36C24418B0585-0001002.pdf
PDF 657 KB Posted
- Solicitation number
- 36C24418B0585
About this file
36C24418B0585 0001 Drawing 01-E101.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24419C0030-000.docx | DOCX document | |
| 36C24418B0585-0004001.pdf | ||
| 36C24418B0585-0004000.docx | DOCX document | |
| 36C24418B0585-0003001.pdf | ||
| 36C24418B0585-0003000.docx | DOCX document | |
| 36C24418B0585-0002002.pdf | ||
| 36C24418B0585-0002001.pdf | ||
| 36C24418B0585-0002000.docx | DOCX document | |
| 36C24418B0585-0001001.pdf | ||
| 36C24418B0585-0001005.pdf | ||
| 36C24418B0585-0001003.pdf | ||
| 36C24418B0585-0001004.pdf | ||
| 36C24418B0585-0001006.pdf | ||
| 36C24418B0585-0001000.docx | DOCX document | |
| 36C24418B0585-003.docx | DOCX document | |
| 36C24418B0585-001.docx | DOCX document | |
| 36C24418B0585-006.docx | DOCX document | |
| 36C24418B0585-002.docx | DOCX document | |
| 36C24418B0585-005.pdf | ||
| 36C24418B0585-004.pdf | ||
| 36C24418B0585-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J J
DD DD
J J
DD DD
J
J J
J
DD DD
DD DD
J
DD
DD
AHU
RF
PANEL
PP-4
AHU-6 (RF-6)
AHU-6 (SF-6)
PP-4-16,18,20
PP-4-1,3,5
S R
AHU
RF
ME-MCC1
ME-MCC1-1
AHU-1 (SF-1)
ME-MCC1-2
AHU-1 (RF-1)
S R
AHU
AHU
PANEL
ESP-3H
ME-MCC2
AHU-3 (SF-3)
ESP-3H-49,51,53
ME-MCC2-7
AHU-5 (SF-5)
AHU-3 (RF-3)
AHU-5 (RF-5)
ESP-3H-44,46,48
ME-MCC2-91
RF
RF
S R
S R
RTU
L
(ROOF)
PPAC-13,15,17
S
R
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
KEY PLAN - MULTI FLOOR
1ST FLOOR
MECH RM
171 4TH FLOOR
MECH RM
1ST FLOOR
LAUNDRY
141D
BASEMENT
MECH ROOM
BASEMENT
MECH ROOM
6/ 8/
:1
9:
A M
CORRECT
RETRO-COMMISSIONING
DISCREPANCIES
503-15-205
BK BK
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
01-E101
ELECTRICAL NEW WORK PLAN
06/07/2018
14-
100% CONSTRUCTION DOCUMENTS
NORTH
TRUE NORTH
PROJECT
POWER GENERAL NOTES
1 FINAL LOCATION OF ALL EQUIPMENT SHALL BE DETERMINED IN THE FIELD AND SHALL BE INSTALLED AS DIRECTED BY
THE ARCHITECT OR OWNER'S REPRESENTATIVE. WHERE STRUCTURAL OPENINGS ARE NOT AVAILABLE, THE CONTRACTOR SHALL CORE DRILL WALLS AND FLOORS AS REQUIRED TO PERMIT PASSAGE OF CONDUITS. THE ELECTRICAL CONTRACTOR SHALL PROVIDE A MARKED-UP PLAN WITH LOCATION PENETRATIONS FOR REVIEW AND
APPROVAL OF THE STRUCTURAL ENGINEER BEFORE ROUGH-IN BEGINS.
2 DURING THE BIDDING PROCESS, THE ELECTRICAL CONTRACTOR SHALL REVIEW DRAWINGS AND SPECIFICATIONS OF ALL OTHER TRADES (ARCHITECTURAL, SITE/LANDSCAPING, HVAC, PLUMBING AND SPECIALTY TRADES). ALL ITEMS REQUIRING POWER INDICATED ON THESE DRAWINGS BUT NOT INDICATED ON THE ELECTRICAL DRAWINGS SHALL BE CONSIDERED A PART OF THE ELECTRICAL CONTRACTOR'S WORK. THIS WORK SHALL BE INSTALLED AS PER NEC
REQUIREMENTS AT NO ADDITIONAL COST TO THE OWNER.
3 THE CONTRACTOR SHALL MAKE EVERY EFFORT TO MAKE ALL FEEDER RUNS CONTINUOUS (NO CABLE BREAKS). IF SPLICING CABLES IN BOXES BECOMES NECESSARY, USE O.Z.G. TYPE "XW" CABLE TAPS, OR APPROVED EQUAL, AND TAPE EACH TAP IN APPROVED MANNER. OBTAIN APPROVAL FROM COR PRIOR TO PERFORMING THE WORK.
4 THE MECHANICAL CONTRACTOR SHALL PROVIDE DISCONNECT SWITCHES, VFD'S. OR COMBINATION STARTERS FOR ALL OF THEIR UNITS. THE ELECTRICAL CONTRACTOR SHALL RECEIVE THESE ITEMS FROM THE MECHANICAL
CONTRACTOR FOR INSTALLATION BY THE ELECTRICAL CONTRACTOR.
5 THE ELECTRICAL CONTRACTOR SHALL COORDINATE CONDUIT PENETRATIONS FOR ROOFTOP EQUIPMENT WITH MECHANICAL AND ROOFING CONTRACTORS. IF PROVISIONS ARE NOT IN PLACE FOR THESE PENETRATIONS THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR MAKING OWN PENETRATIONS AND CONTRACTING THE ROOF
CONTRACTOR FOR SEALING THE ROOF PENETRATIONS.
6 REFER TO MECHANICAL DRAWINGS FOR EXACT LOCATION OF ALL MECHANICAL EQUIPMENT.
7 PROVIDE CONDUIT AND WIRING AS REQUIRED TO MEET CIRCUITING SHOWN TO CONFORM TO NEC REQUIREMENTS.
8 PROVIDE EQUIPMENT GROUND CONDUCTOR IN ALL RACEWAYS. REFER TO PANELBOARD SCHEDULES.
9 REFER TO EQUIPMENT CONNECTION SCHEDULE FOR ELECTRICAL REQUIREMENTS AND CIRCUIT DESIGNATIONS.
10 ROUTE CONDUIT HIGH AGAINST STRUCTURE AND OFFSET UP BETWEEN JOISTS WHERE NECESSARY TO AVOID DUCT
WORK AND HVAC SYSTEM.
11 VERIFY AND COORDINATE EXACT ELECTRICAL REQUIREMENTS OF ALL EQUIPMENT WITH MANUFACTURER'S
RECOMMENDATIONS PRIOR TO INSTALLATION OF EQUIPMENT.
POWER KEYED NOTES
1 PROVIDE CONNECTION TO VFD WITH INTEGRAL DISCONNECT (FURNISHED BY MECHANICAL CONTROACTOR).
COORDINATE EXACT LOCATION OF VFDs WITH MECHANICAL CONTRACTOR. CONTRACTOR SHALL MAKE ALL CONNECTIONS TO NEW CONTROL WIRING AND EQUIPMENT ASSOCIATED WITH EACH MECHANICAL EQUIPMENT.
2 PROVIDE UNISTRUT MOUNTING STRUCTURE FOR VFDS. COORDINATE EXACT LOCATION ON SITE.
3 PROVIDE AND INSTALL DUCT SMOKE DETECTORS (FOR SUPPLY AND RETURN EACH) AND CONNECT TO THE NEAREST FIRE ALARM TERMINAL CABINET. FIELD VERIFY AND REFER TO MECHANICAL DRAWINGS FOR LOCATION
OF DUCT SMOKE DETECTORS.
4 PROVIDE (2) #12, (1)#12GND IN 3/4" CONDUIT AND EXTEND CIRCUIT FROM THE NEAREST RECEPTACLE CIRCUIT TO EACH OF THE AIR HANDLING UNITS FOR POWER TO RECEPTACLE AND LIGHTS INSIDE THE UNIT.
1/8" = 1'-0"
MECHANICAL ROOM 11
1/8" = 1'-0"
MECHANICAL ROOM 171
1/8" = 1'-0"
MECHANICAL ROOM 453
1/8" = 1'-0"
FIRST FLOOR LAUNDRY 141
BethKassahun Stamp
File details come from the government source that posted it.