2026-MPW-162-DIV_02.pdf

PDF 117 KB Posted

Attached to
Annex EV Chargers
Solicitation number
2026-MPW-162
Issued by
Pierce County, Washington

About this file

This is a Demolition specification document (Section 024100) for Pierce County in Washington State, specifically for the Annex EV Chargers project located at 2401 S 35th Street, Tacoma, WA 98409. The specification outlines the demolition work required as part of a larger civil project that includes asphalt demolition, excavation of electrical conduit and camera trenches, and subsequent repaving. The demolition scope involves the removal, disposal, and salvage of materials as indicated on project plans, with backfilling of trenches, holes, or pits resulting from demolition activities. Work must comply with current Washington State Department of Transportation (WSDOT) Standard Specifications for Road, Bridge, and Municipal Construction and applicable Standard Plans, with contractors required to maintain one copy of current specifications and amendments on-site.

The specification establishes detailed execution requirements for demolition activities, including protection and maintenance of above-ground and subsurface utilities, power structures, and telecommunications infrastructure unless otherwise directed. Contractors must make clean, straight, vertical cuts between existing improvements to remain and portions to be removed, with fill material compacted to match surrounding ground levels per Section 310000 Earthwork requirements. Specific requirements are provided for asphalt and concrete demolition, with all removal activities meeting standards shown on project plans. The broader Annex EV Chargers project also includes electrical work for additional light poles, cameras, conduits, and communication infrastructure, along with installation of EV signage and pavement markings, with an alternate bid option for security cameras and telecommunications connectivity equipment.

View the file

Other files

File Type Posted
Kempower_Satellite_Unit_datasheet.pdf PDF
Kempower_Unit_datasheet.pdf PDF
2026-MPW-162_-_DIV_00.pdf PDF
Hazmat_Report.pdf PDF
Sample_ACM_Compliance.docx DOCX document
Hot_Work_Procedure.pdf PDF
Background_Check_Form.pdf PDF
2026-MPW-162-20260518_DWG_PC_Annex_EV_Infrastructure_-_CD_Dwgs.pdf PDF
2026-MPW-162-DIV_31.pdf PDF
2026-MPW-162-DIV_27.pdf PDF
2026-MPW-162-DIV_28.pdf PDF
2026-MPW-162-DIV_32.pdf PDF
2026-MPW-162-DIV_26.pdf PDF
2026-MPW-162-DIV_03.pdf PDF
2026-MPW-162-DIV_01_.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 024100

DEMOLITION

PIERCE COUNTY

ANNEX EVSE SERVICE 024100 - 1 CD SET

PART 1 GENERAL

1.01 DESCRIPTION OF WORK

A. Work includes removal, disposal, and salvage of materials, as indicated on the plans or directed by the Engineer. Work also includes backfilling of trenches, holes or pits that result from demolition.

1.02 RELATED DOCUMENTS

A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section.

B. The following Sections relate to this section:

1. Section 31 2500 - EROSION AND SEDIMENTATION CONTROLS

1.03 STANDARD SPECIFICATIONS

A. All work to be performed and materials to be used shall be in accordance with the current edition of the Standard Specifications for Road, Bridge, and Municipal Construction, and the current Standard Plans as published by the Washington State Department of Transportation (WSDOT), unless otherwise indicated herein.

B. Contractor shall have one (1) copy of the current edition of the Standard Specifications and all amendments therein, and applicable WSDOT Standard Plans at job site.

C. Standard Specifications apply only to performance and materials and how they are to be incorporated into the work. Legal/contractual relationship sections and the measurement and payment sections do not apply to this document.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION

3.01 GENERAL REQUIREMENTS

A. With certain exceptions, the Contractor shall raze, remove, and dispose of existing improvements and other obstructions that lie wholly or partially within the areas identified on the Plans. The exceptions are utility-owned equipment, items indicated to remain on the plans, and any other items the Owner may direct the Contractor to leave intact. The Contractor shall:

1. Protect and maintain all above-ground surface and subsurface utilities and pipes.

2. Protect and maintain all power and telecommunications structures and conduits, unless otherwise indicated on the plans.

3. Fill cavities left by the removal of structures. Fill shall be compacted to meet the requirements of Section 31 0000 EARTHWORK and shall match the level of the surrounding ground.

4. Make a clean, straight, vertical cut between any existing improvements to remain and the portion to be removed.

B. When salvageable material is to remain the Owner's property, the materials identified shall be removed as described herein or on the plans.

3.02 ASPHALT DEMOLITION

A. Make a clean, straight, vertical cut between all asphalt pavement to remain and the portion to be removed.

SECTION 024100

DEMOLITION

PIERCE COUNTY

ANNEX EVSE SERVICE 024100 - 2 CD SET

B. Asphalt removal and trenching shall meet the requirements shown in the Plans.

3.03 CONCRETE DEMOLITION

A. Make a clean, straight, vertical cut between all concrete to remain and the portion to be removed.

B. Concrete removal shall meet the requirements shown in the Plans.

END OF SECTION 024100