This document is a Presolicitation Notice for a Department of Veterans Affairs (VA) construction project at the Batavia VA Medical Center. The solicitation (Number 36C24225B0043) is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS Code 236220, with a size standard of $45.0 million. The project involves kitchen equipment site preparation, specifically modifying electrical, plumbing, and HVAC systems to install a new dishwasher and booster heater, with a project magnitude between $100,000 and $250,000.

Key dates include a mandatory pre-bid site visit on Tuesday, August 5, 2025, at 1 PM ET, and a bid opening on Wednesday, August 27, 2025, at 11 AM ET. Bids must be submitted electronically to Idalia Algarin, Contracting Officer, by the specified time. The contractor will work with the kitchen vendor Ecolab to disconnect existing utilities and connect new equipment, with a total performance period of 70 calendar days from the Notice to Proceed. Bid bonding will be required, and solicitation materials will be available on SAM.gov starting July 29, 2025, with anticipated contract award in August 2025.

View the file

Other files

File Type Posted
36C24225B0043 0002.docx DOCX document
REQUEST FOR INFORMATION.docx DOCX document
site visit - sign in sheet.pdf PDF
B 2 drawings binder.pdf PDF
36C24225B0043 0001.docx DOCX document
ELECTRICAL EQUIPMENT SCHEDULE.pdf PDF
Schedules and Requirements.zip ZIP file
P07 - WAGE DETERMINATION.pdf PDF
Specifications.zip ZIP file
LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75.docx DOCX document
BUY AMERICAN ACT CERTIFICATE 52.225-2.docx DOCX document
Panel Schedule.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Presolicitation Notice

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24225B0043 X 07-29-2025

TBD

528A4-21-210 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227

IDALIA ALGARIN

NETWORK CONTRACTING OFFICE NC02

22875 UNION ROAD SUITE 3500

CHEEKTOWAGA

NY

14227

ALGARIN, IDALIA

716-862-7461 X 22395 The Contractor shall furnish all materials, supplies, equipment, personnel and supervision for Project # 528A4-21-210.

Kitchen Equipment Site Prep in accordance with the drawings and specifications at the Batavia VA Medical Center.

Completion Time: 10 weeks (70 Calendar Days) from the Notice to Proceed

This is a 100% Service-Disabled Veteran Owned Small Business (SDVOSB) set aside procurement. In order to be eligible for for award, Contractor must be registered in SAM (www.sam.gov) with a Unique Entity Identifier and are verified/visible/ certified as SDVOSB in www.vetbiz.va.gov and/or in the Dynamic Small Business Search (DSBS) (SBA - Dynamic Small Business Search) at the time of this procurement. Offerors must submit their annual Vets4212 Report. The North American Industry Classification System Code (NAICS) is 236220- Business Size is $45.0 Million.

Magnitude of Construction: Between $100,000 and $250,000.

Contractor will be responsible to coordinate and schedule work plan work typically during duty hours of 8AM to 4:30PM ET except as noted in the general conditions and as approved by the CO. Work shall comply with VA Specifications and regulations, all applicable Federal, State and Local codes, including specific regulations related to working at the Batavia VA Medical Center.

A pre-bid site visit is scheduled for Tuesday, August 5, 2025, at 1 PM ET. Prospective bidders shall meet at Batavia VAMC, Bldg 2 by the loading docks. NOTE: NO OTHER SITE VISITS WILL BE ALLOWED. INTERESTED BIDDERS ARE STRONGLY

ENCOURAGED TO ATTEND.

To preserve the integrity of the procurement process, all questions and request for information must be submtted in writing to Idalia Algarin, CO at idalia.algarin@va.gov. Questions must be received no later than Friday, August 15 2025 by 12 noon ET.

The bid opening will be held online via Microsoft Teams ( 1347-566-4838,956521366#) on Wednesday, August 27, 2025 at 11 am. ET. ONLY EMAILED BIDS to Idalia Algarin, CO at idalia.algarin@va.gov will be accepted. The bids shall include copies of the original bid bond.

VAAR 852.219-75 Limitations of Subcontracting Certificate is separete requirement. ATTACHED FAR 52.2225-2 Buy American Act Certificate is separate requiremetn. ATTACHED

BOTH CERTIFICATES MUST BE RECEIVED WITH THE BID.

NOTE: CONTRACTORS MUST ACKNOWLEDGE ALL SOLICIATION AMENDMENTS.

X 52.211-10 X

10 DAYS

11AM

EDT

08-27-2025 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

528-3650162-4192-854200-3223 23NRNR000

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

Idalia Algarin, CO

Construction Scope of Work Dishwasher Machine Preparation and Installation Project 528A4-21-210

Period of Performance – 70 days from Notice to Proceed

1. General Information

1.1 Location

Work performed under this scope will be for and conducted within VA Western New York Healthcare System (VAWNYHS) at the Batavia VA Medical Center (VAMC) located at 222 Richmond Avenue, Batavia NY 14020 under VA Project Number 528A4-21-210.

1.1.1 Period of Performance

The contractor is expected to work 40 hours per week to remain on schedule and staff this project to meet the period of performance. This project has an expedited timeframe due to its critical nature.

Total of 70 days (including time for equipment delivery) from Notice to Proceed to project acceptance. This shall include project submittals to be completed prior to the start of work and close out documents. The submittals shall be provided as soon as the Notice to Proceed (NTP) is issued.

Project Awarded; Prime Contractor puts his sub-contractors on Notice for the Notice to Proceed and to prepare the critical documents.

Day 1; NTP Issued by Contracting and VA COR prepares a kickoff meeting. The Contractor commences to gather the critical submittals and send them to the COR for review on the day that the NTP is issued.

Day 7; Critical submittals are all provided to the COR by Day 7 after the NTP at the latest. This shall include the safety / infection control plan, lead paint removal plan, all OSHA-30 certifications for the Site Superintendent and all Competent Person’s, specific training including but NOT limited to electrical training certifications and long lead equipment items for equipment such as the NEMA 4X panel, etc.

The Contractor is NOT allocated time to obtain training for OSHA, electrical safety, etc. The contractor shall be responsible for assuring that they and their sub-contractors are qualified to meet the project requirements at the time of bidding.

Day 21; Safety Plans, Infection Control and Hazardous Materials plans provided within One (1) week maximum after the NTP. All submittals approved within Three (3) weeks of NTP. Contractor shall make this a priority to execute this project.

Work to commence as soon as equipment arrives. The contractor shall provide a date of arrival as soon as the submittals are approved.

Work on site after mobilization shall be completed, reviewed and accepted within Two (2) weeks after mobilization.

The contractor will be working with the VA Equipment Vendor to set up and connect to the dishwashing equipment that is provided by others.

1.1.2 Work Hours - Hours of Operation

Not All work on this project is Monday through Friday 7:30AM to 4:00PM. It is expected that the contractor works 40 hours per week to remain on schedule. What is provided below is NOT all inclusive of off-hours work.

Off Hours Work: The contractor shall be expected to work off hours approximately 40% of the time on this project on site. The kitchen operates from 5am until 6pm each day and when the dishwashing machine is operational work shall be conducted off hours (after 6pm). When the Dishwashing Machine is disconnected the work can take place during normal business hours.

1.2 Background

Batavia VAMC was built in 1932 along with its kitchen. The most recent dishwasher was installed over 10 years ago and is in need of replacement. Due to the age of the dishwasher, the electrical, plumbing, and venting systems are outdated as well. Hence the replacement of the dishwasher will require modifications of all trades. This is a high priority job that is to be executed expeditiously. The contractor who is awarded this project shall accept the timeframe stated above. The dishwashing machine is critical to the service to our Veterans who preeminently reside at the Batavia VA.

1.3 Purpose

The purpose of this effort is to perform modifications of the electrical, plumbing and HVAC system to prepare for the installation of the new dishwasher machine. The contractor shall work with the kitchen vendor [Ecolab] to disconnect the existing utilities on the existing dishwasher to be removed and connect the new dishwasher and booster heater. The dishwasher and booster heater are provided by others, and all other work is provided as part of this contract.

The Batavia VAMC requires a Contractor to perform construction work necessary to accomplish this goal.

1.4 Scope

The scope of construction work is fully described in the construction documents (drawings and specifications). Additional administrative and management related requirements are described in Section 3: Requirements. A brief overview of the construction work is included but not limited to the following:

General Work Contractor shall disconnect and cap all unused connections to existing dishwasher machine which including but not limited to:

Domestic water – cap and prepare to connect to new dishwasher Detergent /chemical related – disconnect and remove Steam (back to main distribution as shown on drawings) Drain line cut and prepare new connection for new dishwasher Vents/exhaust – shall be refurbish and extend to new dishwasher venting location Electrical and control wirings Contractor shall remove existing dishwasher to a dedicated recycling bin that is located on campus per COR direction Contractor shall modify and utilize existing drain line connection for new dishwasher Contractor shall replace all flooring in the dishwasher room to match existing in areas as shown on drawings. New flooring will pitch to nearest floor drain per specification appropriately to prevent any standing water.

The contractor shall work alongside the kitchen vendor (Ecolab) with the new dishwasher installation.

The contractor shall extend and make all final connections to the new dishwasher that included but not limited to the following:

3/4” type L copper - domestic hot water threaded male connection to new water softener including shut off valve.

3/4” type L copper – water connection from the booster heater to new dishwasher including new shut off valve.

domestic water SHALL not be flex piping.

Drain Vent/exhaust Insulate all new and existing domestic water piping to the new dishwasher.

ALL Disciplines that shall penetrate floor/wall: The contractor shall perform a radar penetrating survey of the floor/wall where the core drill will take place for the new conduit penetration. The VA COR shall be present for this survey as there are in some location live electrical conduits in the concrete slab in this building. The intent of this is to locate any conduits or support beams prior to core drilling. After drilling, the floor shall be fire sealed around the conduits or pipes.

Contractor shall provide core drill’s report to COR for documentation and approval prior to proceed with core drilling through floor/walls.

The contractor shall survey the existing site conditions prior to bidding noting ceiling heights, routing of electrical, piping, etc.

Refer to the table provided for safety requirements in the Appendix section for the Site Superintendent and Competent Person (CP) for each discipline on this project.

Ceiling Grid Repair Work The electrical conduit runs (Demolition and New), and the Steam and Condensate Return demolition work is located above the suspended ceiling. The contractor shall be responsible to repair and or replace the ceiling grids and replace the ceiling tiles that are removed with new 2x2 ceiling tiles. No tiles or grid shall be re-installed that are damaged. The contractor shall anticipate replacing the ceiling tiles that are removed as they will become damaged.

Steam and Condensate Return Piping Removal Refer to the drawings provided. The contractor shall remove up to 60 feet of 2” diameter steam piping and 60 feet of 1” condensate return pipe to the point of disconnect. The work shall entail ceiling grid repair work, a utility shut down to turn off steam (refer to the 010000 GENERAL REQUIREMENTS SPECIFICATION) and cutting and capping the steam and condensate pipe.

Electrical Work Removal The electrical contractor shall be responsible to disconnect the existing dishwasher and supporting electrical systems from the existing electrical system so that this equipment can be removed from the building 2 kitchen as part of this contract. Refer to the electrical demolition drawings provided, electrical specifications and electrical data in the appendix of this document. The drawings shall provide information in conjunction with this document and the specifications.

Turn off the circuit breakers for the existing dishwasher and supporting equipment on the existing dishwasher electrical panel located on drawings. Lock and tag out work until all work is completed.

Disconnect electrical conductors and components from the dishwasher and supporting electrical equipment.

Remove existing disconnect switches, conduit, and conductors back to source panel that served the existing dishwasher.

Cover conduit penetrations in the electrical panel with blanks.

Keep the existing circuit breakers in the electrical panel. Provide a new updated typed panel schedule showing the circuits removed as “SPARE”.

Electrical New Work The electrical contractor shall provide a new electrical service to support the new dishwasher and booster heater. Refer to the electrical new work drawings, specifications and this document provided. The drawings shall provide information in conjunction with this document and the specifications. The new Kitchen Equipment Panel Schedule and the Electrical Equipment Connections Schedule is in the Appendix of this Document.

Provide and install new surface mounted NEMA-4X Rigid Stainless Steel lockable panel located in the dishwashing area 1st floor building 2. Refer to the drawings and schedules provided in this document.

Mount the new panel on stainless steel uni-strut on the wall and floor. Provide a shop drawing to detail how the Uni-strut will be mounted. There shall be NO trip hazards on the floor with the Uni-strut.

Provide circuit breakers as indicated on panel schedule and provide a new typed panel schedule inside of the panel.

Provide the conduit, conductors and pull boxes from the ground floor Panel-P to the new panel in the kitchen. Shall be galvanized rigid steel (GRS).

From the new panel in the kitchen to the disconnect switches provide GRS conduit. Some Rigid GRS conduits shall extend after the disconnect switch to a GALVANIZED junction box, then the termination that shall connect to the dishwasher and booster heater shall be 4-feet (max) of Galvanized flexible 3/4” conduit.

The contractor shall perform a radar penetrating survey of the floor where the core drill will take place for the new conduit penetration. The VA COR shall be present for this survey as there are in some location live electrical conduits in the concrete slab in this building. The intent of this is to locate any conduits or support beams prior to core drilling. There are existing live electrical conduits in some parts of the concrete slab.

Refer to the VA specifications provided including but NOT limited to; 260533 RACEWAY AND CONDUITS, 078400 FIRESTOPPING, 079200 JOINT SEALANTS to seal the penetrations around conduits. There shall be no penetration that is open between floors as this is a fire hazard. The penetration shall be sealed the day that the penetration is made.

Provide galvanized pull boxes as needed for ease of the conductor pull. The plans show general locations for pull boxes however it is the contractor’s discretion for pull box locations and to provide additional pull boxes as needed. The contractor shall assess this during the pre-bid walk through and include this in the bid.

Provide heavy duty 600-Volt rated, single arm throw, lockable (in the off position), NEMA-4X stainless steel disconnect switches for both the dishwasher and booster heater.

Non fusible for the 60-Amp, 3-pole booster heater Non fusible for the 100-Amp, 3-pole dishwasher The contractor shall make the final electrical connections (terminations) from the disconnect switches to the dishwasher and booster heater. Refer to drawings and schedules provided for conduit and conductor sizes. The contractor shall work with the kitchen supplier vendor for startup procedures on the kitchen equipment.

What is provided in the Scope for this document is NOT all inclusive. This is a summary, and the contractor shall review the contract drawings and specifications thoroughly prior to bidding on the project. Keep in mind contractor will be working side by side with Ecolab for the installation of the new kitchen equipment.

Refer to the requirements in this document, the new electrical panel schedule and equipment schedule at the end of this document, specifications and drawings.

1.4.1 Site Conditions, As Built and Record Documents

Although the VA makes every effort to keep drawings current to existing conditions, changes and updates are sometimes not recorded. It is therefore the Contractor’s responsibility to perform field investigation and verify the accuracy of the drawings with the actual conditions.

The contractor shall check existing conditions at the project site prior to bidding.

1.4.2 Quality Assurance/Quality Control Plan

The Contractor is responsible for reviewing the work done by any subcontractors that the Contractor has hired to assist with the completion of this SOW. The Contractor must provide the Government with a Quality Assurance/Quality Control (QA/QC) Plan that documents the methods, processes, procedures that are going to be implemented by the Contractor to validate the work their subcontractors perform.

1.4.3 Hazardous Materials

Hazardous material removal is required for this project. Refer to the contract Drawings, Safety Requirements Table in this SOW, Specifications (particularly the General Requirements and Safety Specifications) for ALL safety requirements.

Lead Paint Abatement Working adjacent to Asbestos Containing Materials (ACM) however NO ACM abatement required on this project.

Tenting and Negative Air Required for Lead Paint Abatement.

Refer to the Safety Table of Requirements provided in this document.

The SAFETY Requirements for the Prime Contractor and the Sub-Contractor are REQUIRED to be awarded this contract. The prime and sub-contractor shall NOT be allowed time or compensation to attend classes at the Governments expense for training that is outlined in the documents provided.

Refer to this document in the appendix, the drawings and the specifications required for safety and lead paint abatement.

1.4.4 Personal Protective Equipment (PPE)

The Contractor is responsible for obtaining/providing, inspecting, and maintaining any required Personal Protective Equipment (PPE) and access equipment (lifts, scaffolding, etc...) necessary to perform services identified in this SOW. Refer to the Safety Specification for further information.

1.4.5 General

This Scope of Work has been broken down into general requirements that are applicable to the entire contract and the specific construction effort:

3.1General (Section 0)
3.2Construction (Section 0)

The bidding Contractor(s) should conduct a brief pre award site survey of the campus. The site visit information will be posted in the solicitation by the contracting officer.

1.4.6 Phasing

This is a phased project. See phasing drawings and PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 01 00 00 GENERAL REQUIREMENTS - 528A4-21-210 for phasing requirements.

1.5Site Information
1.5.1Safety

All Contractor personnel working onsite at the Medical Center will be required to attend a 1- hour Buffalo VAMC site specific safety training class. This class will be held on site and will be taught by a member of the Buffalo VAMC safety office. Attendance to this class and proof of the 10- hour OSHA (30-hour for supervisors, refer to General Requirements and Safety Specifications for the complete contract requirements). Participation in this class is mandatory and must be done prior to the commencement of work on-site.

Refer to this document in the appendix, the drawings and the specifications required for safety and lead paint abatement.

1.5.2 Access

All visits and access requests to the VAWNYHS under this scope of work shall be coordinated through the Contracting Officer Representative (COR) and approved as per the schedule submission requirements in the drawings and specifications. The contractor shall pay close attention to the ICRA Drawings for days and times to work in each critical area, the General Requirements Specifications, Asbestos Specifications and Project Schedules Specifications.

1.5.3 Photography

PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, Section 01 00 00 (General Requirements - 528A4-21-210), Article 1.31 requires the contractor to obtain the services of a professional photographer to document the entire construction process.

As a reminder, it is VHA policy to respect the privacy of all persons (e.g., Veterans, patients, residents, members of the VHA workforce, and visitors) consistent with the needs of operating a national health care system. Privacy protections on VHA premises vary according to the needs and purposes of different types of areas, the persons included, and the purpose of the production and use of photographs, digital images, and video or audio recordings (excerpt from VHA Directive 1078).

The Contractor shall ensure that any photographs taken do NOT include any VHA patients, members of the VHA workforce, or visitors to the VAMC facility.

2. Applicable Documents The following documents are applicable to this Scope of Work (SOW) to the extent specified herein. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 of this SOW, whether they are listed here.

2.1 Government Documents

The following directives, guides, handbooks, and drawings form a part of this document to the extent specified herein. Unless otherwise specified, the latest revisions available shall be used.

Copies of construction related Department of Veterans Affairs directives, guides, and handbooks are available from the Office of Construction and Facilities Management website:

http://www.cfm.va.gov/til/index.asp

DEPARTMENT OF VETERANS AFFAIRS

DIRECTIVES

1078
PRIVACY OF PERSONS REGARDING PHOTOGRAPHS, DIGITAL IMAGES, AND VIDEO OR AUDIO RECORDINGS

2.2 Veterans’ Health Administration Western New York Documents The following drawings and documents form a part of this document to the extent specified herein.

Documents identified as “AS MODIFIED FOR VA PROJECT 528A4-21-210” are base VA documents that have been tailored to the needs of this specific effort. While the base VA documents are available on the Office of Construction and Facilities Management website listed above, the Contractor shall use the modified version listed below, NOT the base document. Copies of these documents are available from the KO, COR, or Technical POC.

VA WESTERN NEW YORK HEALTHCARE SYSTEM, BATAVIA VA MEDICAL CENTER

DRAWINGS

PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 00 01 15 LIST OF DRAWING SHEETS (AS MODIFIED FOR VA PROJECT 528A4-21-210) lists all drawings for this construction effort.

SPECIFICATIONS (AS MODIFIED FOR VA PROJECT 528A4-21-210)

PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, SECTION 00 01 10 TABLE OF CONTENTS (AS MODIFIED FOR VA PROJECT 528A4-21-210) lists all relevant and modified construction specifications for this construction effort.

2.3 Non-Government Publications

All work shall be accomplished in strict accordance with the latest codes and standards. The Contractor shall follow any/all applicable standards and codes, including, but not limited to applicable NFPA standards, NEC, JCAHO, OSHA, ANSI, ASHRAE, and all other codes.

3. Requirements The Contractor shall provide personnel, material, services, and facilities to perform, accomplish, and deliver the required services detailed in this scope of work.

3.1 General

This section contains general information that is applicable for the duration of the contract (i.e. applies to all Parts of this effort).

3.1.1 Status Updates

The Contractor shall prepare and submit periodic status reports throughout the duration of the contract. The reporting period will begin at Notice to Proceed. The contents of status reports shall include but is not limited to the following information/topics:

Summary and Current Status of Project Progress Accomplished (for the previous month) Refer to Project Schedules Specifications Progress Anticipated (for the next three months) Refer to Project Schedules Specifications Updated Schedule Refer to Project Schedules Specifications Problems Encountered and Anticipated Technical, Schedule, and Cost Risk Assessment Risk Mitigation Strategy Financial Data (i.e., allocated funding, obligations, expenditures, etc.)

Status reports may be organized in Contractor specified format. Status reports will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). Status reports shall be submitted via email to the KO and COR by the 5th business day of every month.

3.1.2 Meetings

Several different meetings are identified under this contract. The information contained within this section is relevant to all meetings identified in this contract. Any meeting specific details can be in its respective section of this SOW.

3.1.2.1 Meeting Scheduling

All meetings identified within this SOW are to be coordinated and scheduled with the COR. See Section 0 and Section 0 for more details.

3.1.2.2 Meeting Agenda

The Contractor shall provide a meeting agenda 3 business days prior to the scheduled date of the meeting.

Meeting agendas may be organized in Contractor specified format. Meeting agendas will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF). Meeting agendas shall be submitted via email to the COR.

3.1.2.3 Meeting Presentation Materials

Any required presentation materials (e.g., handouts, slide presentation, design information, drawings, schedules, cut sheets, etc....) shall be provided to the Government at the same time as the meeting agenda.

Meeting presentation materials may be organized in Contractor specified format. Meeting presentation materials will be supplied as a digital product to the Government in a Microsoft Office compatible format (*.DOC, *.DOCX, *.PPT, *.PPTX), Portable Document Format (*.PDF), or AutoCAD (*.DWG, *.DXF) as applicable to the specific document and meeting.

While email is an acceptable method to receive this information, note that the VA has a size restriction for attachments on email. No email can be sent or received by the VA that is larger than 5MB. If meeting presentation materials are larger than this size, the Contractor must determine an alternate method to submit the required materials by the due date (e.g., FTP website, optical digital media, etc....).

3.1.2.4 Meeting Minutes

The Contractor shall provide meeting minutes to document the discussion had during the meeting. The VA COR may provide their notes from the meeting in the form of an email and the contractor shall incorporate those notes into the minutes. The contents of meeting minutes shall include but is not limited to the following information/topics:

Meeting attendees Narrative to describe contents of meeting (will likely mirror the meeting agenda) List of action items (for both the Government and the Contractor) Presentation materials used during the meeting should be included as enclosures.

Meeting minutes may be organized in Contractor specified format. Meeting minutes will be supplied as a digital product to the Government in a Microsoft Word compatible format (*.DOC, *.DOCX) or Portable Document Format (*.PDF).

The Contractor shall provide draft meeting minutes within 3 business days of the meeting. The Government will review and provide comments back to the Contractor within 3 business days of receipt of the draft meeting minutes. The Contractor shall finalize the meeting minutes and submit the final meeting minutes to the Government within 3 business days of receipt of Government comments.

3.2 Construction

The Contractor’s work for construction shall include, but is not limited to the following:

3.2.1 Kick-off Meeting and Site Survey

The Contractor shall conduct a kick-off meeting at the VAMC. During the kick-off meeting the Contractor shall address their plan to meet the design intent, review the schedule, and review their plan to address any risks associated with the effort.

This meeting shall comply with the terms of Section 0 of this SOW.

See section 0 for the timing of this meeting.

Site surveys shall be conducted in accordance with Section 0.

3.2.2 Submittals

In accordance with the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES (528A4-21-210), the contractor shall provide submittals and shop drawings for review prior to starting work. All submittals shall be provided and approved prior to mobilization.

A submittal log has been generated for this effort and represents a list of the minimum required submittals based upon the current construction documents. Although every attempt has been made to ensure that this list is complete, additional submittals not listed may be required.

3.2.3Preconstruction Conference and Requirement
Once the submittals have been approved, the Contractor shall attend a Error! No text of specified style in document.. This meeting will be a follow-up to the 3.2.1Kick-off Meeting and Site Survey. In preparation for this meeting the Contractor shall submit:

An updated work plan that adds additional details based upon approved submittal information.

Revised or new Activity Hazard Analysis (AHA) based on approved submittals.

Any additional clarifying details about the work to be performed that have been updated bases upon the approved submittals.

Any action items resulting from this meeting shall be addressed prior to ordering any materials or beginning the actual construction work.

This meeting shall comply with the terms of Section 0 of this SOW and the terms of PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 35 26 SAFETY REQUIREMENTS (528A4-21-210); Article 1.6 Preconstruction Conference.

See section 0 for the timing of this meeting.

The Pre-Construction Risk Assessment (PCRA) has been completed by the VA for this project, and it mirrors what is required in the contract documents for this project. As stated above and in the contract documents, the contractor shall provide all documentation outlined in the contract documents including but NOT limited to the following.

Refer to specifications 010000 GENERAL REQUIREMENTS and 013526 SAFETY REQUIREMENTS As per the Pre-Construction Risk Assessment, safety department want the contractor to be prepared to submit all listed items, as part of their safety plan, infection control plan, confined space plan and plan to drill through concrete as follows but not limited to:

When creating dust, the contractor shall have Negative Air with HEPA filtration going out the window.

When creating dust, the contractor shall provide a work plan to the VA to shut down the Air Handling Unit in the basement of the building and cover all ventilation (supply, return and exhaust).

When drilling through concrete the contractor shall have in their work plan to have shrouds with HEPA filtration.

out and tag out any electrical panels to do electrical work.

Bypass fire alarm daily for the devices when creating dust.

Provide a shutdown notice and tentative duration prior to shut down.

Provide work plan for all water/sanitary disruption prior to any shutdown.

All work plans are subject to approval from the VA.

3.2.4General Construction
The Contractors’ scope of work for 3.2.4General Construction shall include, but is not limited to, the procedures outlined in PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS (528A4-21-210).

Work includes, but not limited to, all labor, material, equipment, and supervision to perform the required demolition, modification, construction, and/or installation of the dishwashing machine.

3.2.5 Status Meetings

The Contractor shall attend periodic status meetings with the VA to discuss construction progress, submittals, and RFIs during the project. The construction phase is anticipated to be no longer than 1 month. This time estimate includes the time required to perform the preparatory administrative work (e.g., plans, schedules, submittals, etc...)

Status meetings will commence after the 3.2.3 Preconstruction Conference is held (section 0). Status meetings shall be held every week for the remainder of the effort. At a minimum, the attendees of the status meeting shall be VAMC COR and one person from the prime Contractor. Additional personnel may be invited to the meeting as required.

As part of the last status meeting the resurvey of the site will be conducted (see PG-18-1: MASTER CONSTRUCTION SPECIFICATIONS, Section 01 00 00 (General Requirements - 528A4-21-210), Article 1.8, Paragraph C).

The Contractor and/or Subcontractor shall provide meeting minutes in accordance with the terms of Section 0.

4. Verification Final functional verification of the installed equipment shall be conducted jointly before final acceptance of the constructed product. The groups that will participate in the verification process include:

Prime Contractor Subcontractor (as applicable) VA Engineering These functional tests will be based upon manufacturer data and will be checked against VA regulatory requirements as applicable.

All equipment installed will be subject to these tests. For any equipment that does not pass the functional verification test, the Contractor shall troubleshoot the issue and determine if the root cause of the problem.

If the root cause is the result of the construction work, the Contractor shall repair and/or replace the faulty construction work and any subsequently damaged equipment at no additional cost to the Government.

If the root cause is the result of faulty equipment (manufacturer defect), the Contractor shall coordinate with the fabricator to repair and/or replace the faulty equipment and any subsequently damaged equipment at no additional cost to the Government.

5. Delivery

5.1 Technical POC

The Contractor shall coordinate all visits and meetings with and provide the required quantity of submittals to assigned COR.

5.2 Schedule and Submittals

Refer to the top of this document for specific period of performance guidelines. This is a time sensitive project. The contractor shall meet all contract requirements for training and experience when bidding on this project. There is NO time allocated for the prime contractor or the sub-contractors to gain training after the bid is awarded.

Independent of the not to exceed period of performance, the Contractor shall comply with the individual relative and absolute timelines identified in this SOW.

The Contractor is responsible for submitting a detailed schedule in accordance with PG-18-1 MASTER CONSTRUCTION SPECIFICATIONS; SECTION 01 32 16.15, PROJECT SCHEDULES (528A4-21-210). This schedule must include all administrative work (preparatory as well as any permitting or shut down requests) and must also show associated predecessor and successor logic associated with all tasks performed under this contract.

6. Government Furnished Information, Materials, & Equipment The government shall supply the following information:

All BATAVIA VAMC drawings and modified program guides and specifications from section 0.

Government Furnished Materials (GFM) and Government Furnished Equipment (GFE) are not required and will not be provided for this effort.

The contractor is HIGHLY encouraged to attend in lieu of arrange.

7. Autodesk

SECTION 01 32 00

CONSTRUCTION DOCUMENTATION

PART 1- GENERAL

1.1 DESCRIPTION:

A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning and Retro-Commissioning contracts. There is no user, license, or subscription fee to the contractor for using this cloud-based platform.

1.2 REQUIREMENTS:

A.Contractor shall accomplish and complete the following tasks upon award of contract:
1.Request access to ACC platform and Productivity NOW Learning Site to project VA COR NLT 14 days from contract award.
2.Only staff that shall utilize the platform to be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.
3. The access request shall be in writing and include a list of staff. The list shall include the following information:
•Full Name
•Company Name
•Email Address
•Role/Position on the project (i.e., Project manager, site super)
4.Upon granting access, staff shall complete required ACC training through Productivity NOW platform within 12 Calendar days.
5.Upon successful completion of training, the contractor shall submit certificates of completion to COR NLT 2 Business days.
B.Access to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. The contractor shall complete ACC training within that period.
C.Additional Staff and Subcontractors can be added at any time with a request for submission to the project COR as described above.
D.The contractor shall only use the ACC platform for all contract required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in contract amount be provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence out of platform shall not be the governing authority contradicting direction and will be at the contractor’s expense. Official project correspondence and collaboration includes but not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
E.Contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes pertains to staff who was granted access to the ACC platform. The contractor shall request termination of access, replacement of personnel and/or any other action that might impact the contractor ability to maintain required utilization of the platform.
F.Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing required ACC platform training.

E N D

Appendix – Safety

Appendix – Electrical

528A4-21-210
Dishwasher Machine Preparation and Installation

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
STATEMENT OF WORK25
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS25
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS28
2.1 BID OPENING INFORMATION28
2.2 Special Notes regarding FAR 52.229-3: Federal, State and Local Taxes:28
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)29
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)29
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)29
2.4 52.228-1 BID GUARANTEE (SEP 1996)30
2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)31
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)31
2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)32
2.8 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018)32
2.9 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)33
2.10 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)33
REPRESENTATIONS AND CERTIFICATIONS34
3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025)34
3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)38
3.3 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023)40
3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)45
GENERAL CONDITIONS47
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)47
4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES (DEC 2023)47
4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)48
4.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)49
4.5 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025)51
4.6 52.225-2 BUY AMERICAN CERTIFICATE (OCT 2022)55
4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)56
4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)60
4.9 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)61
4.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)64
4.11 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)65
4.12 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)66
4.13 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)68
4.14 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)68
4.15 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)69
4.16 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)69
4.17 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)71

ATTACHMENT

STATEMENT OF WORK

36C24225B0043 Page 1 of Page 1 of

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

(a) Solicitation materials consisting of drawings, specifications and other information may be obtained from the Contract Opportunities (formerly FedBizOpps) website:

https://sam.gov/ An Offerors mailing list WILL NOT BE prepared by the Contracting Officer.

SOLICITATION AMENDMENTS: Amendments to the solicitation will be posted at https://sam.gov/ Paper copies of the amendments will NOT be individually mailed. No other notification of amendments will be provided. Offerors are reminded that they are responsible for obtaining and acknowledging all amendments to this solicitation prior to the time for receipt of offers.

(b) A bid guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000, whichever is less. Irrevocable Letter of Credit (ILC) may be submitted in lieu of a bid bond. Failure to furnish the required bid guarantee in the proper form and amount, by the proposal due date, will require rejection of the proposal in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.

(c) The awardee for this procurement will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25. See FAR Clause 52.228-15 Performance and Payment Bonds—Construction.

Magnitude of Construction: $100,000 - $250,000.

(d) CONTRACTOR RESPONSIBILITY:

Safety or Environmental Violations and Experience Modification Rate “All Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years.

All Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the offeror’s insurance company and be furnished on the insurance carrier’s letterhead.

Self-insured contractors or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

(e) TRAINING:

All employees of the Prime Contractor and Subcontractors shall have the 10-hour OSHA certified construction safety course. The Prime Contractor’s competent site superintendent and any ‘foreman’ of the subcontractor(s) shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the Contracting Officer for review and approval prior to any work being performed. Failure to present the proper training documentation will result in the individual being removed from the job; the individual may only return after the proper documentation has been provided. There shall be no exceptions to this requirement.

(f) KEYS: All keys provided to the Contractor or any subcontractor for use during the project shall be returned to the Contracting Officer's Representative (COR) at completion of the work or upon request. No keys shall be reproduced by the Contractor or any subcontractor. There will be a $10 charge for each key that is lost or not returned to the COR.

(h) System for Award Management (SAM):

Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database, https://sam.gov/ and enter all mandatory information into the system. Contractors must be registered in SAM at the time of award and should be registered at the time of the proposal submission.

(j) Contractor Normal Work Hours:

The contractor’s work hours are from 8:00AM to 4:30PM, Monday through Friday, excluding federal holidays. Federal holidays that fall on a non-workday; Saturday or Sunday, the holiday usually is observed on Monday if the holiday is on Sunday or on Friday if the holiday is on Saturday.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .