This document is an amendment to a federal contract opportunity solicitation for renovation work at the Buffalo VA Medical Center. The key details are:

The solicitation is for a firm fixed-price contract to perform renovations in multiple rooms in Building 1 of the Buffalo VAMC, including abatement, demolition, and construction work. The work includes removing carpet, demolishing partitions and flooring, and completing floor, ceiling, and wall repairs in various rooms. Asbestos-containing materials have been identified and must be abated. The contractor must provide all labor, equipment, and supervision to perform the requested renovations, which must be completed within 365 days of award. The VA will provide some materials for the work in two of the rooms. Detailed submittal requirements and a project schedule are provided.

View the file

Other files

File Type Posted
36C24224B0024 0005.docx DOCX document
sign in sheet.pdf PDF
36C24224B0024 0003.docx DOCX document
36C24224B0024 0002.docx DOCX document
36C24224B0024 0001.docx DOCX document
B1 Core.pdf PDF
929D 929D1.pdf PDF
36C24224B0024_1.docx DOCX document
09 91 00 Bldg 1 ADC Painting.docx DOCX document
02 82 13.19 Bldg 1 Asbestos Floor Tile and Mastic Abatement.docx DOCX document
20240215 635D 637D 638D Demo Plan.pdf PDF
01 00 00 Bldg 1 ADC General Requirements.docx DOCX document
01 74 19 Bldg 1 ADC Construction Waste.docx DOCX document
Buffalo VAMC 138C 139C Report.pdf PDF
Buffalo VAMC Report Rooms 635D 637D 638D.pdf PDF
20240131 138C 139C DEMOLITION LAYOUT.pdf PDF
09 51 00 Bldg 1 ADC Acoustical Ceilings.docx DOCX document
01 32 16.15 Bldg 1 ADC Project Schedules.docx DOCX document
09 65 19 Bldg 1 ADC Resilient Tile Flooring.docx DOCX document
02 41 00 Bldg 1 ADC Demolition.docx DOCX document
02 82 11 Bldg 1 ADC Traditional Asbestos Abatement.docx DOCX document
01 35 26 Bldg 1 ADC Safety Requirements.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04/12/2024

NONE

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24224B0024 04-12-2024

X X X 04/30/2024 at 10:00 EST X See attached

Michael Spivack Contracting Officer This amendment answers the following vendor questions posed during the walkthrough on 04/10/2024 and provide a copy of the sign in sheet:

1. In rooms 138C and 139C do ceiling removal work include removing the tracking?

A. Yes

2. What is the composition of the partitions to be removed in rooms 138C and 139C?

A. Steel studs

3. In rooms 138C and 139C, what is the floor to deck height?

A. 12ft

4. Does the mastic need to be removed in all locations even if it does not contain asbestos?

A. Yes, all mastic needs to be removed by the contractor.

5. What are the containment requirements in locations containing asbestos?

A. All containment shall be performed in accordance with local ICRA (Infection Control Risk Assessment), the contractor may build their containment structure into the hallway and negative air can be vented out the window.

6. How many mobilizations are to be expected?

A. Rooms B1 and 929D/D1 are occupied and it is unsure when they will be available to be worked on. As a result two or possibly three mobilizations will be required.

7. In room B1 does the rubber cove base need to be removed along with the carpet?

A. Yes

8. Can you provide guidance in regards for procedures for removal of both contaminated and non-contaminated debris.

A. All construction debris shall be transported from the room being demolished to the dumpster in covered containers to avoid any dust being distributed throughout the hospital.

The contractor shall only use elevators 7,8,9,10 to transport any construction debris and brought directly to the loading dock.

9. in rooms 635D/637D/638D what are the partition walls made of?

A. Masonry and plaster

10. What is the requirement for skimming and finishing walls?

A. Contractors are only required to go as high as the level of the drop ceiling.

All other terms and conditions remain the same See attached document: sign in sheet.