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EDB ENTERING DRY BULB
EF EXHAUST FAN
ABBREVATION LEGEND
1/8" = 1'-0"
TITLE
GENERAL PROJECT NOTES
1 ALL CONSTRUCTION WORK SHALL CONFORM WITH THE APPLICABLE CODES AND ORDINANCES OF THE
FEDERAL JURISDICTION, AS WELL AS ALL APPLICABLE CODES OF THE COMMONWEALTH OF
PENNSYLVANIA.
2 INSTALLATIONS PERFORMED IN CONNECTION WITH THESE DRAWINGS SHALL COMPLY WITH THE MOST
RECENT NFPA EDITION.
3 THE SITE WORK SHALL BE PROPERLY SUPERVISED BY THE CONTRACTORS JOB SITE SUPERINTENDANT.
SUFFICIENT PERSONNEL SHALL BE EMPLOYED TO COMPLETE THE WORK WITHIN THE CONTRACTED TIME.
PERSONNEL SHALL BE SKILLED IN THE TASK ASSIGNED.
4 THE CONTRACTOR SHALL, AT ALL TIMES, MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD THE PUBLIC
AND ALL PERSONS ENGAGED IN THE PERFORMANCE OF THE WORK.
5 THE DRAWINGS REFLECT CONDITIONS AS CAN BE INFERRED FROM VISIBLE CONDITIONS, OR FROM
DRAWINGS AND INFORMATION FURNISHED BY THE OWNER, BUT CANNOT BE GUARANTEED. THE
CONTRACTOR SHALL VERIFY ALL GRADES, LINE LEVELS AND DIMENSIONS INDICATED ON THE DRAWNGS AND SHALL REPORT ALL INCONSISTENCIES TO THE ARCHITECT PRIOR TO THE EXECUTION OF THE WORK.
RECHECK ALL DIMENSIONS PRIOR TO ORDERING MANUFACTURED AND/OR FABRICATED ITEMS.
6 PLAN DIMENSIONS, UNLESS NOTED OTHERWISE, ARE TO THE FACE OF THE WALL FINISH OR CENTERLINE
OF COLUMN.
7 ALL INDICATIONS OF MASONRY ARE SHOWN IN ACTUAL DIMENSIONS (NOT NOMINAL), UNLESS NOTED
OTHERWISE.
8 THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF PRODUCTS PURCHASED FOR THIS PRODUCT AND STORED ON THE PROJECT SITE. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER ON PREFERRED LOCATIONS FOR STORED MATERIALS ON THE
PROJECT SITE, IF ALLOWED AS PART OF THE REQUIREMENTS OF THIS PROJECT.
9 THE CONTRACTOR SHALL MAINTAIN AREAS UNDER THE CONTRACTOR'S CONTROL TO BE FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH. CONTAINERS FOR DEPOSIT OF DEBRIS AND RUBBISH SHALL BE
PROVIDED BY THE CONTRACTOR. COORDINATE LOCATION OF CONTAINERS WITH THE OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT. REMOVE AND DISPOSE OF DEMOLITION MATERIAL OFF SITE IN
ACCORDANCE WITH APPLICABLE CODES AND/OR SPECIFICATIONS.
10 EXTRANEOUS MATERIALS SHALL BE PERIODICALLY REMOVED, AND AT THE CONCLUSION OF THE PROJECT. ALL UNUSED TOP SOIL SHALL BE STOCKPILED ON THE SITE FOR THE OWNER'S USE.
11 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL FIRESAFING / FIRESTOPPING MATERIALS AT ALL THROUGH-WALL AND THROUGH-CEILING PENETRATIONS AS REQUIRED FOR THE CONSTRUCTION WORK AND TO MAINTAIN FIRE RATINGS OF FLOORS AND WALLS. MATERIALS AND INSTALLATION DETAILS SHALL CONFORM TO UNDERWRITER LABORATORIES LISTING FOR RATED
ASSEMBLIES.
12 ALL WOOD FRAMING AND SHEATHING SHALL BE FIRE RETARDANT TREATED AS REQUIRED BY THE
BUILDING CODE CLASSIFICATION OF 'NONCOMBUSTIBLE'
13 DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO CONSTRUCTION.
NOTIFY THE ARCHITECT OF ANY DEVIATIONS OR DISCREPANCIES FOUND AND RECEIVE DIRECTION
BEFORE PROCEEDING.
14 DURING CONSTRUCTION THE CONTRACTOR WILL WORK ADJACENT TO PATIENT OCCUPIED FLOORS.
CONSTRUCTION RELATED ACTIVITIES ARE NOT TO ADVERSELY IMPACT THESE AREAS. CONSTRUCTION RELATED ACTIVITIES THAT MIGHT AFFECT THESE AREAS MUST BE COORDINATED WITH AND APPROVED
BY THE VA PRIOR TO OCCURRENCE.
15 CONTRACTOR SHALL PROVIDE TEMPORARY DUST ENCLOSURES DURING ALL DEMOLITION AND
CONSTRUCTION ACTIVITIES. CONTRACTOR TO COORDINATE LOCATIONS WITH CONTRACTING OFFICER. IF EXISTING WALLS ARE USED, PENETRATIONS MUST BE SEALED TO CREATE A DUST PROOF ENCLOSURE.
16 MODIFICATIONS TO THE EXISTING MEP SYSTEMS WILL IMPACT ADJACENT SPACES OUTSIDE THE GENERAL SCOPE OF WORK. ANY DISTURBANCE OF EXISTING CONDITIONS AND FINISHES MUST BE
REPAIRED TO MATCH THE CONDITIONS PRIOR TO CONSTRUCTION IMPACTS.
17 THE FACILITY IS OPERATIONAL. CONTRACTOR SHALL MAKE PROVISIONS FOR OWNER AND PUBLIC USE OF THE BUILDING AROUND THE CONSTRUCTION AREA. DELIVERIES, STAGING, STORAGE OF MATERIALS AND OTHER CONSTRUCTION RELATED ACTIVITIES SHALL BE COORDINATED WITH THE CONTRACTING OFFICER
SO AS TO NOT ADVERSELY AFFECT THE BUILDING OPERATIONS.
18 ASBESTOS AND LEAD ARE NOT ANTICIPATED TO EXIST IN THE WORK AREA. HOWEVER, IF
ASBESTOS-CONTAINING MATERIAL IS DISCOVERED OR SUSPECTED, STOP WORKING IN THE AREA
IMMEDIATELY AND CONTACT THE COR.
19 ALL REVISIONS TO THE DRAWINGS MUST PROCEED THROUGH THE ARCHITECT. OWNER / CONTRACTOR
REVISIONS MAY BE CONSIDERED INVALID.
20 ALL EXPOSED GYPSUM WALL BOARD EDGES TO HAVE METAL EDGE TRIM.
21 THE CONTRACTOR RESPONSIBLE FOR COMPARING AND COORDINATING ALL DRAWINGS FOR PROPER FIT AND ATTACHMENT OF ALL PARTS. DETAILS NOT SHOWN OR DESCRIBED IN THESE NOTES SHALL BE CONSTRUCTED TO SAME SIZE AND CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN, SPECIFIED, OR COMMONLY CONSTRUCTED IN THE INDUSTRY.
22 NO STRUCTURAL MEMBER SHALL BE OMITTED, NOTCHED, CUT, BLOCKED OUT, OR RELOCATED WITHOUT
PRIOR APPROVAL BY THE ARCHITECT OR ENGINEER.
23 PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT PROPERTY AT
ALL TIMES DURING CONSTRUCTION.
24 ALL TEMPORARY BRACING AND SHORING SHALL BE DESIGNED TO SUSTAIN ALL CONSTRUCTION LOADS, SOIL PRESSURE, LATERAL AND OTHER LOADS TO WHICH THE STRUCTURE MAY BE SUBJECTED.
25 CONTRACTOR SHALL COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER HEADS, REGISTERS, ETC.
WITH THE REFLECTED CEILING PLAN LAYOUT.
26 ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS SHALL BE CENTERED WITH SUSPENDED
ACOUSTICAL PANELS, UNLESS NOTED OTHERWISE ON DRAWINGS.
27 ALL VOIDS IN MASONRY, CONCRETE AND OTHER ASSEMBLIES CREATED AROUND PENETRATIONS SHALL
BE FILLED / PATCHED WITH CONSTRUCTION TO MATCH SURROUNDING CONDITIONS.
28 CONTRACTOR IS RESPONSIBLE FOR PAINTING ALL EXPOSED STEEL, DECKING, PIPING, CONDUIT, SPRINKLER PIPING AND DUCTS WHICH ARE EXPOSED IN AREAS WITH NO CEILINGS AND SCHEDULED TO
RECEIVE PAINT FINISH AS INDICATED ON THE FINISH SCHEDULE.
22 22A
47B
26A
S00
E02
27A
29 29A 30
31 32
32B 32C47A
28A
18B
18A
E00
E00A
E00B
5B
5A
13A
S03
7A
1A
S02
42A
42B
35 37
37A
48C
S01
A000A
A000 A000C
AS000
A000E
31A
S04
A000B
A000K A000J A000I A000H A000G A000F
A000D
16B
SHR RM
41A
41A
41C
41D
SF
SF
SF
MECH RM ENG
SVC
ELEC SHOPENG
SVC
CHIEF
M&R
OFFICE
STOR
MACHINE SHOP
PLUMBING
SHOP
ENG
SVC
CARPENTER SHOP ENG
SVC
PLAN
RM
CORR
PAINT
SHOP
M TLT
EMS
STAIRS
MECH
RM
ELEV
LOBBY
MAIL ROOM
MAS
STOR
MAS
STORAGE
MAS
BIO-MED
SHOP
STOR
A&MM
FHC MCCORR
FHC
MECH RM ENG
SVC
CORR
STORAGE ENG
SVC
ELEV
ELEV
ELEV
A/C SHOP ENG
SVC
CORR
TELE
EC
FHC
STORAGE
VCS
STAIRS
OFFICE CRED
UN
CRED
UN
OFFICE CRED
UN
LOCKER
RM
CLO
OFFICE
EMS
CH OFF
VCS
RETAIL
STORE
RETAIL
STOR
STAIRS
TEL
TEL
CL
SIGN
SH
STOR
A&MM
MECH
RM
UNEXCAVATED
EC
ELEC
CL
HAC
CORR
HAC
STOR
STAIRS
PHARMACY
CACHE
STOR MECH
MECH
SHAFT
STAIRS
ELEC
UNEXCAVATED
EQ
STOR
ELEVATOR
ELEV. M/C
ROOM
MECH
PIT
POLICE TRAINING
ROOM
STAIRS
MECHANICAL
ROOM
HVAC
SHOP336
SF
OFFICE OFFICE OFFICE OFFICE OFFICE DATA
PANDEMIC
CORR
STOR
STOR
KITCHEN
STORAGE VCS
DINING RM VCS
17B
LOCKER ROOM
VESTIBULE
17A
TOILET ROOM
MENS
STORAGE
A&MM
STORAGE
A&MM
HSK
ROOM
COMPUTER
RM
CANTEEN
OFFICE
STORAGE
VCS
FD
DN
141C
141Q
141L
141B
141D
141E 141N 141M
131B 131C
131D
131E
131F
141A
141G
142 143 E102
144A 145
145A 145B
S100 132
140C
140B
140A
134A
131A
130B
130A
131K
131J
131H
131G
129B
129A 129
125A
147B 147D
148A
E100
126A
118 119 194C
120A
118A
117A
116B
117B
199A
S102
198C
116A
116C 116D
115A
100C
100D
100A
100B
101A 101B
101D
S103
102A
102B
113B 113A 103
198D
197A 197
194B
151A 152A 157D 156A4
195B
157A
157J
194A
193G
193F
S101
193E
193D 193C
188B
187186
185184183
180A
157B
E101
176H
172G
172E
172D
172F
172I
172J
172C
172B
172A
S104
162A
160160A159159A 159B159C
158A
168A
161A
165 164
168B
157E
169C
169B
169A
161B
173174
175A
157C 177A
A117A
A117
A120 A119 A118
A123
A121
A125
A122A
A122B
A124 A126
A127 A129
A130 A131
A128
A132 A133
A135 A134
AS100
A114
A122
A136 A137
A116 A115 A112
A140A
A140
A139 A138E A138D A138C A138B
A141
A142
A138A A138
A143A138F
A109A111
A110
A148 A147
A146 A138G
A145
A144
A105
A106
A107A A107
A106F
A106A
A106BA106C
A106E A106D
A104
A102 A101B
A101A
A101 A101C
A101D
A100
A101E
154 156A1
156B 156
147C
147G
147F
148A147H
147A
147E
187A
LAUNDRY
VETERANCE
BEN.
VETERANCE
BEN.
FIRE
CLOS.
LAUNDRY
STOR. STORAGE VEST
CAT
SCAN
OFFICE
COMPUTER
RM
XRAY FILE
STOR
LAUNDRY
CORR
PATIENT
CLOTHING
STORAGE
ELEC
CLOS
ELEV
WOMENS EMPLOYEE
LOUNGE
SOCIAL
WORK
CLINIC
OFFICE
STAIRS OFFICE
LITTER
AREA
MORGUE
AUTOPSY
TLT
TLT
XRAY
CAT
SCAN
STOR
CL
CL
CL
STORAGE
ULTRTA
SOUND
OFFICE
XRAY FILE
STOR
SOILED
UTIL
VIEWING
RADIOLOGY
DEXA OFFICE
XRAY XRAY
WAITING
WAITING
FXC
TLT
XRAY
OFFICE
OFFICE STOR
STRESS
OFFICE
WAITING
ELEV
W
TLT
TLT
MENS
OFFICE
OFFICE
OFFICE
DIET CONSULT LOBBY
OP MANGER
OFF
RESPIRATORY
RESP.
EXAM/TREAT
RESP.
TOILET
CASHIER
TEL
CL
STAIRS
ELEC
RM
BILLING
OFF
EXAM/TREAT
CORR
EXAM/TREAT
EXAM/TREAT
WAITING
TOILET
TOILET
CLERK/HBA
CORR.
CLERK/HBA
CLERK/HBA
EQUIPMENT
RM
CORR.
NURSE
STA.
STOR.
STAIRS DIRTY
UT.
ENT./CONF.
CORR.
NURSING
CONSULT. SURG.
NURSE
EXAM
AUDIOLOGY
ELECTRIC
AUDIOLOGY
OFFICE
OFFICE
OFFICE PRIMARY
CARE
M
TLT
W
TLT
PR
CAREMED
DIR
CORR
CLERK
OFF
CHIEF
CLERK
OFF
CLERK
OFF
CLERK
OFF
CLERK
OFF MULTI-PURPOSE
SECRETARY
PR. CARE
OFF
MED
PREP
VEST
MED
RECORDS
OFFICE
STAIRS
MED
RECORDS
EQUIP
CLERK CLERK
VEST
POLICEDIR.SECURITY
M.
TLT
W.
TLT
MECH
RM
MECH
RM
OUTPATIENT
LOBBY
ELEV
CHECK-IN
CLERK
CLERK
CLERK
CLERK
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
EXAM
RM
STAIRS
WAITING
ROOM
HAC
MECH
RM
ELEC.
CL.
DIR.OPSERV.
OFFICE
EXAM
RM
CORR
B.P.SCR
RM
TLT ELEC
CL
TEL
CL
TLT
EXAM
RM
TLT
VAULT
PHARMACY
EXAM
RM
EXAM
RM
EXAM
RM
CORR
EXAM
RM
EXAM
RMTLT
HAC
STOR.
OFFICE
CONF
RM
PHARMACY
OFF
MECH
SHAFT
MECH
SHAFT
WAITING
CORR
PAT
TLT
STAFF
TLT CONF/MTG
STAFF
RM.
CLERKS
MEDS
DISCHARGE
DISCHARGE
CLEAN
UTIL. SOILED
EX/TRT/OFF
EXAM
RM
EX
RM EX/TRT/OFF
CORR
EX
RM EX/TRT/OFF
EX/TRT/OFF EX/TRT/OFF
STAIRS
CORR
CORR
EX
RM
EX/TRT/OFF
EX/TRT/OFF
EX/TRT/OFF EXAM
ELEC.CL.
HAC
PAT
TLT
BED
BED
BED
BED
DECONTAMINATION
VESTIBULE
EQUIP.
ALCOVE
CORR
CORR
NURSES
STATION
CORR
EXAM
RM
OXYGEN
ALCOVE
CLEAN
HOLD
MED
RM. NOUR
CLERKA
TRIAGE
REGISTRATION
CENTRAL
REGISTRATION
TLT/SHR
ON-CALL
ELIGIBILITY
MACHINES
OPERATOR
STAFF
TLT
V.I.C
OFFICE LOCKERS
CORR
CORR WAITING
WHEEL CHAIR
STOR.
WAITING
RECEP
AOD
VESTIBULE
ER
WAITING
CLINIC
CLOSET
RM
EXAM
RM
PRACTITIONER
NURSE
PRACTITIONER
EXAM
RM
INTERVIEW
H O U S E
K E E P
IN
G
TOIL
ROOMSCAN
CONTROL
RM
FREEZER
FREEZER
OXYGEN SMOKING
RM
OFFICE
LOCKER
SUPERVISOR
CONSULT #
CONSULT #
RX
PICKUP
STORAGE
MONITOR
ECHO/EKG
ENTRANCETOILET
CAROTID
SECURITY
EXISTING
STORAGE
FUTURE MENTAL HYGIENE & CLINIC
SPACE 40' X
72'
FUTURE EXPANSION OF
ADMINISTRATION
U P
UP
DN
REFRIGERATOR
LEOB
KPA(1)
KPB
KPCUP
W208
232C
236A
W202
234A
229A
S201
E202
240C
240B
E200
222 A
225A
W207
W203
W201
RECYCLING & TRASH
RED BAG STORAGE
CORR
FOOD FREEZER
CORR
CLEANING SUPPLIES
STOR
STOR
WAREHOUSE
STORE
TLT
INGREDIENT STORAGE
BREAK ROOM
STAIRS
FOOD BANK
SOILED
ELEV
KITCHEN
DISH ROOM
DIETICIAN OFFICE
CHIEF NUTRITION
ELEV
REFRIGERATOR
OFFICE
REFRIGERATOR
CL
TOILET
RECEIVING
BREAKROOM
x x x x x x x x x xxxxxxx x
CHEMISTRY
LAB
OFFICE
253A
OFFICE
253B
SECRETARY
253C WAITING ROOM
253D
TOILET
253E
TOILET
253F
LAB
253G
PHLEBOTOMY
253H
LAB
BLOOD BANK
253J
UNPACKING
253K-A
EMPLOYEE
LOCKER ROOM
253L
HAC
253M
SPEC
CHEMISTRY
253N
LIBRARY
WASH ROOM
253P
EQUIP
253Q
STORAGE
253R
MICRO
BIOLOGY
253S
MICRO OFFICE
253T
MICROBIOLOGY
253U
HISTOLOGY
253V
TOILET
254A
TOILET
254B
LAB
CONFERENCE
ROOM
WORK ROOM
256A
OFFICE
256B
STORAGE
253K
CRASH CART
253L-A
CORRIDOR
274G
CORRIDOR
STAIRS
S204
256D
256E
256F
OFFICE
TOILET
OFFICE
OFFICE
C O
NT
RO
L
RO
O M
OFFICE
OFFICE
SEC OFF ICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICEOFFICE
OFFICE
OFFICE
ED. SPACE
ED
SP
AC
E
SOCI AL WK
OFFICE
LIBRARY
TO
OFFICE
CONFERENCE ROOM
EX.
VENT ILAT ION
DUCT
CORRIDOR
CORRIDOR
274F ELEVATORS
E 201 OFFICE
ED. SPACE
UP
UP
274B
240A
216A
205A
S203
203A
240D
274A
S202 E200
271272 273 268
241A
243 243A 243B 244A
251251A
252A
265266
274C
274D
275A
275B
275C
273A
CORR
OFFICE
DIRECTORS
VOLUNTEER STOR
CHIEF VOL
SERV
SECRY VOL
SERV
CATHOLIC
SOC WK
OFFICE
OFFICE
OFFICE
SACRISTY
CHAPLIN
OFFICE
HAC
STAIRS
PROSTHET
OFFICE
STOR
CHAPEL
FXC
ELEC
CLO
EDUCATION
CLASSROOM
LOUNGE
CHAPLAIN
CORR
STAIRS
ELEV
VOL.
KIT
HAC
ELEC.
CL
TELE
CL
OFFICE
RECEPTIONIST
WAITING
ROOM DARK
RM XRAY XRAY STOR
STOR
EXAM
ROOM
STOR
STERILIZER
RM
EXAM/TR
DENTAL CAST
RM
EXAM/TREXAM/TR
ORAL
SURG
STORAGE
STORWOMENS
MENS
LOBBY
VEST
CORRIDOR
CORR
CORR
CORR
CORR
TEL
OFFICE
STOR
MECH
ROOM
DIET
COMM
SUITE
CORRIDOR
MINI
AUDITORIUM'B' &
'C'
MINI
AUDITORIUM
'A'
X X X X
X X
X X
Fountain
Fountain
S304
S301
E301
364365
370B
366B
356B
357B
360359358357J
359H 357-3 357-2 357-1
357D
357A
356-5
356-4
356-3
356-2
352-1
356-6
368A
366C
350A 352A
366D
245C 345B
345A
307A
309A
377C
369A 369B
370A
377A
376C
376B
375B
375C
376A375A
366E
377B
381A
382B
342B
342A
342C
321322323324
S300
S302E300
313A
315A
302A
305A
306B
S303
305C
301B
319A321A
326 327
331 332
325B
334A
386A
386B
386C
386D
386E
386F
386G
357C
366A
332A
383A
342D
335A
335B
300A
305B
306A
302B
306C
323A
STAIRS
STAIRS
ELEV
ANESHESIA
WORKROOM
TEL
ELEC
ENGSTOR
STOR
SCRUB
RM
OPER RM
OR
OPER RM
OR
XRAY
OR
CYSTOSCOPY
STOR
ICU
HAC
TLT
ICU
CL LIN
ICU
MEDICATION
ROOM
UTILITY
ROOM
NURSE
STA
NURSE STA
OR
FEMALE
LOCKERHACSTORAGE
ISOLATION
ROOM
ISOLATIONRECOVERY
OR
RECOVERY
OR
RECOVERY
OR
TLT
PATIENT
RECEIVING
SLD UT
OR
1-BED RM
ICU
1-BED RM
ICU
1-BED RM
ICU
1-BED RM
ICU
1-BED RM
ICU
1-BED RM
ICU
MEDICAL
SVC
STER RM
OR
SCRUB
RM
SHOWER ISOLATION
NRS
SUPR
CONSUT
RM
STORAGE
VISITORS
LAUNGE
TLT STAFF
LOUNGE
SCRUB
RM
M. DRESS RM
ICU F. DRESS RM
ICU
TLT
ICU
TLT
TLT
STORAGE
SPD
STOR
OR
DRK RM
OR
STER. RM.
OR
STORAGE
SPD
SH
LOUNGE
OFFICE
SH
M
TLT
F
TLT
HEAD NRS
OF
PAT RCVG
OR
SLD UT
OR
CONF RM
OR
STORAGE
SPD
STERILIZATION RM
SPD
WAREHOUSE
SPD
STER RM
SPD
HAC
DECONT AREA
SPD
STOR
W. DRESS RM
SPD
TLT
M. DRESS RM
SPD
CHIEF
SPD
SEC SURG
SVC
OFFICE SURG
SVC
CHIEF SURG
SVC
CHIEF MED
SVC
HOPETEL
HOPETEL
HAC
WAITING
ROOM
NURSING
NURSING
WAITING
ROOM
MED
REC
NRS
STA
NURSINGEXAM
RM
SURGERYEYEGUHAC
STAIRS
MECHANICAL
ROOM
STOR
TLT
ELEC
CLO
TEL
CLO
STAIRSELEV
TLT
TLT NRS
SVC
NURSES
STATION
DAY
ROOM
CO
ORDINATOR
PODIATRY
UTILITY
RM
NURSING
GU
SURGERY
STAIRS
DR
RM
BATH/SH
DR
RM
DRESS
RM
TLT
DRESS
RM
SD
LINEN
TLTTLT
WAITING
ROOM
NEURO
EXAM
NEURO
NURSING
EXAM
RM EXAM
RM
FXC
CLOSET
EYE
TECH
NURSING
TLT
NURSING
CORR
LOBBY
CORR
CORR
CORR
CORR
CORR
CORR
IV
STOR
HAC
ELEV.
EQUIP
TLT
TEL
CLO
SECRETARY
OFFICE
CLERICAL
STAFF
GU
SURGICAL
ROOM
ROOM
CHECK
OUT
SPECIALITY
SERVICE
PODIATRY
MED.RM
S400
429 430 431 432
415A
S404
434I
S401
434J
443444 445447
S402
444A
400401
E400
405406
412A
413A
444A 444B
444C414
418417
STAIRS
4-BED RM NRS
SVC
4-BED RM NRS
SVC
TLTTLT
1-BED RM NRS
SVC
NRS.
STATION
STAIRS
MECHANICAL
ROOM
THERAPY
RECREATION
SLD
UT
STAIRS
HAC
CONG.
BATH
LOUNGEOFFICE
CL
LINEN
MED
PREP
OXY
STOR
STAIRS
TEL.
CL
CORRIDOR
OFFICEOFFICE
OFFICE
TLT
ELEV
STOR
STOR
NOUR
KIT
LINEN
ROOM
BREAK
ROOM
UTL.
ROOM
STO
ELEC
ROOM
TLT
1-BED RM NRS
SVC
ISOLA
ISOLA
CORR CORR
SECR
CORRFXC
FXC
CRASH
CART
TEL.
CL
STOR
NRS.
STATION
TOILET TOILET
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
KEY PLAN - MULTI FLOOR
1ST FLOOR
MECH RM
171 4TH FLOOR
MECH RM
1ST FLOOR
LAUNDRY
141D
BASEMENT
MECH ROOM
BASEMENT
MECH ROOM
6/ 7/
:0
6:
A M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
JKG TP
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
01-A002
BUILDING 1 - CONTRACTOR'S WORK PATH
PLANS
06/07/2018
17028
100% CONSTRUCTION DOCUMENTS
NORTH
TRUE NORTH
PROJECT
CONTRACTOR(S) TO HAVE ACCESS TO
FREIGHT ELEVATOR F05. ELEVATOR IS
ACCESSIBLE THROUGH THE ON GRADE
ENTRANCE AT SECOND FLOOR RECEIVING
W203 AND WAREHOUSE W202.
1" = 40'-0"
00-BASEMENT FLOOR-EXIST
1" = 40'-0"
01-FIRST FLOOR-EXIST
1" = 40'-0"
02-SECOND FLOOR-EXIST
1" = 40'-0"
03-THIRD FLOOR-EXIST
1" = 40'-0"
04-FOURTH FLOOR-EXIST
WORK AREA
MECH RM 453
PRIMARY PATH UP
STAIRWELL FROM FIRST
FLOOR AT-GRADE
ENTRANCE
LEGEND:
CONTRACTOR'S PRIMARY ENTRANCE/PATHWAY
CONTRACTOR'S SECONDARY ENTRANCE/PATHWAY
AT-GRADE ENTRANCE TO
1st AND 4th FLOOR
MECHANICAL ROOMS
WORK AREA
MECH RM 155
WORK AREA
LAUNDRY 141D
CONTRACTOR(S) ACCESS
THROUGH FREIGHT
ELEVATOR F05.
WORK AREA
MECH RM ENG SVC 18
WORK AREA
A/C SHOP ENG
SVC 11
CONTRACTOR(S)
PRIMARY STAGING
AREA AT CONCRETE
PLAZA EAST OF
BUILDING, REFER TO
ARCHITECTURAL SITE
PLAN
STAGING AREA TO BE
FENCED OFF AND
SECURED WITH
LOCKING GATE(S)
CONTRACTOR(S) SECONDARY
STAGING AREA TENTATIVE
LOCATION. FINAL LOCATION
TO BE DETERMINED BY VA
PRIOR TO CONSTRUCTION,
REFER TO ARCHITECTURAL
SITE PLAN
STAGING AREA TO BE FENCED
WITH LOCKING GATE(S)
DIRECT ACCESS
TO WORK AREA
MECH RM 155
GENERAL PROJECT NOTE:
1. CONTRACTOR(S) SHALL SCHEDULE AND COORDINATE PHASING WITH VA
ONCE DELIVERY DATES ARE KNOWN,
TEMPORARY AHU
MAY BE SET IN
SERVICE DRIVE
LEADING TO MECH
RM 155
TEMPORARY AHU
MAY BE SET IN
GRASSY AREA
OUTSIDE OF
A/C SHOP 11
TEMPORARY AHU(S) MAY
BE SET ON ROOF OF
MECH RM 453 ON THE
ADJACENT ROOF AREA
1-HOUR SMOKE BARRIER
1-HOUR FIRE PARTITION
2-HOUR FIRE PARTITION
CONTRACTOR TO INSTALL NEW AIR HANDLING
UNIT PER HVAC DRAWINGS ON ROOF OF
EXISTING FIRST FLOOR LAUNDRY AREA.
WORK ON ROOF FOR PENETRATIONS, CURB,
ETC. TO BE COMPLETED BY SIMON ROOFING
SO AS NOT TO VOID EXISTING WARRANTY
CONTRACT. CONTACT KELLY WEST OF SIMON
ROOFING FOR MORE INFORMATION ON THE
WARRANTY AND ASSOCIATED WORK TO BE
COMPLETED. PHONE 1-866-641-7663 OR EMAIL
TO KELLYW@SIMONROOFING.COM
RAMP
N O F I R E A R M S O R O R W E A P O N S A L L O W E D O N T H I S P R O P E R T Y
FIRE HYDRANT
S
CONCRETE PAD
FA
N
TRANSFORMER PAD
#16
#8
#03
#19
GAZEBO
#06
#10 #05
#04
#07
#01
MAIN BUILDING
#12
#02 T-3
#17
#18
#20A
#20B
#14
#15
#11
GAZEBO
#09
SMOKING SHELTER
27TH STREET
27TH STREET
PL
EA
SA
NT
V
AL
LE
Y B
OU
LE
VA
RD
OL
D
US
R
OU
TE
CONC. PAD
1127.2
1156.0
1130 1
W
W
W
W
W
W
S
S
S
W
W
W W
W
SW
S
W
CONTRACTOR(S) PRIMARY STAGING AREA AT THIS LOCATION. STAGING
AREA TO BE FENCED OFF AND SECURED WITH LOCKING GATE(S).
COORDINATE ANY WALKWAY, AISLE, DRIVE LANE, OR PARKING SPACE
CLOSURES THROUGHOUT THE PROJECT DURATION WITH COR PRIOR
TO SUCH CLOSURES. TYPICAL FOR ALL STAGING AREAS.
CONTRACTOR(S) SECONDARY STAGING AREA TENTATIVE
LOCATION. FINAL LOCATION TO BE DETERMINED BY VA PRIOR
TO CONSTRUCTION, STAGING AREA TO BE FENCED WITH
LOCKING GATE(S). COORDINATE EXTENTS OF STAGING AREA
WITH COR PRIOR TO INSTALLATION.
COORDINATE POSSIBLE THIRD STAGING AREA WITH THE COR
NEAR BUILDING 3 BOILER PLANT. STAGING AREA SIZE AND
EXACT LOCATION TO BE DETERMINED PRIOR TO INSTALLATION.
COORDINATE JOB TRAILER LOCATION NEARBY WITH THE VA
PRIOR TO PLACEMENT.
BUILDING #3
BUILDING #1
BUILDING #4
BUILDING #5
CONSULTANTS:
Drawing Title
Approved: Site Manager
Project Title
Location
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
ARCHITECTS/ENGINEERS:
6"
6" 6" o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
Approved: Project ManagerApproved: Manager, Projects Section
Approved: Vice President, Facilities Management
Approved: Chief Operating Officer
Approved: Director
65432
SEAL
209 SANDUSKY STREET
PITTSBURGH, PENNSYLVANIA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
Revision# Date
503-15-205
JKG TP
01-A003 06/07/2018
100% CONSTRUCTION DOCUMENTS
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
06/07/2018 17028
ARCHITECTURAL SITE PLAN
NORTH
TRUE NORTH
PROJECT
1" = 60'-0"
ARCHITECTURAL SITE PLAN
DRAWING SYMBOLS
SYMBOLS DESCRIPTION
PIPELINE ABBREVIATIONS HVAC SYMBOLS
EQUIPMENT TAG ABBREVIATIONS
DESCRIPTIONSYMBOLS
PIPELINE SYMBOLS
DOUBLE LINE SHEETMETAL
SINGLE LINE - SHEET METAL
DESCRIPTIONSYMBOLS
DUAL TEMPERATURE WATER RETURN
DUAL TEMPERATURE WATER SUPPLY
HOT WATER HEATING RETURN
HOT WATER HEATING SUPPLY
INVERTED ECCENTRIC REDUCER
(VENTURI FLOW STATION)
TWO-WAY MODULATING
THREE-WAY MODULATING CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
BALANCING COCK
WATER FLOW MEASURING DEVICE
PIPING TURNED DOWN
TWO-WAY CONTROL VALVE
MOTORIZED VALVE
AUTOMATIC AIR VENT
PIPING TURNED UP
FUNNEL DRAIN
CONTROL VALVE
A
M
MANUAL AIR VENT
(TWO POSITION TYPE)
AQUASTAT
PRESSURE TAP
THERMOMETER
STRAINER
PRESSURE GAUGE
UNION
ECCENTRIC REDUCER
MANUAL VOLUME CONTROL DAMPER (VD)
RISE/DROP IN DUCTWORK
(ARROW SHOWS DIRECTION OF DROP)
SMOKE DAMPER/DETECTOR
PANEL IN DUCT AND CEILING)
EXHAUST AIR DUCT DN
SUPPLY AIR DIFFUSER
ACCESS DOOR ON SIDE OF DUCT
EXHAUST REGISTER
RETURN AIR REGISTER
ACCESS DOOR ON BOTTOM OF DUCT
DETECTOR BY E.C. DAMPER BY H.C.
FIRE DAMPER AT FIRE WALL (PROVIDE ACCESS
OR HORIZONTAL DUCT ABOVE CEILING (PROVIDE
FIRE DAMPER IN VERTICAL DUCT THRU FLOOR
ACCESS PANEL IN DUCT AND WALL OR CEILING)
SUPPLY AIR REGISTER (DUCT OR WALL)
EXHAUST/RETURN AIR REGISTER (DUCT OR WALL)
COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
SUPPLY DUCT DN
RETURN AIR DUCT DN
EXHAUST AIR DUCT UP
RETURN AIR DUCT UP
SUPPLY DUCT UP
ROUND SUPPLY, RETURN OR
OVAL SUPPLY, RETURN OR
RECTANGULAR SUPPLY, RETURN OR
DIRECTION OF AIR FLOW)
DUCT W/O TURNING VANES
DUCT MOUNTED SMOKE
BY EC, INSTALLED BY HC
RELIEF DUCT WIDTH (SHOWN)XDEPTH
RELIEF DUCT WIDTH (SHOWN)XDEPTH
LOW LOSS TAKE OFF (ARROW INDICATES
RADIUS ELBOW (DUCT WIDTH 17" AND LOWER)
(ARROW INDICATES AIR FLOW DIRECTION)
BOOT CONNECTION WITH MANUAL VD
DUCT W/TURNING VANES (DUCT WIDTH OVER 18")
WALL SWITCH
DUCT/SPACE STATIC PRESSURE SENSOR
DETECTOR PROVIDED
CONICAL SPIN-IN FITTING
24"X24"24"X24"
12"X12"
SD
S
WS
M
AD
REFRIGERANT LINE
REFRIGERANT SUCTION
RL
RS
HWHS
HWHR
DTS
DTR
THERMAL VAV DIFFUSERTF
CD CONDENSATE DRAIN LINE
MPS MEDIUM PRESSURE STEAM SUPPLY
MPCR MEDIUM PRESSURE CONDENSATE RETURN
PUMPED CONDENSATEPC
HRS ENERGY (HEAT) RECOVERY SUPPLY
HRR ENERGY (HEAT) RECOVERY RETURN
NAME PIPE TO BE REMOVED
NAME EXISTING PIPING TO REMAIN
TEE- OUTLET
SIDE CONNECTION
CAPPED OUTLET
TEE - OUTLET UP
12"X12"
12"/12"
RELIEF VALVE
BUTTERFLY VALVE
PLUG VALVE
GATE VALVE
GLOBE VALVE
PIPE BREAK (SINGLE LINE)
DIRECTION OF FLOW
FLEXIBLE CONNECTION
BACKFLOW PREVENTION DEVICE
DUCT END CAP
24X12
SQUARE ELBOW WITH
TURNING VANES
RADIUS TURN ELBOW
RETURN CROSS
SECTION DN
EXHAUST CROSS
SECTION UP
SUPPLY DUCT
CROSS SECTION DN
RETURN CROSS
SECTION UP
CROSS SECTION UP
SUPPLY DUCT
ROUND DUCT SIZE (DIAMETER)
FLEXIBLE DUCT (DIAMETER SIZE)
DUCT SIZE (WIDTH X DEPTH)
24"Ø
DUCT W/ TURNING VANES
CONDENSER WATER RETURN
CONDENSER WATER SUPPLYCWS
CWR
CTD COOLING TOWER DRAIN LINE
BALL VALVE
(HINGED & GASKETED)
(HINGED & GASKETED)
FD
F/SD
FDFD
LPS LOW PRESSURE STEAM SUPPLY
LPCR LOW PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM SUPPLY
HPCR HIGH PRESSURE CONDENSATE RETURN
BACKDRAFT DAMPER
B
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
24"Ø
12"Ø
DRAWING NUMBER WHERE DRAWN
H200
SECTION LETTER
DRAWING NUMBER WHERE DRAWNH100
DETAIL NUMBER
CONNECT TO EXISTING AT THIS POINT
DEMO/REMOVE TO THIS POINT
EQUIPMENT NUMBER1
AHU POWERED EQUIPMENT
EQUIPMENT NUMBER1
RHC NON-POWERED EQUIPMENT
CD-#
# AIRFLOW QUANTITY
DIFFUSER/REGISTER/GRILLE TYPE
STAINLESS STEEL DUCTWORK
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
ACC AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACCUM ACCUMULATOR
AHU AIR HANDLING UNIT
ASHP AIR SOURCE HEAT PUMP
B BOILER
BB BASEBOARD HEATER
BD BAROMETRIC DAMPER
BDD BACK DRAFT DAMPER
CC CHILLED WATER COOLING COIL
CD CONDENSATE DRAIN
CIRC CIRCULATOR
CMPR COMPRESSOR
CONV CONVECTOR
CP CONDENSATE PUMP
CUH CABINET UNIT HEATER
DC DRY COOLER
EF EXHAUST FANS
ER EXHAUST REGISTER
ERW EXHAUST REGISTER WALL
ET EXPANSION TANK
ECUH ELECTRIC CABINET UNIT HEATER
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WALL HEATER
EVAP EVAPORATOR
FT FINNED TUBE RADIATION
FCU FAN COIL UNIT
FPB FAN POWERED BOX
FU FURNACE
GIV GRAVITY INTAKE VENTILATOR
GRV GRAVITY ROOF VENTILATOR
H HUMIDIFIER
HC HOT WATER HEATING COIL
HUH HORIZONTAL UNIT HEATER
P PUMP
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
RG RETURN GRILLE
RR RETURN REGISTER
RAG RETURN AIR GRILLE
RCP RADIANT CEILING PANEL
RTU ROOF TOP UNIT
SF SUPPLY FAN
SSAC SPLIT SYSTEM AIR CONDITIONING UNIT
SSDC SECURITY SUPPLY DIFFUSER CEILING
SSEF SECURITY SMOKE EXHAUST FAN
SSGW SECURITY SUPPLY SUPPLY GRILLE WALL
SLSD SUPPLY LINEAR SLOT DIFFUSER
UH UNIT HEATER
UV UNIT VENTILATOR
UCD UNDER CUT DOOR
VAV VARIABLE AIR VOLUME
DRAWING KEYNOTE - DEMOLITION
DRAWING KEYNOTE - PLAN / ELEVATION NEW WORK
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
6/ 7/
:2
3:
P M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
JKG JKG
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
00-H001
HVAC SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
06/07/2018
14-
100% CONSTRUCTION DOCUMENTS
SS SOIL STACK
ST PR STATIC PRESSURE
ST STL STAINLESS STEEL
STD STANDARD
STER STERILIZER
STL STEEL
STOR STORAGE
STR STRAINER
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL TOP
T TOP
TA THROWAWAY
TAN TANGENT
TC TELECOMMUNICATIONS
CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TDV TRIPLE DUTY VALVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROOVE
TH THERMOMETER
THRES THRESHOLD
TR TEMPERATURE RISE
TRANS TRANSITION
TRANSR TRANSFORMER
TSTAT THERMOSTAT
TV TURNING VANES OR TELEVISION
TYP TYPICAL
UC UNDER CABINET OR UNDER CUT
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VAL VALVE
VD VOLUME DAMPER
VENT…