36C24119R0104-0005014.pdf
PDF Posted
- Attached to
- 631-17-002 Exterior Site Improvements
- Solicitation number
- 36C24119R0104
About this file
36C24119R0104 0005 631-17-002_10-Basin Details.pdf
View the file
Other files
Show 40 more
Latest 50 of 171 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
D
SD
S
D
S
D
S
D
S
D
S D
DMH51
RIM:323.4
DMH50
RIM:322.5
CB204
TG:322.5WQU-2
CDS 2020-5
WATER QUALITY UNIT
RIM:321.8
WQU-1
CDS 2015-4
WATER QUALITY UNIT
RIM:320.5
CB201
TG:321.7
CB200
TG:321.7
OCS-1
TG:317.2
CB208
TG:316.7
CB207
TG:316.75
FES51
INV. 316.00
FES50
INV. 316.00
18" HDPE
18" HDPE
18" HDPE
12"
HDPE
12" HDPE
12" HDPE
18" HDPE
12" HDPE
8" PVC
18" HDPE
" H
DP
E
" H
DP
E
30'
LEVEL SPREADER
[9.1m]
0+00
1+00
2+00
3+00
4+00
4+40
0+00
1+00
1+91
0+00
1+00
1+72
HEALING GARDEN
BIORETENTION BASIN 'A'
BOTTOM ELEV.= 316.00
BERM ELEV. = 318.00
8" NON-PERFORATED PVC PIPE
20' LONG 10' WIDE
EMERGENCY OVERFLOW
ELEV.=317.5
6" PERFORATED PVC PIPE
UNDERDRAIN ELEV.=313.50
BOTTOM OF STONE BED ELEV.=313.00
LS 1
30' LONG LEVEL SPREADER
(INCLUDING OUTFALL STILLING BASIN)
INV IN=310.0
(REFER TO DETAIL)
RIP RAP
APRON (TYP.)
REFER TO DETAIL SHEETS FOR
ADDITIONAL INFORMATION FOR
THE LEVEL SPREADER, BERM,
OUTLET CONTROL STRUCTURE,
FLARED END SECTIONS, RIPRAP,
EMERGENCY SPILLWAY, BASIN SECTION
& CONSTRUCTION GUIDELINES
STONE BED & PERFORATED PIPE
SHALL EXTEND UNDER THE RAISED
PAVER PATIO AREA
RIP RAP
APRON (TYP.)
CONSTRUCT LEVEL SPREADER
AT LEVEL GRADE TO ENSURE
EVEN DISTRIBUTION OF
STORMWATER DISCHARGE
(ADJUST GRADE AS NECESSARY)
90' [27.4m]
100' [30.5m]
293.8'
[89.5m]
299.6'
[91.3m]
298.4'
[90.9m]
55' [16.8m]
10' [3.1m]
20' [6.1m]
10' [3m]
40' [12.2m]
10' [3m]
(TYP.)
CROSS SECTION 'B'
CROSS SECTION 'A'
HEALING GARDEN BIORETENTION BASIN 'A' PROFILE
HORIZONTAL SCALE: 1'=30"
VERTICAL SCALE: 1'=3"
1.6
3.1
3.9
4.0
3.8
4.4
5.0
4.5
2.4
0.1
0+00
8.1
6.0
1+00
9.0
6.0
2+00
6.0
6.0
3+00
6.0
9.3
4+00 4+40
PROPOSED
GRADE
EXISTING
GRADE
PROPOSED
6' WIDE ADA
ACCESSIBLE
CONC WALK
PROPOSED
6" PERFORATED PVC
PIPE UNDERDRAIN
W/STONE BED
PROPOSED
STONE
PAVER
PATIO
PROPOSED
6' WIDE ADA
ACCESSIBLE
CONC WALK
8" PVC
STA. 2+21.85
INV. 313.50
BASIN 'A' - CROSS SECTION - B PROFILE
HORIZONTAL SCALE: 1'=30"
VERTICAL SCALE: 1'=3"
9.7
2.7
6.1
9.0
0.1
0+00
7.6
8.7
1+00
2.1
2.4
1+70
PROPOSED
GRADE EXISTING
GRADE
PROPOSED
6' WIDE ADA
ACCESSIBLE
CONC
WALK
12" HDPE
STA. 0+58.41
INV. 312.93
C B2
TG
:31 6.7
ST
A:
0+
.47
IN
V.
O
UT
:31
3.0
PROPOSED
STONE
PAVER
PATIO
PROPOSED
6" PERFORATED PVC
PIPE UNDERDRAIN
W/STONE BED
BASIN 'A' - CROSS SECTION - A PROFILE
HORIZONTAL SCALE: 1'=30"
VERTICAL SCALE: 1'=3"
8.3
0.7
3.6
6.6
7.9
0+00
8.1
8.9
1+00
0.0
1.7
1+70
PROPOSED
GRADE
EXISTING
GRADE
PROPOSED
CONCRETE
STAIRS
W/HANDRAILS
PROPOSED
STONE
PAVER
PATIO
PROPOSED
6' WIDE ADA
ACCESSIBLE
CONC WALK
PROPOSED
6" PERFORATED PVC
PIPE UNDERDRAIN
W/STONE BED
PROPOSED
6' WIDE ADA
ACCESSIBLE
CONC WALK
C B2
TG
:31 6.7
ST
A:
0+
.36
IN
V.
O
UT
:31
3.0
Know what's below.
before you dig.Call
R
Feet
0 30 60
PLAN VIEW
SCALE: 1"=30'
STORMWATER BASIN INFILTRATION SURFACE
MAJOR CONTOUR (5')
SD
MAJOR CONTOUR (1')
STORM SEWER PIPE
STORM SEWER STRUCTURES
SUBSURFACE STONE BED
SITE SYMBOL - IMPROVEMENTS
FEET
BASIN BOTTOM
ELEV.=316.00
FABRICATED TRASH GRATE
(BOLTED TO STRUCTURE)
T/G=317.20
FINISHED GRADE
(SEE PLAN)
6"
8" CRUSHED STONE
OUTLET PIPE TO
LEVEL SPREADER (LS-1)
18" HDPE
INV.=311.50
4'x4' BOX
UNCOMPACTED
IN-SITU SOIL
18" FILTER MEDIA
(EXTEND TO TOW OF SLOPE)
BOTTOM OF FILTER MEDIA=314.50
BOTTOM OF BASIN=316.00
6" PERFORATED PVC PIPE
(PER AASHTO M252)
PERFORATED PIPE INV.=313.50
(SEE PLAN FOR LAYOUT)
2"-3" PEA STONE CHOKER
COURSE (#8 OR #9)
BOTTOM OF STONE=314.25
TOP OF STONE=314.50
WALKWAY
TOP OF BERM=318.00
FILTER FABRIC AROUND
UNDERDRAIN GRAVEL BED
(TOP, BOTTOM AND SIDES)
UNDERDRAIN GRAVEL BED
(#57 WASHED STONE)
(GRAVEL SHALL EXTEND
UNDER ENTIRE FILTER MEDIA)
BOTTOM OF STONE=313.00
TOP OF STONE=314.25
(ADDITIONAL STONE REQUIRED
AS FILL WHEN EXISTING GRADE
IS BELOW THE BOTTOM OF
STONE ELEVATION - SHALL BE FREE
DRAINING GRAVEL PER MADOT M1.04.1)
EXISTING
GRADE
BIORETENTION BASIN NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE STORMWATER POLLUTION PREVENTION
PLAN (SWPPP) PREPARED FOR THE PROJECT.
2. THE CONSTRUCTION OF THE TEMPORARY SEDIMENT TRAP AND BIORETENTION BASIN SHALL BE OVERSEEN BY THE
DESIGN ENGINEER OR AN APPROVED REPRESENTATIVE.
3. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE OWNER AND SHALL INSTALL
EROSION CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS. THE BIORETENTION BASIN AREA SHALL BE
UTILIZED AS A TEMPORARY SEDIMENT TRAP DURING THE CONSTRUCTION OF UP GRADIENT IMPROVEMENTS.
INITIAL EXCAVATION SHALL BE PERFORMED EARLY ON TO CONSTRUCT TEMPORARY SEDIMENT TRAP. INITIAL
EXCAVATION SHALL NOT BE CARRIED TO WITHIN ONE (1) FOOT OF THE FINAL BOTTOM ELEVATION. THE TOPSOIL
LAYER SHALL BE STRIPED AND REMOVED. IF THE STRIPING OF TOPSOIL BRINGS THE TEMPORARY SEDIMENT TRAP
TO WITHIN ONE (1) FOOT OF THE FINAL BOTTOM ELEVATION OF THE INFILTRATION ELEVATION, OVEREXCAVATION
DURING THE CONVERSION OF THE BIORETENTION BASIN SHALL OCCUR, UTILIZING FREE DRAINING GRAVEL AS FIL.
4. FOLLOWING CONSTRUCTION AND STABILIZATION OF THE UP GRADIENT PARKING IMPROVEMENTS, FINAL
CONSTRUCTION OF THE BIORETENTION MAY PROCEED. DURING CONSTRUCTION OF THE BIORETENTION BASIN, THE
INFILTRATION SURFACE OF THE BIORETENTION BASIN SHALL BE PROTECTED FROM SEDIMENTATION AND SOIL
COMPACTION. EXISTING SUBGRADE WITHIN BASIN SHALL NOT BE COMPACTED OR SUBJECT TO CONSTRUCTION
EQUIPMENT TRAFFIC. CONTRACTOR SHALL ENSURE NO CONSTRUCTION EQUIPMENT SHALL BE PERMITTED TO RUN
OVER EXCAVATED SUBGRADE, STONE AND INFILTRATION SURFACE AND/OR MEDIA.
5. EXCAVATION OF INFILTRATION AREAS SHALL BE COMPLETED FROM THE PERIMETER OF THE BASIN WHERE
POSSIBLE TO AVOID COMPACTION BY EQUIPMENT TRAFFICKING. WORK SHALL BE PERFORMED IN PHASES TO
ELIMINATE EQUIPMENT TRAFFICKING. COMPLETE EXCAVATION AND INSTALLATION OF PROPOSED MATERIALS IN
LENGTHS THAT EQUIPMENT CAN REACH WITHOUT HAVING TO WORK ON EXCAVATED SURFACE.
6. AFTER EXCAVATION OF BASIN TO INFILTRATION ELEVATION, SCARIFY EXISTING SOIL SURFACE. WHERE EROSION
OF SUBGRADE HAS CAUSED ACCUMULATION OF FINE MATERIALS AND/OR SURFACE PONDING IN THE GRADED
BOTTOM, THIS MATERIAL SHALL BE REMOVED AND THE UNDERLYING SOILS SCARIFIED TO A MINIMUM DEPTH OF SIX
(6) INCHES.
7. HALT EXCAVATION AND NOTIFY ENGINEER IMMEDIATELY IF EVIDENCE OF SINKHOLE ACTIVITY IS ENCOUNTERED
WITHIN INFILTRATION AREA.
8. INSTALL STONE BED AND PERFORATED UNDERDRAIN PIPE. WRAP UNDERDRAIN WITH FILTER FABRIC PRIOR TO
BACKFILLING. UNDERDRAIN PIPE SHALL HAVE 3/8" PERFORATIONS SPACED AT SIX (6) INCH CENTERS, MIN. FOUR (4)
HOLES PER ROW, MAX. SPACING OF UNDERDRAIN PPE IS TEN (10) FEET ON CENTER. THE STONE BED AND
PERFORATED UNDERDRAIN PIPE SHALL EXTEND UNDER THE RAISED PAVER PATIO AREA. ANY PORTION OF THE
BASIN WHERE EXISTING GRADE IS LOWER THAN THE ELEVATION OF THE PERFORATED PIPE, FREE DRAINING
GRAVEL SHALL BE USED AS FILL MATERIAL. AFTER INSTALLATION OF STONE BED, PERFORATED PIPE AND FILTER
FABRIC, INSTALL PEA STONE CHOKER COURSE.
9. BACKFILL BIORETENTION BASIN WITH SPECIFIED SOIL MIX. OVERFILLING IS RECOMMENDED TO ACCOUNT FOR
SETTLEMENT. LIGHT HAND TAMPING IS ACCEPTABLE IF NECESSARY. BOTTOM OF INFILTRATION AREA SHALL BE AT
LEVEL GRADE TO PROMOTE EVEN INFILTRATION ACROSS THE ENTIRE SURFACE. THE INFILTRATION AREA AND
PLANT GROWTH AREAS SHALL BE LOOSE AND FRIABLE, HIGH IN ORGANIC MATTER AND COMPLETED WITHOUT
COMPACTION FROM HEAVY EQUIPMENT. THE SOIL ADJACENT TO AND UNDER THE PAVER PATIO AREA SHALL NOT
BE SPECIFIED SOIL MIX, RATHER THIS AREA SHALL BE BACKFILLED AND COMPACTED SOIL FOR PURPOSES OF
STRUCTURAL SUPPORT OF THE PAVER PATIO.
10. THE SOIL MIX FOR BIORETENTION BASINS SHALL BE A MIXTURE OF SAND (40%), COMPOST (30-40%) AND TOPSOIL
(20-30%). THE SOIL MIX MUST BE UNIFORM, FREE OF STONES, STUMPS, ROOTS OR SIMILAR OBJECTS LARGER THAN
TWO (2) INCHES. CLAY CONTENT SHOULD NOT EXCEED 5%. SOIL pH SHOULD GENERALLY BE BETWEEN 5.5-6.5, A
RANGE THAT IS OPTIMAL FOR MICROBIAL ACTIVITY AND ABSORPTION OF NITROGEN, PHOSPHORUS AND OTHER
POLLUTANTS. USE SOILS WITH MINIMUM 5% ORGANIC CONTENT AND MAXIMUM 500-PPM SOLUBLE SALTS. THE SAND
COMPONENT SHALL BE GRAVELLY SAND THAT MEETS ASTM D422. THE TOPSOIL COMPONENT SHALL BE A SANDY
LOAM, LOAMY SAND OR LOAM TEXTURE. THE COMPOST COMPONENT MUST BE PROCESSED FROM YARD WASTE IN
ACCORDANCE WITH MASSDEP GUIDELINES. THE COMPOST SHALL NOT CONTAIN BIOSOLIDS.
SIEVE NO. PERCENT BY WEIGHT PASSING
2-INCH 100
INCH 70-100
INCH 50-80
40 15-40
200 0-3
11. PRESOAK PLANTING SOIL PRIOR TO PLANTING VEGETATION TO AID IN SETTLEMENT. SEED BIORETENTION BASIN
ACCORDING TO LANDSCAPE PLAN. ALL PLANT MATERIAL SHALL BE TOLERANT OF INUNDATION AND DROUGHT
CONDITIONS. NATIVE PLANT MATERIALS ARE REQUIRED.
12. LEVEL SPREADER SHALL BE INSTALLED PER DETAIL.
13. PERFORM MAINTENANCE IN ACCORDANCE WITH THE POST CONSTRUCTION OPERATION AND MAINTENANCE PLAN.
14. THE BIORETENTION BASIN SHALL NOT BE USED FOR SNOW STORAGE.
BERM SHALL HAVE IMPERVIOUS
BARRIER OR BE CONSTRUCTED
USING IMPERVIOUS SOIL PER
MASS HIGHWAY SPEC
INSTALL PERMANENT EROSION CONTROL MATTING NAG-C350 (OR EQUIVALENT)
WITH STAPLE PATTERN D, PER MANUFACTURER'S SPECIFICATIONS, OVER 4" LOAM
ACROSS CREST. INSTALL 9" DEPTH MODIFIED RIP-RAP M2.02.4 OVER 3" DEPTH 3/4" STONE
OVER FILTER FABRIC ON BACK SLOPE OF BERM EMERGENCY SPILLWAY AREA.
EMERGENCY
SPILLWAY
12" HDPE
(BOTH SIDES)
INV.=312.50
8" PVC (NON-PERFORATED)
INV.=313.50
REFER TO BERM DETAIL FOR
FURTHER INFORMATION RELATED
TO MATERIAL, DISCHARGE PIPE,
ANTI-SEEP COLLAR &
CONSTRUCTION GUIDELINES
20'
COMPACTED SUBGRADE
SPILLWAY ELEV.=317.50
BERM ELEV.=318.00
30 LF CONC. CURB (18" DEEP)
(TOP CURB ELEV.=317.50) WALKWAY ALONG BASIN BERM
(MUST BE ADA ACCESSIBLE
40'
* STONE BED & PERFORATED PIPE
SHALL EXTEND UNDER THE RAISED
PAVER PATIO AREA
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
DANIEL J. WITCZAK, P.E.
AutoCAD SHX Text
MA# 53668
AutoCAD SHX Text 9/27/2018
AutoCAD SHX Text Witczak
AutoCAD SHX Text Peters
AutoCAD SHX Text VA Medical Center Northampton
AutoCAD SHX Text Leeds, MA
AutoCAD SHX Text
AutoCAD SHX Text 631-17-002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAPAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text DANIEL J WITCZAK CIVIL No. 53668
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Bioretention Basin 'A' Plan
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Exterior Site Improvements
AutoCAD SHX Text 100% Review Plans
AutoCAD SHX Text
AutoCAD SHX Text
CS166
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BIORETENTION BASIN 'A'
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OUTLET CONTROL STRUCTURE (OCS- 1)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
BIORETENTION BASIN 'A' CROSS SECTION
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
BIORETENTION BASIN 'A' SPILLWAY
WETLANDS
(REGULATED)
COLLAPSED
TUNNEL
CULVERT
INSTALL
GUIDERAIL
(60 LF)
DMH56
RIM:349.4 12
" H
DP
E
S
D
S
D
S
D
S
D
18" HDPE
FES3
INV. 334.00
18" HDPE
DMH54
RIM:341.3
12" HDPE
18" HDPE
CB214
TG:346.412" HDPE
CB213
TG:341.4
12" HDPE
OCS-2
TG:336.0
24" HDPE
FES4
INV. 332.50
S
D 12" HDPE
FES5
INV. 333.00
S
D
S
D
12" HDPE
LE
VE
L S
PR
EA
DE
R [9
.1m
0+
1+
2+
2+
0+00
1+00
1+69
0+00
1+00
1+46
BIORETENTION BASIN 'B'
BOTTOM ELEV.=334.00
BERM ELEV. =337.00
S
D
DMH55
RIM:346.2
S
D
CB212 - NO SUMP
TG:341.1
S
D
S
D
S
D
12" HDPE
S
D
" H
DP
E
CB211
TG:339.5
S
D
" H
DPE
LS 3
30' LONG LEVEL SPREADER
INCLUDING OUTFALL STILLING BASIN
INV=327.0
(REFER TO DETAIL)
20' LONG 10' WIDE
EMERGENCY OVERFLOW
ELEV.=336.5
6" PERFORATED PVC PIPE
UNDERDRAIN ELEV.=331.50
BOTTOM OF STONE BED ELEV.=331.00
CB220
TG:334.6
12"
HDPE
S
D
8" PVC
S
D
S
D
S
D
DMH74
RIM:347.3
12" HDPE
S
D
DMH73
RIM:348.7
WQU-4
CDS 2020-5
WATER QUALITY UNIT
RIM:341.0
18" HDPE
18" HDPE
S
DFES4-A
INV. 332.50
RIP RAP
APRON (TYP.)
RIP RAP
APRON (TYP.)
REFER TO DETAIL SHEETS FOR
ADDITIONAL INFORMATION FOR
THE LEVEL SPREADER, BERM,
OUTLET CONTROL STRUCTURE,
FLARED END SECTIONS, RIPRAP,
EMERGENCY SPILLWAY, BASIN SECTION
& CONSTRUCTION GUIDELINES
CONSTRUCT LEVEL SPREADER
AT LEVEL GRADE TO ENSURE
EVEN DISTRIBUTION OF
STORMWATER DISCHARGE
(ADJUST GRADE AS NECESSARY)
1.7
[34 m]
7.9
[39 m]
4.1
[43
.9m
0.4
[48
.9m ] 17
6.5
[53 .8m
8'[2.4m](TYP.)
CROSS SECTION 'A'
CROSS SECTION 'B'
BIORETENTION BASIN 'B' PROFILE
HORIZONTAL SCALE: 1'=30"
VERTICAL SCALE: 1'=3"
3.2
3.7
2.7
2.9
3.3
4.4
4.8
4.5
0+00
4.5
4.0
1+00
4.0
4.0
2+00
5.6
2+65
8" PVC
STA. 1+20.94
INV. 331.50
PROPOSED
GRADE
EXISTING
GRADE
10' [3m]
BERM
10' [3m]
BERM
PROPOSED
6" PERFORATED PVC
PIPE UNDERDRAIN
W/STONE BED
BASIN 'B' CROSS SECTION -A PROFILE
HORIZONTAL SCALE: 1'=30"
VERTICAL SCALE: 1'=3"
8.1
1.7
5.4
9.0
0.3
0+00
4.0
4.0
1+00
5.3
5.7
1+69
PROPOSED
GRADE
EXISTING
GRADE
10' [3m]
BERM
PROPOSED
6" PERFORATED PVC
PIPE UNDERDRAIN
W/STONE BED
BASIN 'B' CROSS SECTION -B PROFILE
HORIZONTAL SCALE: 1'=30"
VERTICAL SCALE: 1'=3"
6.3
9.8
3.6
6.8
0+00
7.0
4.0
1+00
2.2
1+47
PROPOSED
GRADE
EXISTING
GRADE
10' [3m]
BERM
PROPOSED
6" PERFORATED PVC
PIPE UNDERDRAIN
W/STONE BED
Know what's below.
before you dig.Call
R
Feet
0 30 60
PLAN VIEW
SCALE: 1"=30'
STORMWATER BASIN INFILTRATION SURFACE
MAJOR CONTOUR (5')
SD
MAJOR CONTOUR (1')
STORM SEWER PIPE
STORM SEWER STRUCTURES
SUBSURFACE STONE BED
SITE SYMBOL - IMPROVEMENTS
0 3
FEET
BASIN BOTTOM
ELEV.=334.00
FABRICATED TRASH GRATE
(BOLTED TO STRUCTURE)
T/G=336.00
FINISHED GRADE
(SEE PLAN)
6"
8" CRUSHED STONE
OUTLET PIPE TO
LEVEL SPREADER (LS-3)
24" HDPE
INV.=331.00
4'x4' BOX
10'
UNCOMPACTED
IN-SITU SOIL
18" FILTER MEDIA
(EXTEND TO TOW OF SLOPE)
BOTTOM OF FILTER MEDIA=332.50
BOTTOM OF BASIN=334.00
6" PERFORATED PVC PIPE
(PER AASHTO M252)
PERFORATED PIPE INV.=331.50
(SEE PLAN FOR LAYOUT)
TOP OF BERM=337.00
2"-3" PEA STONE CHOKER
COURSE (#8 OR #9)
BOTTOM OF STONE=332.25
TOP OF STONE=332.50
FILTER FABRIC AROUND
UNDERDRAIN GRAVEL BED
(TOP, BOTTOM AND SIDES)
UNDERDRAIN GRAVEL BED
(#57 WASHED STONE)
(GRAVEL SHALL EXTEND
UNDER ENTIRE FILTER MEDIA)
BOTTOM OF STONE=331.00
TOP OF STONE=332.25
WALKWAY
BERM SHALL HAVE IMPERVIOUS
BARRIER OR BE CONSTRUCTED
USING IMPERVIOUS SOIL PER
MASS HIGHWAY SPEC
INSTALL PERMANENT EROSION CONTROL MATTING NAG-C350 (OR EQUIVALENT)
WITH STAPLE PATTERN D, PER MANUFACTURER'S SPECIFICATIONS, OVER 4" LOAM
ACROSS CREST. INSTALL 9" DEPTH MODIFIED RIP-RAP M2.02.4 OVER 3" DEPTH 3/4" STONE
OVER FILTER FABRIC ON BACK SLOPE OF BERM EMERGENCY SPILLWAY AREA.
EMERGENCY
SPILLWAY
12" HDPE
INV.=331.50
8" PVC (NON-PERFORATED)
INV.=331.50REFER TO BERM DETAIL FOR
FURTHER INFORMATION RELATED
TO MATERIAL, DISCHARGE PIPE,
ANTI-SEEP COLLAR &
CONSTRUCTION GUIDELINES
20'
COMPACTED SUBGRADE
6" FILTER STONE
12" RIPRAP (R-4)
SPILLWAY ELEV.=336.50
BERM ELEV.=337.00
22 LF CONC. CURB (18" DEEP)
(TOP CURB ELEV.=336.50)
NON-WOVEN GEOTEXTILE FABRIC
(MIRAFI FW300 OR EQUAL)
23'
BIORETENTION BASIN NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE STORMWATER POLLUTION PREVENTION
PLAN (SWPPP) PREPARED FOR THE PROJECT.
2. THE CONSTRUCTION OF THE TEMPORARY SEDIMENT TRAP AND BIORETENTION BASIN SHALL BE OVERSEEN BY THE
DESIGN ENGINEER OR AN APPROVED REPRESENTATIVE.
3. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE OWNER AND SHALL INSTALL
EROSION CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS. THE BIORETENTION BASIN AREA SHALL BE
UTILIZED AS A TEMPORARY SEDIMENT TRAP DURING THE CONSTRUCTION OF UP GRADIENT IMPROVEMENTS.
INITIAL EXCAVATION SHALL BE PERFORMED EARLY ON TO CONSTRUCT TEMPORARY SEDIMENT TRAP. INITIAL
EXCAVATION SHALL NOT BE CARRIED TO WITHIN ONE (1) FOOT OF THE FINAL BOTTOM ELEVATION. THE TOPSOIL
LAYER SHALL BE STRIPED AND REMOVED. IF THE STRIPING OF TOPSOIL BRINGS THE TEMPORARY SEDIMENT TRAP
TO WITHIN ONE (1) FOOT OF THE FINAL BOTTOM ELEVATION OF THE INFILTRATION ELEVATION. OVEREXCAVATION
DURING THE CONVERSION OF THE BIORETENTION BASIN SHALL OCCUR, UTILIZING FREE DRAINING GRAVEL AS FILL.
4. FOLLOWING CONSTRUCTION AND STABILIZATION OF THE UP GRADIENT PARKING IMPROVEMENTS, FINAL
CONSTRUCTION OF THE BIORETENTION MAY PROCEED. DURING CONSTRUCTION OF THE BIORETENTION BASIN, THE
INFILTRATION SURFACE OF THE BIORETENTION BASIN SHALL BE PROTECTED FROM SEDIMENTATION AND SOIL
COMPACTION. EXISTING SUBGRADE WITHIN BASIN SHALL NOT BE COMPACTED OR SUBJECT TO CONSTRUCTION
EQUIPMENT TRAFFIC. CONTRACTOR SHALL ENSURE NO CONSTRUCTION EQUIPMENT SHALL BE PERMITTED TO RUN
OVER EXCAVATED SURFACE, STONE AND INFILTRATION SURFACE AND/OR MEDIA.
5. EXCAVATION OF INFILTRATION AREAS SHALL BE COMPLETED FROM THE PERIMETER OF THE BASIN WHERE
POSSIBLE TO AVOID COMPACTION BY EQUIPMENT TRAFFICKING. WORK SHALL BE PERFORMED IN PHASES TO
ELIMINATE EQUIPMENT TRAFFICKING. COMPLETE EXCAVATION AND INSTALLATION OF PROPOSED MATERIALS IN
LENGTHS THAT EQUIPMENT CAN REACH WITHOUT HAVING TO WORK ON EXCAVATED SURFACE.
6. AFTER EXCAVATION OF BASIN TO INFILTRATION ELEVATION, SCARIFY EXISTING SOIL SURFACE. WHERE EROSION
OF SUBGRADE HAS CAUSED ACCUMULATION OF FINE MATERIALS AND/OR SURFACE PONDING IN THE GRADED
BOTTOM, THIS MATERIAL SHALL BE REMOVED AND THE UNDERLYING SOILS SCARIFIED TO A MINIMUM DEPTH OF SIX
(6) INCHES.
7. HALT EXCAVATION AND NOTIFY ENGINEER IMMEDIATELY IF EVIDENCE OF SINKHOLE ACTIVITY IS ENCOUNTERED
WITHIN INFILTRATION AREA.
8. INSTALL STONE BED AND PERFORATED UNDERDRAIN PIPE. WRAP UNDERDRAIN WITH FILTER FABRIC PRIOR TO
BACKFILLING. UNDERDRAIN PIPE SHALL HAVE 3/8" PERFORATIONS SPACED AT SIX (6) INCH CENTERS, MIN. FOUR (4)
HOLES PER ROW, MAX. SPACING OF UNDERDRAIN PPE IS TEN (10) FEET ON CENTER.
9. BACKFILL BIORETENTION BASIN WITH SPECIFIED SOIL MIX. OVERFILLING IS RECOMMENDED TO ACCOUNT FOR
SETTLEMENT. LIGHT HAND TAMPING IS ACCEPTABLE IF NECESSARY. BOTTOM OF INFILTRATION AREA SHALL BE AT
LEVEL GRADE TO PROMOTE EVEN INFILTRATION ACROSS THE ENTIRE SURFACE. THE INFILTRATION AREA AND
PLANT GROWTH AREAS SHALL BE LOOSE AND FRIABLE, HIGH IN ORGANIC MATTER AND COMPLETED WITHOUT
COMPACTION FROM HEAVY EQUIPMENT.
10. THE SOIL MIX FOR BIORETENTION BASINS SHALL BE A MIXTURE OF SAND (40%), COMPOST (30-40%) AND TOPSOIL
(20-30%). THE SOIL MIX MUST BE UNIFORM, FREE OF STONES, STUMPS, ROOTS OR SIMILAR OBJECTS LARGER THAN
TWO (2) INCHES. CLAY CONTENT SHOULD NOT EXCEED 5%. SOIL pH SHOULD GENERALLY BE BETWEEN 5.5-6.5, A
RANGE THAT IS OPTIMAL FOR MICROBIAL ACTIVITY AND ABSORPTION OF NITROGEN, PHOSPHORUS AND OTHER
POLLUTANTS. USE SOILS WITH MINIMUM 5% ORGANIC CONTENT AND MAXIMUM 500-PPM SOLUBLE SALTS. THE SAND
COMPONENT SHALL BE GRAVELLY SAND THAT MEETS ASTM D422. THE TOPSOIL COMPONENT SHALL BE A SANDY
LOAM, LOAMY SAND OR LOAM TEXTURE. THE COMPOST COMPONENT MUST BE PROCESSED FROM YARD WASTE IN
ACCORDANCE WITH MASSDEP GUIDELINES. THE COMPOST SHALL NOT CONTAIN BIOSOLIDS.
SIEVE NO. PERCENT BY WEIGHT PASSING
2-INCH 100
INCH 70-100
INCH 50-80
40 15-40
200 0-3
11. PRESOAK PLANTING SOIL PRIOR TO PLANTING VEGETATION TO AID IN SETTLEMENT. SEED BIORETENTION BASIN
ACCORDING TO LANDSCAPE PLAN. ALL PLANT MATERIAL SHALL BE TOLERANT OF INUNDATION AND DROUGHT
CONDITIONS. NATIVE PLANT MATERIALS ARE REQUIRED.
12. LEVEL SPREADER SHALL BE INSTALLED PER DETAIL.
13. PERFORM MAINTENANCE IN ACCORDANCE WITH THE POST CONSTRUCTION OPERATION AND MAINTENANCE PLAN.
14. THE BIORETENTION BASIN SHALL NOT BE USED FOR SNOW STORAGE.
AutoCAD SHX Text
EBOX
AutoCAD SHX Text 100'
AutoCAD SHX Text 100'
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
DANIEL J. WITCZAK, P.E.
AutoCAD SHX Text
MA# 53668
AutoCAD SHX Text 9/27/2018
AutoCAD SHX Text Witczak
AutoCAD SHX Text Peters
AutoCAD SHX Text VA Medical Center Northampton
AutoCAD SHX Text Leeds, MA
AutoCAD SHX Text
AutoCAD SHX Text 631-17-002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAPAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text DANIEL J WITCZAK CIVIL No. 53668
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Bioretention Basin 'B' Plan
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Exterior Site Improvements
AutoCAD SHX Text 100% Review Plans
AutoCAD SHX Text
AutoCAD SHX Text
CS167
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BIORETENTION BASIN 'B'
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
OUTLET CONTROL STRUCTURE (OCS- 2)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
BIORETENTION BASIN 'B' CROSS SECTION
AutoCAD SHX Text
%%USECTION A-A
AutoCAD SHX Text
AutoCAD SHX Text
NTS
BIORETENTION BASIN 'B' SPILLWAY
GV
S
GV
S
W V
SMH30
SMH9
SMH8
SMH4
GRAVEL BASIN ACCESS
ABANDONED SEWER LINE
SMHABANDONED
CONC SW
S
S
S
WV
WV
WV
WV
D
D
D
D
ST
CB096
CB009
CB114
DMH029
DMH
CB012
CB011
FRONT HILL ROAD
STORMWATER BASIN
EMERGENCY
SPILLWAY
ELEV=339.70
STORMWATER
DIVERSION
CHANNEL
STORMWATER
RIPRAP CHANNEL
OUTLET CONTROL
STRUCTURE
(TOP OF CONC.
AVG. ELEV.=338.20)
24" HDPE
(SECONDARY
OUTLET)
SEDIMENT
FOREBAY
RIPRAP INLET
STORMWATER
DIVERSION
CHANNEL
24" HDPE
(PRIMARY OUTLET)
INV.=335.00
RIPRAP INLET
DMH
DMH
INV
RELOCATED
TREELINE
CB225
TG:335.6
CB012
TG:334.36
12" HDPE
CB011
TG:333.74
S
D
S
D
S
D
S
D
DMH62
RIM:343.9
24" H
DPE
24" H
DPE
SD
S D
S D
SD
36" HDPEDMH67
RIM:347.9
36" HDPE
S
D
S
D
S
D
S
D
24" HDPE
FES-ED-1
INV. 335.00
FES-ED-2
INV. 335.00
FES-ED-3
INV. 335.00
Know what's below.
before you dig.Call
R
Feet
0 30 60
PLAN VIEW
SCALE: 1"=30'
STORMWATER BASIN INFILTRATION SURFACE
MAJOR CONTOUR (5')
SD
MAJOR CONTOUR (1')
STORM SEWER PIPE
STORM SEWER STRUCTURES
SUBSURFACE STONE BED
SITE SYMBOL - IMPROVEMENTS
FEET
EXISTING INFILTRATION BASIN CROSS SECTION
CATTAILS
REPAIRED INFILTRATION BASIN CROSS SECTION
ENGINEERED SOIL MIX
(VARIABLE DEPTH)
INFILTRATION
BASIN SEED MIX
INFILTRATION BASIN NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE STORMWATER POLLUTION PREVENTION
PLAN (SWPPP) PREPARED FOR THE PROJECT.
2. THE ENGINEER SHALL BE NOTIFIED PRIOR TO EXCAVATION OF THE EXISTING BASIN. THE ENGINEER OR AN
APPROVED REPRESENTATIVE SHALL BE ON-SITE DURING THE REPAIR OF THE BASIN.
3. THE EXISTING OUTLET CONTROL STRUCTURE SHALL BE RESET TO BE 0.3 FEET HIGHER, TO MATCH PREVIOUSLY
APPROVED BASIN DESIGN.
4. EXCAVATE BOTTOM OF EXISTING BASIN TO REMOVE THE TOP LAYER OF LOAM, WHICH IS APPROXIMATELY SIX (6)
INCHES IN DEPTH.
5. CONTINUE TO EXCAVATE BOTTOM OF EXISTING BASIN TO REMOVE ALL COMPACTED MATERIAL, WHICH WILL VARY
IN DEPTH. EXCAVATION OF INFILTRATION AREAS SHALL BE COMPLETED IN PHASES TO ELIMINATE EQUIPMENT
TRAFFICKING AND TO AVOID COMPACTION OF NEWLY EXPOSED SUBGRADE MATERIAL. HALT EXCAVATION AND
NOTIFY ENGINEER IMMEDIATELY IF EVIDENCE OF SINKHOLE ACTIVITY IS ENCOUNTERED WITHIN INFILTRATION
AREA.
6. AFTER EXCAVATION OF COMPACTED MATERIAL, SCARIFY EXISTING SOIL SURFACE. WHERE EROSION OF
SUBGRADE HAS CAUSED ACCUMULATION OF FINE MATERIALS AND/OR SURFACE PONDING IN THE GRADED
BOTTOM, THIS MATERIAL SHALL BE REMOVED AND THE UNDERLYING SOILS SCARIFIED TO A MINIMUM DEPTH OF
SIX (6) INCHES.
7. THE AREA OF REMOVED MATERIAL DURING EXCAVATION SHALL BE REPLACED WITH AN ENGINEERED MIX TO AN
ELEVATION SIX (6) INCHES BELOW THE EXISTING 24" HDPE DISCHARGE PIPE. OVERFILLING IS RECOMMENDED TO
ACCOUNT FOR SETTLEMENT. LIGHT HAND TAMPING IS ACCEPTABLE IF NECESSARY. BOTTOM OF INFILTRATION
AREA SHALL BE AT LEVEL GRADE TO PROMOTE EVEN INFILTRATION ACROSS THE ENTIRE SURFACE. THE
INFILTRATION AREA AND PLANT GROWTH AREAS SHALL BE LOOSE AND FRIABLE, HIGH IN ORGANIC MATTER AND
COMPLETED WITHOUT COMPACTION FROM HEAVY EQUIPMENT.
8. THE SOIL MIX FOR THE INFILTRATION BASIN SHALL BE A MIXTURE OF SAND (40%), COMPOST (30-40%) AND
TOPSOIL (20-30%). THE SOIL MIX MUST BE UNIFORM, FREE OF STONES, STUMPS, ROOTS OR SIMILAR OBJECTS
LARGER THAN TWO (2) INCHES. CLAY CONTENT SHOULD NOT EXCEED 5%. SOIL pH SHOULD GENERALLY BE
BETWEEN 5.5-6.5, A RANGE THAT IS OPTIMAL FOR MICROBIAL ACTIVITY AND ABSORPTION OF NITROGEN, PHOSPHORUS AND OTHER POLLUTANTS. USE SOILS WITH MINIMUM 5% ORGANIC CONTENT AND MAXIMUM
500-PPM SOLUBLE SALTS. THE SAND COMPONENT SHALL BE GRAVELLY SAND THAT MEETS ASTM D422. THE
TOPSOIL COMPONENT SHALL BE A SANDY LOAM, LOAMY SAND OR LOAM TEXTURE. THE COMPOST COMPONENT
MUST BE PROCESSED FROM YARD WASTE IN ACCORDANCE WITH MASSDEP GUIDELINES. THE COMPOST SHALL
NOT CONTAIN BIOSOLIDS.
SIEVE NO. PERCENT BY WEIGHT PASSING
2-INCH 100
3/4 INCH 70-100
1/4 INCH 50-80
40 15-40
200 0-3
9. PRESOAK PLANTING SOIL PRIOR TO PLANTING VEGETATION TO AID IN SETTLEMENT. SEED INFILTRATION BASIN
ACCORDING TO LANDSCAPE PLAN. ALL PLANT MATERIAL SHALL BE TOLERANT OF INUNDATION AND DROUGHT
CONDITIONS. NATIVE PLANT MATERIALS ARE REQUIRED.
10. PERFORM MAINTENANCE IN ACCORDANCE WITH THE POST CONSTRUCTION OPERATION AND MAINTENANCE PLAN.
SEED MIX D - BIORETENTION & INFILTRATION BASIN BOTTOM
% OF
MIX LATIN NAME COMMON NAME CULTIVAR/
ECOTYPE
2.0 ASCLEPIAS INCARNATA SWAMP MILKWEED PA
2.0 ASTER NOVAE-ANGLIAE NEW ENGLAND ASTER PA
3.0 CHAMAECRISTA FASCICULATA PARTRIDGE PEA PA
3.0 COREOPSIS LANCEOLATA LANCE LEAF COREOPSIS ANY
20.0 ELYMUS VIRGINICUS VIRGINIA WILDRYE PA
2.0 HELIOPSIS HELIANTHOIDES OX-EYE SUNFLOWER PA
0.5 JUNCUS TENUIS PATH RUSH PA
0.7 MONARDA FISTULOSA WILD BERGAMOT
FIG(PA)
25.0 PANICUM ANCEPS BEAKED PANICGRASS MD
8.0 PANICUM RIGIDULUM REDTOP PANICGRASS PA
0.4 PYCNANTHEMUM TENUIFOLIUM NARROW LEAVED MOUNTAIN MINT PA
3.0 RUDBECKIA HIRTA BLACK EYED SUSAN ANY
25.4 SCHIZACHYRIUM SCOPARIUM LITTLE BLUSTEM CAMPER
4.0 VERBENA HASTATA BLUE VERVAIN PA
1.0 VERNONIA NPVEBORACENSIS NEW YORK IRONWEED PA
100 TOTAL
APPLY THIS MIX AT 20 LBS PER ACRE WITH 30 LBS PER ACRE OF GRAIN RYE AS A COVER CROP. BE SURE TO
TRIM THE MEADOW TO EIGHT (8) INCHES HEIGHT WHENEVER GRAIN RYE REACHES 18 TO 24 INCHES HEIGHT.
6"± LOAM
SANDY LOAM
(TO BE SCARIFIED AND REMAIN)
SANDY LOAM
(SEVERLY COMPACTED, TO BE EXCAVATED - VARIABLE DEPTH)
SANDY LOAM
AutoCAD SHX Text
EBOX
AutoCAD SHX Text
EBOX
AutoCAD SHX Text
EBOX
AutoCAD SHX Text
EBOX
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
DANIEL J. WITCZAK, P.E.
AutoCAD SHX Text
MA# 53668
AutoCAD SHX Text 9/27/2018
AutoCAD SHX Text Witczak
AutoCAD SHX Text Peters
AutoCAD SHX Text VA Medical Center Northampton
AutoCAD SHX Text Leeds, MA
AutoCAD SHX Text
AutoCAD SHX Text 631-17-002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAPAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text DANIEL J WITCZAK CIVIL No. 53668
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Existing Detention Basin Plan
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Exterior Site Improvements
AutoCAD SHX Text 100% Review Plans
AutoCAD SHX Text
AutoCAD SHX Text
CS168
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NTS
| 10_Basin_Details_Plan-CS166 Bioretention Basin 'A' Plan |
| Sheets and Views |
| 10_Basin_Details_Plan-CS166 Bioretention Basin 'A' Plan |
| 10_Basin_Details_Plan-CS167 Bioretention Basin 'B' Plan |
| Sheets and Views |
| 10_Basin_Details_Plan-CS167 Bioretention Basin 'B' Plan |
| 10_Basin_Details_Plan-CS168 Existing Detention Basin Plan |