This is a specification document for electrical work at the Pierce County Annex in Tacoma, Washington, specifically covering Division 26 (electrical systems) for an Electric Vehicle (EV) charging station installation project. The project scope includes installation of additional light poles, cameras, electrical and communication conduit, EV signage, and pavement markings, with civil work encompassing asphalt demolition, excavation for electrical and camera trenches, and repaving. The specifications establish comprehensive requirements for general electrical provisions, basic electrical materials and methods, wire and cables, grounding and bonding systems, raceway systems, and supporting devices, with all work required to comply with the National Electrical Code (NEC), state and local codes, and applicable industry standards including UL, NEMA, and IEEE standards. The contractor must submit detailed submittals including product data, shop drawings, and operation and maintenance manuals, with initial closeout submittals due at least 30 days before demonstration or training. All materials must be UL listed and labeled, with equipment warranties commencing at Substantial Completion for a period of one year, and the contractor is responsible for obtaining all required permits and fees.
The specifications require the contractor to conduct comprehensive site visits during the bidding period to assess installation conditions, coordinate extensively with other trades to prevent conflicts and ensure proper clearances, and include all coordination costs within the base bid without additional charges to the Owner. Costs for redesign work required by the Owner's Engineer are compensated at a rate of $150 per hour and deducted from Final Payment. The contractor must provide all labor, materials, equipment, supervision, and tools necessary for construction, installation, connection, testing, and operation of electrical systems, and assumes full responsibility for coordinating with mechanical equipment suppliers (Divisions 21-23) regarding power connections, controllers, and disconnect switches. Testing and field quality control must be performed in accordance with Section 260810, with test reports organized by building system type and provided in both PDF and manufacturer software formats for inclusion in operation and maintenance manuals.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 260500
GENERAL ELECTRICAL PROVISIONS
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 1 CD SET
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Description: Work includes materials, equipment, labor, supervision, tools and items necessary for the construction, installation, connection, testing and operation of electrical work. This section applies to all Divisions 26, 27, and 28 sections.
B. General Requirements: General Conditions, Supplementary Conditions and Division 01 sections apply to Work in this section.
1.2 CODES AND STANDARDS
A. Perform work in accordance with requirements of the state in which the work is performed.
B. Conform to applicable industry standards, UL standards, NEMA standards, and other standards as noted.
1. Notify the A/E of deviations in Contract Documents to applicable codes and ordinances prior to installation of the Work. Perform changes in the Work after initial installation due to requirements of code enforcing agencies at no additional cost to the Owner.
2. If conflict occurs between legally adopted codes and the Contract Documents, the codes prevail. Contractor to comply with requirements of the Contract
Documents which may exceed code requirements and not contrary to same.
C. Operating Conditions:
1. Temperature: Minus 20 deg C to plus 40 deg C.
2. Altitude: Up to 3,300 feet (1,000 meters).
1.3 PERMIT INFORMATION
A. Permit Application: Arrange for and pay for all required permits, fees, and inspections required for work included in Division 26, 27, and 28.
B. Permit Submittal Plan Review: Submit the following to the AHJ as required to support the permit application:
1. Electrical Permit: Submit bid documents
2. Fire Alarm Permit: Submit Shop drawings
C. Approved Permit Plans Printing: Print and have available for the inspector a full size color set of the approved plan review drawings. A digital set of approved drawings will be provided electronically and will be the same size and sheet count as the Bid Documents.
1.4 SUBMITTALS
A. Comply with requirements in Division 01 and with additional requirements indicated in this article.
B. Electronic Product Data:
1. Comply with requirements in Section 013300 and additional requirements indicated in this article.
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 2 CD SET
2. Submit each specification section complete at one time with a dedicated submittal number for each section. For example, submit products for
Section 260519 under one submittal number and products for Section 260533 under a different submittal number. Submitting multiple sections at one time acceptable as long as each section has a dedicated submittal number. Include submittal number and date submitted in file name.
3. Partial product submittals not acceptable and will be returned without review except as follows:
a. Section 260573 Power Studies including representative one-line diagram of distribution system (with bus numbers as described herein) indicating which devices will be presented in protective device coordination study and indicate additional information required to complete the study.
b. Section 260923 Lighting Controls including products and materials for first submittal and Shop Drawings for second submittal.
c. Sections 265100 Lighting and 265561 Stage Lighting Systems including products and materials for first submittal and Shop Drawings for second submittal.
d. Section 283111 Fire Alarm and Detection Systems including products and materials for first submittal and Shop Drawings for second submittal.
e. Long lead items.
f. Site and underground work.
4. Clearly mark catalog pages, equipment, and model number to be used. Indicate associated specification section and paragraph number on each page. Identify required options and accessories.
5. Format:
a. PDF file format.
b. Bookmark each submittal to facilitate browsing to each specification paragraph number.
c. Include table of contents for each specification section. Include catalog numbers or drawing numbers.
d. Include the Contractor and manufacturer’s representative contact information for each product. Include job name (or abbreviation of job name), specification number, and contractor submittal number in file name.
C. Shop Drawings:
1. Submit as specified in the individual specification sections. Submit minimum
30 days prior to starting fabrication on installation work. Do not fabricate on install until reviewed by the A/E. Include complete location dimensions, and hanger and support sizes and dimensions.
2. “Typical” drawings and wiring diagrams not accepted unless they specifically apply to this project.
3. Provide drawings at sufficient scale to show details clearly on same size sheets as Drawings.
4. Show required coordination with work of other trades.
5. Identify details and show their locations in Project.
6. Include description of configuration and operation of proposed systems.
7. Include outline drawings of proposed equipment in plan and elevation views including overall dimensions, weights, and clearance required.
8. Include one-line electrical diagrams required for control and sensing.
9. Request floor plan backgrounds in electronic format from the A/E.
10. Direct use of the Drawings as the basis of Contractor’s prepared Shop Drawings not acceptable.
11. Format:
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 3 CD SET
a. PDF file format.
D. Approval: Approval of a manufacturer’s name or product by the A/E does not relieve the
Contractor of the responsibility for providing materials and equipment which comply in detail with requirements of the Contract Documents.
E. Re-Submittals: Clearly identify re-submittals. Provide revised tabs, indexes, page renumbering, and other formats to interface with original submittal. Identify changes and include date for project tracking.
F. Schedule of Values:
1. Comply with the requirements in Division 01 with additional requirements as indicated in this paragraph.
2. Include costs in Schedule of Values as follows:
a. Mobilization.
b. Submittals.
c. Electrical Permit.
d. Electrical Site – Utility Provisions, Material.
e. Electrical Site – Utility Provisions, Labor.
f. Electrical Site – Power and Low Voltage, Material.
g. Electrical Site – Power and Low Voltage, Labor.
h. Power Systems – Switchgear, Disconnects, Material.
i. Power Systems – Switchgear, Disconnects, Labor.
j. Power Systems – Feeder Raceway Rough-in, Material.
k. Power Systems – Feeder Raceway Rough-in, Labor.
l. Power Systems – Feeder Conductor, Material.
m. Power Systems – Feeder Conductor, Labor.
n. Power Systems – Equipment Connections.
o. Power Systems – Branch Circuit Raceway Rough-in, Material.
p. Power Systems – Branch Circuit Raceway Rough-in, Labor.
q. Power Systems – Branch Circuit Wiring, Material.
r. Power Systems – Branch Circuit Wiring, Labor.
s. Power Systems – Devices & Trim, Material.
t. Power Systems – Devices & Trim, Labor.
u. Punch List and Close Out.
v. Testing Commissioning and Training.
1.5 CLOSEOUT SUBMITTALS
A. Initial Closeout Submittal: Submit draft copy of the closeout documents at least [30] days before commencing demonstration or training. The A/E will review and comment on whether general scope and content are acceptable
1. Correct or revise each manual to comply with A/E comments
B. Final Closeout Submittal: Submit each closeout document in final form prior to requesting inspection for Substantial Completion
C. Closeout Documents include the following:
1. Operation and Maintenance Manuals: identified in Section 260823.
2. Record Drawings: identified in Section 260823
3. Test Reports and Certificates: identified in Section 260823
4. Warranties: identified in Section 260823
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 4 CD SET
5. Certifications: Submit written certifications from the governing building authorities stating that work has been inspected and accepted, and complies with applicable codes and ordinances.
1.6 DEFINITIONS AND ABBREVIATIONS
A. Refer to Division 01 for definitions and abbreviations. Additional definitions and abbreviations are as follows.
B. “Approved” or “Approval” means written approval by the owner or “Owner’s agent” (A/E).
C. “Codes” means AHJ adopted codes, rules, and ordinances and additional codes as specified herein.
D. “Concealed” means spaces out of sight. For example, above ceilings, below floors, between double walls, furred-in areas, pipe and duct shafts, and similar spaces.
E. The word “Contractor”, as used in Divisions 26, 27, and 28 sections, means the electrical subcontractor.
F. “Coordination”, “Coordinating”, and “Coordinate” means to bring, or the bringing, into a common action, movement, or combination so as to act together in a smooth concerted way.
G. “Demolition”, “Demo”, “Demolish” means to disconnect, remove and properly dispose of existing devices, components, equipment.
H. “Directed”, “Requested”, “Accepted”, and Similar Terms means these terms imply “by the
A/E” unless otherwise indicated.
I. “Exposed” means open to view. For example, raceways installed in a tunnel or raceways installed in a room and not covered by other construction.
J. “Furnish” means supply and deliver to the project site ready for unloading, unpacking, assembly, installation, and similar activities.
K. “Indicated” and “Indicated on the Drawings” means shown on Drawings by notes, graphics or schedules, or written into other portions of Contract Documents. Terms such as “shown”, “noted”, “scheduled” and “specified” have same meanings as “indicated”, and are used to assist the reader in locating particular information.
L. “Install” means to place in position for service or use. Includes operations at project site, such as unloading, unpacking, assembly, erection, placing, preserving, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar activities.
M. “PDF file format” means a searchable Portable Document Format. These files are either created from searchable source document that contains text replicated into the PDF or by creating a searchable PDF by scanning the documents and applying Optical Character
Recognition and having all text be recognized.
N. “Provide” means furnish and install for a complete, finished, and operable system and ready for intended use.
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 5 CD SET
O. “Shop Drawings” means Document which fully details equipment and intended installation relative to this specific Project.
P. “Structural Members” means all above and below grade elements associated with the structural support of the building or structure.
Q. “Substantial Completion” means that the entire project (or readily definable portion thereof if so designated in the Contracted Documents) is acceptable to code enforcement authorities and to extent required by such authorities, has been inspected and approved by such authorities, and is suitable for occupancy by the Owner or occupant for the purpose intended. Refer to Divisions 00 and 01 for additional requirements.
R. “Work” or “Project” means entire scope of work required by the Contract Documents.
S. Abbreviations:
A/E Engineer ADS Acoustical Distinguishable Space AFCI Arc Fault Circuit Interrupter AHJ Authorities Having Jurisdiction ANSI American National Standards Institute ASTM American Society for Testing and Materials ATP Acceptance Test Procedure BMS Building Management System BOM Bill-of-Material C Degrees Celsius CEC Canadian Electrical Code CCT Correlated Color Temperature CIS Common Intelligibility Scale CSA Canadian Standards Association CR Controlled Receptacle CRI Color Rendering Index CU Coefficient of Utilization DAS Distributed Antenna System EBS Educational Broadband Service EMS Energy Management System EMT Electrical Metallic Tubing EPO Emergency Power Off ETL Environmental Technology Laboratory EUSERC Electric Utility Service Equipment Requirements F Degrees Fahrenheit FC Foot-candle FM Factory Mutual Engineering Corporation GB Ground Fault Circuit Interrupter Breaker GFCI Ground Fault Circuit Interrupter GFI Ground Fault Circuit Interrupter GUI Graphical User Interface HDPE High-density polyethylene HID High-intensity discharge HVAC Heating, Ventilation and Air Conditioning IC Insulation contact IBC International Building Code IDF Intermediate distribution frame IEC International Electrotechnical Commission IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 6 CD SET
IMC Intermediate Metal Conduit K Kelvin kVA Kilo Volt Amps LED Light-emitting diode LPI Lightning Protection Institute MC Metal Clad MDF Main distribution frame NEC National Electrical Code, NFPA 70 (latest adopted edition with
Amendments) NEMA National Electrical Manufacturer's Association NETA International Electrical Testing Association NFPA National Fire Protection Association NRTL Nationally Recognized Test Laboratory OSHA Occupational Safety and Health Administration PCB Polychlorinated Biphenyl PDU Power Distribution Units PF Power factor RMC Rigid Metal Conduit RMS Root Mean Square RTRC Reinforced thermosetting resin conduit SCCR Short Circuit Current Rating SPD Surge Protective Devices STC Factory Standard Test Condition STI Sound transmission index STIPA STI for public address systems TCLP Toxicity characteristic leaching procedure THD Total Harmonic Distortion TIA Telecommunications Industry Association UL Underwriters Laboratories Inc.
UPS Uninterruptible Power Supply V Volts VOIP Voice Over Internet Protocol VRLA Valve Regulated Lead Acid Batteries
1.7 MATERIALS
A. Where two or more manufacturers are listed, select for use any of those listed. The first mentioned, in general, was used as the basis of design. Bids on any manufacturer named acceptable as long as that manufacturer meets every aspect of the Contract
Documents. Note that equipment layout is based on equipment listed in equipment schedules.
B. Ensure that equipment will fit within available space. Where other than basis of design manufacturer is selected for the Project, the Contractor is responsible for verifying equipment will fit within available space and meet manufacturer’s and code required clearances.
C. Where other than basis of design manufacturer is selected for the Project, include cost of resulting additional work, coordination with other trades, and redesign of associated building services and structure as required to accommodate selected equipment. Include redesign drawings with submitted Shop Drawings.
D. Include costs in base bid for required redesign work by A/E to accommodate proposed
Product. The Owner will compensate Engineer through the A/E at rate of $150.00 per hour for time and expense for required review of submittals and additional coordination
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 7 CD SET
for redesign work. Amount of compensation will be deducted from Final Payment to the
Contractor.
1.8 STANDARDS OF QUALITY
A. Materials and Equipment: UL listed and labeled or other AHJ approved testing laboratory and in compliance with other industry standards as specified.
B. Provide manufacture’s regularly catalogued items and supply as a complete unit in accordance with manufacturer’s standard specifications and any optional items required for proper installation for equipment unless otherwise noted. Install equipment and materials in accordance with the manufacturer’s recommendations and best trade practices.
C. Provide new products unless indicated otherwise in the Contract Documents.
D. Fabricator and Manufacturer Qualifications: Specialists with at least 5 years’ experience and regularly engaged in manufacture of equipment and materials specified.
E. Furnish products of a single manufacturer for items which are used in quantity. A
Product, for the purpose of this paragraph, is an assembly of components such as switchboards, transformers, panelboards, and similar items. Materials such as wire and cable, raceways, outlet boxes, and similar items not requiring maintenance are not included in the single manufacturer requirement of this paragraph.
F. Installer Qualifications: Specialists with at least 5 years’ experience and regularly engaged in the installation of the system, equipment, and materials specified. Where required by the AHJ, employ licensed trades persons.
1.9 SUBSTITUTIONS
A. Comply with requirements in Division 01 with additional requirements indicated in this article.
B. Substitutions will be considered following bid award only when a product becomes unavailable through no fault of the Contractor.
C. Where “Manufacturer” paragraphs include the words "or approved", prior approval of the proposed substitution is required. The A/E is sole judge of quality of proposed substitution.
D. When the A/E approves a substitution request, the approval is given with the understanding that the Bidder:
1. Has investigated proposed Product and determined that it meets or exceeds the quality level of the specified Product.
2. Will provide the same warranty for the Substitution as for the specified Product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to Owner.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
E. Whenever a Product is described by detail, specification, trade name, manufacturer's name or catalog reference, use only such Product, unless written approval is given for
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 8 CD SET
substitution prior to bid. Submit written requests on substitution request form included in
Division 01. Approved substituted manufacturers will be listed by Addendum.
F. Provide as specified certain products, materials, and systems where “manufacturer” paragraphs are followed by the words “no substitutions”.
G. Substitutions will not be considered when they are indicated or implied on Shop Drawings or product data submittals, without separate written prior approval, or when approval will require revision to the Contract Documents.
1.10 DRAWINGS AND SPECIFICATIONS
A. General: The electrical drawings are diagrammatic. Complete details of building features which affect electrical installation may not be shown. For additional details, refer to other Contract Documents. Report any discrepancies to the A/E along with suggested revisions. Obtain written response from the A/E before proceeding with changes.
B. Depiction of Work: Drawings do not show the exact characteristics of the work including, physical arrangement of equipment, lengths of wiring or conduit runs. Base work on actual field measurements and conditions. Provide work required to complete the installation.
C. Dimensions: Do not scale drawings. Dimensional accuracy is not guaranteed, and field verification of dimensions, locations, and levels to suit field conditions is required.
D. Since the Drawings of floor, wall, and ceiling installation are made at small scale, outlets, devices, equipment, and similar items are indicated only in their approximate location.
Locate outlets and apparatus symmetrically on floors, walls, and ceilings where not dimensioned and coordinate such locations with work of other trades to prevent interferences.
E. Discrepancies: Field verify dimensions and existing conditions prior to performing work.
Bring to the A/E’s attention any discrepancies within the Contract Documents and between the Contract Documents and field conditions. Also for any design and layout changes required due to specific equipment selection, prior to the Contractor’s work
(equipment and material purchasing and installation). Provide corrective work required after discovery of such discrepancies, inconsistencies, or ambiguities at no additional cost to the Owner.
F. Specifications: These specifications are written in imperative mood and streamlined form. The imperative language is directed to the Contractor, unless specifically noted otherwise. The words “shall be” are included by inference where a colon (:) is used within sentences or phrases.
1.11 RECORD DRAWINGS
A. Comply with requirements in Division 01, with additional requirements as indicated in this article.
B. Prepare As-Built drawings: Red line As-Built Drawing prints in digital or hand drawn format (pencil and black pen not acceptable). Include:
1. Corrections and Changes: Record during the progress of the Work, showing work as actually installed.
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 9 CD SET
a. Show the measured locations of portions of the Work and changes the
Contractor has made.
b. In general, tolerance plus or minus 1’-0” from actual location.
c. Show addendum items, change orders, clarifications, supplemental instructions, and deviations from the Drawings. Show device or equipment changes and indicate where the change was originated. Only indicating the document where the change originated from will not be accepted.
2. Updates: Neatly hand-draft on daily basis and kept readily available at project site. Updates are subject to review by the A/E on a regular basis throughout construction. Updates are to include the following at a minimum:
a. Feeder routing indicating upstream and downstream equipment.
b. Installation locations for underground raceways and where they transition to above grade.
c. Device locations and mounting heights.
d. Junction and pull boxes with two or more home runs.
e. Junction and pull boxes with one home run.
f. Circuit information.
g. Shop Drawings: Update shop drawings with changes or deviations from the Original Shop Drawings. Provide updates to manufacturer/vendor for inclusion in Record Drawings.
C. Record Drawings: Develop a digital set of Record Drawings for the project utilizing the as-built drawings. Hand drawn comments or markups to be transferred into a digital markup (scans of the as-builts will not be accepted). Digital Record Drawings can be in
AutoCAD or PDF format. At end of construction, check drawings for completeness and accuracy.
D. Shop Drawing Record Drawings: Provide updated shop drawings based on As-Built drawings for use as Record Drawings.
E. Per project closeout procedures, submit in Digital Record Drawings and a copy of the As-
Builts. Note each sheet as “RECORD DRAWING”.
1.12 COORDINATION
A. Coordinate Divisions 26, 27, and 28 work with other trades.
B. Be aware of restricted space for installation of electrical systems. Include offsets and perform rerouting and coordination to fit elements in available space. Include provisions for such requirements in bid.
C. Electrical equipment and systems shown are based on existing drawings as available and on limited project site observations to the extent possible under current conditions.
Field verify existing conditions prior to commencement of work. Obtain specific locations of structural and architectural features or equipment items from referenced drawings, field measurements, or trade providing material or equipment.
D. Coordinate raceway installations to clear light fixtures and electrical cable trays. Include clearance over light fixtures to allow removal and replacement. Include minimum 6 inch clearance above and to sides of cable trays.
E. Existing Conditions:
1. General Construction:
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 10 CD SET
a. Installation of electrical, telecommunications, and electronic safety and security work will require openings, removal and replacement of ceilings, sleeves, and restoration of general construction to match existing. Some work occurs in areas not requiring alterations as part of architectural work. Coordinate new openings and restoration work so that there is no additional cost to the Owner.
b. General construction work shown on the architectural drawings may require removal, relocation, and reinstallation of existing electrical, telecommunications, electronic safety and security work. Since existing conditions cannot be completely detailed on the Drawings, survey the site and perform required Work at no additional cost to the Owner.
2. This project may require work in the presence of asbestos containing material
(ACM). Division 26 does not provide for or cover the identification, removal, incapsulation, or disposal of such material. If the presence of ACM is suspected, notify the Owner and general contractor prior to proceeding with in the vicinity of
ACM.
F. Be responsible for beam penetrations as they relate to the electrical work. Submit sizes and locations to the structural engineer for review and determination of structural details.
G. Coordinate attachments to structure to verify that attachment points on equipment and structure can accept seismic, weight, and other loads imposed.
1.13 QUALITY OF WORK
A. Provide work in accordance with best trade practices. Remove substandard work and provide new material at no extra cost to the Owner.
1.14 SITE VISIT
A. Visit site during bidding period to note conditions affecting installation of Work. No additional charges allowed due to failure to adequately review conditions.
B. Investigate each space through which equipment must be moved. Where necessary, arrange with equipment manufacturers to ship equipment in sections with suitable dimensions for moving through restricted spaces. For movement through occupied spaces, ascertain from the Owner as acceptable times of day or night that movement could occur. Include costs in bid for off hours labor, reassembly, and field testing.
1.15 CERTIFICATION
A. By submitting a bid for the electrical, telecommunications, electronic safety and security systems, the Contractor and his subcontractors acknowledge and certify the following:
1. That they have carefully examined and fully understand the Drawings and
Specifications (including but not limited to architectural, site, utility, mechanical, structural and electrical drawings and specifications. In addition, they have determined that the Drawings and Specifications are adequate to complete the electrical systems and that they can provide a complete finished and operable system in accordance with the Contract Documents.
2. That they have had a reasonable opportunity to discover any ambiguities in the
Contract Documents and such ambiguities have been brought to the attention of the A/E in writing prior to submitting the bid.
3. That they have reviewed the project progress schedule with the general contractor, fully understand the schedule, and they have verified, prior to
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 11 CD SET
submitting a bid, availability of necessary labor and materials, including supervision and office backup, and can comply with the schedule requirements.
4. That there may be changes to the scope of work and that they understand that any proposal submitted for performance of additional work includes costs associated with such change including but not limited to labor, materials, subcontracts, equipment, taxes, fees, schedule impact, loss of efficiency, supervision, overhead and profit.
5. That the Contract requires them to coordinate their work with that of other trades and that responsibility for coordination includes rerouting, offsets, and similar provisions, to fit Work and address manufacturer’s recommended clearances for service access, maintenance, and replacement of equipment in a manner that is compatible with work of other trades in the same area.
6. That routing of elements of electrical systems shown on the Drawings is schematic only and that offsets and rerouting probably will be required in installation and that labor and materials have been included for such in their bids.
7. That they understand submittals of material and equipment to the A/E is for the purpose of establishing what they are providing for the project. Any review undertaken by the A/E does not relieve them of their responsibilities to furnish and install materials and equipment required for work in the project nor does such review relieve them of their responsibilities for coordination with other trades and designers to ensure that such materials and equipment will fit and be suitable for purpose intended.
8. That they agree to receive payment for bid amounts as full compensation for furnishing materials and labor which may be required in prosecution and completion of work required under the Contract Documents, and in respects to complete the contract work to the satisfaction of the A/E.
9. That they include in their bids costs to furnish bonds as specified in the Contract
Documents.
1.16 WARRANTY
A. Conform to requirements in General Conditions, Supplementary Conditions, and
Division 01. Where not so prescribed or defined, provide for a period of 1 year.
B. Warranty periods within Divisions 26, 27, and 28 are based on industry standard warranty periods and commence on the Substantial Completion date. Provide extended factory warranties as required to account for the difference between standard factory warranty start time and date of the Substantial Completion.
1.17 EQUIPMENT FURNISHED BY OWNER INSTALLED BY CONTRACTOR (FOIC)
A. Material Handling and Delivery: Coordinate delivery of FOIC equipment. Receive, off load, transport, store, hoist, unpack, dispose of packing, same as for other project equipment arriving at job site. Requirements of the Contract Documents apply to FOIC equipment.
B. Operation and Maintenance Data: Obtain from the Owner operation and maintenance data for the FOIC equipment and incorporate them into the Operations and Maintenance
Manuals.
C. Start-up and Warranty:
1. FOIC equipment suppliers will pass on to the Contractor start-up information, maintenance and parts information, and warranty provisions of their products in
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 12 CD SET
accordance with the equipment suppliers contract requirements. Organize and coordinate start-up and warranty requirements for the FOIC equipment.
2. Include one year warranty on FOIC equipment starting at Substantial Completion regardless of shorter time limits by FOIC suppliers.
1.18 DEMONSTRATION
A. Comply with requirements in Division 01 with additional requirements indicated in this article.
B. Following installation of electrical work and prior to final acceptance, demonstrate that equipment and systems operate as indicated in the Contract Documents and in accordance with manufacturer’s recommendations.
C. Perform in presence of the A/E and Owner’s representative, unless otherwise directed by the A/E. Give minimum 1 week notice prior to demonstrations.
D. Provide instruments and personnel required to conduct demonstrations.
1.19 SUBSTANTIAL COMPLETION
A. Comply with requirements in Division 01.
B. Prepare list of items that are not complete prior to asking for a substantial completion review by the A/E.
1.20 ALTERNATES
A. General: See Bid Form and Alternates described in Division 01 for possible effect on work of Divisions 26, 27, and 28.
1.21 TESTING
A. Comply with requirements in Section 260810.
1.22 PROJECT TRAINING
A. Upon completion and testing of equipment and system installation, assemble equipment factory representatives and subcontractors for system training with Owner's representatives as required in specific specification sections.
B. Provide representative and subcontractor assistance in start-up, check out, and training for their respective system and remain on-site until the total system operation is thoroughly reviewed by the Owner's representatives and are thoroughly trained. Return for additional training sessions as required to completely train Owner's Representatives.
C. Provide factory representative and system subcontractor personal instruction on operating and maintenance of their equipment to the Owner's maintenance and operation personnel. To certify acceptance of operation and instruction by the Owner's representative, prepare a written statement as follows:
1. This is to certify that the factory representative and system subcontractor for each system listed below have performed start-up and final check out of their respective systems.
PIERCE COUNTY
ANNEX EVSE SERVICE 260500 - 13 CD SET
2. The Owner's maintenance and operation personnel have received complete and thorough instruction in the operation and maintenance of each system.
SYSTEM FACTORY REPRESENTATIVE
(List systems included) (List name and address of factory representative).
Owner's Representative Contractor
D. Submit copy of acceptance to A/E.
1.23 PUNCHLIST AND FINAL REVIEWS
A. Provide electrical foreperson assistance at the time of punchlist and final reviews and accompany the reviewing party, and remove coverplates, panel covers and other access panels as requested to allow review of entire electrical system.
B. Punch List: Review each punch list item; update field conditions to address items or provide comment response for reason the item has not been addressed in the field.
1.24 PROJECT CLOSEOUT
A. Include costs of engineering services required beyond the final completion date paid by the Contractor at a rate of $150 per hour.
B. Punchlists by A/E at Substantial Completion and final completion dates. Submit Record
Drawings and final Operation and Maintenance Manuals prior to Substantial Completion date. Subsequent reviews paid by the Contractor at a rate of $150 per hour.
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
Not used.
END OF SECTION 260500
SECTION 260510
BASIC ELECTRICAL MATERIALS AND METHODS
PIERCE COUNTY
ANNEX EVSE SERVICE 260510 - 1 CD SET
GENERAL
1.1 SECTION INCLUDES
A. Description: Work includes basic electrical requirements specifically applicable to
Divisions 26, 27, and 28 sections including general material and installation requirements and site work.
B. General Requirements: Drawings and general provisions of the Contract, including
General and Supplementary Conditions and Division 01 sections apply to the Work in this section.
1.2 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with applicable city, county, and state codes and ordinances.
B. UL Compliance: Where UL fire-resistance rating is indicated for construction penetrated by access units, furnish UL listed and labeled units, except for those units which are smaller than minimum size requiring ratings as recognized by governing authority.
C. Codes and Standards:
1. ASTM D 1557, Standard Test Methods for Laboratory Compaction
Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3).
1.3 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, and handle products in accordance with manufacturer’s recommendations, using means and methods to prevent damage, deterioration, and loss, including theft.
B. Deliver products to site in manufacturer’s original containers, complete with labels.
C. Inspect products upon delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.
D. Store products subject to damage by weather conditions above ground, under cover in weathertight enclosure, with ventilation adequate to prevent condensation. Maintain temperature and humidity within range required by manufacturer’s instructions.
PRODUCTS
2.1 GENERAL
A. Furnish specified items acceptable to AHJ as suitable for intended use.
B. New, unless otherwise indicated, free from defects and the standard products of reputable manufacturers regularly engaged in production of such equipment.
C. Furnish similar items of equipment by same manufacturer.
D. Materials and Equipment: UL listed and labeled or other AHJ approved testing laboratory and in compliance with other industry standards as specified.
PIERCE COUNTY
ANNEX EVSE SERVICE 260510 - 2 CD SET
E. Remove rejected or damaged material from site.
F. Samples may be required for non-standard or substituted items before installation.
Submit samples as required in specific specification sections.
G. Furnish required items necessary for installation and testing procedures.
2.2 POSTED INSTRUCTIONS
A. Posted Operating Instructions: Furnish simplified, consolidated equipment control and power diagrams. Graphically represent entire system and actual equipment installed.
Include concise written instructions on how to start and stop systems. Show settings and conditions to be observed. Indicate what control adjustments are to be made or maintained by the operator.
1. Include control diagrams and specific operating instructions.
2. Indicate how to energize each major component of systems. Show what action must be taken in an emergency, how to restore power following an outage, and what precautions to be taken when maintenance is required.
3. Include photographic or comparable non-fading reproductions, either framed under glass or encased in non-discoloring plastic.
4. Include one-line diagrams of electric power distribution riser.
B. Copies of operating instructions shall be used with Operation and Maintenance Manuals as basis in training Owner's employees in the operation and maintenance of systems and related installed equipment.
2.3 ENCLOSURES
A. NEMA Type 1 – Dry Interior locations unless otherwise noted on drawings or as specified below.
B. NEMA 3R Weather-proof/Rain-proof – Windblown rain, sleet, ice – Provide in all locations where exposed to moisture unless otherwise noted.
C. NEMA 4 – Water-tight/Rain-tight – Splashing and hose directed water, windblown dust, ice.
EXECUTION
3.1 EXAMINATION
A. Verify installation conditions as satisfactory to receive work of the various sections. Do not install until unsatisfactory conditions are corrected.
3.2 INSPECTIONS
A. Confirm that installations have been inspected before enclosure within building features, buried, or otherwise hidden from view. Pay costs associated with uncovering or exposing installations and features not previously inspected and for repair to exposed surfaces.
3.3 PREPARATION
A. Protect surrounding areas and surfaces to prevent damage as work is installed.
PIERCE COUNTY
ANNEX EVSE SERVICE 260510 - 3 CD SET
B. Obtain equipment roughing-in dimensions from approved Shop Drawings or actual measurements.
C. Be familiar with the location of other trade's equipment. Eliminate conflicts. Check door swings before installing switches. Locate switches on strike side of doors unless noted otherwise.
D. Layout electrical, telecommunications, and electronic safety and security work in advance of construction to eliminate unnecessary cutting, drilling, channeling, and similar activities. Where such cutting, drilling, channeling and similar activities become necessary for proper installation, perform with care using skilled mechanics of trades involved. Repair damage to building and equipment at no additional cost to the Owner.
E. Perform cutting work of other trades only with consent of that trade. Cutting structural members not permitted without consent of the A/E.
3.4 INSTALLATION
A. Install Work as specified and in accordance with the Drawings and manufacturer's instructions. Where these conflict, manufacturer's instructions govern.
B. Review Architectural, Mechanical and other applicable drawings and applicable Shop
Drawings to prevent switches, outlets, and other equipment from being hidden behind doors, cabinets, counters, heating equipment, and similar items, or from being located in whiteboards, tackboards, glass panels, and similar items. Relocate electrical devices and connections as directed by the A/E at no additional cost to the Owner if the work is not properly coordinated.
C. Where conduit, outlets, and apparatus are encased in concrete, locate and secure at point of installation. Check locations of electrical items before and after concrete and masonry installation and relocate displaced items.
D. Provide block-outs, sleeves, demolition work, and similar items required for installation of
Work specified in this division.
3.5 WORKMANSHIP
A. Work and materials will be subject to observation at any time by the Owner and the A/E.
B. Install material and equipment in accordance with manufacturer's instructions. Provide calibrated torque wrenches and screwdrivers as required.
C. Cutting and Patching: Do not weld to, cut, or notch structural members or building surfaces without approval of the A/E. Restore surfaces neatly to original condition after cutting, channeling, chasing, and drilling of walls, partitions, ceilings, paving, and anchorage of conduit, raceways, and other electrical equipment.
3.6 WELDING, CUTTING, AND DRILLING
A. Perform in accordance with American Welding Society Standards.
PIERCE COUNTY
ANNEX EVSE SERVICE 260510 - 4 CD SET
3.7 EARTHWORK
A. Perform earthwork required for installation of electrical work below grade. Provide earthwork meeting requirements in this article and Division 31, whichever is most stringent. Provide earthwork meeting requirements of the serving utility company where earthwork is related to utility infrastructure.
B. Locate and protect existing utilities and other underground work in manner which will ensure that no damage or service interruption will result from excavating and backfilling.
Perform excavation in a manner which protects walls, footings, and other structural members from being disturbed or damaged in any way.
C. Place and maintain barricades, warnings, construction signs, illumination and guards as required during periods of open excavation to protect persons from injury and to avoid property damage. Provide bracing and shoring as necessary to maintain stability of excavation and to comply with safety codes.
D. Coordinate excavations with weather conditions to minimize possibility of washouts, settlements and other damages and hazards.
E. Do not excavate until required materials are on site and the Work is ready to proceed without delay, so that total time lapse from excavation to completion of backfilling will be minimal. Refer to other sections for additional requirements for excavating.
F. Store excavated material (temporarily) near excavation in manner which will not interfere with or damage excavation or other work.
G. Retain excavated material which complies with requirements for backfill material.
Dispose of excavated material which is either in excess of quantity needed for backfilling or does not comply with requirements for backfill material. Remove unused material from project site and dispose of in lawful manner.
H. Backfill trenches only after observation by the A/E. Install backfill material under, around, and between conduit and sides of trench by hand, shovel tamped in place. Cover in 6 inch layers to 12 inch thickness over top of conduit or cabling. For final backfill, fill and tamp remainder of backfill material in 6 inch layers. Provide backfill materials as follows for buried conduit or cable (other than concrete encased):
1. Backfill below, on sides of, and over conduit or cable: Sand or pea gravel.
Minimum thickness of 6 inches above, below and at sides of outer conduits.
Minimum 3” spacing between conduits.
2. Backfill to within 6 inches of Final Grade: Soil material suitable for compacting to required densities. Per Division 31requirements.
3. Backfill for top 6 Inches of excavation: Top soil except where excavations occur below paved or gravel area provide compacted gravel backfill or surface area as indicated.
I. Compacting:
1. Perform compacting individually, for each 6 inch layer (maximum) loose thickness of initial and final backfill. Comply with ASTM D 1557. Where roadway or parking area surfaces will be placed over backfill, and to 10 feet beyond building perimeter, compacted to 95 percent of maximum density. Elsewhere, 90 percent. Test in accordance with Divisions 1 and 31.
PIERCE COUNTY
ANNEX EVSE SERVICE 260510 - 5 CD SET
2. Take special care in compacting under services where they enter building to prevent settling. Contractor fully responsible for damage to piping and property as a result of settling around service conduit and cabling.
J. Subsidence: Where subsidence is measurable or observable at electrical work excavations during project warranty period, remove surface (pavement, lawn or other finish), add backfill material, compact, and replace surface treatment. Restore appearance, quality, and condition of surface or finish to match adjacent work and eliminate evidence of restoration to greatest extent possible.
3.8 CONCRETE BASES
A. Unless noted otherwise, provide 4 inch high reinforced concrete bases for floor mounted and floor standing electrical equipment, including generators, transformers, switchgear, battery racks, motor control centers, and similar equipment. Extend bases 4 inches beyond equipment or mounting rails in each direction unless noted otherwise on the
Drawings.
B. Concrete bases shall be provided under Division 26. Coordinate size and location of bases and provide required anchor bolts, sleeves, and templates required to obtain proper installation.
C. Provide concrete pads and vaults for power company furnished pad mounted transformers in accordance with power company clearance requirements.
3.9 CLEANING
A. Clean equipment, conduit, and fittings and remove packing cartons and other debris created by Divisions 26, 27, and 28 Work.
B. Before Substantial Completion, carefully clean equipment, fixtures, exposed raceways and similar items. Remove construction labels, dirt, cuttings, paint, plaster, mortar, concrete, and similar items. Clean fixtures, interiors and exteriors of equipment and raceways.
3.10 IDENTIFICATION
A. Provide nameplates and decals required to identify equipment and components, comply with requirements in Section 260553.
B. Mount operating instructions and diagrams near equipment or elsewhere as otherwise designated by the Owner.
3.11 PROTECTION
A. Protect equipment during and after electrical hookup, painting, and final testing.
END OF SECTION 260510
SECTION 260511
ELECTRICAL CONNECTIONS FOR EQUIPMENT
PIERCE COUNTY
ANNEX EVSE SERVICE 260511 - 1 CD SET
GENERAL
1.1 SECTION INCLUDES
A. Description: Work includes final electrical connection to equipment having electrical requirements. Contractor shall make final connections for Owner furnished equipment including switches, receptacles, and similar items. See other applicable specification sections for building temperature control wiring requirements specified in Divisions 21, 22, and 23.
B. General Requirements: Drawings and general provisions of the Contract, including
General and Supplementary Conditions and Division 01 sections apply to Work in this section.
C. Connection to Equipment Specified in Divisions 21, 22, and 23 as Follows unless
Specified Otherwise in Divisions 21, 22, and 23:
1. For motorized only equipment with built-in controllers (packaged equipment), Connect power and provide an external disconnect at equipment. Division 23 will provide control wiring.
2. For motorized only equipment with external controller (non-packaged equipment), provide external motor controller, disconnect switch, and make power wiring complete to equipment. Division 23 will provide control wiring.
3. For electric duct heaters with built-in controllers (packaged type equipment), connect power complete and provide external disconnect switch at equipment.
Division 23 will provide control wiring.
4. For electric duct heaters with remote controllers (non-packaged type equipment), provide external controller, disconnect switch, and make power wiring to equipment. Division 23 will provide control wiring.
5. For combination motorized and electric heating packaged units specified with built in controllers and specified with “single point electrical connection” under
Division 23, connect power and provide external disconnect switch. Division 23 will provide control wiring.
6. For equipment requiring a full voltage non-reversing starter, include as a combination disconnect unit.
D. Refer to Division 23 sections for control system wiring.
E. Refer to sections of other divisions for specific individual equipment power requirements.
1.2 QUALITY ASSURANCE
A. Regulatory Requirements: Comply with applicable city, county, and state codes and ordinances.
B. NEC Compliance: Comply with applicable portions of NEC as to type of products used and installation of electrical power connections.
C. Comply with applicable NEMA standards and refer to NEMA standards for definitions of terminology herein. Comply with NEC for workmanship and installation requirements and to applicable Division 26 sections.
D. UL Labels: Provide electrical connection products and materials which have been UL listed and labeled.
PIERCE COUNTY
ANNEX EVSE SERVICE 260511 - 2 CD SET
PRODUCTS
2.1 ELECTRICAL CONNECTIONS MATERIALS
A. For each electrical connection indicated, include complete assembly of materials, including but not limited to, raceways, conductors, cords, cord caps, wiring devices, pressure connectors, terminals (lugs), electrical insulating tape, heat-shrinkable insulating tubing, cable ties, solderless wire nuts, and other items and accessories to complete splices, terminations, and connections.
B. Comply with requirements in Section 260519 for wires and cables, Section 260533 for raceway systems, and Section 262726 for wiring devices.
C. Include Final Connections for Equipment Consistent with the Following:
1. Permanently Installed Fixed Equipment: Flexible seal-tite conduit from branch circuit terminal equipment, and raceway to equipment, control cabinet, terminal junction box, and wiring terminals. Totally enclose wiring in raceway.
2. Movable and/or Portable Equipment: Wiring device, cord cap, and multi-conductor cord suitable for equipment and in accordance with NEC requirements.
3. Other methods as required by NEC and as required by special equipment and field conditions.
EXECUTION
3.1 INSTALLATION OF ELECTRICAL CONNECTIONS
A. Make electrical connections in accordance with connector manufacturer's written instructions and with recognized industry practices, and complying with requirements of
NEC and NECA's "Standard of Installation" to ensure that products fulfill requirements.
B. Connect electrical power supply conductors to equipment conductors in accordance with equipment manufacturer's written instructions and wiring diagrams.
C. Coordinate installation of electrical connections for equipment with installed equipment.
D. Verify electrical loads (voltage, phase, full load amperes, number and point of connections, minimum circuit ampacity, and similar characteristics) for equipment furnished under other divisions, by reviewing respective shop…