36C24418B0585 0001 Drawing 01-ED101.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419C0030-000.docx | DOCX document | |
| 36C24418B0585-0004001.pdf | ||
| 36C24418B0585-0004000.docx | DOCX document | |
| 36C24418B0585-0003001.pdf | ||
| 36C24418B0585-0003000.docx | DOCX document | |
| 36C24418B0585-0002002.pdf | ||
| 36C24418B0585-0002001.pdf | ||
| 36C24418B0585-0002000.docx | DOCX document | |
| 36C24418B0585-0001001.pdf | ||
| 36C24418B0585-0001005.pdf | ||
| 36C24418B0585-0001004.pdf | ||
| 36C24418B0585-0001006.pdf | ||
| 36C24418B0585-0001002.pdf | ||
| 36C24418B0585-0001000.docx | DOCX document | |
| 36C24418B0585-003.docx | DOCX document | |
| 36C24418B0585-001.docx | DOCX document | |
| 36C24418B0585-006.docx | DOCX document | |
| 36C24418B0585-002.docx | DOCX document | |
| 36C24418B0585-005.pdf | ||
| 36C24418B0585-004.pdf | ||
| 36C24418B0585-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V F
D V
F D
M
V F
D
M
V F
D
VFD
V F
D
EXISTING
AHU-6 (SF-6)
EXISTING
RF-4 (RF-6)
PANEL
PP-4
RF-4(RF-6)
VFD W/DISC.
20A/3P/208V
CB AT PP-4
AHU-6(SF-6)
VFD W/DISC.
100A/3P/208V
CB AT PP-4
EXISTING
LAUNDRY CHILLER
(ON GRADE
OUTDOORS)
EXISTING
LAUNDRY RM
AHU
PPAC
LAUNDRY PUMP
PPAC-7
30A/3P 208V/3PH
LAUNDRY FAN
PPAC-5
50A/3P 208V/3PH
LAUNDRY CHILLER
PPAC-7
200A/3P 208V/3PH
EXISTING
AHU-1 (SF-1)
EXISTING
RF-1
LP1-A1/7
W/DISC.
50A/3P/480V MCP
AT ME-MCC1
30A/480V/3PH NF
DISC. 15A/3P MCP
AT ME-MCC1
ME-MCC1
ME-MCC2
EXISTING AHU-3 (SF-3)
EXISTING AHU-5 (SF-5)
EXISTING
RF-3 (RF-5)
W/DISC.
7A/3P 480 MCP AT ME-MCC2
EF-2
60A/208V/3PH COMB
STARTER W/NF DISC.
50A/3P/208V CB AT ESP-3H
EXISTING
EF-2
PANEL
ESP-3H
AHU-5(SF-5) VFD W/DISC.
15A/3P/480V MCP AT ME-MCC2
AHU-3(SF-3) VFD W/DISC.
100A/3P/208V CB AT ESP-3H
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
KEY PLAN - MULTI FLOOR
1ST FLOOR
MECH RM
171 4TH FLOOR
MECH RM
1ST FLOOR
LAUNDRY
141D
BASEMENT
MECH ROOM
BASEMENT
MECH ROOM
6/ 8/
:1
9:
A M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
BK BK
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
01-ED101
ELECTRICAL DEMOLITION PLAN
06/07/2018
14-
100% CONSTRUCTION DOCUMENTS
NORTH
TRUE NORTH
PROJECT
1/8" = 1'-0"
BASEMENT - MECHANICAL ROOM 11
1/8" = 1'-0"
BASEMENT - MECHANICAL ROOM 18
1/8" = 1'-0"
1ST FLOOR - MECHANICAL ROOM 171
1/8" = 1'-0"
FOURTH FLOOR - MECHANICAL ROOM 453
1/8" = 1'-0"
1ST FLOOR LAUNDRY
ELECTRICAL DEMOLITION GENERAL NOTES
1 UNLESS NOTED OTHERWISE, REMOVE ALL ELECTRICAL DEVICES ASSOCIATED WITH MECHANICAL EQUIPMENT
IDENTIFIED SHALL BE DEMOLISHED. REMOVE ALL ASSOCIATED CONDUIT AND WIRE BACK TO THE UPSTREAM DISTRIBUTION DEVICE. EXISTING DEVICES SHOWN ARE DIAGRAMMATIC AND BASED ON FIELD SURVEYS AND/OR RECORD DRAWINGS PROVIDED BY THE OWNER AND DOES NOT REPRESENT THE FULL SCOPE OF DEMOLITION WORK. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE PLANS ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING DEVICES AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD CONDITIONS SHALL GOVERN. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN CLARIFICATIONS FROM ARCHITECT/ENGINEER IF NECESSARY.
2 CONTRACTOR SHALL PROVIDE A MINIMUM TWO WEEKS WRITTEN NOTICE PRIOR TO ANY SHUT DOWN. NOTICE IS
TO INCLUDE BUT IS NOT LIMITED TO THE LOCATION, PANELS AND DURATION OF SHUT DOWN.
3 OWNER SHALL HAVE RIGHT OF FIRST REFUSAL TO ANY EQUIPMENT, DEVICES, LUMINAIRES, ETC. DEMOLISHED
FROM RENOVATION AREA PRIOR TO DISPOSAL.
4 MAINTAIN CONTINUITY OF SERVICE TO AREAS OUTSIDE THE PROJECT BOUNDARY. PATCH AND REPAIR ALL CIRCUITS CUT OFF DURING DEMOLITION BY WIRING METHODS COMPATIBLE WITH THE EXISTING INSTALLATION.
5 THE ELECTRICAL CONTRACTOR SHALL REVIEW THE DRAWING OF ALL OTHER TRADES IN THIS CONTRACT. THE REMOVAL OF ELECTRICAL SERVICE TO ALL EQUIPMENT IDENTIFIED ON OTHER TRADE DRAWINGS IS THE
RESPONSIBILITY OF THE ELECTRICAL CONTRACTOR.
6 EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT AND LIGHT FIXTURES THAT MAY BE
CONNECTED TO THE SAME CIRCUIT REMAIN OPERATIONAL AND ACTIVE.
7 CONTRACTOR SHALL EXAMINE CONDITIONS AND TEST FUNCTIONALITIES OF ALL EXISTING ELECTRICAL EQUIPMENT IDENTIFIED TO BE RE-USED AND/OR RELOCATED. PROVIDE REPORT TO ENGINEER AND OWNER
PRIOR TO DEMOLITION.
ELECTRICAL DEMOLITION KEYED NOTES
1 DISCONNECT AND REMOVE EXISTING ELECTRICAL INSTALLATION INCLUDING BUT NOT LIMITED TO POWER
AND CONTROL WIRES/CONDUITS, DISCONNECT SWITCHES AND VFDs ASSOCIATED WITH MECHANICAL
EQUIPMENT IDENTIFIED TO BE DEMOLISHED BACK TO SOURCE.
2 REFER TO MECHANICAL DRAWINGS FOR DUCTWORK DEMOLITION IN THIS AREA. COORDINATE WITH MECHANICAL CONTRACTOR AND REMOVE AND RE-INSTALL EXISTING CEILING MOUNTED ELECTRICAL DEVICES AFTER THE INSTALLATION OF NEW DUCTWORK IS COMPLETE. CEILING MOUNTED ELECTRICAL DEVICES INCLUDE BUT ARE NOT LIMITED TO: LIGHTING FIXTURES, LIGHTING CONTROLS, FIRE ALARM
DEVICES AND SPEAKERS.
BethKassahun Stamp