2027-07 Addendum 2.pdf
PDF 1 MB Posted
- Attached to
- HVAC Upgrades - DPW Garage
- Solicitation number
- BID 2027-07
- Issued by
- Fairfield County, Connecticut
About this file
This Addendum #2, issued September 10, 2026, by the Town of Stratford, Connecticut for HVAC Upgrades at the Department of Public Works Maintenance Garage located at 550 Patterson Avenue, Stratford, CT 06614 (Project Number 2027-07) provides supplemental instructions and clarifications to the original contract documents. The addendum includes an RFI (Request for Information) log containing 14 responses addressing critical project concerns, including requirements for soil contamination testing and removal unit pricing, asbestos testing for existing boiler and steam piping demolition, roof warranty maintenance by W.P. Hickman Systems, Inc., site restoration and tank removal scope clarification, building management system (BMS) coordination with Connecticut Temperature Controls, equipment spacing modifications, permit fee waivers, and gas pressure specifications (2 PSI delivery regulated to 9–14 inches water column for heating units). The addendum also includes updated mechanical schedules (M-200) detailing gas-fired infrared heater specifications for six units (IR-1 through IR-6) with 175,000 BTU/hour input capacity and 50-foot tube lengths, and provides plumbing descriptions, symbols, and notes along with garage and roof plumbing plans (P-001, P-100, and P-101) showing gas piping routes, cleanouts, and equipment connections.
The project requires coordination between multiple parties including Snyder Architects as project manager, Facilities Group, Inc. as the mechanical engineer, and Landmark as the controls contractor, with existing BMS integration to be performed by Automated Control Logic Inc. Key contractual requirements mandate that the roofing subcontractor maintain existing roof warranty certifications, the site be restored to as-found condition with paved areas after tank removal, vehicle repair operations continue during construction with coordinated phasing, and the Town waive local permit fees. Gas piping roof support spacing has been approved at 8-foot on-center for steel pipe, the existing oil tank contains an estimated 1,500 gallons with tank identification numbers to be provided post-award, and the 4,000-gallon underground fuel storage tank requires State of Connecticut identification for removal compliance. All work must conform to 2020 New York State Building and Mechanical Codes, 2018 International Existing Building Code, local fire department regulations, and best trade practices.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/10/2026
Addendum 2 1 of 2
ADDENDUM #2
HVAC Upgrades:
DPW Maintenance Garage
550 Patterson Ave.
Stratford, CT 06614
TOWN PROJECT NUMBER: 2027-07
ISSUED: 9/10/2026
PROJECT TEAM
Architect / Project Manager Mechanical Engineer
9/10/2026
Addendum 2 2 of 2
The work shall be carried out in accordance with the following supplemental instructions and in accordance with the Contract Documents.
MISCELLANEOUS CHANGES / CLARIFICATIONS
1. Requests For Information (RFI) Log
• See attached RFI Log.
DRAWING CHANGES
1. M-200 Mechanical Schedules (See attached)
2. P-001 Plumbing Descriptions Symbols and Notes (See attached)
3. P-100 Garage Plumbing Plan (See attached)
4. P-101 Roof Plumbing Plan (See attached)
*** END OF ADDENDUM #2 ***
RFI LOG
DPW Maintenance Garage Date: 9/10/2026
Question Date Received
Directed To Response Response Date
1 Please provide information in case there is oil contamination in soil.
9/1/2026 Town See attached revised Bid Form that includes unit pricing to remove contaminated soil and soil testing.
9/1/2026
2 The boiler, flue, and related steam piping to be demolished may have ACM’s. This will need to be tested, with proper reports.
9/1/2026 Town See attached asbestos testing report from AMC Environmental and Abatement Specification.
9/1/2026
3 There will be roofing work to consider. Is there a bond on the roof?
9/1/2026 Town Existing roof is a built-up roof system under warranty by W.P.
Hickman Systems, Inc. Roofing sub-contractor must have appropriate certifications to maintain roof warranty.
9/1/2026
4 Please clarify site restoration scope of work in regards to tank removal?
9/1/2026 Snyder Site shall be restored to as-found condition and disturbed areas paved.
9/1/2026
5 Is there a BMS system currently in place at this location? If so, what vendor currently serves the system. If no BMS, is there a preferred vendor?
9/1/2026 Landmark The building does not currenty have a BMS system.
Connecticut Temperature Controls (CTC) is the town controls vendor.
9/3/2026
6 I did not see a sequence of operation for the new HVAC equipment temperature controls. Can this be provided, or clarified?
9/1/2026 Landmark Addendum #1: See attached controls information and Sequence of Operation.
9/3/2026
7 Please advise regarding building use and coordination during construction.
9/2/2026 Snyder/Town Vehicle repair operations much continue during construction so coordnation is needed between contractor and mechanics to phase work accordingly.
9/3/2026
8 Does the 4000 gallon underground fuel storage tank have an identification number? This info will be required by the State of Connecticut if it is to be removed.
9/3/2026 Snyder/Town Indentification number will be provided after project is awarded. 9/3/2026
9 Can the spacing of gas pipe roof supports be spaced at 8 ft. on center in lieu of 4 ft. on center? 8 ft. O/C will meet code for steel pipe supports.
9/3/2026 Landmark 8' spacing is acceptable for steel pipe. 9/10/2026
10 Will the Town of Stratford waive local Permit Fees for this Town funded project?
9/3/2026 Snyder/Town Yes 9/3/2026
11 Oil tank is located below a concrete pad at grade. Can this area be covered with asphalt paving after tank removal in lieu of a concrete pad?
9/3/2026 Snyder/Town Yes 9/3/2026
12 Please confirm oil tank size and estimated existing oil in the tank.
9/3/2026 Snyder/Town The tank is 2500 gallons and 1500 gallons of oil is estimated to be in the tank. VIF
9/10/2026
13 Please confirm the gas pressure from the utility building meter for gas pressure regulators to be installed for new heating units.
9/3/2026 Landmark The gas pressure delivered for distribution is 2 PSI and the heaters need the pressure regulated to a maximum of 14" WC and a minimum of 9" WC
9/10/2026
14 The equipment drawings for the Greenheck DGX heating and ventilation units state, “Verify that the correct BMS protocol has been selected before ordering.” However, the controls sequence states that BMS communication is not required and that all unit monitoring and adjustment shall be performed locally. Please confirm whether HV-1 and HV-2 are required to be furnished with a factory BACnet communication interface and integrated into the building management system for monitoring. If integration is required, please confirm the preferred protocol—BACnet/IP or BACnet MS/TP—and identify the existing BMS manufacturer.
9/10/2026 Landmark See Addendum #1 9/10/2026
Fan Charts And Performance
Supply Fan Performance
Total Volume
(CFM)
External SP
(in. wg)
Total SP
(in. wg) RPM Operating
Power (hp) Motor Fan
Qty Size (HP) Qty Type Drive-Type
5,400 1 1.859 1277 2.53 1 3 1 Plenum Direct
Pressure Drop (in. wg) Diffuser Weatherhood Filter Damper Cooling Heating External Total
- 0.02 0.144 0.07 - 0.625 1 1.859
Sound Performance in Accordance with AMCA Sound Power by Octave Band
62.5 125 250 500 1000 2000 4000 8000 Lwa dBA Sones
76 76 78 80 78 73 70 65 82 71 19.9
Supply Fan
DGX-P122-H22-D1 (HV-1 & HV-2)
Unit Performance
Design Conditions
Elevation (ft) Summer DB (°F) WB (°F) Winter (°F) Supply (CFM) Outdoor Air (CFM)
180 91.5 76.3 3.1 5,400 5,400
Unit Specifications Qty Weight (lb) Cooling Type Heating Type Unit Installation Unit ETL Listing
2 1,290 (+/- 5%) None Direct Gas-Fired Outdoor/Indoor ANSI Z83.4 / CSA 3.7
Configuration Unit Orientation Unit Configuration Outdoor Air Intake Return Air Intake Supply Air Discharge
Horizontal Constant Volume 100% OA End - Bottom
Heating Specifications
Type Gas Type Gas Pressure Capacity (MBH) Temperature
Rise (°F) Performance
Min
(in. wg)
Max (Psi) Input Output EAT (°F) LAT (°F)
Direct Gas Natural 9 0.5 550.9 506.8 86.9 3.1 90.0
Air Performance
Type Total
Volume
(CFM)
External SP
(in. wg)
Total SP
(in. wg) RPM Operating
Power (hp) Fan
Qty Type Size (in.) Drive-Type
Supply 5,400 1 1.859 1277 2.53 1 Plenum 22 Direct-Drive
Motor Specifications Motor Qty Size (HP) Enclosure Efficiency RPM
Supply Fan Motor 1 3 hp ODP NEMA Premium 1200
Electrical Specifications Power Supply Rating (V/C/P) MCA (A) MOP (A) SCCR
Unit 208/60/3 15.2 25.0 5kA
Clearance Specifications
Recommended Minimum Combustible Clearances Floor (in.) Top (in.) Sides (in.) Ends (in.)
Insulated Units 0 0 0 0 Non-Insulated Units 0 6 6 6
Notes - Combustible Clearances Clearance to combustibles is defined as the minimum distance required between the heating source and the adjacent combustible surfaces to ensure the adjacent surface's temperature does not exceed 90 F above the ambient temperature.
Recommended Minimum Service Clearances Housing 32 and less (in.) Housing 35 and higher (in.)
42 on the controls side of the unit 48 on the controls side of the unit
Notes - Service Clearances To ensure ample space for component removal (evaporative cooling media, coils, filters, etc.), service clearances should be 6 in. wider than the width of the module itself.
Heating Specifications
Heating Performance
Type Gas Type Gas Pressure Capacity (MBH) Temperature
Rise (°F) Performance
Min
(in. wg)
Max (Psi) Input Output EAT (°F) LAT (°F)
Direct Gas Natural 9 0.5 550.9 506.8 86.9 3.1 90.0
Gas Train Details Redundant
Main Valves
Electronic Modulating
Valve Pilot Valve Internal
Regulator Visual
Indication Valve
Proof of Closure Valve
Gas Pressure Switch(es)
External Regulator
Std Std Std Std - - High & Low -
Additional Heating Information ETL Approved FM Compliant Temperature
Control Flame Sensing Ignition Control CO2 Sensor Flame Safeguard Display
Std Yes Discharge Flame Rod Economy Pilot - -
Unit Details 92% thermal efficiency Cast aluminum burner manifold with stainless steel mixing plates Electronic modulation burner control
10 second pre-purge sequence Low fire start
Notes Birdscreen weatherhoods ship knocked down and require field installation.
Damper(s) supplied are low leakage, motorized VCD-23 (leakage rate of 3 CFM/ft^2 @ 1 in.wg), Class 1A Verify that the correct BMS Protocol has been selected before ordering.
HVAC Upgrades:
Maintenance Garage
Department of Public Works 550 Patterson Ave.
Stratford, CT
SNYDER
ARCHITECTS, LLC
Architecture . Planning . Construction Management
Trumbull, CT 203-243-3346 info@snyderarchitects.com
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text
GAS FIRED INFRARED HEATER SCHEDULE
AutoCAD SHX Text
TAG
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
DETROIT RADIANT MODEL NUMBER
AutoCAD SHX Text MAX. INPUT (BTU/h)
AutoCAD SHX Text
TUBE LENGTH (FT)
AutoCAD SHX Text
EMITTER TUBE MATERIAL
AutoCAD SHX Text
FUEL TYPE
AutoCAD SHX Text V
AutoCAD SHX Text
PH
AutoCAD SHX Text
HZ
AutoCAD SHX Text
FLA
AutoCAD SHX Text
REMARKS
AutoCAD SHX Text
IR-1
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
HL3-50-175
AutoCAD SHX Text 175,000
AutoCAD SHX Text
AutoCAD SHX Text
4" Ø BLACK COATED ALUMINIZED STEEL
AutoCAD SHX Text
GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.7
AutoCAD SHX Text
SEE NOTES
AutoCAD SHX Text
IR-2
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
HL3-50-175
AutoCAD SHX Text 175,000
AutoCAD SHX Text
AutoCAD SHX Text
4" Ø BLACK COATED ALUMINIZED STEEL
AutoCAD SHX Text
GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.7
AutoCAD SHX Text
SEE NOTES
AutoCAD SHX Text
IR-3
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
HL3-50-175
AutoCAD SHX Text 175,000
AutoCAD SHX Text
AutoCAD SHX Text
4" Ø BLACK COATED ALUMINIZED STEEL
AutoCAD SHX Text
GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.7
AutoCAD SHX Text
SEE NOTES
AutoCAD SHX Text
IR-4
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
HL3-50-175
AutoCAD SHX Text 175,000
AutoCAD SHX Text
AutoCAD SHX Text
4" Ø BLACK COATED ALUMINIZED STEEL
AutoCAD SHX Text
GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.7
AutoCAD SHX Text
SEE NOTES
AutoCAD SHX Text
IR-5
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
HL3-50-175
AutoCAD SHX Text 175,000
AutoCAD SHX Text
AutoCAD SHX Text
4" Ø BLACK COATED ALUMINIZED STEEL
AutoCAD SHX Text
GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.7
AutoCAD SHX Text
SEE NOTES
AutoCAD SHX Text
IR-6
AutoCAD SHX Text
GARAGE
AutoCAD SHX Text
HL3-50-175
AutoCAD SHX Text 175,000
AutoCAD SHX Text
AutoCAD SHX Text
4" Ø BLACK COATED ALUMINIZED STEEL
AutoCAD SHX Text
GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 0.7
AutoCAD SHX Text
SEE NOTES
AutoCAD SHX Text NOTES: 1. REFER TO SPECIFICATIONS, DETAILS, AND CONTROL DRAWINGS FOR ADDITIONAL INFORMATION. 2. VERIFY TUBE LENGTH IN FIELD PRIOR TO ORDERING. 3. MIN. XX IN. WCg. 4. FURNISH COMPLETE WITH ALUMINUM REFLECTORS, STAINLESS STEEL BURNER, MOUNTING CABLES, AND FLEXIBLE GAS CONNECTOR. 5. MOUNT AS HIGH AS POSSIBLE PER MANUFACTURER'S RECOMMENDATION.
AutoCAD SHX Text
4-WAY
AutoCAD SHX Text
SILVER
AutoCAD SHX Text
TYPE 1
AutoCAD SHX Text
DIFFUSER, REGISTER & GRILLE SCHEDULE
AutoCAD SHX Text
DROP BOX
AutoCAD SHX Text
DIFFUSER
AutoCAD SHX Text
STANDARD FEATURES:
AutoCAD SHX Text
1. DOUBLE DEFELCTION GRILLES
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
BLOW PATTERN
AutoCAD SHX Text
STYLE
AutoCAD SHX Text
MODULE SIZE
AutoCAD SHX Text
FINISH
AutoCAD SHX Text
BORDER
AutoCAD SHX Text
AutoCAD SHX Text
NECK SIZE
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
KEY
AutoCAD SHX Text 30x30
AutoCAD SHX Text
AFPD-2810-15T
AutoCAD SHX Text
UNITED ENERTECH
AutoCAD SHX Text D-1
AutoCAD SHX Text D-2
AutoCAD SHX Text 37-49-68
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
THROW
AutoCAD SHX Text
GRILLE SIZE
AutoCAD SHX Text
TONS
AutoCAD SHX Text
NOMINAL SIZE (CFM)
AutoCAD SHX Text 28x10
AutoCAD SHX Text .096
AutoCAD SHX Text .042
AutoCAD SHX Text
NOISE CRITERIA
AutoCAD SHX Text
TOTAL PRESSURE (W.G. @ 0 DEFLECTION)
AutoCAD SHX Text
VELOCITY PRESSURE (W.G.)
AutoCAD SHX Text
AutoCAD SHX Text
4-WAY
AutoCAD SHX Text
TYPE 1
AutoCAD SHX Text
DROP BOX
AutoCAD SHX Text
DIFFUSER
AutoCAD SHX Text
AutoCAD SHX Text 30x30
AutoCAD SHX Text
AFPD-2810-15T
AutoCAD SHX Text
UNITED ENERTECH
AutoCAD SHX Text 37-49-68
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 28x10
AutoCAD SHX Text .096
AutoCAD SHX Text .042
AutoCAD SHX Text
AutoCAD SHX Text
2. TURNING VANES
AutoCAD SHX Text
3. INSULATION
AutoCAD SHX Text
SILVER
AutoCAD SHX Text
MECHANICAL SCHEDULES
AutoCAD SHX Text M-200
AutoCAD SHX Text Project
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Revisions
AutoCAD SHX Text Issued
AutoCAD SHX Text Scale
AutoCAD SHX Text Job No.
AutoCAD SHX Text 19-024
AutoCAD SHX Text
ISSUED FOR BID
AutoCAD SHX Text 08/24/2026
AutoCAD SHX Text
AS INDICATED
AutoCAD SHX Text 08/24/2026
AutoCAD SHX Text 2725 Main Street Stratford, CT 06614
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text
REVISIONS PER ADDENDUM 2
AutoCAD SHX Text 09/10/2026
STRATFORD PUBLIC WORKS
550 PATTERSON AVE, STRATFORD, CT 06614
PLUMBING ABBREVIATION LIST
PLUMBING SYMBOL LIST
HVAC Upgrades:
Maintenance Garage
Department of Public Works 550 Patterson Ave.
Stratford, CT
SNYDER
ARCHITECTS, LLC
Architecture . Planning . Construction Management
Trumbull, CT 203-243-3346 info@snyderarchitects.com
FACILITIES
GROUP, INC.
LANDMARK
(203) 866-8019 Fax
(203) 866-4626 Tel Norwalk, CT 06855 252 East Avenue
AutoCAD SHX Text
1. THE INTENT OF THIS PROJECT IS TO UPGRADE EXISTING HVAC SYSTEMS IN THE BUILDING. THIS INCLUDES, BUT IS NOT LIMITED TO, THE FOLLOWING WORK: - DEMOLITION OF EXISTING EQUIPMENT AS SHOWN ON DEMOLITION OF EXISTING EQUIPMENT AS SHOWN ON PLANS - CLEANING OF ALL EXISTING TO REMAIN DUCTWORK BY CLEANING OF ALL EXISTING TO REMAIN DUCTWORK BY LICENSED CONTRACTOR - INSTALLATION OF NEW HVAC EQUIPMENT AS SHOWN ON INSTALLATION OF NEW HVAC EQUIPMENT AS SHOWN ON PLANS - RIGGING OF NEW EQUIPMENT ONTO ROOF. RIGGING OF NEW EQUIPMENT ONTO ROOF. - NEW GALVANIZED SHEET METAL DUCTWORK NEW GALVANIZED SHEET METAL DUCTWORK - NEW REFRIGERANT, STEAM, AND CONDENSATE PIPING NEW REFRIGERANT, STEAM, AND CONDENSATE PIPING - AIR TESTING AND BALANCING AIR TESTING AND BALANCING - STARTUP AND TESTING BY FACTORY AUTHORIZED STARTUP AND TESTING BY FACTORY AUTHORIZED REPRESENTATIVES. - EQUIPMENT TAGS AND DUCT/PIPING LABELS. EQUIPMENT TAGS AND DUCT/PIPING LABELS. - NEW DDC CONTROLS. NEW DDC CONTROLS. - CLOSEOUT PACKAGE INCLUDING CUT SHEETS, AS BUILT CLOSEOUT PACKAGE INCLUDING CUT SHEETS, AS BUILT DRAWINGS AND WARRANTY INFORMATION. - OWNER TRAINING ON NEW EQUIPMENT AND CONTROLS. OWNER TRAINING ON NEW EQUIPMENT AND CONTROLS. 2. IN ADDITION TO EQUIPMENT SUBMITTALS CONTRACTOR SHALL ISSUE 3/8" SCALE DUCTWORK AND PIPING SHOP DRAWINGS TO ENGINEER FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF WORK. PROVIDE CONTROLS WIRING DIAGRAMS FOR REVIEW AND APPROVAL.
AutoCAD SHX Text
%%UPROJECT DESCRIPTION
AutoCAD SHX Text
1. ALL BIDDERS SHALL VISIT PROJECT SITE TO ALL BIDDERS SHALL VISIT PROJECT SITE TO THOROUGHLY FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS. CLAIMS FOR EXTRA PAYMENTS FOR WORK, WHICH COULD HAVE BEEN IDENTIFIED VIA CAREFUL SITE INSPECTION, WILL NOT BE ACKNOWLEDGED. 2. PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL PRIOR TO COMMENCEMENT OF WORK, CONTRACTOR SHALL PREPARE EQUIPMENT SUBMITTALS PER SPECIFICATION AND SUBMIT TO DESIGN ENGINEER FOR REVIEW/APPROVAL. 3. UPON COMPLETION OF WORK, CONTRACTOR SHALL SUBMIT UPON COMPLETION OF WORK, CONTRACTOR SHALL SUBMIT AS-BUILTS DRAWINGS IN ACCORDANCE WITH SPECIFICATIONS. 4. PRIOR TO CLOSEOUT, CONTRACTOR SHALL SUBMIT PRIOR TO CLOSEOUT, CONTRACTOR SHALL SUBMIT OPERATION AND MAINTENANCE MANUAL TO ENGINEER FOR APPROVAL. FOLLOWING APPROVAL, CONTRACTOR SHALL DELIVER (1) HARD COPY AND (1) DIGITAL COPY ON THUMB DRIVE TO OWNER. REFER TO PROJECT SPECIFICATIONS FOR ADDITIONAL CLOSEOUT REQUIREMENTS. 5. CONTRACTOR SHALL TRAIN OWNER ON EQUIPMENT & CONTRACTOR SHALL TRAIN OWNER ON EQUIPMENT & CONTROLS. 6. WHETHER INDICATED ON PLANS OR NOT, ALL DUCT WHETHER INDICATED ON PLANS OR NOT, ALL DUCT PENETRATIONS THROUGH CORRIDOR WALLS SHALL INCLUDE FUSIBLE LINK FIRE-SMOKE DAMPERS AND DUCT ACCESS DOORS. CONTRACTOR SHALL INCLUDE THIS IN HIS BASE BID. 7. CONTRACTOR SHALL INCLUDE IN HIS BID THE COST TO CONTRACTOR SHALL INCLUDE IN HIS BID THE COST TO PROFESSIONALLY CLEAN ALL EXISTING DUCTWORK TO REMAIN AFTER CONSTRUCTION IS COMPLETE, INCLUDING ALL ASSOCIATED ACCESSORIES INSIDE THE PROJECT AREA. THIS SHALL INCLUDE ALL BELOW-SLAB RETURN AIR DUCTWORK. 8. CONTRACTOR SHALL NOTE THAT EXISTING BMS HARDWARE CONTRACTOR SHALL NOTE THAT EXISTING BMS HARDWARE IS MANUFACTURED BY ANDOVER. CONTRACTOR SHALL ENGAGE EXISTING BUILDING ATC CONTRACTOR TO INTEGRATE ALL NEW EQUIPMENT INTO BMS AND CARRY THIS COST IN BASE BID. EXISTING ATC CONTRACTOR: AUTOMATED CONTROL LOGIC INC. 578 COMMERCE ST. THORNWOOD, NY 914-769-8880 8.1. ATC CONTRACTOR SHALL FURNISH ALL HARDWARE, ATC CONTRACTOR SHALL FURNISH ALL HARDWARE, END DEVICES AND WIRING REQUIRED FOR CONTROL AND MONITORING OF NEW HVAC EQUIPMENT. ATC CONTRACTOR SHALL DO ALL PROGRAMMING, BUILD ALL GRAPHICS FOR NEW EQUIPMENT AND UPDATE THERMAL FLOOR PLANS FOR NEW TEMPERATURE ZONES. WORK SCOPE SHALL INCLUDE ALL REQUIRED HARDWARE AND SOFTWARE MODIFICATIONS. 8.2. ATC CONTRACTOR SHALL NOTE THAT NEW VRF ATC CONTRACTOR SHALL NOTE THAT NEW VRF SYSTEM WILL BE FURNISED WITH A LEVEL OF FACTORY CONTROLS. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH EQUIPMENT MANUFACTURER TO DIFFERENTIATE FACTORY POINTS FROM 'ALC POINTS' AND VERIFY THEIR SCOPE OF WORK IN TERMS OF FIELD HARDWARE AND WIRING. CLAIMS FOR EXTRA PAYMENTS DURING CONSTRUCTION, ARISING FROM A FAILURE TO COORDINATE IN THE BIDDING PHASE, WILL NOT BE APPROVED.
AutoCAD SHX Text
%%UPROJECT NOTES:
AutoCAD SHX Text
1. OVER-ALL DEMOLITION WORK IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, OVER-ALL DEMOLITION WORK IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, DEMOLITION WORK IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, DEMOLITION WORK IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, WORK IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, WORK IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, IS DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, DEFINED IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, IN THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, THE ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, ARCHITECTURAL DRAWINGS AS RELATED TO INSTALLATION OF NEW M, DRAWINGS AS RELATED TO INSTALLATION OF NEW M, DRAWINGS AS RELATED TO INSTALLATION OF NEW M, AS RELATED TO INSTALLATION OF NEW M, AS RELATED TO INSTALLATION OF NEW M, RELATED TO INSTALLATION OF NEW M, RELATED TO INSTALLATION OF NEW M, TO INSTALLATION OF NEW M, TO INSTALLATION OF NEW M, INSTALLATION OF NEW M, INSTALLATION OF NEW M, OF NEW M, OF NEW M, NEW M, NEW M, M, M, E, & P EQUIPMENT, PIPING, DUCTWORK, AND ASSOCIATED ACCESSORIES. 2. ALL DEMOLITION WORK TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL ALL DEMOLITION WORK TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL DEMOLITION WORK TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL DEMOLITION WORK TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL WORK TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL WORK TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL TO BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL BE COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL COORDINATED WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL WITH BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL BUILDING MANAGER TO AVOID POTENTIAL CONFLICTS. ALL MANAGER TO AVOID POTENTIAL CONFLICTS. ALL MANAGER TO AVOID POTENTIAL CONFLICTS. ALL TO AVOID POTENTIAL CONFLICTS. ALL TO AVOID POTENTIAL CONFLICTS. ALL AVOID POTENTIAL CONFLICTS. ALL AVOID POTENTIAL CONFLICTS. ALL POTENTIAL CONFLICTS. ALL POTENTIAL CONFLICTS. ALL CONFLICTS. ALL CONFLICTS. ALL ALL ALL ALL DEMOLITION WORK TO BE DONE DURING THE HOURS DESIGNATED. 3. MAINTAIN STABLE AND SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT MAINTAIN STABLE AND SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT STABLE AND SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT STABLE AND SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT AND SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT AND SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT SAFE CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT CONDITIONS AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT AT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT ALL TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT TIMES, TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT TAKING CAUTION TO PROTECT THE EXISTING AND ADJACENT CAUTION TO PROTECT THE EXISTING AND ADJACENT CAUTION TO PROTECT THE EXISTING AND ADJACENT TO PROTECT THE EXISTING AND ADJACENT TO PROTECT THE EXISTING AND ADJACENT PROTECT THE EXISTING AND ADJACENT PROTECT THE EXISTING AND ADJACENT THE EXISTING AND ADJACENT THE EXISTING AND ADJACENT EXISTING AND ADJACENT EXISTING AND ADJACENT AND ADJACENT AND ADJACENT ADJACENT ADJACENT BUILDINGS, THEIR OCCUPANTS, STREET FRONT AND THE PUBLIC. 4. DEMOLISHED MATERIAL, NOT IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE DEMOLISHED MATERIAL, NOT IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE MATERIAL, NOT IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE MATERIAL, NOT IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE NOT IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE NOT IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE IDENTIFIED FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE FOR SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE SALVAGE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE BY THE OWNER, SHALL BECOME THE PROPERTY OF THE THE OWNER, SHALL BECOME THE PROPERTY OF THE THE OWNER, SHALL BECOME THE PROPERTY OF THE OWNER, SHALL BECOME THE PROPERTY OF THE OWNER, SHALL BECOME THE PROPERTY OF THE SHALL BECOME THE PROPERTY OF THE SHALL BECOME THE PROPERTY OF THE BECOME THE PROPERTY OF THE BECOME THE PROPERTY OF THE THE PROPERTY OF THE THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE OF THE OF THE THE THE CONTRACTOR AND SHALL BE COMPLETELY REMOVED FROM THE JOB SITE. 5. PROVIDE PROTECTION TO ALL EXISTING ELECTRICAL, MECHANICAL, AND PLUMBING EQUIPMENT TO REMAIN. PROVIDE PROTECTION TO ALL EXISTING ELECTRICAL, MECHANICAL, AND PLUMBING EQUIPMENT TO REMAIN. 6. COORDINATE WITH GENERAL CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, COORDINATE WITH GENERAL CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, WITH GENERAL CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, WITH GENERAL CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, GENERAL CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, GENERAL CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, CONTRACTOR TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, TO REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, REMOVE ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, ALL ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, ABANDONED ELECTRICAL CABLES FROM EXISTING LOCATIONS, ELECTRICAL CABLES FROM EXISTING LOCATIONS, ELECTRICAL CABLES FROM EXISTING LOCATIONS, CABLES FROM EXISTING LOCATIONS, CABLES FROM EXISTING LOCATIONS, FROM EXISTING LOCATIONS, FROM EXISTING LOCATIONS, EXISTING LOCATIONS, EXISTING LOCATIONS, LOCATIONS, LOCATIONS, TRACE BACK TO THEIR SOURCE AND TAG. 7. THE SCOPE OF THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR THE SCOPE OF THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR SCOPE OF THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR SCOPE OF THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR OF THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR OF THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR THE DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR DEMOLITION WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR WORK HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR HAS GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR GENERALLY BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR BEEN INDICATED ON THE ARCHITECTURAL DRAWINGS FOR INDICATED ON THE ARCHITECTURAL DRAWINGS FOR INDICATED ON THE ARCHITECTURAL DRAWINGS FOR ON THE ARCHITECTURAL DRAWINGS FOR ON THE ARCHITECTURAL DRAWINGS FOR THE ARCHITECTURAL DRAWINGS FOR THE ARCHITECTURAL DRAWINGS FOR ARCHITECTURAL DRAWINGS FOR ARCHITECTURAL DRAWINGS FOR DRAWINGS FOR DRAWINGS FOR FOR FOR CONTRACTORS INFORMATION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, INFORMATION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, INFORMATION. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, SHALL BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, BE THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, THE CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, CONTRACTORS RESPONSIBILITY TO DETERMINE THE FULL SCOPE, RESPONSIBILITY TO DETERMINE THE FULL SCOPE, RESPONSIBILITY TO DETERMINE THE FULL SCOPE, TO DETERMINE THE FULL SCOPE, TO DETERMINE THE FULL SCOPE, DETERMINE THE FULL SCOPE, DETERMINE THE FULL SCOPE, THE FULL SCOPE, THE FULL SCOPE, FULL SCOPE, FULL SCOPE, SCOPE, SCOPE, EXTENT, NATURE AND MANNER OF DEMOLITION REQUIRED. 8. ONLY WORKMEN SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION ONLY WORKMEN SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION WORKMEN SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION WORKMEN SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION SKILLED AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION AND KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION KNOWLEDGEABLE IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION IN THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION THEIR RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION RESPECTIVE TRADES SHALL BE ENGAGED IN THE DEMOLITION TRADES SHALL BE ENGAGED IN THE DEMOLITION TRADES SHALL BE ENGAGED IN THE DEMOLITION SHALL BE ENGAGED IN THE DEMOLITION SHALL BE ENGAGED IN THE DEMOLITION BE ENGAGED IN THE DEMOLITION BE ENGAGED IN THE DEMOLITION ENGAGED IN THE DEMOLITION ENGAGED IN THE DEMOLITION IN THE DEMOLITION IN THE DEMOLITION THE DEMOLITION THE DEMOLITION DEMOLITION DEMOLITION OF ANY WORK. 9. CONTRACTORS SHALL TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED CONTRACTORS SHALL TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED SHALL TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED SHALL TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED TAKE SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED SPECIAL CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED CARE TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED TO DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED DEMOLISH ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED ONLY THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED THAT WORK WHICH IS REQUIRED TO BE DEMOLISHED WORK WHICH IS REQUIRED TO BE DEMOLISHED WORK WHICH IS REQUIRED TO BE DEMOLISHED WHICH IS REQUIRED TO BE DEMOLISHED WHICH IS REQUIRED TO BE DEMOLISHED IS REQUIRED TO BE DEMOLISHED IS REQUIRED TO BE DEMOLISHED REQUIRED TO BE DEMOLISHED REQUIRED TO BE DEMOLISHED TO BE DEMOLISHED TO BE DEMOLISHED BE DEMOLISHED BE DEMOLISHED DEMOLISHED DEMOLISHED AND NOT TO DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS NOT TO DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS NOT TO DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS TO DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS TO DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS DISTURB ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS ANY WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS WORK WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS WHICH IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS TO REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS REMAIN. IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IF IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS IN THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS THE COURSE OF DEMOLITION, CONTRACTOR DESTROYS COURSE OF DEMOLITION, CONTRACTOR DESTROYS COURSE OF DEMOLITION, CONTRACTOR DESTROYS OF DEMOLITION, CONTRACTOR DESTROYS OF DEMOLITION, CONTRACTOR DESTROYS DEMOLITION, CONTRACTOR DESTROYS DEMOLITION, CONTRACTOR DESTROYS CONTRACTOR DESTROYS CONTRACTOR DESTROYS DESTROYS DESTROYS OR DISTURBS ANY WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH DISTURBS ANY WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH DISTURBS ANY WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH ANY WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH ANY WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH WORK WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH WHICH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH IS TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH TO REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH REMAIN, THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH THEN HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH HE SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH SHALL AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH AT HIS OWN EXPENSE, REPAIR OR REPLACE SUCH HIS OWN EXPENSE, REPAIR OR REPLACE SUCH HIS OWN EXPENSE, REPAIR OR REPLACE SUCH OWN EXPENSE, REPAIR OR REPLACE SUCH OWN EXPENSE, REPAIR OR REPLACE SUCH EXPENSE, REPAIR OR REPLACE SUCH EXPENSE, REPAIR OR REPLACE SUCH REPAIR OR REPLACE SUCH REPAIR OR REPLACE SUCH OR REPLACE SUCH OR REPLACE SUCH REPLACE SUCH REPLACE SUCH SUCH SUCH WORK AS NECESSARY. 10. REMOVE AND DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL REMOVE AND DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL AND DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL AND DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL DISCARD ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL ALL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL DEMOLISHED ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL ITEMS IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL IN A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL A MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL MANNER FULLY APPROVED BY THE AUTHORITY HAVING LOCAL FULLY APPROVED BY THE AUTHORITY HAVING LOCAL FULLY APPROVED BY THE AUTHORITY HAVING LOCAL APPROVED BY THE AUTHORITY HAVING LOCAL APPROVED BY THE AUTHORITY HAVING LOCAL BY THE AUTHORITY HAVING LOCAL BY THE AUTHORITY HAVING LOCAL THE AUTHORITY HAVING LOCAL THE AUTHORITY HAVING LOCAL AUTHORITY HAVING LOCAL AUTHORITY HAVING LOCAL HAVING LOCAL HAVING LOCAL LOCAL LOCAL JURISDICTION. 11. DO NOT SCALE DRAWINGS., FOLLOWING PRINTED DIMENSIONS SHALL TAKE PRECEDENT. DO NOT SCALE DRAWINGS., FOLLOWING PRINTED DIMENSIONS SHALL TAKE PRECEDENT. 12. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO SHALL VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO VERIFY ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO ALL DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO DIMENSIONS AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO AND JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO JOB CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO CONDITIONS PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO PRIOR TO SUBMITTING BIDS AND SHALL REPORT TO TO SUBMITTING BIDS AND SHALL REPORT TO TO SUBMITTING BIDS AND SHALL REPORT TO SUBMITTING BIDS AND SHALL REPORT TO SUBMITTING BIDS AND SHALL REPORT TO BIDS AND SHALL REPORT TO BIDS AND SHALL REPORT TO AND SHALL REPORT TO AND SHALL REPORT TO SHALL REPORT TO SHALL REPORT TO REPORT TO REPORT TO TO TO THE OWNER'S REPRESENTATIVE ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY OWNER'S REPRESENTATIVE ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY OWNER'S REPRESENTATIVE ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY REPRESENTATIVE ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY REPRESENTATIVE ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY ANY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY DISCREPANCIES OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY OR OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY OMISSIONS WHICH WOULD INTERFERE WITH SATISFACTORY WHICH WOULD INTERFERE WITH SATISFACTORY WHICH WOULD INTERFERE WITH SATISFACTORY WOULD INTERFERE WITH SATISFACTORY WOULD INTERFERE WITH SATISFACTORY INTERFERE WITH SATISFACTORY INTERFERE WITH SATISFACTORY WITH SATISFACTORY WITH SATISFACTORY SATISFACTORY SATISFACTORY COMPLETION OF WORK. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY OF WORK. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY OF WORK. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY WORK. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY WORK. ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY ALL BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY BUILDING DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY DEPARTMENT PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY PERMITS SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF ANY BE OBTAINED PRIOR TO COMMENCEMENT OF ANY BE OBTAINED PRIOR TO COMMENCEMENT OF ANY OBTAINED PRIOR TO COMMENCEMENT OF ANY OBTAINED PRIOR TO COMMENCEMENT OF ANY PRIOR TO COMMENCEMENT OF ANY PRIOR TO COMMENCEMENT OF ANY TO COMMENCEMENT OF ANY TO COMMENCEMENT OF ANY COMMENCEMENT OF ANY COMMENCEMENT OF ANY OF ANY OF ANY ANY ANY CONSTRUCTION WORK.
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text
1. ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF ALL WORK SHALL CONFORM TO THE REQUIREMENTS OF WORK SHALL CONFORM TO THE REQUIREMENTS OF WORK SHALL CONFORM TO THE REQUIREMENTS OF SHALL CONFORM TO THE REQUIREMENTS OF SHALL CONFORM TO THE REQUIREMENTS OF CONFORM TO THE REQUIREMENTS OF CONFORM TO THE REQUIREMENTS OF TO THE REQUIREMENTS OF TO THE REQUIREMENTS OF THE REQUIREMENTS OF THE REQUIREMENTS OF REQUIREMENTS OF REQUIREMENTS OF OF OF 2020 NEW YORK STATE EXISTING BUILDING CODE, AS NEW YORK STATE EXISTING BUILDING CODE, AS NEW YORK STATE EXISTING BUILDING CODE, AS YORK STATE EXISTING BUILDING CODE, AS YORK STATE EXISTING BUILDING CODE, AS STATE EXISTING BUILDING CODE, AS STATE EXISTING BUILDING CODE, AS EXISTING BUILDING CODE, AS EXISTING BUILDING CODE, AS BUILDING CODE, AS BUILDING CODE, AS CODE, AS CODE, AS AS AS WELL AS 2018 INTERNATIONAL EXISTING BUILDING CODE, AS 2018 INTERNATIONAL EXISTING BUILDING CODE, AS 2018 INTERNATIONAL EXISTING BUILDING CODE, 2018 INTERNATIONAL EXISTING BUILDING CODE, 2018 INTERNATIONAL EXISTING BUILDING CODE, INTERNATIONAL EXISTING BUILDING CODE, INTERNATIONAL EXISTING BUILDING CODE, EXISTING BUILDING CODE, EXISTING BUILDING CODE, BUILDING CODE, BUILDING CODE, CODE, CODE, 2020 NEW YORK STATE MECHANICAL CODE, 2018 NEW YORK STATE MECHANICAL CODE, 2018 NEW YORK STATE MECHANICAL CODE, 2018 YORK STATE MECHANICAL CODE, 2018 YORK STATE MECHANICAL CODE, 2018 STATE MECHANICAL CODE, 2018 STATE MECHANICAL CODE, 2018 MECHANICAL CODE, 2018 MECHANICAL CODE, 2018 CODE, 2018 CODE, 2018 2018 2018 INTERNATIONAL MECHANICAL CODE, LOCAL FIRE MECHANICAL CODE, LOCAL FIRE MECHANICAL CODE, LOCAL FIRE CODE, LOCAL FIRE CODE, LOCAL FIRE LOCAL FIRE LOCAL FIRE FIRE FIRE DEPARTMENT RULES AND REGULATIONS, UTILITY COMPANY RULES AND REGULATIONS, UTILITY COMPANY RULES AND REGULATIONS, UTILITY COMPANY AND REGULATIONS, UTILITY COMPANY AND REGULATIONS, UTILITY COMPANY REGULATIONS, UTILITY COMPANY REGULATIONS, UTILITY COMPANY UTILITY COMPANY UTILITY COMPANY COMPANY COMPANY REQUIREMENTS, AND THE BEST TRADE PRACTICES. 2. THE CONTRACTOR SHALL LAYOUT HIS OWN WORK, AND THE CONTRACTOR SHALL LAYOUT HIS OWN WORK, AND CONTRACTOR SHALL LAYOUT HIS OWN WORK, AND CONTRACTOR SHALL LAYOUT HIS OWN WORK, AND SHALL LAYOUT HIS OWN WORK, AND SHALL LAYOUT HIS OWN WORK, AND LAYOUT HIS OWN WORK, AND LAYOUT HIS OWN WORK, AND HIS OWN WORK, AND HIS OWN WORK, AND OWN WORK, AND OWN WORK, AND WORK, AND WORK, AND AND AND SHALL PROVIDE ALL DIMENSIONS REQUIRED FOR OTHER PROVIDE ALL DIMENSIONS REQUIRED FOR OTHER PROVIDE ALL DIMENSIONS REQUIRED FOR OTHER ALL DIMENSIONS REQUIRED FOR OTHER ALL DIMENSIONS REQUIRED FOR OTHER DIMENSIONS REQUIRED FOR OTHER DIMENSIONS REQUIRED FOR OTHER REQUIRED FOR OTHER REQUIRED FOR OTHER FOR OTHER FOR OTHER OTHER OTHER TRADES: MECHANICAL, ELECTRICAL, ETC. 3. MECHANICAL WORK SHALL BE PERFORMED BY PERSONS MECHANICAL WORK SHALL BE PERFORMED BY PERSONS WORK SHALL BE PERFORMED BY PERSONS WORK SHALL BE PERFORMED BY PERSONS SHALL BE PERFORMED BY PERSONS SHALL BE PERFORMED BY PERSONS BE PERFORMED BY PERSONS BE PERFORMED BY PERSONS PERFORMED BY PERSONS PERFORMED BY PERSONS BY PERSONS BY PERSONS PERSONS PERSONS LICENSED IN THEIR TRADES, WHO SHALL ARRANGE FOR IN THEIR TRADES, WHO SHALL ARRANGE FOR IN THEIR TRADES, WHO SHALL ARRANGE FOR THEIR TRADES, WHO SHALL ARRANGE FOR THEIR TRADES, WHO SHALL ARRANGE FOR TRADES, WHO SHALL ARRANGE FOR TRADES, WHO SHALL ARRANGE FOR WHO SHALL ARRANGE FOR WHO SHALL ARRANGE FOR SHALL ARRANGE FOR SHALL ARRANGE FOR ARRANGE FOR ARRANGE FOR FOR FOR AND OBTAIN THROUGH THE DEPARTMENT OF BUILDINGS OBTAIN THROUGH THE DEPARTMENT OF BUILDINGS OBTAIN THROUGH THE DEPARTMENT OF BUILDINGS THROUGH THE DEPARTMENT OF BUILDINGS THROUGH THE DEPARTMENT OF BUILDINGS THE DEPARTMENT OF BUILDINGS THE DEPARTMENT OF BUILDINGS DEPARTMENT OF BUILDINGS DEPARTMENT OF BUILDINGS OF BUILDINGS OF BUILDINGS BUILDINGS BUILDINGS ALL REQUIRED PERMITS, INSPECTIONS AND REQUIRED SIGN REQUIRED PERMITS, INSPECTIONS AND REQUIRED SIGN REQUIRED PERMITS, INSPECTIONS AND REQUIRED SIGN PERMITS, INSPECTIONS AND REQUIRED SIGN PERMITS, INSPECTIONS AND REQUIRED SIGN INSPECTIONS AND REQUIRED SIGN INSPECTIONS AND REQUIRED SIGN AND REQUIRED SIGN AND REQUIRED SIGN REQUIRED SIGN REQUIRED SIGN SIGN SIGN OFFS. 4. ELECTRICAL WORK SHALL BE PERFORMED BY PERSONS ELECTRICAL WORK SHALL BE PERFORMED BY PERSONS WORK SHALL BE PERFORMED BY PERSONS WORK SHALL BE PERFORMED BY PERSONS SHALL BE PERFORMED BY PERSONS SHALL BE PERFORMED BY PERSONS BE PERFORMED BY PERSONS BE PERFORMED BY PERSONS PERFORMED BY PERSONS PERFORMED BY PERSONS BY PERSONS BY PERSONS PERSONS PERSONS LICENSED IN THEIR TRADES, WHO SHALL ARRANGE FOR IN THEIR TRADES, WHO SHALL ARRANGE FOR IN THEIR TRADES, WHO SHALL ARRANGE FOR THEIR TRADES, WHO SHALL ARRANGE FOR THEIR TRADES, WHO SHALL ARRANGE FOR TRADES, WHO SHALL ARRANGE FOR TRADES, WHO SHALL ARRANGE FOR WHO SHALL ARRANGE FOR WHO SHALL ARRANGE FOR SHALL ARRANGE FOR SHALL ARRANGE FOR ARRANGE FOR ARRANGE FOR FOR FOR AND OBTAIN THROUGH THE BUREAU OF ELECTRICAL OBTAIN THROUGH THE BUREAU OF ELECTRICAL OBTAIN THROUGH THE BUREAU OF ELECTRICAL THROUGH THE BUREAU OF ELECTRICAL THROUGH THE BUREAU OF ELECTRICAL THE BUREAU OF ELECTRICAL THE BUREAU OF ELECTRICAL BUREAU OF ELECTRICAL BUREAU OF ELECTRICAL OF ELECTRICAL OF ELECTRICAL ELECTRICAL ELECTRICAL CONTROL ALL REQUIRED PERMITS, INSPECTIONS AND ALL REQUIRED PERMITS, INSPECTIONS AND ALL REQUIRED PERMITS, INSPECTIONS AND REQUIRED PERMITS, INSPECTIONS AND REQUIRED PERMITS, INSPECTIONS AND PERMITS, INSPECTIONS AND PERMITS, INSPECTIONS AND INSPECTIONS AND INSPECTIONS AND AND AND REQUIRED SIGN OFFS. 5. THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, THE GENERAL CONTRACTOR SHALL DO ALL CUTTING, GENERAL CONTRACTOR SHALL DO ALL CUTTING, GENERAL CONTRACTOR SHALL DO ALL CUTTING, CONTRACTOR SHALL DO ALL CUTTING, CONTRACTOR SHALL DO ALL CUTTING, SHALL DO ALL CUTTING, SHALL DO ALL CUTTING, DO ALL CUTTING, DO ALL CUTTING, ALL CUTTING, ALL CUTTING, CUTTING, CUTTING, PATCHING, REPAIRING AS REQUIRED TO PERFORM ALL OF REPAIRING AS REQUIRED TO PERFORM ALL OF REPAIRING AS REQUIRED TO PERFORM ALL OF AS REQUIRED TO PERFORM ALL OF AS REQUIRED TO PERFORM ALL OF REQUIRED TO PERFORM ALL OF REQUIRED TO PERFORM ALL OF TO PERFORM ALL OF TO PERFORM ALL OF PERFORM ALL OF PERFORM ALL OF ALL OF ALL OF OF OF THE WORK INDICATED ON THE DRAWINGS, AND ALL OTHER WORK INDICATED ON THE DRAWINGS, AND ALL OTHER WORK INDICATED ON THE DRAWINGS, AND ALL OTHER INDICATED ON THE DRAWINGS, AND ALL OTHER INDICATED ON THE DRAWINGS, AND ALL OTHER ON THE DRAWINGS, AND ALL OTHER ON THE DRAWINGS, AND ALL OTHER THE DRAWINGS, AND ALL OTHER THE DRAWINGS, AND ALL OTHER DRAWINGS, AND ALL OTHER DRAWINGS, AND ALL OTHER AND ALL OTHER AND ALL OTHER ALL OTHER ALL OTHER OTHER OTHER WORK THAT MAY BE REQUIRED TO COMPLETE THE JOB.
AutoCAD SHX Text
GENERAL SCOPE OF WORK NOTES
AutoCAD SHX Text
DRAWING INDEX
AutoCAD SHX Text
PLUMBING SPECIFICATIONS
AutoCAD SHX Text
GARAGE PLUMBING PLAN
AutoCAD SHX Text P-001
AutoCAD SHX Text
PLUMBING DESCRIPTIONS, SYMBOLS, LEGEND & NOTES
AutoCAD SHX Text
PLUMBING DETAILS
AutoCAD SHX Text P-002
AutoCAD SHX Text P-100
AutoCAD SHX Text P-200
AutoCAD SHX Text P-101
AutoCAD SHX Text
ROOF PLUMBING PLAN
AutoCAD SHX Text
UP (PENETRATES FLOOR SLAB)
AutoCAD SHX Text
UP
AutoCAD SHX Text
TYP
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NTS
AutoCAD SHX Text
MIN
AutoCAD SHX Text
MINIMUM
AutoCAD SHX Text
DN
AutoCAD SHX Text
DOWN (PENETRATES FLOOR SLAB)
AutoCAD SHX Text
FL
AutoCAD SHX Text
EL
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
DWG
AutoCAD SHX Text
DRAWING
AutoCAD SHX Text
CONTINUATION
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
CV
AutoCAD SHX Text
CONT
AutoCAD SHX Text
CONN
AutoCAD SHX Text
CW
AutoCAD SHX Text
CLG
AutoCAD SHX Text
CONNECT
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
CO
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
AFF
AutoCAD SHX Text
EX
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text
MOUNTED
AutoCAD SHX Text
MTD
AutoCAD SHX Text
VERIFY IN FIELD
AutoCAD SHX Text
VIF
AutoCAD SHX Text
EXISTING PIPING TO REMAIN
AutoCAD SHX Text
EXISTING PIPING TO BE REMOVED
AutoCAD SHX Text
GAS PIPING
AutoCAD SHX Text
PIPE RISE OR UP THRU SLAB
AutoCAD SHX Text
PIPE DROP OR DOWN THRU SLAB
AutoCAD SHX Text
POINT OF NEW CONNECTION
AutoCAD SHX Text
NOTE: NOT ALL SYMBOLS ARE USED
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
DESCRIPTION
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .