This document is a solicitation (Solicitation Number: 36C24224B0024) issued by the Department of Veterans Affairs Veterans Health Administration for the renovation of Building 1 at the Buffalo VA Medical Center. The key requirements include abatement and demolition of asbestos-containing materials in various rooms, removal of flooring and ceilings, and construction of new floors, ceilings, and wall repairs in specific rooms. The contractor shall provide all labor, equipment, and supervision to perform the requested renovations, with some materials provided by the VA. The work shall be completed within 365 days of award. The solicitation provides detailed information on the scope of work, applicable documents, required submittals, and a summary list of deliverables and their due dates.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Western New York Healthcare System 3495 Bailey Avenue Bldg. 1 Abatement, Demo, and Construction Buffalo, NY 14215
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.1 DESCRIPTION:
This section specifies demolition and removal of buildings, portions of buildings, utilities, other structures, and debris from trash dumps shown.
1.2 RELATED WORK:
A. Demolition and removal of masonry walls, wall tile, and flooring tile from Restrooms 49 & 50, Building 1, Basement Level C-Wing B. Construction Waste Management: Section 01 74 19 CONSTRUCTION WASTE MANAGEMENT.
C. Infectious Control: Section 01 35 26, SAFETY REQUIREMENTS.
1.3 PROTECTION:
| A. | Perform demolition in such manner as to eliminate hazards to persons and property; to minimize interference with use of adjacent areas, utilities and structures or interruption of use of such utilities; and to provide free passage to and from such adjacent areas of structures. Comply with requirements of GENERAL CONDITIONS Article, ACCIDENT PREVENTION. |
| B. | Provide safeguards, including warning signs, barricades, temporary fences, warning lights, and other similar items that are required for protection of all personnel during demolition and removal operations. Comply with requirements of Section 01 00 00, GENERAL REQUIREMENTS, Article PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES AND IMPROVEMENTS. |
| C. | Prevent spread of flying particles and dust. Sprinkle rubbish and debris with water to keep dust to a minimum. Do not use water if it results in hazardous or objectionable condition such as, but not limited to; ice, flooding, or pollution. Vacuum and dust the work area daily. |
| D. | In addition to previously listed fire and safety rules to be observed in performance of work, include following: |
| 1. | Wherever a cutting torch or other equipment that might cause a fire is used, provide, and maintain fire extinguishers nearby ready for immediate use. Instruct all possible users in use of fire extinguishers. |
| 2. | Always keep hydrants clear and accessible. Prohibit debris from accumulating within a radius of 4500 mm (15 feet) of fire hydrants. |
| E. | Before beginning any demolition work, the Contractor shall survey the site and examine the drawings and specifications to determine the extent of the work. The contractor shall take necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Medical Center; any damaged items shall be repaired or replaced as approved by the Resident Engineer. |
| G. | The work shall comply with the requirements of Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS. |
| H. | The work shall comply with the requirements of Section 01 00 00, GENERAL REQUIREMENTS and Section 01 35 26, SAFETY REQUIREMENTS. |
PART 2 - PRODUCTS (Not Used)
PART 3 – EXECUTION
3.1 DEMOLITION:
| A. | Debris, including brick, concrete, stone, metals, and similar materials shall become property of Contractor and shall be disposed of by them daily, off the Medical Center to avoid accumulation at the demolition site. Materials that cannot be removed daily shall be stored in areas specified by the Resident Engineer. Contractor shall dispose debris in compliance with applicable federal, state, or local permits, rules and/or regulations. |
| B. | Remove and legally dispose of all materials that then become property of contractor and shall be disposed of in compliance with applicable federal, state, or local permits, rules and/or regulations. Materials that are discovered to be hazardous, shall be handled as unforeseen. The removal of hazardous material shall be referred to Hazardous Materials specifications and handled accordingly. |
3.2 CLEANUP:
On completion of work of this section and after removal of all debris, leave site in clean condition satisfactory to Resident Engineer. Cleanup shall include off the Medical Center disposal of all items and materials not required to remain property of the Government as well as all debris and rubbish resulting from demolition operations.
E N D 02 41 00 - 5