EXTERIOR SITE IMPROVEMENTS AT THE
VA CENTRAL WESTERN MASSACHUSETTS
HEALTHCARE SYSTEM - LEEDS, MA
PROJECT NUMBER: 631-17-002
CONTRACT NUMBER: VA241-17-C-0136
PROFESSIONAL ENGINEER'S CERTIFICATION
I HEREBY CERTIFY THAT ALL INFORMATION INDICATED ON THIS
DRAWING WAS OBTAINED OR VERIFIED BY ACTUAL MEASUREMENTS IN
THE FIELD, AND THAT EVERY EFFORT HAS BEEN MADE TO FURNISH
COMPLETE AND ACCURATE INFORMATION.
DANIEL J. WITCZAK, P.E. MA #53668
VA SIGNOFF/APPROVAL
AN AUTHORIZED SIGNATURE BELOW INDICATES THE DEPARTMENT OF
VETERANS AFFAIRS APPROVAL.
AUTHORIZED SIGNATURE DATE
PRINTED NAME TITLE
LOCATION MAP
SCALE: 1" = 1,000'
SOURCE: USGS EAST HAMPTON, MA QUAD MAP
LOCATION MAP
N.T.S.
DRAWING INDEX
SHEET NO.
DWG
NO.
OF TOTAL Sheet Title
GI001 1 OF 140 Cover Sheet
GI002 2 OF 140 Legend and Notes Sheet
CS101 3 OF 140 Overall Existing Features and Demolition Plan
CS102 4 OF 140 Existing Features and Demolition Plan 'A'
CS103 5 OF 140 Existing Features and Demolition Plan 'B'
CS104 6 OF 140 Existing Features and Demolition Plan 'C'
CS105 7 OF 140 Existing Features and Demolition Plan 'D'
CS106 8 OF 140 Existing Features and Demolition Plan 'E'
CS107 9 OF 140 Existing Features and Demolition Plan 'F'
CS108 10 OF 140 Existing Features and Demolition Plan 'G'
CS109 11 OF 140 Existing Features and Demolition Plan 'H'
CS110 12 OF 140 Existing Features and Demolition Plan 'I'
CS111 13 OF 140 Existing Features and Demolition Plan 'J'
CS112 14 OF 140 Existing Features and Demolition Plan 'K'
CS113 15 OF 140 Existing Features and Demolition Plan 'L'
CS114 16 OF 140 Overall Layout Plan
CS115 17 OF 140 Layout Plan 'A'
CS116 18 OF 140 Layout Plan 'B'
CS117 19 OF 140 Layout Plan 'C'
CS118 20 OF 140 Layout Plan 'D'
CS119 21 OF 140 Layout Plan 'E'
CS120 22 OF 140 Layout Plan 'F'
CS121 23 OF 140 Layout Plan 'G'
CS122 24 OF 140 Layout Plan 'H'
CS123 25 OF 140 Layout Plan 'I'
CS124 26 OF 140 Layout Plan 'J'
CS125 27 OF 140 Layout Plan 'K'
CS126 28 OF 140 Layout Plan 'L'
CS127 29 OF 140 Signage Plan 'A'
CS128 30 OF 140 Signage Plan 'B'
CS129 31 OF 140 Signage Plan 'C'
CS130 32 OF 140 Signage Plan 'D'
CS131 33 OF 140 Signage Details 'A'
CS132 34 OF 140 Signage Details 'B'
CS133 35 OF 140 Pavement Phasing Plan
CS134 36 OF 140 Overall Grading Plan
CS135 37 OF 140 Grading & Utility Plan 'A'
CS136 38 OF 140 Grading & Utility Plan 'B'
CS137 39 OF 140 Grading & Utility Plan 'C'
CS138 40 OF 140 Grading & Utility Plan 'D'
CS139 41 OF 140 Grading & Utility Plan 'E'
CS140 42 OF 140 Grading & Utility Plan 'F'
CS141 43 OF 140 Grading & Utility Plan 'G'
CS142 44 OF 140 Grading & Utility Plan 'H'
CS143 45 OF 140 Grading & Utility Plan 'I'
CS144 46 OF 140 Grading & Utiltiy Plan 'J'
CS145 47 OF 140 Grading & Utility Plan 'K'
CS146 48 OF 140 Spot Grade Plan 'A'
CS147 49 OF 140 Spot Grade Plan 'B'
CS148 50 OF 140 Spot Grade Plan 'C'
CS149 51 OF 140 Spot Grade Plan 'D'
CS150 52 OF 140 Spot Grade Plan 'E'
CS151 53 OF 140 Roadway Profile Plan 'A'
CS152 54 OF 140 Roadway Profile Plan 'B'
CS153 55 OF 140 Roadway Profile Plan 'C'
CS154 56 OF 140 Roadway Profile Plan 'D'
CS155 57 OF 140 Roadway Profile Plan 'E'
CS156 58 OF 140 Roadway Profile Plan 'F'
CS157 59 OF 140 Roadway Profile Plan 'G'
CS158 60 OF 140 Stormwater Profile Plan 'A'
CS159 61 OF 140 Stormwater Profile Plan 'B'
CS160 62 OF 140 Stormwater Profile Plan 'C'
CS161 63 OF 140 Stormwater Profile Plan 'D'
CS162 64 OF 140 Stormwater Profile Plan 'E'
CS163 65 OF 140 Stormwater Profile Plan 'F'
CS164 66 OF 140 Stormwater Profile Plan 'G'
CS165 67 OF 140 Stormwater Profile Plan 'H'
CS166 68 OF 140 Bioretention Basin 'A' Plan
CS167 69 OF 140 Bioretention Basin 'B' Plan
CS168 70 OF 140 Existing Detention Basin Plan
CS169 71 OF 140 Landscaping Plan 'A'
CS170 72 OF 140 Landscaping Plan 'B'
CS171 73 OF 140 Landscaping Plan 'C'
CS172 74 OF 140 Landscaping Details
CS173 75 OF 140 Lighting Plan 'A'
CS174 76 OF 140 Lighting Plan 'B'
CS175 77 OF 140 Lighting Plan 'C'
CS176 78 OF 140 Lighting Details
CS177 79 OF 140 Overall Erosion & Sedimentation Plan
CS178 80 OF 140 Erosion and Sedimentation Control Plan 'A'
CS179 81 OF 140 Erosion and Sedimentation Control Plan 'B'
CS180 82 OF 140 Erosion and Sedimentation Control Plan 'C'
CS181 83 OF 140 Erosion and Sedimentation Control Plan 'D'
CS182 84 OF 140 Erosion and Sedimentation Control Plan 'E'
CS183 85 OF 140 Erosion and Sedimentation Control Plan 'F'
CS184 86 OF 140 Erosion and Sedimentation Control Plan 'G'
CS185 87 OF 140 Erosion and Sedimentation Control Plan 'H'
CS186 88 OF 140 Erosion and Sedimentation Control Plan 'I'
CS187 89 OF 140 Erosion and Sedimentation Control Plan 'J'
CS188 90 OF 140 Erosion and Sedimentation Control Plan 'K'
CS189 91 OF 140 Erosion + Sedimentation Detail Sheet 'A'
CS190 92 OF 140 Erosion + Sedimentation Detail Sheet 'B'
CS191 93 OF 140 Construction Detail Sheet 'A'
DRAWING INDEX
SHEET NO.
DWG
NO.
OF TOTAL Sheet Title
CS192 94 OF 140 Construction Detail Sheet 'B'
CS193 95 OF 140 Construction Detail Sheet 'C'
CS194 96 OF 140 Construction Detail Sheet 'D'
CS195 97 OF 140 Construction Detail Sheet 'E'
CS196 98 OF 140 Construction Detail Sheet 'F'
CS197 99 OF 140 Construction Detail Sheet 'G'
CS198 100 OF 140 Construction Detail Sheet 'H'
CS199 101 OF 140 Construction Detail Sheet 'I'
CS200 102 OF 140 Construction Detail Sheet 'J'
CS201 103 OF 140 Construction Detail Sheet 'K'
CS202 104 OF 140 Sonotube Concrete Repair Plan 'A'
CS203 105 OF 140 Sonotube Concrete Repair Plan 'B'
CS204 106 OF 140 Sonotube Concrete Repair Detail Sheet
CS205 107 OF 140 Concrete Repair Plan 'A'
CS206 108 OF 140 Concrete Repair Plan 'B'
CS207 109 OF 140 Concrete Repair Plan 'C'
CS208 110 OF 140 Concrete Repair Plan 'D'
CS209 111 OF 140 Concrete Repair Plan 'E'
CS210 112 OF 140 Concrete Repair Plan 'F'
CS211 113 OF 140 Concrete Repair Plan 'G'
CS212 114 OF 140 Concrete Repair Plan 'H'
CS213 115 OF 140 Concrete Repair Plan 'I'
CS214 116 OF 140 Concrete Repair Plan 'J'
CS215 117 OF 140 Concrete Repair Plan 'K'
CS216 118 OF 140 Concrete Repair Plan 'L'
CS217 119 OF 140 Concrete Repair Plan 'M'
CS218 120 OF 140 Concrete Repair Plan 'N'
CS219 121 OF 140 Concrete Repair Plan 'O'
CS220 122 OF 140 Concrete Repair Plan 'P'
CS221 123 OF 140 Concrete Repair Plan 'Q'
CS222 124 OF 140 Concrete Repair Plan 'R'
CS223 125 OF 140 Concrete Repair Details Sheet 'A'
CS224 126 OF 140 Concrete Repair Details Sheet 'B'
CS225 127 OF 140 Concrete Repair Details Sheet 'C'
CS226 128 OF 140 Concrete Repair Details Sheet 'D'
CS227 129 OF 140 Concrete Repair Details Sheet 'E'
CS228 130 OF 140 Concrete Repair Details Sheet 'F'
CS229 131 OF 140 Concrete Repair Details Sheet 'G'
CS230 132 OF 140 Concrete Repair Details Sheet 'H'
CS231 133 OF 140 Concrete Repair Details Sheet 'I'
CS232 134 OF 140 Concrete Repair Details Sheet 'J'
CS233 135 OF 140 Concrete Repair Details Sheet 'K'
AS101 136 OF 140 Architectural Overall Site Plan
AD101 137 OF 140 Building 27 Demolition Plan
AD102 138 OF 140 Building T13 and T15 Demolition Plan
AD103 139 OF 140 Building T7 Demolition Plan
AD104 140 OF 140 Building 42 Demolition Plan
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
DANIEL J. WITCZAK, P.E.
AutoCAD SHX Text
MA# 53668
AutoCAD SHX Text 9/27/2018
AutoCAD SHX Text Witczak
AutoCAD SHX Text Peters
AutoCAD SHX Text VA Medical Center Northampton
AutoCAD SHX Text Leeds, MA
AutoCAD SHX Text
AutoCAD SHX Text 631-17-002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAPAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text DANIEL J WITCZAK CIVIL No. 53668
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Cover Sheet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Exterior Site Improvements
AutoCAD SHX Text 100% Review Plans
AutoCAD SHX Text
AutoCAD SHX Text
GI001
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING CONDITIONS NOTES
1. THE EXISTING FEATURES PLAN INFORMATION SHOWN IN THIS PLAN SET ARE BASED ON AN ON THE
GROUND FIELD SURVEY BY ACELA ENGINEERING DURING NOVEMBER 2017, JANUARY 2018 AND APRIL
2018. AREAS SHOWN OUTSIDE THE SCOPE OF WORK ARE BASED ON DRAWINGS PROVIDED BY THE
DEPARTMENT OF VETERAN AFFAIRS.
2. ONLY THOSE ITEMS VISIBLE ON THE GROUND AT THE TIME OF SURVEY WERE LOCATED AND SHOWN
ON THIS PLAN. CONTRACTORS AND OTHER USERS OF THIS PLAN ARE RESPONSIBLE FOR
VERIFICATION AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION WORK AT LOCATIONS
SHOWN HEREON. ACELA ENGINEERING ASSUMES NO LIABILITY TO DAMAGE TO ANY EXISTING UTILITY
DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE THAT
MAY OCCUR DURING CONSTRUCTION.
3. THE SURVEY IS BASED ON MASSACHUSETTS STATE PLANE COORDINATE SYSTEM.
4. THE CONTRACTOR MAY CONDUCT TEST PITS TO VERIFY EXISTING CONDITIONS. TEST PITS
CONDUCTED AT THE CONTRACTORS CONVENIENCE TO VERIFY EXISTING CONDITIONS SHALL BE AT
THE CONTRACTORS EXPENSE AND SHALL BE APPROVED AND COORDINATED WITH THE OWNER.
DEMOLITION NOTES
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY;
TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR
INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE TO AND FROM SUCH
ADJACENT AREAS OF STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING
LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL
DURING DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED EXCAVATIONS
UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO
KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE
CONDITION SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION. VACUUM AND DUST THE
WORK AREA DAILY.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND
EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE
CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING ITEMS TO
REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; AND
DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER
REPRESENTATIVE (COR). THE CONTRACTOR SHALL COORDINATE THE WORK WITH ALL OTHER WORK
AND SHALL CONSTRUCT AND MAINTAIN SHORING, BRACING, AND SUPPORTS AS REQUIRED. THE
CONTRACTOR SHALL ENSURE THAT STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE
RESPONSIBLE FOR INCREASING STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE
REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION OF NEW
UTILITY LINES AND NEW CONSTRUCTION.
8. COMPLETELY DEMOLISH AND REMOVE BUILDINGS AND STRUCTURES, INCLUDING ALL
APPURTENANCES RELATED OR CONNECTED THERETO, AS NOTED BELOW:
A. AS REQUIRED FOR INSTALLATION OF NEW UTILITY SERVICE LINES.
B. TO FULL DEPTH WITHIN AN AREA DEFINED BY HYPOTHETICAL LINES LOCATED 5 FT (1500 MM)
OUTSIDE BUILDING LINES OF NEW STRUCTURES.
9. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND
LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND SIMILAR
MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF BY THE
CONTRACTOR DAILY, OFF THE MEDICAL CENTER TO AVOID ACCUMULATION AT THE DEMOLITION SITE.
MATERIALS THAT CANNOT BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED BY THE
CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF
MATERIALS UNCOVERED DURING ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND FEDERAL LAWS SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
10. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM PRESENT
LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT DRAINAGE.
CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND
LOCAL PERMITS, RULES AND/OR REGULATIONS.
11. DEMOLITION OF BUILDINGS T7, 42, T15, T13, AND 27 ARE TO BE DEMOLISHED AS PART OF THIS
PROJECT. IN ADDITION, BUILDINGS 34, 35, 40, 41, 52, 63, T8 AND T12 ARE TO BE DEMOLISHED BY
OTHERS ON A SEPARATE PROJECT PRIOR TO THE START OF THIS PROJECT.
CONCRETE REPAIR NOTES
1. EXPANSION JOINTS SHALL BE INSTALLED WHENEVER CONCRETE IS PLACED AGAINST ROADWAY
PAVEMENT, PARKING LOTS, BUILDINGS, OR STRUCTURES AND PER VA REQUIREMENTS
2. SPACING OF ALL JOINTS SHALL BE PER THE CONCRETE SIDEWALK JOINT SPACING DETAIL.
3. CONCRETE SIDEWALK SHALL BE FOUR (4) INCHES THICK WITH A SIX (6) INCH THICK
" CRUSHED STONE
SUBBASE REINFORCED WITH 6x6-W1.4xW1.4 WELDED WIRE FABRIC AT MID-DEPTH ON CHAIRS.
4. CONCRETE LOADING AREAS AND CONCRETE SIDEWALK DRIVEWAY CROSSINGS SHALL BE SIX (6)
INCHES THICK WITH A EIGHT (8) INCH THICK
" CRUSHED STONE SUBBASE REINFORCED WITH
6x6-W1.4xW1.4 WELDED WIRE FABRIC AT MID-DEPTH ON CHAIRS.
5. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELED AND BROOMED WITH A FINE
BRUSH IN A TRANSVERSE DIRECTION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGED ASPHALT ADJACENT TO THE
AREA OF CONSTRUCTION ASSOCIATED WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK
AND/OR STAIRS.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SPREADING TOPSOIL, SEEDING AND STABILIZING ANY
DAMAGED OR UNVEGETATED PERVIOUS AREA ADJACENT TO THE AREA OF CONSTRUCTION
ASSOCIATED WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK AND/OR STAIRS.
8. POSITIVE DRAINAGE SHALL BE PROVIDED ALONG ALL SIDEWALKS. SIDEWALK CONSTRUCTION AND
REPAIR SHALL BE COMPLETED IN A MANNER TO PREVENT LOW POINTS AND STANDING WATER.
PAVEMENT RECONSTRUCTION NOTES
1. ALL WASTE, DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND
LAWFULLY DISPOSED OF.
2. SAWCUT PAVEMENT TO A DEPTH OF 2" WHERE MILLING OPERATIONS ABUT BITUMINOUS PAVEMENT TO
REMAIN. SEAL JOINT WITH 12" WIDE ASPHALT SEALANT.
3. MILL ASPHALT TO DEPTH OF 2" IN AREAS LABELED MILL & OVERLAY. ASPHALT MILLINGS TO BE RECYCLED
IN ACCORDANCE WITH MASSDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION
AND REMOVED FROM SITE.
4. A RECLAIMED BASE SHALL BE UTILIZED, WHERE SUITABLE, IN THE AREAS WHERE EXISTING PAVEMENT IS
TO BE RECONSTRUCTED. THE RECLAMATION SHALL MEET THE MINIMUM REQUIREMENTS AND CROSS
SECTION OF THE FULL DEPTH CONSTRUCTION. IF THE EXISTING CROSS SECTION DOES NOT PROVIDE
ADEQUATE DEPTH OR MATERIAL FOR RECLAMATION, NEW MATERIAL SHALL BE IMPORTED. ANY
RECLAIMED MATERIAL SHALL BE DEEMED SUITABLE PRIOR TO REUSE.
5. POOR IN-SITU SOIL THAT IS DEEMED UNSUITABLE FOR USE AS PAVING SUBGRADE SHALL BE
OVER-EXCAVATED AND REPLACED WITH HIGHER QUALITY LOAD-BEARING FILL.
6. PAVEMENT RECONSTRUCTION AND ASSOCIATED IMPROVEMENTS TO BE STAGED TO MINIMIZE
DISRUPTION TO RESIDENTS AND OFFICE FUNCTIONS. STAGING AREAS AND EQUIPMENT STORAGE SHALL
BE COORDINATED WITH THE CONTRACTING OFFICERS REPRESENTATIVE(COR).
7. REPAIR DAMAGED CURB AS INDICATED, OR AS NECESSARY IF ADDITIONAL DAMAGE OCCURS DURING
CONSTRUCTION.
8. ALL PAVEMENT MARKINGS AND ROAD SIGNS TO BE IN ACCORDANCE WITH THE CURRENT EDITION OF
THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). ALL PAVEMENT MARKINGS SHALL BE
HOT THERMOPLASTIC MARKINGS.
UTILITY NOTES
1. KEEP HYDRANTS CLEAR AND ACCESSIBLE AT ALL TIMES. PROHIBIT DEBRIS FROM ACCUMULATING
WITHIN A RADIUS OF 15 FT (4500 MM) OF FIRE HYDRANTS.
2. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE
REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S), HAVE NOT INDEPENDENTLY VERIFIED
THE INFORMATION AS SHOWN ON THE PLANS. THE UTILITY INFORMATION SHOWN DOES NOT
GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT THAT
ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING CONSTRUCTION, THE
CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES AND ELEVATIONS OF THE
POINTS OF CONNECTION TO THE EXISTING UTILITIES AND SHALL CONFIRM THAT THERE ARE NO
INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES
WITHIN THE PUBLIC RIGHTS OF WAY.
3. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF STORM INLET BOXES PRIOR TO ORDERING GRADE
ADJUSTMENT RINGS OR TOP UNITS.
4. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING
CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS
INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED
WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE FURNISHED IN WRITING BY THE
CONTRACTOR TO THE ENGINEER FOR THE RESOLUTION OF THE CONFLICT. THE CONTRACTORS FAILURE
TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR
ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE CONFLICT.
5. ANY EXISTING UTILITY STRUCTURE OR BOX IN VERTICAL CONFLICT WITH ANY PAVEMENT
RECONSTRUCTION SHALL BE ADJUSTED.
6. RIM ELEVATIONS FOR DRAINAGE AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC
AND TELEPHONE PULL BOXES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE SET/RESET
AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE OR LOAM AND SEED AREAS: ONE INCH ABOVE SURROUNDING AREA AND TAPER EARTH
TO THE RIM ELEVATION.
7. ANY EXISTING UTILITY STRUCTURE, BOX OR POLE IN HORIZONTAL CONFLICT WITH ANY PAVEMENT
RECONSTRUCTION AND/OR WIDENING SHALL BE RELOCATED.
8. IMMEDIATELY PRIOR TO THE END OF CONSTRUCTION OR ACCEPTANCE BY THE OWNER, THE
CONTRACTOR SHALL INSPECT ALL CATCH BASINS AND DRAINAGE MANHOLES WITHIN AND DOWNSTREAM
OF THE LIMITS OF WORK. PIPES AND STRUCTURES SHALL BE CLEANED AND FLUSHED AS NECESSARY.
LAYOUT AND MATERIALS NOTES
1. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY EXISTING PAVEMENT, WALKWAY
AND BUILDING ELEVATIONS AT INTERFACE WITH PROPOSED PAVEMENTS AND WALKWAYS, AS WELL AS
EXISTING GROUND ELEVATIONS ADJACENT TO MANHOLES AND DRAINAGE STRUCTURES TO ASSURE
PROPER TRANSITIONS BETWEEN EXISTING AND PROPOSED FACILITIES.
2. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND ARE NOT
NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE DRAWINGS. THE
CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS, MANUFACTURER'S LITERATURE, SHOP
DRAWINGS AND FIELD MEASUREMENTS OF SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT
FEATURES.
3. THE CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS, SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL FIELD VERIFY LOCATION OF
PROJECT FEATURES.
4. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
- ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT OR ASSEMBLY
WHILE THE SPECIFICATIONS LIST TWO OR MORE ACCEPTABLE MANUFACTURES AND/OR
PRODUCTS. WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY THE DRAWINGS IS
THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY.
- THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS OF SPECIFIED
PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN" MAY VARY FROM THAT SHOWN
BY THE DRAWINGS.
- THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN LIEU OF THE
"BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE COR. HOWEVER, THE
CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE TO THE OWNER) FOR ALL
COORDINATION AND REVISIONS TO DIMENSIONS AND/OR DETAILS NECESSARY TO ACHIEVE THE
SAME FUNCTIONAL AND AESTHETIC DESIGN INTENT AS ILLUSTRATED BY THE "BASIS OF DESIGN"
SHOWN BY THE CONTRACT DOCUMENTS.
5. THE CONTRACTING OFFICER REPRESENTATIVE (COR) SHALL DIRECT THE ALIGNMENT OF THE SIDEWALK
IN AREAS WITHIN FIVE (5) FEET OF EXISTING TREES.
CONCRETE
EARTH, CRUSHED ROCK GRAVEL
MILL & OVERLAY
FENCE
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - EARTHWORK
SITE SYMBOLS - UTILITIES
SITE SYMBOLS - IMPROVEMENTS
EARTH, UNDISTURBED
EARTHWORK, COMPACTED FILL
SAND
EARTHWORK, GRAVEL, POROUS FILL
FULL DEPTH PAVEMENT - RESTORATION OF EXISTING
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES
SLANTED TEXT INDICATES EXISTING FEATURES
LANDSCAPE AREA
FULL DEPTH PAVEMENT - PROPOSED PAVING EXPANSION
SITE SYMBOLS - GENERAL
BENCHMARK
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
PROPERTY LINE
CONCRETE COVERED WALKWAY
HYDRANT, FIRE
WATER VALVE
STORM SEWER PIPE
GAS LINE
UTILITY, WATER MANHOLEW
UTILITY, UTILITY POLE
UTILITY, SANITARY MANHOLES
UTILITY, ELECTRICAL MANHOLEE
WV
GV
SIGN
LIGHT POLE
BOLLARD
WATER VALVE
CABLE TV LINE
STEAM LINE
WATER LINE
ELECTRIC LINE
SANITARY SEWER LINE
EDGE OF PAVEMENT
EDGE OF STONE
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
EDGE OF WOODS LINE
GUARDRAIL
SITE SYMBOLS - EXISTING
DECIDUOUS TREES
CONIFEROUS TREES
305B
31A
SOIL LINE
SOIL LABEL
FENCE LINE
DRAINAGE MANHOLE
DRAINAGE CATCH BASIN
DRAINAGE END SECTION
D
BITUMINOUS
SITE SYMBOLS - ABBREVIATIONS
BITUM
CONCRETECONC
SIDEWALKSW
DRAINAGE MANHOLEDMH
STORMWATER CATCH BASINCB
STORMWATER PIPE ENDINV
CLEANOUTCO
SANITARY MANHOLESMH
SQUARE FEETSF
LINEAR FEETLF
APPROXIMATELYAPPROX
STEAM MANHOLEST
UNDERGROUND TELEPHONE
WETLAND FLAG WITH NUMBER
WATER QUALITY UNITWQU
OUTLET CONTROL STRUCTUREOCS
FLARED END SECTIONFES
GENERAL NOTES
1. THESE PLANS ARE FOR THE CONSTRUCTION OF NEW PARKING FACILITIES, PAVEMENT WIDENING AND
RECONSTRUCTION, BUILDING DEMOLITION & CONCRETE REPAIR. THE CONTRACTOR SHALL
COORDINATE CONSTRUCTION WITH THE VAMC.
2. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS PREPARED FOR VAMC EXTERIOR SITE
IMPROVEMENTS, PREPARED BY ACELA ENGINEERING CO.
3. THE CONTRACTOR SHALL NOTIFY "DIG-SAFE" (1-888-344-7233) AT LEAST 72 HOURS PRIOR TO
EXCAVATION.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION
ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS.
THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS WHEN CONSTRUCTION IS BEING
PERFORMED ADJACENT TO BUILDING ENTRANCES/WALKWAYS.
5. UPON AWARD OF CONTRACT, THE CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION
NOTIFICATIONS, APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS
ASSOCIATED WITH THE WORK INDICATED WITHIN THE CONSTRUCTION PLANS, SPECIFICATIONS AND
CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR
OBSTRUCT ROADWAYS, SIDEWALKS AND/OR FIRE HYDRANTS WITHOUT APPROPRIATE PERMITS
AND/OR PERMISSIONS.
6. TRAFFIC SIGNAGE (TEMPORARY AND PERMANENT) SHALL CONFORM TO THE MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES FOR ALL LOCAL RIGHTS OF WAY AND BE IN ACCORDANCE WITH TRAFFIC
MANAGEMENT PLANS.
7. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTORS
OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
8. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF SIX (6)
INCHES OF TOPSOIL. THESE ARES SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
9. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE
RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
10. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT
ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING
DAMAGES, IF ANY, AT NO COST TO OWNER.
11. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES DAILY AND
PAVE ALL TRENCHES BY END OF DAY FRIDAY. NO OPEN TRENCHES SHALL BE LEFT UNATTENDED.
12. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING
SITE SURVEY. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND
MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES
BEFORE COMMENCING OR PROCEEDING WITH WORK.
13. THE ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON PROCEDURE, OR FOR SAFETY
PRECAUTIONS AND PROGRAMS IN CONNECTION WITH WORK, ALL OF WHICH SHALL BE THE SOLE
RESPONSIBILITY OF THE CONTRACTOR. METHODS AND MATERIALS USED IN THE CONSTRUCTION OF
IMPROVEMENTS FOR THIS PROJECT SHALL CONFORM TO THE CURRENT CONSTRUCTION STANDARDS
AND SPECIFICATIONS OF THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATION.
14. MATERIALS WHICH COULD BE A POTENTIAL SOURCE OF STORMWATER POLLUTION, SUCH AS
GASOLINE, DIESEL FUEL, HYDRAULIC OIL, ETC., SHALL BE STORED AT THE END OF EACH DAY IN A
STORAGE TRAILER OR COVERED LOCATION, OR TAKEN OFF-SITE AND PROPERLY DISPOSED OF. ALL
TYPES OF WASTE GENERATED AT THIS SITE SHALL BE DISPOSED OF IN A MANNER CONSISTENT WITH
STATE LAW AND/OR REGULATIONS.
15. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE
AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN
WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS,
SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE MAINTAINED AT ALL TIMES DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY
PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING
CONSTRUCTION.
17. AN APPROVED SET OF PLANS AND ALL APPLICABLE PERMITS MUST BE AVAILABLE AT THE
CONSTRUCTION SITE.
18. THE CONTRACTOR AGREES THAT HE/SHE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR
JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING
SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM "THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER." THE
CONTRACTOR IS RESPONSIBLE FOR INSTALLING A PROTECTIVE BARRIER AROUND THE SITE PRIOR
TO AND MAINTAINED DURING CONSTRUCTION.
19. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS
ISSUED BY ACELA ENGINEERING CO. ANY DEVIATIONS FROM THESE DOCUMENTS SHALL REQUIRE
NOTIFICATION TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF/OR CONSTRUCTION OF ANY
CHANGE. WITHOUT NOTIFICATION TO THE ENGINEER, THE CONTRACTOR WILL BE WORKING AT
HIS/HER OWN RISK. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE
REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF THE
OWNER AND THE ENGINEER SHALL BE CORRECTED AT THE CONTRACTORS EXPENSE.
20. CONSTRUCTION ACTIVITIES SHALL NOT CONFLICT WITH THE VAMC OPERATIONS AND
EMPLOYEE/PATIENT PARKING. THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE VAMC
POLICE DEPARTMENT. WORK AFFECTING BUILDING ENTRANCES, WALKWAYS, LOADING AREAS,
PARKING, ETC. SHALL BE COORDINATED AND SCHEDULED WITH THE VAMC.
21. THE CONTRACTOR SHALL MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT
DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF
CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. RECORD DOCUMENTS SHALL
ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE
DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO EXCEPTION
ALLOWED**
22. BIORETENTION BASINS SHALL NOT BE USED FOR SNOW STORAGE.
23. ANY EXISTING PROPERTY LINE MONUMENTATION DISTURBED DURING CONSTRUCTION SHALL BE
RESET BY A PROFESSIONAL LICENSED SURVEYOR AT THE CONTRACTORS EXPENSE.
EROSION CONTROL NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE STORMWATER POLLUTION
PREVENTION PLAN (SWPPP) PREPARED FOR THE PROJECT.
2. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE OWNER AND
SHALL INSTALL EROSION CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS.
3. THE CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES DAILY, REMOVE
SEDIMENT ON A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH STORM EVENT, AND
DISPOSE OF SEDIMENT IN AN UPLAND AREA SUCH THAT THEY DO NOT ENCUMBER OTHER DRAINAGE
STRUCTURES AND PROTECTED AREAS.
4. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT
SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH
SEDIMENTATION IS CAUSED BY WATER, WIND, OR DIRECT DEPOSIT.
5. THE CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS
ARE EXPOSED FOR A MINIMUM TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE
STABILIZED TO PREVENT EROSION.
6. THE CONTRACTOR SHALL INSTALL PROTECTIVE MEASURES TO PREVENT DEBRIS AND/OR SEDIMENT
FROM ENTERING DRAINAGE CATCH BASINS AND PIPES. UPON COMPLETION OF CONSTRUCTION AND
ESTABLISHMENT OR PERMANENT GROUND COVER, THE CONTRACTOR SHALL REMOVE AND DISPOSE
OF EROSION CONTROL MEASURES AND REMOVE ANY DEBRIS AND/OR SEDIMENT FROM ALL DRAINAGE
INFRASTRUCTURE.
7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTROL DUST AND TAKE ALL NECESSARY
MEASURES TO ENSURE ALL ROADS ARE MAINTAINED IN A DUST FREE CONDITION AT ALL TIMES
THROUGHOUT THE DURATION OF THE PROJECT. REPETITIVE TREATMENTS SHOULD BE APPLIED AS
NECESSARY.
8. PERMANENT VEGETATIVE COVER SHALL BE INSTALLED TO ALL DISTURBED AREAS THAT HAVE
REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER
THE CONSTRUCTION ACTIVITY IN ANY GIVEN AREA HAS PERMANENTLY CEASED. THE RECOMMENDED
PERMANENT SEEDING DATES ARE APRIL 1 TO JUNE 15 AND AUGUST 15 TO OCTOBER 1.
9. TEMPORARY VEGETATIVE COVER SHALL BE APPLIED TO ANY DISTURBED AREAS (INCLUDING SOIL
STOCKPILE AREAS) THAT HAVE NOT YET REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT
MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS
TEMPORARILY CEASED, UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21) DAYS. THE
RECOMMENDED TEMPORARY SEEDING DATES ARE MARCH 1 TO JUNE 15 AND AUGUST 15 TO
OCTOBER 1.
10. AREAS WHICH HAVE BEEN TEMPORARILY OR PERMANENTLY SEEDED SHOULD BE MULCHED
IMMEDIATELY FOLLOWING SEEDING IN ADDITION TO AREAS WHICH CANNOT BE SEEDED WITHIN THE
RECOMMENDED SEEDING DATES AND ANY SOIL STOCKPILE AREAS. TEMPORARY MULCHING SHOULD
BE PERFORMED AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE
CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED UNLESS THE ACTIVITY IS TO
RESUME WITHIN TWENTY-ONE (21) DAYS. STRAW OR HAY MULCH, WOOD FIBER MULCH, AND
HYDROMULCH ARE RECOMMENDED. THE MATERIALS USED IN MULCHING SHALL CONFORM TO THE
REQUIREMENTS LISTED IN THE MASSACHUSETTS HIGHWAY DEPARTMENT STANDARD
SPECIFICATIONS.
11. ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAIN EVENTS, TO CHECK
FOR EROSION. WHERE EROSION IS OBSERVED, ADDITIONAL MULCH MUST BE APPLIED. IF NETTING IS
USED, THE NET SHOULD BE INSPECTED AFTER RAIN EVENTS FOR DISLOCATION OR FAILURE. IF
WASHOUTS OR BREAKAGE OCCUR, THE NET MUST BE REINSTALLED AS NECESSARY AFTER
REPAIRING DAMAGE TO SLOPE. INSPECTIONS SHOULD TAKE PLACE UNTIL VEGETATIVE COVER IS
FIRMLY ESTABLISHED. VEGETATION IS CONSIDERED TO BE FIRMLY ESTABLISHED AT A MINIMUM
HEIGHT OF THREE (3) INCHES. ANY EXISTING OR PROPOSED CATCH BASINS THAT MAY BE SUBJECT TO
SEDIMENTATION PROCESSES SHALL HAVE SILT SACKS INSTALLED TO PREVENT SEDIMENT FROM
ENTERING THE PROPOSED STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION OF THE
DISTURBED SITE. THE PROPER INLET PROTECTION DEVICES SHALL BE INSTALLED WHERE
STORMWATER CATCH BASINS ARE TO BE MADE OPERATIONAL BEFORE PERMANENT STABILIZATION
OF ANY DISTURBED DRAINAGE AREA.
12. THE CONTRACTOR SHALL RESTORE DISTURBED AREAS AS CLOSELY AS POSSIBLE. AREAS DAMAGED
DURING CONSTRUCTION SHALL BE RESODDED, RESEEDED, OR OTHERWISE RESTORED TO THEIR
ORIGINAL STATE. TREES AND OTHER EXISTING VEGETATION SHALL BE RETAINED WHEREVER
FEASIBLE.
13. THE CONTRACTOR SHALL PREVENT DUST, SEDIMENT AND DEBRIS FROM EXISTING THE SITE AND
SHALL BE RESPONSIBLE FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF NECESSARY.
14. ALL EXISTING AND PROPOSED CATCH BASINS SHALL RECEIVE INLET PROTECTION. AN APPROPRIATE
INLET PROTECTION OPTION SHALL BE SELECTED BASED ON LOCATION AND TRIBUTARY AREA.
15. PERIMETER CONTROL SHALL BE INSTALLED DOWNSLOPE OF ALL DISTURBANCE. AN APPROPRIATE
OPTION FOR PERIMETER CONTROL SHALL BE SELECTED BASED ON LOCATION AND UPSLOPE
DISTURBANCE. COMPOST FILTER SOCK AND SILT FENCE ARE VIABLE OPTIONS FOR PERIMETER
CONTROL.
16. A TEMPORARY SEDIMENT TRAP SHALL BE INSTALLED IN THE LOCATION OF PROPOSED BIORETENTION
BASINS A & B. THE SEDIMENT TRAP SHALL UTILIZE THE PROPOSED BASIN BERM AS STORAGE AREA
AND EXCAVATE THE APPROPRIATE VOLUME BASED ON TRIBUTARY AREA. EXCAVATION OF SEDIMENT
TRAP SHALL BE NOT BE WITHIN ONE FOOT OF THE PROPOSED INFILTRATION SURFACE ELEVATION.
17. ALL DISTURBED SLOPES OF 3:1 OR STEEPER SHALL RECEIVE EROSION CONTROL MATTING AND BE
IMMEDIATELY STABILIZED.
18. ALL BIORETENTION BASINS, BERMS, OUTLETS AND OTHER NON-PIPED COMPONENTS OF THE
PROPOSED STORMWATER SYSTEM SHALL BE CONSTRUCTED AS PROPOSED AND STABILIZED PRIOR
TO RECEIVING DRAINAGE FLOWS FROM THE PROPOSED DEVELOPMENT.
TRAFFIC MANAGEMENT NOTES
1. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS AT ALL
TIMES, EXCEPT WHERE STATED ON THE PAVEMENT PHASING PLAN, OR IF GIVEN PERMISSION BY THE
VAMC AND CONTRACTING OFFICERS REPRESENTATIVE.
2. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES AND BARRELS
REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
3. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND CROSSWALK
CLOSURES.
4. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED DAILY AFTER
CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
5. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, DRIVEWAY, LOADING RAMP AND/OR
SIDEWALK CLOSURES WITH THE VAMC PRIOR TO PERFORMING WORK.
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
DANIEL J. WITCZAK, P.E.
AutoCAD SHX Text
MA# 53668
AutoCAD SHX Text 9/27/2018
AutoCAD SHX Text Witczak
AutoCAD SHX Text Peters
AutoCAD SHX Text VA Medical Center Northampton
AutoCAD SHX Text Leeds, MA
AutoCAD SHX Text
AutoCAD SHX Text 631-17-002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAPAHCS PLANNING AND ENGINEERING
AutoCAD SHX Text DANIEL J WITCZAK CIVIL No. 53668
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text U
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Legend And Notes Sheet
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Exterior Site Improvements
AutoCAD SHX Text 100% Review Plans
AutoCAD SHX Text
AutoCAD SHX Text
GI002
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 200'
AutoCAD SHX Text 100'
AutoCAD SHX Text 50'
AutoCAD SHX Text
AutoCAD SHX Text
SCALE
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text H
AutoCAD SHX Text
TU
AutoCAD SHX Text
WF #
| 01_Cover_Sheet-GI001 Cover Sheet |
| Sheets and Views |
| 01_Cover_Sheet-GI001 Cover Sheet |
| 01_Cover_Sheet-GI002 Legend and Notes Sheet |
| Sheets and Views |
| 01_Cover_Sheet-GI002 Legend and Notes Sheet |
File details come from the government source that posted it. Updated .