This document is a Solicitation for a federal contract opportunity for the renovation of Building 1 at the VA Western New York Healthcare System in Buffalo, NY. The scope of work includes the abatement and demolition of asbestos-containing materials such as floor tile, mastic, and drywall, as well as the installation of new flooring, ceilings, and wall repairs in several rooms. The contractor will be responsible for providing all labor, equipment, and supervision to perform the required renovations. The government will provide some materials for the work in rooms 929D and 929D1. All work must be completed within 365 days of contract award. The solicitation details the applicable documents, requirements, approach, submittals, and delivery schedule for the project.

View the file

Other files

File Type Posted
36C24224B0024 0005.docx DOCX document
36C24224B0024 0004.docx DOCX document
sign in sheet.pdf PDF
36C24224B0024 0003.docx DOCX document
36C24224B0024 0002.docx DOCX document
36C24224B0024 0001.docx DOCX document
B1 Core.pdf PDF
929D 929D1.pdf PDF
36C24224B0024_1.docx DOCX document
09 91 00 Bldg 1 ADC Painting.docx DOCX document
02 82 13.19 Bldg 1 Asbestos Floor Tile and Mastic Abatement.docx DOCX document
20240215 635D 637D 638D Demo Plan.pdf PDF
01 00 00 Bldg 1 ADC General Requirements.docx DOCX document
01 74 19 Bldg 1 ADC Construction Waste.docx DOCX document
Buffalo VAMC 138C 139C Report.pdf PDF
Buffalo VAMC Report Rooms 635D 637D 638D.pdf PDF
20240131 138C 139C DEMOLITION LAYOUT.pdf PDF
09 51 00 Bldg 1 ADC Acoustical Ceilings.docx DOCX document
01 32 16.15 Bldg 1 ADC Project Schedules.docx DOCX document
02 41 00 Bldg 1 ADC Demolition.docx DOCX document
02 82 11 Bldg 1 ADC Traditional Asbestos Abatement.docx DOCX document
01 35 26 Bldg 1 ADC Safety Requirements.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Western New York Healthcare System 3495 Bailey Avenue Building 1 Abatement, Demo, and Construction Buffalo, NY 14215

SECTION 09 65 19

RESILIENT TILE FLOORING

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies the installation of luxury vinyl tile, and accessories required for a complete installation.

1.2 RELATED WORK:

B. Resilient Base: Section 09 65 13, RESILIENT BASE AND ACCESSORIES.

C. Subfloor Testing and Preparation: Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

D. Removal of Existing Construction Containing Asbestos: Section 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.

E. Color, Pattern and Texture for Resilient Tile Flooring and Accessories: Section 09 06 00, SCHEDULE FOR FINISHES.

1.8 APPLICABLE PUBLICATIONS:

A.The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B.ASTM International (ASTM):
E1155/E1155M-14Determining Floor Flatness and Floor Levelness Numbers
F710-11Preparing Concrete Floors to Receive Resilient Flooring
F1700-13aSolid Vinyl Floor Tile
C.Code of Federal Regulation (CFR):
40 CFR 59Determination of Volatile Matter Content, Water Content, Density Volume Solids, and Weight Solids of Surface Coating

D. International Standards and Training Alliance (INSTALL):

3.2 SUBFLOOR PREPARATION:

A. Prepare surfaces to receive resilient tile and adhesive as per Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES.

//1. Remove existing resilient floor and existing adhesive. // B. Prepare concrete substrates in accordance with ASTM F710.

C. Perform work regarding removal of flooring and adhesive containing asbestos as specified in Section 02 82 13.19, ASBESTOS FLOOR TILE AND MASTIC ABATEMENT.

3.3 INSTALLATION:

A.Install in accordance with manufacturer's instructions for application and installation unless specified otherwise.
B.Mix tile from at least two containers. An apparent line either of shades or pattern variance is not acceptable.
C.Tile Layout:
1.If layout is not shown on construction documents, lay tile symmetrically about center of room or space with joints aligned.
2.Vary edge width as necessary to maintain full size tiles in the field, no edge tile to be less than 1/2 the field tile size, except where irregular shaped rooms make it impossible.
3.Place tile pattern in the same direction; do not alternate tiles unless specifically indicated in the construction documents to the contrary. // Match tile installation to approved mockup. //
D.Application:
1.Adhere floor tile to flooring substrates using a full spread of adhesive applied to substrate to produce a completed installation without open cracks, voids, raising and puckering at joints, telegraphing of adhesive spreader marks, and other surface imperfections.
2.Scribe, cut, and fit floor tiles to butt neatly and tightly to vertical surfaces and permanent fixtures including built-in furniture, cabinets, pipes, outlets, and door frames.
3.Extend floor tiles into toe spaces, door reveals, closets, and similar openings. Extend floor tiles to center of door openings.

4. Roll tile floor with a minimum 45 kg (100 pound) roller.

E. Seal joints at pipes with sealants in accordance with Section 07 92 00, JOINT SEALANTS.

F.Installation of Edge Strips:
1.Locate edge strips under center line of doors unless otherwise shown on construction documents.
2.Set resilient edge strips in adhesive. Anchor metal edge strips with anchors and screws.
3.Where tile edge is exposed, butt edge strip to touch along tile edge.
4.Where thin set ceramic tile abuts resilient tile, set edge strip against floor file and against the ceramic tile edge.

SPEC WRITER NOTES:

3.4 CLEANING AND PROTECTION:

A.Clean adhesive marks on exposed surfaces during the application of resilient materials before the adhesive sets. Exposed adhesive is not acceptable.
B.Keep traffic off resilient material for a minimum 72 hours after installation.
C.Clean flooring as recommended in accordance with manufacturer’s printed maintenance instructions and within the recommended time frame. As required by the manufacturer, apply the recommended number of coats and type of polish and/or finish in accordance with manufacturer’s written instructions.
D.When construction traffic occurs over tile, cover resilient materials with reinforced kraft paper properly secured and maintained until removal is directed by COR. At entrances and where wheeled vehicles or carts are used, cover tile with plywood, hardboard, or particle board over paper, secured and maintained until removal is directed by COR.
E.When protective materials are removed and immediately prior to acceptance, replace damaged tile and mouldings, re-clean resilient materials.

3.5 LOCATION:

A.Unless otherwise indicated in construction documents, install tile flooring, under areas where casework, laboratory and pharmacy furniture and other equipment occur.
B.Extend tile flooring for room into adjacent closets and alcoves.

- - - E N D - - -

09 65 19 - 1