This document is a Demolition Plan related to a federal contract opportunity for renovations at the Buffalo VA Medical Center. The key details are:

The scope of work includes demolition and abatement in several locations in Building 1 at the Buffalo VAMC, including rooms 138C, 138C-1, 138C-2, 138C-3, 139C, 635D, 637D, 638D, B1 Core, 929D, and 929D1. The work involves removing partitions, floors, ceilings, and finishes containing asbestos. New flooring, ceilings, and wall repairs are required in rooms 929D and 929D1. The contractor must provide all labor, equipment, and supervision. The VA will provide some materials for the 929D and 929D1 renovations. All work must be completed within 365 days of award. Applicable documents include VA directives, VHA Western New York documents, and industry standards. The contractor must attend a kickoff meeting, submit required plans and schedules, and follow demolition and abatement protocols. Air monitoring will be provided by the VA during abatement. The government has rights to all records and deliverables produced under this contract.

View the file

Other files

File Type Posted
36C24224B0024 0005.docx DOCX document
36C24224B0024 0004.docx DOCX document
sign in sheet.pdf PDF
36C24224B0024 0003.docx DOCX document
36C24224B0024 0002.docx DOCX document
36C24224B0024 0001.docx DOCX document
B1 Core.pdf PDF
929D 929D1.pdf PDF
36C24224B0024_1.docx DOCX document
09 91 00 Bldg 1 ADC Painting.docx DOCX document
02 82 13.19 Bldg 1 Asbestos Floor Tile and Mastic Abatement.docx DOCX document
01 00 00 Bldg 1 ADC General Requirements.docx DOCX document
01 74 19 Bldg 1 ADC Construction Waste.docx DOCX document
Buffalo VAMC 138C 139C Report.pdf PDF
Buffalo VAMC Report Rooms 635D 637D 638D.pdf PDF
20240131 138C 139C DEMOLITION LAYOUT.pdf PDF
09 51 00 Bldg 1 ADC Acoustical Ceilings.docx DOCX document
01 32 16.15 Bldg 1 ADC Project Schedules.docx DOCX document
09 65 19 Bldg 1 ADC Resilient Tile Flooring.docx DOCX document
02 41 00 Bldg 1 ADC Demolition.docx DOCX document
02 82 11 Bldg 1 ADC Traditional Asbestos Abatement.docx DOCX document
01 35 26 Bldg 1 ADC Safety Requirements.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2.01.01.5 1.5

2.01.01.51.5

6 7 8 9 10

1 2 3 4 5

614C-3

612-C

614C-2 614C-1

614C-4 615-C

601-C 636-A

#3

#4

600-C

EXIST. 635-D

EXIST. 637-D

634-D

EMS

639-D

EMS

607-1

602C-1

602-C

603C-2

603C-1

603-C

#9

604-C605-C

606-C

607-C

607C-1

608-C

609-C

610-C

637-C

636-C

635C-1

635-C

634-C

633-C

634C-1611-C611C-1

600C-1

600C-3

#8

625C-1

627C-1

629C-1

619C-1

620C-1

622C-1

631C-2 630C-1

618C-1

600C-2

#7

616-C 617-C

630-C

618-C

619-C

620-C

621-C

622-C

623-C

625-C

631-C

631C-1

633-D

631-D

630-D

628-D

#10

602-D

603-D

604-D

604D-1

600D-1

628D-2

627D-1

628D-1

608-D

613-D

614-D

628-D 626-D 625-D

625D-1

615D-1

608D-1

616D-1 618D-1

623D-1 621D-1

#12

617-D 618-D 619-D

621-D622-D623-D624-D

600D-3

609-D

612-D#11

600D-2

634-A

601-A

633-A

632-A

632A-1 631-A

630-A

630A-1

629A-1

629-A

600-A

606-A 603A-2

603A-1

603-A

602-A

601A-1

606A-2

606A-1

607A-1

600A-1

606A-3 608A-1 610A-1

616A-1618A-1 619A-1

623A-1

628A-1

600A-2 #2

627A-1

#1

624A-1

625A-1

625A-2

625A-3 625A-4

625A-5

625A-6

607-A 608-A 609-A 610-A

619-A 618-A

622-A 628-A

627-A

624-A

616-A 615-A

612-A

613-A

611-A

601-B

632-B

631-B

630-B

629-B

628-B

633-B

627-B

600-B

601B-1

602-B

602B-1

604-B

603B-1

605-B

605B-2

605B-1

606B-1

606-B

607-B

607B-1

618B-1

618-B

620-B621-B

616B-1

614B-1

609B-1

611B-1

#5

600B-1

612-B

614-B

615-B

616-B

617-B

626-B625-B

622-B

#6

626B-1 623B-4

623B-1623B-2

623B-3

600B-2

"A" WING

"B" WING

"D" WING

"C" WING

611-D1

EXIST.

CHASE

EXIST.

CHASE

E

X

IS

T

C O

O R

ID

O

R

EXIST. 638-D

EXIST.

635D-1

& 635D-2

EXIST.

638D-1

& 638D-2

DD33DD33

DD11DD11

DD55DD55

DD22DD22

DD11DD11

DD33DD33

DD22DD22 DD66DD66 DD77DD77

DD99DD99DD88DD88

EXIST. DOOR & FRAME TO REMAIN AS

CONSTRUCTION/DUST BARRIER.

DOOR TO BE REPLACED BY VAMC AFTER

DEMOLITION IS COMPLETE.

DD55DD55

DD77DD77

DD88DD88

DD66DD66

DD99DD99

DD22DD22 DD77DD77

DD88DD88

DD66DD66

DD99DD99

DD33DD33

DD11DD11

DD22DD22 DD66DD66 DD77DD77

DD99DD99DD88DD88

DD22DD22 DD66DD66 DD77DD77

DD99DD99DD88DD88

LINE OF EXISTING

CEILING CHANGE LINE OF EXISTING

PLASTER SOFFIT

TO REMAIN

DD1100DD1100

DD1111DD1111

DD1111DD1111

DD1122DD1122

DD1122DD1122

DD1122DD1122

EXISTING WINDOW MOUNTED

A/C UNIT SHALL REMAIN

AND BE PROTECTED

EXISTING WINDOW MOUNTED

A/C UNIT SHALL REMAIN

AND BE PROTECTED

EXIST. DOOR & FRAME TO REMAIN AS

CONSTRUCTION/DUST BARRIER.

DOOR TO BE REPLACED BY VAMC AFTER

DEMOLITION IS COMPLETE.

EXISTING GAS CONNECTION

PROTECT DURING DEMOLITION

REVISIONS

DATE:

A0.1

PHARMACISTS

OFFICES 635D, 637D & 638D

RENOVATIONS

DATE

PROJECT NO.

BUILDING NUMBER: CHECKED: DRAWN:

LOCATION:

STATION NO. 528 VAMC BUFFALO, NEW YORK

MEDICAL CENTER DIRECTOR:

ASSOCIATE MEDICAL CENTER DIRECTOR:

DATE:

DATE:

CLINICAL ENGINEERING DATE

SAFETY OFFICER DATE:

INFECTION CONTROL

DATE

DATE

DATE

DATE

ENGINEERING MANAGER

CHIEF OF STAFF

CARELINE MANAGER

ARCHITECT / ENGINEER: A/E FIRM SEAL PROJECT TITLE:

DEMOLITION

PLAN

DRAWING TITLE

RAD

528-24-114

1/19/2024

ISSUED FOR INTERNAL REVIEW 1/19/24

BCS/MP1

ROBERT A. DOLLMAN, R.A.

Architect & Healthcare Engineer

VA WESTERN NEW YORK HEALTHCARE SYSTEM

BUFFALO VA MEDICAL CENTER

3495 BAILEY AVE.

BUFFALO, NEW YORK 14215

email: robert.dollman@va.gov Mobile: 716-598-3451

VA

U.S. Department of Veterans Affairs

DDEEMMOOLLIITTIIOONN PPLLAANN

1111 11//44"" == 11''--00""

NN

DEMOLITION KEY NOTES:DEMOLITION KEY NOTES:

EXISTING MASONRY & PLASTER PARTITION WALL TO BE REMOVED FULL HEIGHT.

EXISTING PARTITION WALL FINISHES (ALL SIDES) TO BE REMOVED DOWN TO SUBSTRATE (SUBSTRATE MAY BE PLASTER, GYP. BD. OR MASONRY).

EXISTING SWING DOORS & FRAMES TO BE REMOVED.

EXISTING PLUMBING CHASE TO BE REMOVED FULL HEIGHT. ALL EXISTING UTILITIES AND PIPING CONTAINED WITHIN CHASE SHALL REMAIN IN PLACE.

UTILITIES MAY BE ACTIVE, PROTECT DURING DEMOLITION.

EXISTING PLUMBING FIXTURES AND ALL RESTROOM ACCESSORIES TO BE REMOVED. PIPING TO BE REMOVED SO NO DEAD-LEGS REMAIN.

EXISTING FLOOR FINISHES TO BE REMOVED THROUGHOUT DOWN TO CONCRETE SUBSTRATE.

EXISTING SUSPENDED GYPSUM BOARD OR ACOUSTICAL CEILING SYSTEM TO BE REMOVED THROUGHOUT ROOM.

INCLUDES ALL EXIST. SURFACE MOUNTED AND RECESSED MECHANICAL AND ELECTRICAL ITEMS AND IMPROVEMENTS.

EXISTING SPRINKLER HEADS & PIPING TO BE PROTECTED & REMAIN FOR REUSE.

RADIATOR COVERS TO BE REMOVED.

EXISTING SWING DOOR ONLY TO BE REMOVED. (NOT FRAME)

REMOVE AND DISPOSE OF ALL CLOSET ACCESSORIES

ALL ARTWORK, WINDOW TREATMENTS, FURNITURE, AND I.T. RELATED SYSTEMS SHALL BE REMOVED BY THE VA.

DD11DD11

DD##DD##

DD22DD22

DD33DD33

DD44DD44

DD55DD55

DD66DD66

DD77DD77

66TTHH FFLLOOOORR KKEEYY PPLLAANN

2222 NNTTSS

NN

SCOPE OF WORK AREA

A. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY; TO MINIMIZE INTERFERENCE WITH

USE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE

PASSAGE TO AND FROM SUCH ADJACENT AREAS OF STRUCTURES. COMPLY WITH REQUIREMENTS OF GENERAL CONDITIONS

ARTICLE, ACCIDENT PREVENTION.

B. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR

ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING DEMOLITION AND REMOVAL OPERATIONS.

C. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO KEEP DUST TO A MINIMUM. DO

NOT USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITION SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING, OR

POLLUTION. VACUUM AND DUST THE WORK AREA DAILY.

DDEEMMOOLLIITTIIOONN GGEENNEERRAALL NNOOTTEESS

D. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND

SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID

DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; ANY

DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE RESIDENT ENGINEER. THE CONTRACTOR SHALL COORDINATE

THE WORK OF THIS SECTION WITH ALL OTHER WORK AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS AS

REQUIRED. THE CONTRACTOR SHALL ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR

INCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR

DEMOLITION WORK PERFORMED UNDER THIS CONTRACT. DO NOT OVERLOAD STRUCTURAL ELEMENTS. PROVIDE NEW SUPPORTS AND

REINFORCEMENT FOR EXISTING CONSTRUCTION WEAKENED BY DEMOLITION OR REMOVAL WORKS. REPAIRS, REINFORCEMENT, OR

STRUCTURAL REPLACEMENT MUST HAVE RESIDENT ENGINEER’S APPROVAL.

E. REMOVE AND LEGALLY DISPOSE OF ALL MATERIALS, OTHER THAN EARTH TO REMAIN AS PART OF PROJECT WORK, FROM ANY TRASH

DUMPS SHOWN. MATERIALS REMOVED SHALL BECOME PROPERTY OF CONTRACTOR AND SHALL BE DISPOSED OF IN COMPLIANCE WITH

APPLICABLE FEDERAL, STATE OR LOCAL PERMITS, RULES AND/OR REGULATIONS.

F. ON COMPLETION OF WORK OF THIS SECTION AND AFTER REMOVAL OF ALL DEBRIS, LEAVE SITE IN CLEAN CONDITION SATISFACTORY

TO RESIDENT ENGINEER. CLEAN‑UP SHALL INCLUDE OFF THE MEDICAL CENTER DISPOSAL OF ALL ITEMS AND MATERIALS NOT REQUIRED

TO REMAIN PROPERTY OF THE GOVERNMENT AS WELL AS ALL DEBRIS AND RUBBISH RESULTING FROM DEMOLITION OPERATIONS.

DD88DD88

DD99DD99

DD1100DD1100

DD1111DD1111

DD1122DD1122