This document is an amendment to Solicitation Number 36C24224B0024 for the Building 1 Abatement, Demo, Construction project at the Buffalo VA Medical Center. The project involves renovations to several rooms in Building 1, including abatement and demolition work, as well as new flooring, ceiling, and wall repairs. The period of performance is 365 days. The VA will provide some materials for the renovation work in rooms 929D and 929D1. The document includes questions from potential contractors and responses from the VA, including information on drawing availability, the period of performance, and the location of the "B1 Core." The amendment also provides details on the order of precedence for applicable documents, as well as records management and submittal requirements for the contractor.

View the file

Other files

File Type Posted
36C24224B0024 0005.docx DOCX document
36C24224B0024 0004.docx DOCX document
sign in sheet.pdf PDF
36C24224B0024 0003.docx DOCX document
36C24224B0024 0002.docx DOCX document
B1 Core.pdf PDF
929D 929D1.pdf PDF
36C24224B0024_1.docx DOCX document
09 91 00 Bldg 1 ADC Painting.docx DOCX document
02 82 13.19 Bldg 1 Asbestos Floor Tile and Mastic Abatement.docx DOCX document
20240215 635D 637D 638D Demo Plan.pdf PDF
01 00 00 Bldg 1 ADC General Requirements.docx DOCX document
01 74 19 Bldg 1 ADC Construction Waste.docx DOCX document
Buffalo VAMC 138C 139C Report.pdf PDF
Buffalo VAMC Report Rooms 635D 637D 638D.pdf PDF
20240131 138C 139C DEMOLITION LAYOUT.pdf PDF
09 51 00 Bldg 1 ADC Acoustical Ceilings.docx DOCX document
01 32 16.15 Bldg 1 ADC Project Schedules.docx DOCX document
09 65 19 Bldg 1 ADC Resilient Tile Flooring.docx DOCX document
02 41 00 Bldg 1 ADC Demolition.docx DOCX document
02 82 11 Bldg 1 ADC Traditional Asbestos Abatement.docx DOCX document
01 35 26 Bldg 1 ADC Safety Requirements.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

NONE

Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga

NY

14227 To all Offerors/Bidders

36C24224B0024 04-03-2024

X X X

X See attached document.

This amendment answers the following contractor questions:

1. Please provide a drawing showing rooms 929D and 929D1-1.

A. Attached is a drawing showing the location of both rooms, this drawing is not to scale.

1. Solicitation page 1/85 box 11 calls for completion in 180 days. Scope of work page 69 1.-A calls for completion in 365 days. Which is correct?

A. The scope of work is correct, the period of performance is 365 days. Block 11 of the SF1442 (pg 1) shall be changed to 365. Several of the rooms are currently occupied and work in those rooms cannot occur until they are vacated. As the date when the occupants are to be relocated has yet to be determined, there is a need for a long period of performance.

1. Reference is made to the B1 Core. Where is this and what is it; please provide a drawing.

A. Attached is a drawing showing the location of both rooms, this drawing is not to scale.

1. Solicitation page 74/85 SOW 1.5.5-A states materials supplied by VA for location Where is location 4?

A. Location 4. refers to rooms 929D and D1 (section 1.3 A) 4.)

All other terms and conditions remain the same.

See attached document: B1 Core.