2026-MPW-162-20260518_DWG_PC_Annex_EV_Infrastructure_-_CD_Dwgs.pdf
PDF 12 MB Posted
- Attached to
- Annex EV Chargers
- Solicitation number
- 2026-MPW-162
- Issued by
- Pierce County, Washington
About this file
This is a Construction Documents (CD) set for an Electric Vehicle Service Equipment (EVSE) infrastructure project at Pierce County Annex in Tacoma, Washington, prepared by Hargis Engineers Inc. and KPFF Consulting Engineers. The project involves installing electric vehicle charging infrastructure in the parking lot adjacent to the Pierce County Annex building located at 2401 S 35th Street, Tacoma, WA 98409. The base scope includes installation of 15 Level 2 electric vehicle charging stations and 2 Level 3 DC fast chargers, with the electrical service sized to accommodate future expansion to 90 Level 2 chargers and 3 Level 3 chargers. Civil work encompasses asphalt demolition and restoration, installation of underground electrical and communications conduit trenches, security fencing modifications including a 12-foot automatic slide gate on the southeast portion and a 12-foot manual slide gate on the northwest portion, bollard installation, and parking lot modifications with EV stall striping. Bid Alternate #1 includes installation of 5 security cameras, OneReach fiber-to-Ethernet extender devices for both the Intermediate Distribution Frame (IDF) and camera side, and associated cabling to connect cameras to an existing telecommunications room switch. The electrical infrastructure requires a new Tacoma Power utility service connection with a 1000 kVA transformer, main switchboard with metering, and distribution panelboards to support Level 2 and Level 3 charging equipment. The project must comply with 2021 International Building Code, 2021 National Electrical Code, Washington State Energy Code, and local amendments.
The construction documents include comprehensive civil, electrical, and security design specifications with detailed site plans, equipment schedules, one-line diagrams, and installation details. The Level 2 charging stations are G9-40A units requiring 208V single-phase power at 8.3 kW each, while Level 3 chargers are Kempower units requiring 480V three-phase power with a 200 kW capacity per unit. The electrical service design includes surge protective devices, separate grounding systems, and conduit encasement at street crossings. Security features include access control systems with card readers at the pedestrian gate and vehicle gates, gate lock hardware with electrified controls, and IP security cameras as part of the alternate bid. All charging stations are owner-furnished and contractor-installed (OFCI), with Level 3 installations coordinated with a manufacturer's supervisor on-site. The project is in the construction documents phase with a release date of April 17, 2026, and contractor responsibilities include obtaining all required permits from the City of Tacoma, coordinating utility installations with Tacoma Public Utilities, conducting pre-construction meetings, verifying utility locations through call-before-you-dig procedures, managing traffic control and work phasing, implementing erosion control measures, and coordinating with the owner on final device locations and installation procedures. Funding source and contract award information are not specified in the design documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Kempower_Satellite_Unit_datasheet.pdf | ||
| Kempower_Unit_datasheet.pdf | ||
| 2026-MPW-162_-_DIV_00.pdf | ||
| Sample_ACM_Compliance.docx | DOCX document | |
| Hazmat_Report.pdf | ||
| Background_Check_Form.pdf | ||
| Hot_Work_Procedure.pdf | ||
| 2026-MPW-162-DIV_32.pdf | ||
| 2026-MPW-162-DIV_31.pdf | ||
| 2026-MPW-162-DIV_28.pdf | ||
| 2026-MPW-162-DIV_27.pdf | ||
| 2026-MPW-162-DIV_26.pdf | ||
| 2026-MPW-162-DIV_03.pdf | ||
| 2026-MPW-162-DIV_02.pdf | ||
| 2026-MPW-162-DIV_01_.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
SECURITY ENGINEER:
HARGIS ENGINEERS INC.
1201 THIRD AVE., SUITE 600
SEATTLE, WA 98101
PH: (206) 727-6530
RECORD ENG: BEN HELMS, P.E.
PM CONTACT: BEN HELMS
ben.helms@hargis.biz
BUILDING DATA
PROJECT TEAM
SCOPE AND CODE
PIERCE COUNTY - ANNEX
EVSE SERVICE
PROJECT NUMBER: 24-00003
PIERCE COUNTY ANNEX
2401 S 35TH ST
TACOMA, WA 98409
CD SET
APRIL 17, 2026
SHEET LIST
ELECTRICAL ENGINEER (PRIME):
HARGIS ENGINEERS INC.
1201 THIRD AVE., SUITE 600
SEATTLE, WA 98101
PH: (206) 448-3376
RECORD ENG: DOUG SVEE, P.E.
PM CONTACT: MARK MERRITT
MARK.MERRITT@HARGIS.BIZ
PROJECT SITE
GENERAL:
G0.01 PROJECT COVER SHEET
CIVIL:
C1.00 CIVIL SITE PLAN
C1.01 CIVIL SITE DETAILS
C2.00 CIVIL ENLARGED FENCE PLAN
C2.01 CIVIL GATE AND FENCE DETAILS
C2.02 CIVIL GATE AND FENCE DETAILS
ELECTRICAL:
E0.01 ELECTRICAL LEGEND, ABBREVIATIONS, AND GENERAL NOTES
E0.02 ELECTRICAL SCHEDULES
E1.01 SITE PLAN
E1.02 ENLARGED POWER SITE PLAN
E1.03 ENLARGED SECURITY SITE PLAN
E3.01 POWER FLOOR PLAN
E6.01 SECURITY FLOOR PLAN
E7.01 ENLARGED EQUIPMENT YARD
E8.01 ELECTRICAL DETAILS
E8.02 ELECTRICAL DETAILS
E8.03 ELECTRICAL DETAILS
E8.04 SECURITY DETAILS
E9.01 PARTIAL POWER ONE-LINE DIAGRAMS
E9.02 SECURITY ONE-LINE DIAGRAM
E9.03 SECURITY ONE-LINE DIAGRAM
E9.04 SECURITY ONE-LINE DIAGRAM
E10.01 PANEL SCHEDULES - EV SERVICE
E10.02 PANEL SCHEDULES - ANNEX
SCOPE OF WORK SUMMARY:
THE PROJECT SCOPE INCLUDES ADDING A NEW TACOMA POWER
SERVICE FOR ELECTRIC VEHICLE CHARGING STATIONS (EVCS) IN
THE FENCED AREA OF THE PARKING LOT ADJACENT TO THE PIERCE
COUNTY ANNEX BUILDING. THE SERVICE WILL BE SIZED FOR A
FUTURE TOTAL INSTALLATION OF (90) LEVEL 2 ELECTRIC VEHICLE
CHARGING STATIONS AND (3) LEVEL 3 DC FAST CHARGERS. THE
SCOPE OF THIS PROJECT WILL INCLUDE THE INSTALLATION OF (15)
LEVEL 2 ELECTRIC VEHICLE CHARGING STATIONS AND (2) LEVEL 3
DC FAST CHARGERS. THE CHARGING STATIONS WILL BE OWNER
FURNISHED, CONTRACTOR INSTALLED (OFCI). THE PROJECT ALSO
INCLUDES NEW ELECTRICAL DISTRIBUTION EQUIPMENT TO FEED
THE EVCS. A NEW MOTORIZED GATES WILL BE PROVIDED AT THE
SOUTH-EAST PORTION OF THE YARD AND A MANUAL VEHICLE GATE
AND REVISED FENCING WILL BE PROVIDED AT THE NORTH-WEST
PORTION OF THE YARD. THE EXISTING PEDESTRIAN GATE AT THE
SOUTH-WEST PORTION OF THE YARD WILL BE MODIFIED WITH
ACCESS CONTROL.
BID ALTERNATE #1:
UNDER BID ALTERNATE #1, PROJECT SCOPE INCLUDES ADDING (5)
SECURITY CAMERAS, ONE-REACH DEVICES ON BOTH THE IDF AND
CAMERA SIDES, AND ALL CABLING TO CONNECT THE CAMERAS TO
THE OWNER PROVIDED SWITCH IN THE TELECOMMUNICATIONS
ROOM. SEE SHEETS E0.02, E1.03, E8.04, AND E9.02 FOR ADDITIONAL
INFORMATION.
DESIGN CODES:
THIS PROJECT SHALL ADHERE TO THE FOLLOWING GOVERNING CODES,
INCLUDING WASHINGTON STATE AND CITY OF TACOMA AMENDMENTS:
2021 INTERNATIONAL BUILDING CODE
2021 INTERNATIONAL FIRE CODE
2021 WASHINGTON STATE ENERGY CODE
2021 NATIONAL ELECTRICAL CODE
WASHINGTON STATE ACCESSIBILITY CODE
PARCEL NUMBER: 7005000521
JURISDICTION: TACOMA, WASHINGTON
PROJECT LOCATION: TACOMA, WASHINGTON
LEGAL DESCRIPTION: SECTION 07 TOWNSHIP 20 RANGE 03 QUARTER 44
PRESCOTT PARK BEG AT SW COR OF L 1 B 16 TH N
ON W LI OF L 1 B 14 & 12 TO NW COR OF L 1 B 12 OF
TH W ON N LI OF SD BLK 12 & N LI OF BLK 21
JUNETTS ADD TO NW COR OF L 11 B 21 OF JUNETTS
ADD TH S ON W LI OF L 11 B 21, 22 & 27 TO SW COR
OF L 11 B 27 TH E ON S LI OF SD B 27 OF JUNETTS
ADD & S LI OF B 16 OF PRESCOTT PARK ADD TO BEG
INC VAC STS & ALLEYS TOG/W W 10 FT OF L 17 L 18 &
E 5 FT OF L 19 B 10 INC POR OF VAC ALLEY OUT OF
008-6 & 052-0 SEG L-0940 BM
PROJECT PARKING AREA
SQUARE FOOTAGE: 41,000
N
PARCEL MAP
N
PROPERTY LINE
PROJECT AREA
CIVIL ENGINEER:
KPFF CONSULTING ENGINEERS
612 WOODLAND SQUARE LOOP SE, SUITE 100
LACEY, WA 98503
PH: (360) 292-7230
RECORD ENG: MARK STEEPY, P.E.
PM CONTACT: CLINT PIERPOINT
clint.pierpoint@kpff.com
PIERCE COUNTY COUNCIL:
DAVE MORELL
PAUL HERRERA
AMY CRUVER
RYAN MELLO
MARTY CAMPELL
JANI HITCHEN
ROBYN DENSON
DISTRICT 1
DISTRICT 2 VICE CHAIR
DISTRICT 3
DISTRICT 4
DISTRICT 5
DISTRICT 6 CHAIR
DISTRICT 7
CLIENT:
TACOMA, WA 98402
1501 MARKET STREET SUITE 450
PIERCE COUNTY FACILITIES MANAGEMENT
PRIMARY CONTACT: COREY ZANUTTINI,
PROJECT MANAGER
PH: (253) 722-4134
SECONDARY CONTACT: HENRY NGUYEN,
CONSTRUCTION PROJECT MANAGER 1
PH: (253) 202-4183
SECONDARY CONTACT: KARL IMLIG,
FM DIRECTOR
PH: (253) 798-2566
SECONDARY CONTACT: RYAN M. MELLO,
PIERCE COUNTY EXECUTIVE
PH: (253) 798-6602
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
ZT
MM
DS
PROJECT COVER
SHEET
G0.01
Zach.Thorson Snapshot
EXISTING
EXISTING
T
EV EVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEV
HH
H H
HH
HH
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
EJE/ERD
CDP
BAL
PR OF E S S I ON A L E NG I NEER
R E G I S T E R E D
T O
S
ATE OF WASHINGT NBLAKE A . LORD
W oo dl an d Sq ua re
L oo p
SE
, S ui te
La ce y, W as hi ng to n
(3
) 2
-7
F ax
(3
) 2
-7
Co ns ul tin g En gi ne er s
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
SCALE
0 20 40
LEGEND
TRENCHING LIMITS
CHARGING STATION PER ELECTRICAL
VAULT PER ELECTRICAL
BOLLARD
PANEL PER ELECTRICAL
CALL BOX FOOTING
HAND HOLE PER ELECTRICAL
C1.00
CIVIL SITE PLAN
1. TRENCH AND EXCAVATION RESTORATION PER
DETAIL A ON SHEET C1.01
2. SEE SHEET C2.00-C2.02 FOR SECURITY FENCE
LAYOUT DETAILS.
3. SEE E SERIES FOR ELECTRICAL PLANS.
4. CONTRACTOR SHALL CONFIRM ALL LOCATIONS OF
PROPOSED IMPROVEMENTS WITH ENGINEER PRIOR
TO ANY DEMOLITION OR OCCURRENCE OF WORK.
5. CONTRACTOR SHALL COORDINATE AND OBTAIN
APPROVAL FROM THE PROJECT TEAM FOR ALL
TRAFFIC, ACCESS , PARKING SHUTDOWNS, AND
DISRUPTIONS, INCLUDING SCHEDULE AND PHASING
PLANS.
6. CONTRACTOR TO SUBMIT EV STALL LETTERING
LAYOUT PRIOR TO INSTALLATION.
NOTES:
A C1.01
B C1.01
GENERAL TESC NOTES
1. EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE BEGINNING OF CONSTRUCTION.
2. THE IMPLEMENTATION OF THIS TESC PLAN AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE TESC BMPS IS THE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS
COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED.
3. EROSION CONTROL MEASURES ARE NOT LIMITED TO THE ITEMS ON THIS PLAN. THE CONTRACTOR IS RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE OF ALL EROSION CONTROL MEASURES. NO SILTATION OF EXISTING OR PROPOSED DRAINAGE FACILITIES SHALL BE ALLOWED. CARE SHALL BE TAKEN TO PREVENT
MIGRATION OF SILTS TO OFF-SITE PROPERTIES
4. CONSTRUCT THE TESC BMPS SHOWN ON THIS PLAN IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER
THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER STANDARDS.
5. THE TESC BMPS SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS.
DURING THE CONSTRUCTION PERIOD, UPGRADE THESE TESC BMPS AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE.
6. THE CONTRACTOR SHALL MAKE DAILY SURVEILLANCE OF ALL EROSION CONTROL MEASURES AND MAKE ANY NECESSARY REPAIRS OR ADDITIONS TO THE EROSION CONTROL MEASURES. THE CONTRACTOR SHALL PROVIDE ADDITIONAL EROSION CONTROL MEASURES AS DETERMINED NECESSARY BY THE PROJECT ENGINEER.
7. INSPECT AND MAINTAIN THE TESC BMPS ON INACTIVE SITES A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT (I.E. A 24-HOUR STORM EVENT WITH A 10-YR OR GREATER
RECURRENCE INTERVAL).
8. DURING THE WET SEASON, NOVEMBER TO MARCH, ALL DISTURBED SOILS SHALL BE STABILIZED WITHIN 48 HOURS AFTER STOP OF WORK. EROSION CONTROL MEASURES SHALL INCLUDE, BUT ARE NOT LIMITED TO, COVERING THE EFFECTED AREA, INCLUDING SPOIL PILES, WITH PLASTIC SHEETING, STRAW MATTING, JUTE MATTING, STRAW MULCH, OR WOOD CHIPS. SEEDING OF THE DISTURBED AREAS SHALL TAKE PLACE AS WEATHER PERMITS.
9. ALL SEEDED OR SODDED AREAS SHALL BE CHECKED REGULARLY TO MAKE SURE VEGETATIVE COVERAGE IS
COMPLETE. AREAS SHALL BE REPAIRED, RESEEDED, AND FERTILIZED AS REQUIRED.
10. TRACKING OF SOIL OFF-SITE WILL NOT BE ALLOWED. IF ANY SOIL IS TRACKED ONTO A PUBLIC STREET IT SHALL BE REMOVED BY THE END OF THAT WORKING DAY. ANY FURTHER TRACKING OF MUD WILL THEN BE PREVENTED BY
SWEEPING OR WASHING OF THE VEHICLE'S TIRES BEFORE DRIVING ON A PUBLIC STREET.
11. NO MORE THAN 500 LF OF TRENCH ON A DOWNSLOPE OF MORE THAN 5% SHALL BE OPENED AT ONE TIME.
12. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
13. TRENCH DEWATERING DEVICES SHALL BE DISCHARGED IN A MANOR THAT WILL NOT ADVERSELY AFFECT FLOWING
STREAMS, DRAINAGE SYSTEMS, OR OFF-SITE PROPERTIES.
14. ALL STORM SEWER INLETS RECEIVING RUNOFF FROM THE PROJECT DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT-LADEN WATER WILL BE FILTERED BEFORE ENTERING THE CONVEYANCE SYSTEM.
15. ALL OFF-SITE CATCH BASINS IMMEDIATELY ADJACENT TO THE SITE SHALL BE PROTECTED FROM SILTATION.
GENERAL CONSTRUCTION NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH PIERCE COUNTY STANDARDS AND THE MOST CURRENT EDITION OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (WSDOT/APWA). IN CASES OF CONFLICT, THE MOST STRINGENT STANDARD SHALL APPLY.
2. THE CONTRACTOR SHALL BE IN COMPLIANCE WITH ALL SAFETY STANDARDS AND REQUIREMENTS AS SET FORTH BY
OSHA, WISHA AND THE STATE OF WASHINGTON, DEPARTMENT OF LABOR AND INDUSTRIES.
3. ALL APPROVALS AND PERMITS REQUIRED BY CITY OF TACOMA SHALL BE OBTAINED BY THE CONTRACTOR PRIOR TO
THE START OF CONSTRUCTION.
4. A PRE-CONSTRUCTION MEETING SHALL BE HELD A MINIMUM 72 HOURS PRIOR TO ON-SITE MOBILIZATION & THE START
OF CONSTRUCTION.
5. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING UTILITIES.
THE CONTRACTOR SHALL VERIFY ALL UTILITY LOCATIONS PRIOR TO CONSTRUCTION BY CALLING THE UNDERGROUND LOCATE LINE AT 811 NOT LESS THAN TWO BUSINESS DAYS AND NOT MORE THAN 10 BUSINESS DAYS PRIOR TO ANY EXCAVATION. THE CONTRACTOR WILL ALSO BE RESPONSIBLE FOR MAINTAINING ALL LOCATE MARKS ONCE THE
UTILITIES HAVE BEEN LOCATED.
6. TEMPORARY ASPHALT PATCHING CAN BE ALLOWED BY THE ENGINEER AS NEEDED TO FACILITATE PARKING LOT ACCESS AND CIRCULATION. CONTRACTOR SHALL SUBMIT PLAN AND DETAILS FOR ENGINEER REVIEW. CONTRACTOR
SHALL BE RESPONSIBLE FOR MAINTENANCE AS REQUIRED.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL IN ACCORDANCE WITH THE WSDOT/APWA STANDARD PLANS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (ALL APPLICABLE “K” PLANS) AND/OR THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). PRIOR TO DISRUPTION OF ANY TRAFFIC, ACCESS PARKING, A TRAFFIC CONTROL PLAN, AND WORK PHASING PLAN SHALL BE PREPARED AND SUBMITTED TO THE ENGINEER FOR APPROVAL. NO WORK SHALL COMMENCE UNTIL ALL APPROVED TRAFFIC CONTROL AND WORK
PHASING PLAN IS IN PLACE.
8. EROSION CONTROL/WATER POLLUTION MEASURES SHALL BE REQUIRED IN ACCORDANCE WITH SECTION 1-07.15 OF THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION AND THE PIERCE COUNTY STORMWATER DESIGN MANUAL. AT NO TIME WILL SILTS AND DEBRIS BE ALLOWED TO DRAIN OFF-SITE OR INTO AN EXISTING OR NEWLY INSTALLED FACILITY UNLESS SPECIAL PROVISIONS HAVE BEEN DESIGNED.
9. ALL SURVEYING AND STAKING SHALL BE PERFORMED BY A LICENSED SURVEYOR OF WASHINGTON STATE.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE A COPY OF AN APPROVED SET OF PLANS AND
SPECIFICATIONS ON THE CONSTRUCTION SITE AT ALL TIMES.
11. ANY CHANGES TO THE DESIGN SHALL FIRST BE REVIEWED AND APPROVED BY THE PROJECT ENGINEER, OWNER, AND
PIERCE COUNTY.
12. PRIOR TO BACKFILL ALL UTILITIES AND FOOTINGS SHALL BE INSPECTED BY THE PROJECT ENGINEER. APPROVAL SHALL NOT RELIEVE THE CONTRACTOR FOR CORRECTION OF ANY DEFICIENCIES AND/OR FAILURES AS DETERMINED BY SUBSEQUENT TESTING AND INSPECTIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE
ENGINEER, COUNTY, OR SPECIAL INSPECTOR FOR THE REQUIRED INSPECTIONS.
EQUIPMENT YARD
PER ELECTRICAL
VAULT PER ELECTRICAL
VAULT PER
ELECTRICAL
PRESERVE & PROTECT
EX BUILDING PANEL EV1-1 PER
ELECTRICAL
VAULT PER ELECTRICAL
FUTURE CHARGER PER
ELECTRICAL
PHASE 1 CHARGER PER
ELECTRICAL (TYP)BOLLARD (TYP)
CENTER CHARGER
IN PARKING STALL
CENTER CHARGER
BETWEEN PARKING
STALLS (TYP)
STRIPE EV STALLS WITH 4'
WIDE BRIGHT GREEN
PAINT (TYP)
EX EV CHARGER
TO REMAIN
EX EV CHARGER
TO REMAIN
EX FENCES TO REMAIN
EX BUILDING
TO REMAIN 6.5' O.C.
(TYP)
4'
6.7' O.C.
(TYP)
1' FROM EX FENCE
PIERCE COUNTY
ANNEX
4' SAWCUT
(TYP)
3' TRENCH WIDTH FOR
CHARGER & PANEL (TYP)
PRESERVE & PROTECT EX LIGHT
POLE TO REMAIN. CONNECT TO EX
LIGHT POLE. SEE ELECTRICAL PLANS
PRESERVE & PROTECT EX
STORMWATER FACILITY
(LOCATION APPROXIMATE)
EX PEDESTRIAN GATE
TO REMAIN
12' AUTOMATIC SLIDE
GATE. SEE SHEET C2.00
LIGHT POLE PER
ELECTRICAL
4" WIDE WHITE STRIPING 2'
O.C. DIAGONAL AS SHOWN
4' (TYP)
4' (TYP)
4' SAWCUT
(TYP)
12' MANUAL SLIDE GATE.
SEE SHEET C2.00
NEW POLE PER
DIVISION 26
PRESERVE & PROTECT EX BUILDING.
STUB UP CONDUIT FOR BUILDING
CONNECTION. SEE ELECTRICAL
PLANS FOR CONTINUATION
BOLLARD (TYP)
GATE OPERATOR. SEE
SHEET C2.00
SECURITY FENCE. SEE
SHEET C2.00 (TYP)
EX FENCES TO REMAIN
VAULT PER ELECTRICAL
24" TALL 4" WIDE
BRIGHT GREEN PAINT
MARKING FOR EV
STALLS (TYP)
4' SAWCUT (TYP)
PLANNED TACOMA PUBLIC
UTILITIES SERVICE POLE
LOCATION. SEE
ELECTRICAL PLANS
PRESERVE & PROTECT EX CURB. TUNNEL
UTILITIES BENEATH CURB. IF CURB IS DAMAGED,
REMOVE & REPLACE IN LIKE & KIND (TYP)
CALL BOX FOOTING. SEE
ELECTRICAL PLANS FOR
CARD READER
PRESERVE & PROTECT EX
LIGHT POLE TO REMAIN
9' (TYP)
REPAINT PARKING STALL
STRIPING. MATCH EX 4"
WIDE WHITE PAINT LINES
(TYP)
REPAINT PARKING STALL.
MATCH EX 4" WIDE WHITE
PAINT LINES (TYP)
PRESERVE & PROTECT EX CURB.
TUNNEL UTILITIES BENEATH CURB.
IF CURB IS DAMAGED, REMOVE &
REPLACE IN LIKE & KIND (TYP)
PRESERVE & PROTECT EX CURB. TUNNEL
UTILITIES BENEATH CURB. IF CURB IS DAMAGED,
REMOVE & REPLACE IN LIKE & KIND (TYP)
4' (TYP) 2' (TYP)
2.5' (TYP)
CALL BOX FOOTING. SEE
ELECTRICAL PLANS FOR
CARD READER
CALL BOX FOOTING. SEE
ELECTRICAL PLANS FOR
CARD READER
C C1.01
STORAGE COURT
OF TACOMA
(6) BOLLARDS PER DETAIL B ON
DWG C1.01 WITH 1' SEPARATION
FROM EXISTING CURB EDGE TO
BOLLARD EDGE
3' CENTER TO
CENTER(TYP)0.5' (TYP)
REPLACE CURB AS NEEDED FOR
BOLLARD INSTALLATION
VAULT PER ELECTRICAL
HH
HAND HOLE PER
ELECTRICAL
HAND HOLE PER ELECTRICAL
HAND HOLE PER
ELECTRICAL
HAND HOLE PER
ELECTRICAL
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
EJE/ERD
CDP
BAL
PR OF E S S I ON A L E NG I NEER
R E G I S T E R E D
T O
S
ATE OF WASHINGT NBLAKE A . LORD
W oo dl an d Sq ua re
L oo p
SE
, S ui te
La ce y, W as hi ng to n
(3
) 2
-7
F ax
(3
) 2
-7
Co ns ul tin g En gi ne er s
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
ASPHALT RESTORATION NOTES:
A. CONTROLLED DENSITY BACKFILL, CDF, WILL BE REQUIRED AS A BACKFILL MATERIAL; OR
B. SELECT BACKFILL MEETING THE REQUIREMENTS OF THE STD SPEC 9-03.19 COMPACTED
TO 95% DENSITY AND PLACED IN A MAXIMUM 6" LIFTS. WRITTEN VERIFICATION OF COMP
ACTION, BASED ACCEPTABLE TESTING METHODS, AND PLACEMENT OF THE BACKFILL WILL BE
REQUIRED; OR
C. NATIVE MATERIAL MAY BE USED AS BACKFILL MATERIAL IF COMPLIES WITH STANDARD SPECIFICATION
1. SEE ELECTRICAL TRENCHING DETAILS OR E SERIES SHEETS.
2. ALL MATERIALS, WORKMANSHIP, AND INSTALLATION SHALL BE IN CONFORMANCE WITH THE WSDOT STANDARD SPECIFICATIONS
FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
3. KEEP TRENCH BOTTOM COMPACTED WITH UNIFORM GRADE. NO TEMPORARY SUPPORTS, I.E. BLOCKS, WILL BE ALLOWED TO
SUPPORT PIPE. TRENCH BOTTOM SHALL BE TO GRADE PRIOR TO PIPE INSTALLATION.
4. RESTORATION SHALL BE IN ACCORDANCE WITH ONE OF THE FOLLOWING:
ALL PATCHES SHALL BE ROLLER COMPACTED. STEEL WHEEL ROLLERS SHALL BE NO WIDER THAN TRENCH PATCH WIDTH. SHOW
THE MATERIAL MEETS THE REQUIREMENTS AS SPECIFIED ABOVE.
EMULSIFIED ASPHALT GRADE CSS-1 TACK
SHALL BE APPLIED TO EDGES OF EXISTING
PAVEMENT. ALL JOINTS SHALL BE SEALED
USING PAVING ASPHALT AR4000W OR
APPROVED EQUAL.
EXISTING A.C. PAVEMENT
SAWCUT EXISTING
PAVEMENT (TYPICAL)
MINIMUM 0.25' HMA (COMPACTED
DEPTH) OR EXISTING PLUS 0.08',
WHICHEVER IS GREATER APPLIED IN
MAXIMUM 0.25' LIFTS
TRENCH BACKFILL SHALL MEET THE
STANDARD SPECIFICATION FOR
BANK RUN GRAVEL 9-03.19
FOUNDATION TYPICAL. REQUIRED
ONLY WHEN UNSUITABLE
MATERIAL IS ENCOUNTERED AND
AS THE ENGINEER DIRECTS.
6" CRUSHED SURFACING TOP
COURSE COMPACTED TO 95% PER
WSDOT STD SPEC 9-03.9(3)
.5' MIN
TYP
4.
ALL ELECTRICAL AND TELECOM
CONDUITS SHALL BE INSTALLED
WITH CONTINUOUS DETECTABLE
INDICATOR PER ELECTRICAL PLANS.
3' MIN
2' M
IN
SCALE: NTS
POWER AND TELECOM TRENCH AND EXCAVATION RESTORATION A
6" CRUSHED SURFACING BASE
COURSE COMPACTED TO 95% PER
WSDOT STD SPEC 9-03.9(3)
6"
2"
#120 RED CDF CONCRETE
ENCASEMENT
ELECTRICAL CONDUIT
AND CONDUIT SPACER
PER ELECTRICAL PLANS
EXISTING CURB
3'
1" M
IN
STEEL CAP PLATE
1/2" REFLECTIVE TAPE (TYP.)
2" 1/
2"
2' -8
4" M
IN
1/8
CONCRETE FOOTING ~
COMMERCIAL CONCRETE PER
WSDOT STD SPEC 6-02.3(2)B
STEEL PIPE ~ ASTM A 53, NPS 6
(6" NOM.), SCHEDULE 80
CEMENT CONCRETE FILLED
4" M
IN
1/2" REFLECTIVE TAPE (TYP.)
POST
SECTION A
SCALE:
B
BOLLARD
N.T.S.
POST
ROUND FOOTING SQUARE FOOTING
1.5'
1.5' DIAM.
A
A
PAINT ASSEMBLY WITH A "HIGHLY VISIBLE" COLOR.
(SAFETY YELLOW IS ACCEPTABLE)
3'2' -8
6" x 1/4" DIAM. STEEL BAR
4"
NOTE:
1. THE BOLLARD SHALL BE PAINTED SAFETY YELLOW.
2. THE BOLLARD SHALL BE INSTALLED PER WSDOT
STD. PLAN H-60.10-01.
5/16" DRILLED HOLE
FRONT VIEW SIDE VIEW
4.
5'
SCALE:
C
CALL-BOX FOOTING
NTS
2' -0
2'-0"
2'-0" X 2'-0" 3000 PSI CONCRETE
FOOTING W/ #4 REINF @ 8"
OC EW
CARD READER ABOVE. SEE ELECTRICAL PLANS
PLAN
SEE ELECTRICAL FOR CARD
READER
CONC. FOOTING PER PLAN
#4 60KSI REINF @ 8" OCEW
SECTION
6"
3" C
LR
3" CLR
6" 6"
MOUNT PEDESTAL ON
ROADSIDE WITH CALL BOX
ALIGNED WITH EDGE OF
FOOTING
6" CSBC PER WSDOT STD SPEC 9-03.9(3)
C1.01
CIVIL SITE DETAILS
0.75' COMPACTED DEPTH MULCHED
AND SEEDED NATIVE BACKFILL PER
WSDOT STD SPEC 8-02.3(9)
EXISTING LANDSCAPE
LANDSCAPE RESTORATION NOTES:
1. ALL MATERIALS, WORKMANSHIP, AND INSTALLATION SHALL BE IN CONFORMANCE WITH THE WSDOT STANDARD SPECIFICATIONS
FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION.
2. KEEP TRENCH BOTTOM COMPACTED WITH UNIFORM GRADE. NO TEMPORARY SUPPORTS, I.E. BLOCKS, WILL BE ALLOWED TO
SUPPORT PIPE. TRENCH BOTTOM SHALL BE TO GRADE PRIOR TO PIPE INSTALLATION.
1'
12' 4'
20'
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
EJE/ERD
CDP
BAL
PR OF E S S I ON A L E NG I NEER
R E G I S T E R E D
T O
S
ATE OF WASHINGT NBLAKE A . LORD
W oo dl an d Sq ua re
L oo p
SE
, S ui te
La ce y, W as hi ng to n
(3
) 2
-7
F ax
(3
) 2
-7
Co ns ul tin g En gi ne er s
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
REMOVE 36 LF OF EXISTING FENCE
AND EXISTING SWING GATE.
INSTALL 12' SLIDING VEHICLE GATE
AND FOUNDATION (AUTOMATIC,
RIGHT OPEN) PER DETAIL 3 ON
DWG C2.02.
INSTALL HYSECURITY GATE
OPERATOR OR APPROVED EQUAL
REMOVE 68 LF OF EXISTING FENCE
TO INCLUDE MANUAL SWING GATE.
EXISTING POSTS TO BE CUT FLUSH
WITH THE EXISTING GRADE AND
FILLED WITH CONCRETE.
INSTALL 168 LF OF PALISADE TRIPLE
POINT SECURITY FENCE PER DETAIL
4 ON DWG C2.02. LOCATE FENCE
WITHIN THE PLANTER BEHIND THE
EXISTING CURB
INSTALL 12' SLIDING VEHICLE
GATE AND FOUNDATION
(MANUAL, LEFT OPEN) PER
DETAIL 1 ON DWG C2.01
C2.00
CIVIL ENLARGED
FENCE PLAN
LEGEND
DEMOLITION LIMITS
PROPOSED PALISADE TRIPLE POINT FENCE
12' MANUAL/AUTOMATIC VEHICLE SLIDE GATE
HYSECURITY GATE OPERATOR (SEE DETAIL 3 ON C2.02)
BOLLARD
CARD READER PER ELECTRICAL
CALL BOX FOOTING
EXISTING PEDESTRIAN GATE TO REMAIN. PROVIDE
SECURITRON SWINGING GATE LOCK MODEL
GL1-FS WITH FMK-SW & APPURTENANCES PER
DIVISION 28. FIELD MODIFY GATE, FRAME, & FENCE
AS NECESSARY TO ACCOMMODATE LOCK
HOUSING & STRIKE ENCLOSURE. .
SCALE
0 20 40
PIERCE COUNTY
ANNEX
INSTALL 24 LF OF PROPOSED
PALISADE TRIPLE POINT SECURITY
FENCE PER DETAIL 4 ON DWG C2.02.
CONNECT TO EXISTING FENCE
B C1.01
1. CONTRACTOR SHALL CONFIRM ALL LOCATIONS OF
PROPOSED IMPROVEMENTS WITH ENGINEER PRIOR
TO ANY DEMOLITION OR OCCURRENCE OF WORK.
2. CONTRACTOR SHALL COORDINATE AND OBTAIN
APPROVAL FROM THE PROJECT TEAM FOR ALL
TRAFFIC, ACCESS, PARKING SHUTDOWNS, AND
DISRUPTIONS, INCLUDING SCHEDULE AND PHASING
PLANS. SEE DIVISION 1 FOR PRE-NOTIFICATION
REQUIREMENTS.
NOTES:
PRESERVE & PROTECT
EX BUILDING
2" GALVANIZED PIPE
HAND RAIL 36" TALL
C C1.01
CONNECT TO EXISTING FENCE
CONNECT TO EXISTING FENCE
INSTALL TERMINAL FENCE
POST WITH 2" MAX GAP TO
WALL
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
EJE/ERD
CDP
BAL
PR OF E S S I ON A L E NG I NEER
R E G I S T E R E D
T O
S
ATE OF WASHINGT NBLAKE A . LORD
W oo dl an d Sq ua re
L oo p
SE
, S ui te
La ce y, W as hi ng to n
(3
) 2
-7
F ax
(3
) 2
-7
Co ns ul tin g En gi ne er s
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
C2.01
CIVIL GATE AND
FENCE DETAILS
6' COUNTERBALANCE GATE SECTION
18' TOTAL GATE LENGTH
12' GATE OPENING SECTION
10 1/2"
8"
10 1/2"
GATE RECEIVER
SQUARE TERMINAL FENCE POST
SQUARE TERMINAL FENCE POST
FENCE LINE
FENCE POST
FENCE LINE
GATE MOUNTING POST
6 1/2" ℄ OF
BOTTOM
CARRIAGE TO
FACE OF POST
GATE RECEIVER
FRONT VIEW SIDE VIEW TOP VIEW
A
DIAGONAL BRACING CONNECTIONS
DIAGONAL BRACING CONNECTIONS
BOTTOM POST MOUNT
TOP POST MOUNT
BOTTOM POST MOUNT
FRONT VIEW SIDE VIEW TOP VIEW
TOP POST MOUNT
SCALE:
SLIDING VEHICLE GATE AND FOUNDATION (MANUAL, OPEN LEFT)
N.T.S.
B
C
D
A
B
C
D
SECTION A-A
CL POST/FTG
TYPICAL POST FOOTING SCHEDULE
FENCE/GATE TYPE
W (FT)
GATE OPENING
WIDTH
D (FT)
FOOTING DIAMETER
H (FT)
FOOTING DEPTH
VERTICAL
REINFORCING
SPIRAL TIE
REINFORCEMENT
SIZE AND PITCH
8' TALL GATE POST 12' 1'-8" 4'-6" (8) #5 #4 @ 8"
8' TALL FENCE POST N/A 1'-3" 4'-6" (6) #5 #4 @ 8"
FOOTING PLAN VIEW
GATE POST FOOTING PROFILE VIEW
NOTES:
CONCRETE:
CONCRETE WORK SHALL CONFORM TO ALL REQUIREMENTS OF IBC CHAPTER 19. CONCRETE MIXTURES SHALL CONFORM TO THE MOST STRINGENT REQUIREMENTS FOR EXPOSURE CATEGORY F2. WATER-REDUCING ADMIXTURES MAY BE INCORPORATED IN CONCRETE MIX DESIGNS, BUT SHALL CONFORM TO ASTM C 494, AND BE USED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. CaCl2 OR OTHER WATER-SOLUBLE CHLORIDE ADMIXTURES SHALL NOT BE USED. WATER/CEMENTITIOUS MATERIALS RATIO SHALL BE MEASURED BY WEIGHT AND SHALL BE BASED ON THE TOTAL CEMENTITIOUS MATERIAL. WATER/CEMENTITIOUS MATERIALS RATIO AND WATER CONTENT SHALL BE DETERMINED BY THE SUPPLIER BASED ON STRENGTH REQUIREMENTS AND SHALL
NOT EXCEED THE MAXIMUM WATER/CEMENTITIOUS MATERIAL
RATIO AND/OR WATER CONTENT IF SHOWN ABOVE OR IN ACI 318 TABLE 19.3.2.1 FOR THE EXPOSURE CLASSES REQUIRED. FIELD-MEASURED SLUMP SHALL CONFORM TO THE SUBMITTED CONCRETE MIX DESIGN.
TOLERANCE OF SLUMP SHALL CONFORM TO ASTM C 94. ALL CONCRETE SUBJECT TO EXPOSURE CLASSES F1, F2 OR F3 SHALL BE AIR ENTRAINED. AIR-ENTRAINING AGENTS SHALL CONFORM TO ASTM C 260. THE AMOUNT OF ENTRAINED AIR SHALL BE ACCORDING TO ACI 318 TABLE 19.3.3.1 WITH A FIELD TOLERANCE OF ±1.5 PERCENT BY VOLUME. THE AMOUNT OF ENTRAINED AIR SHALL BE MEASURED IN THE FIELD AT
THE DISCHARGE FROM THE TRUCK.
THE CONTRACTOR SHALL SUBMIT CONCRETE MIX DESIGNS FOR APPROVAL 2 WEEKS PRIOR TO PLACING ANY CONCRETE. THE MIX DESIGN SHALL BE IN CONFORMANCE WITH ACI 318, CHAPTER 19. THE
SUBMITTAL SHALL INDICATE WHERE EACH CONCRETE MIX IS TO BE USED ON THE PROJECT.
CONCRETE MIXTURES SHALL CONFORM TO THE FOLLOWING REQUIREMENTS: f'C = 4000 PSI AT 28 DAYS, EXPOSURE CATEGORY F2, 1" MAX AGGREGATE SIZE, AND 6% ENTRAINED AIR
REINFORCING STEEL
DEFORMED BARS ASTM A 615, GRADE 60
REINFORCING SHALL BE SUPPORTED AS SPECIFIED BY THE CRSI MANUAL OF STANDARD PRACTICE. REINFORCING STEEL SHALL BE DETAILED IN ACCORDANCE WITH ACI STANDARD OF PRACTICE AS OUTLINED
IN ACI 315, "GUIDE TO PRESENTING REINFORCING STEEL DESIGN DETAILS".
SPECIAL INSPECTION:
CONTRACTOR SHALL COORDINATE SPECIAL INSPECTIONS DURING FENCE, FOOTING, AND GATE INSTALLATIONS.
SCALE:
POST FOOTING DETAILS
N.T.S.
CIRCULAR POLE FTG,
DIAMETER PER SCHEDULE.
GATE POST PER PLAN,
CENTER POST IN FOOTING
SPIRAL TIE SIZE AND
PITCH PER SCHEDULE
VERTICAL REINF
PER SCHEDULE
FENCE POST PER PLAN,
CENTER POST IN
FOOTING
VERTICAL REINF
PER SCHEDULE
SPIRAL TIE SIZE AND
PITCH PER SCHEDULE
(2) TURNS OF SPIRAL @ 3"
PITCH AT TOP OF FTG
SECTION B-B
H
FO
O
TI
N
G D
EP
TH
P
ER
S C
H
ED
U
LE
B/FTG
D - DIAMETER PER SCHEDULE
3" C
LR
2" CLR
D - DIAMETER PER SCHEDULE
3 1/2" TYP
8' FROM
GRADE TO TOP
OF PALE
2" 5"
5' O.C. GATE POST SPACING
A
A
B B
4" MAX GAP BETWEEN
BOTTOM OF GATE AND
EXISTING GRADE
CONTRACTOR SHALL SECURE THE MANUAL SLIDE AT THE GATE RECEIVER
WITH AN OWNER PROVIDED PADLOCK. CONTRACTOR SHALL ENSURE THE
PADLOCK CAN BE ACCESSED FROM BOTH SIDES OF THE SLIDE GATE
SQUARE TERMINAL
FENCE POSTS
LOCATED RECEIVER 48" ABOVE FINISHED GRADE
GATE UPRIGHT
4" MAXIMUM
4" MAX
FENCE POST FOOTING, SEE DETAIL 2 ON THIS SHEET
(2) 34" Ø x 4" LONG WHS
ON (4) SIDES OF POST
4" 8"
T/FDN & T/FG
EX ASPHALT
EX ASPHALT
REMOVE LOOSE MATERIAL, CLEAN
SURFACE, APPLY BONDING AGENT, POUR
FOUNDATION UP AGAINST EX ASPHALT
REMOVE LOOSE MATERIAL, CLEAN
SURFACE, APPLY BONDING AGENT, POUR
FOUNDATION UP AGAINST EX ASPHALT
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
EJE/ERD
CDP
BAL
PR OF E S S I ON A L E NG I NEER
R E G I S T E R E D
T O
S
ATE OF WASHINGT NBLAKE A . LORD
W oo dl an d Sq ua re
L oo p
SE
, S ui te
La ce y, W as hi ng to n
(3
) 2
-7
F ax
(3
) 2
-7
Co ns ul tin g En gi ne er s
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
C2.02
CIVIL GATE AND
FENCE DETAILS
A
5 2 ITEM NO.
PLAN VIEW
8' x 10' Flat Pale Palisade Panel [Standard Pale Spacing]
DESCRIPTION
8' Palisade Panel Line Post
Palisade Rail Connection Plate Palisade Mounting Rail (Standard Spacing)
T Head Fence Bolt Galv Tork-Nut Steel Galv
8' Palisade Pale Carriage Bolt Security Nut
QTY.
A
DETAIL A
10' TYP
4"
34 1/4" O.C.
8'
FROM GRADE
TO TOP OF PALE
34 1/4" O.C.
2 RAIL SPACING
12" FROM GRADE
GRADE
BETWEEN PALES
3 12" TYP GAP
6" STANDARD SPACING
48" TYP
(ISOMETRIC VIEW)
A 1'-3"
(ELEVATION VIEW)
SECTION A-A
2"
FROM GRADE
TO FOOT OF PALE
2 RAIL SPACING
DETAIL B
B
PANEL CONNECTION BRACKET CAPABLE
OF BENDING 45° LEFT OR RIGHT
(TYP)
3" CLEARANCE
6' COUNTERBALANCE GATE SECTION
18' TOTAL GATE LENGTH
12' GATE OPENING SECTION
10 1/2"
8"
10 1/2"
GATE RECEIVER
FENCE POST
FENCE POST
FENCE LINE
FENCE POST
FENCE LINE
GATE MOUNTING POST
6 1/2" ℄ OF
BOTTOM
CARRIAGE TO
FACE OF POSTA
SCALE:
SLIDING VEHICLE GATE AND FOUNDATION (AUTOMATIC, OPEN RIGHT)
N.T.S.
SECTION A-A
SECTION B-B
INSTALL DRIVE RAIL
PER MANUFACTURE
SPECIFICATION
DIAGONAL BRACING CONNECTIONS, SEE DETAIL 1 ON DWG C1.01
BOTTOM POST MOUNT, SEE DETAIL 1 ON DWG C1.01
TOP POST MOUNT, SEE
DETAIL 1 ON DWG C1.01
INSTALL SLIDEDRIVER II GATE
OPERATOR OR APPROVED
EQUAL PER MANUFACTURE
SPECIFICATION
INSTALL CONCRETE FOUNDATION FOR GATE
OPERATOR PER MANUFACTURE SPECIFICATION
3 1/2" TYP
8' FROM
GRADE TO TOP
OF PALE
2" 5"
5' O.C. GATE POST SPACING
A
A
B B
SCALE:
PALLISADE TRIPLE POINTED SECURITY FENCE
N.T.S.
FENCE POST FOOTING, SEE DETAIL 2 ON DWG C1.01
POST FOUNDATIONS, SEE
DETAIL 2 ON DWG C1.01
INSTALL 12" PEDESTAL FOR GATE OPERATOR
PER MANUFACTURE SPECIFICATION
INSTALL SLIDE RAIL PER
MANUFACTURE SPECIFICATION
4" MAX GAP BETWEEN
BOTTOM OF GATE AND
EXISTING GRADE
4" MAX
4" MAXIMUM 4" MAXIMUM
ONE-LINE DIAGRAM
EQUIPMENT ENCLOSURE
BUS
WIRE
TERMINAL / LUG
CONNECTION
DELTA
WYE
CURRENT TRANSFORMER
TRANSFER SWITCH
CIRCUIT BREAKER, FIXED
DISCONNECT SWITCH
FUSE
MOTOR CONNECTION
GENERATOR
METERING DEVICE
(M = METER)
(WH = WATT HOUR METER)
(A = AMMETER)
(V = VOLTMETER)
SURGE PROTECTIVE DEVICE
GROUND
AVAILABLE FAULT CURRENT (SYMMETRICAL) TAG
PANELBOARD - MAIN LUGS ONLY
PANELBOARD - MAIN CIRCUIT BREAKER
HA-3
POWER
SWITCHBOARD/SWITCHGEAR
PANELBOARD, FLUSH-MOUNTED
PANELBOARD, SURFACE-MOUNTED
(FRONT)
TRANSFORMER
POWER POLE, FLOOR TO CEILING
POKE-THRU (WHERE INDICATED, SUBSCRIPT INDICATES
POKE-THRU TYPE)
MOTOR CONNECTION
DISCONNECT SWITCH, NON-FUSED
DISCONNECT SWITCH, FUSED
COMBINATION STARTER/DISCONNECT
MAGNETIC STARTER
EQUIPMENT CONNECTION - CONFIRM CONNECTION
WITH EQUIPMENT MANUFACTURER
SPECIAL RECEPTACLE
DUPLEX RECEPTACLE
FOURPLEX RECEPTACLE
SPLIT WIRED DUPLEX RECEPTACLE
PUSHBUTTON CONTROLLER
(SINGLE OR MULTIPLE BUTTONS)
RECEPTACLES
JUNCTION BOX
SURFACE METAL RACEWAY
RACEWAY CONCEALED IN WALL OR IN CEILING
(EXPOSED IN UNFINISHED AREAS)
RACEWAY RUN BELOW FLOOR OR BELOW GRADE
RACEWAY (CIRCLE DENOTES VERTICAL
TRANSITION)
FLEXIBLE RACEWAY
HOMERUN TO PANEL
(INDICATES PANEL DESIGNATION AND CIRCUIT NUMBER)
VARIABLE FREQUENCY DRIVE
PULL BOX
(WHERE INDICATED, SUBSCRIPT INDICATES PULL BOX TYPE)
VAULT
(WHERE INDICATED, SUBSCRIPT INDICATES VAULT TYPE)
HANDHOLE
(WHERE INDICATED, SUBSCRIPT INDICATES VAULT TYPE)
CIRCUIT BREAKER, DRAWOUT
FUSED SWITCH
CIRCUIT BREAKER WITH GROUND FAULT
PROTECTION
CIRCUIT BREAKER WITH SHUNT TRIP OPERATOR
FUSED SWITCH WITH GROUND FAULT PROTECTION
FLOORBOX (WHERE INDICATED, SUBSCRIPT INDICATES FLOOR
BOX TYPE)
GF
ST
GF
SHUNT TRIP
GROUND FAULT PROTECTION
ELECTRONIC POWER METER
PAD-MOUNT TRANSFORMER
TRANSFORMER
MANUAL MOTOR STARTER WITH THERMAL
OVERLOADS
EMERGENCY POWER OFF PUSHBUTTON
ENCLOSED CIRCUIT BREAKER
RACEWAYS AND BOXES
FURNITURE WALL FEED OUTLET BOX
RACEWAY CONTINUATION
RACEWAY STUB WITH BUSHING
FIRE STOPPING SLEEVE
RACEWAY SLEEVE WITH BUSHING
CABLE TRAY, 12"W x 4"H OVERHEAD, UNLESS
OTHERWISE NOTED
CABLE TRAY, OVERHEAD LADDER TYPE
#10 (GAUGE OF WIRE OTHER THAN AWG#12)
NUMBER OF CONDUCTORS
(GROUND CONDUCTOR)
(PHASE CONDUCTORS)
(NEUTRAL CONDUCTOR)
T
B
VFD
M
J
J F
PB
XX
XX
HH
XX
G
X
ST
GF
EPM
SPD
12,241
480V
208Y 120V
FEEDER TAG
J
F/S FIRE/SMOKE DAMPER
GROUNDING CONDUCTOR
GROUND ROD
GROUNDING BUSBAR
G
GROUNDING
EQUIPMENT GROUNDING CONNECTION
GROUNDING STRAP
NOT ALL SYMBOLS MAY APPEAR ON THE DRAWINGS
GENERAL
EXISTING ELECTRICAL TO BE REMOVED
LIGHTING
POLE-MOUNTED LIGHTING FIXTURE, QUANTITY OF
HEADS AS INDICATED
OCCUPANCY/VACANCY SENSOR, WALL-MOUNTED
OCCUPANCY/VACANCY SENSOR, CEILING-MOUNTED
WHERE INDICATED, SUBSCRIPT INDICATES TYPE
LIGHTING CONTROL
EXISTING ELECTRICAL TO REMAIN
NEW ELECTRICAL WORK
MATCHLINE OR PROPERTY LINE
DETAIL/PLAN IDENTIFIER
SECTION IDENTIFIER
ELEVATION IDENTIFIER
REVISION DEFINITION AREA, AREA ENCIRCLED
CONTAINS CHANGES MADE SUBSEQUENT TO
PREVIOUS ISSUE
REVISION CALLOUT
DEMOLITION NOTE TAG
EQUIPMENT TAG
FLAG NOTE TAG
MECHANICAL EQUIPMENT TAG
NORTH ARROW
ENLARGED PLAN BOUNDARY
E1.1
E1.1 A
E1.1 A
AHU-01
N
LIGHTING CONTROL TAG
LOCATION WHERE PICTURE WAS TAKEN AND
DIRECTION
M X
M
PHOTOSENSORP
LIGHT LEVEL SET POINT TAG
LIGHTING CONTROL PANELLCP
10 FC
X
SWITCH, AS DEFINED BY SUBSCRIPT
# = SWITCH LOCATED WITHIN THE SPACE IT IS CONTROLLING
a = SWITCH LOCATED REMOTE FROM THE SPACE IT IS CONTROLLING
MW = LINE VOLTAGE THREE-WAY OR FOUR-WAY
OSD = OCCUPANCY SENSOR OR VACANCY SENSOR WITH DIMMER
OS = OCCUPANCY SENSOR OR VACANCY SENSOR
K = KEYED LH = LIGHTED HANDLE
P = PILOT LIGHT T = TIMER
SEE SWITCH SCHEDULE FOR ADDITIONAL
INFORMATION
REFER TO LIGHTING ZONE CONTROL PLAN FOR
OCCUPANCY SENSOR OR VACANCY SENSOR
REQUIREMENTS.
CORD DROP CORD RECEPTACLE
RETRACTABLE CORD REEL RECEPTACLE
DEVICE SUBSCRIPTS
(CIRCUIT NUMBER)
(AC,CR,D,EM,GB,GF,IG,SB,TP,USB,WP OR OTHER SUBSCRIPT)
(NON-STANDARD MOUNTING HEIGHT OR AC)
P1A-12
+42" GF
SIMPLEX RECEPTACLE
FUSED CUTOUTS
CIRCUIT BREAKER WITH KIRK KEYK
ABBREVIATIONSNON-STRUCTURAL ELECTRICAL NOTES
1. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM
THE 2021 INTERNATIONAL BUILDING CODE AND FROM
THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
STANDARD 7. THE CONTRACTOR SHALL REFER TO THE
ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS,
AND FURTHER DESCRIPTIONS. THE CONTRACTOR
SHALL ADHERE TO REQUIREMENTS AND AS SUCH,
SHALL BE INCLUDED WITHIN BID. ALSO REFER TO
SPECIFICATIONS.
2. 2021 IBC, 1613.1, SCOPE: ARCHITECTURAL,
MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL
COMPONENTS THAT ARE PERMANENTLY ATTACHED TO
STRUCTURES AND THEIR SUPPORTS AND
ATTACHMENTS SHALL BE DESIGNED AND
CONSTRUCTED TO RESIST THE EFFECTS OF
EARTHQUAKE MOTIONS IN ACCORDANCE WITH
CHAPTERS 11, 12, 13, 15, 17 AND 18 OF ASCE 7.
3. ASCE 7 CONTRACTOR RESPONSIBILITY:
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
CONSTRUCTION OF A SEISMIC-FORCE-RESISTING
SYSTEM, DESIGNATED SEISMIC SYSTEM, OR
COMPONENT LISTED IN THE QUALITY ASSURANCE PLAN
SHALL SUBMIT A WRITTEN CONTRACTOR'S STATEMENT
OF RESPONSIBILITY TO THE REGULATORY AUTHORITY
HAVING JURISDICTION AND TO THE OWNER PRIOR TO
THE COMMENCEMENT OF WORK ON THE SYSTEM OR
COMPONENT. THE CONTRACTOR'S STATEMENT OF
RESPONSIBILITY SHALL INCLUDE THE FOLLOWING:
A. ACKNOWLEDGMENT OF AWARENESS OF THE
SPECIAL REQUIREMENTS CONTAINED IN THE
QUALITY ASSURANCE PLAN;
B. ACKNOWLEDGMENT THAT CONTROL WILL BE
EXERCISED TO OBTAIN CONFORMANCE WITH
THE CONSTRUCTION DOCUMENTS APPROVED
BY THE AUTHORITY HAVING JURISDICTION;
C. PROCEDURES FOR EXERCISING CONTROL
WITHIN THE CONTRACTOR'S ORGANIZATION, THE
METHOD AND FREQUENCY OF REPORTING AND
THE DISTRIBUTION OF THE REPORTS; AND
D. IDENTIFICATION AND QUALIFICATIONS OF THE
PERSON(S) EXERCISING SUCH CONTROL AND
THEIR POSITION(S) IN THE ORGANIZATION.
4. DIVISION 26 RESPONSIBILITIES:
A. HANGERS AND SEISMIC BRACING FOR
ELECTRICAL SYSTEMS SHALL BE DESIGNED AND
SPECIFIED BY DIVISION 26. DIVISION 26 SHALL
REFER TO THE ELECTRICAL DRAWINGS FOR
LOCATIONS OF EQUIPMENT AND ELECTRICAL
SYSTEMS AS STRUCTURAL DRAWINGS DO NOT
SHOW THE LOCATIONS OF ELECTRICAL
EQUIPMENT, RACEWAYS, AND OTHER
COMPONENTS.
B. DIVISION 26 SHALL COORDINATE THE SUPPORT
SYSTEMS AND DESIGN LOADS FOR HUNG
RACEWAYS AND OTHER ELECTRICAL SYSTEMS
(INCLUDING COMBINED MULTIPLE RACEWAY
RUNS) WITH THE GENERAL CONTRACTOR AND
THE STEEL AND WOOD JOIST MANUFACTURERS
IN ADDITION TO OTHER TRADES THAT MAY BE
IMPACTED.
GENERAL NOTES
1. PERFORM WORK IN ACCORDANCE WITH APPLICABLE
NATIONAL AND STATE CODES AS AMENDED LOCALLY
AND ENFORCED BY THE AHJ.
2. OBTAIN AND PAY FOR PERMITS REQUIRED FOR
INSTALLATION OF WORK. ARRANGE AND SCHEDULE
REQUIRED INSPECTIONS.
3. COORDINATE WITH UTILITY COMPANIES FURNISHING
SERVICES TO PROJECT. INSTALLATION OF UTILITY
SERVICES SHALL BE IN ACCORDANCE WITH UTILITY
REQUIREMENTS. VERIFY APPLICABLE INSTALLATION
STANDARDS AND REQUIREMENTS. PROVIDE AND
SUBMIT ELECTRICAL DRAWINGS TO UTILITY FOR
APPROVAL PRIOR TO ROUGH-IN AND PRIOR TO
ORDERING EQUIPMENT.
4. DEVICE LOCATIONS ARE APPROXIMATE.
COORDINATE DEVICE LOCATIONS AND ELEVATIONS
WITH APPROPRIATE DOCUMENTS PRIOR TO
ROUGH-IN.
5. COORDINATE ELECTRICAL WORK WITH THAT OF
OTHER TRADES. REFER TO CIVIL DRAWINGS AND
SPECIFICATIONS. COORDINATION SHALL OCCUR
PRIOR TO FABRICATION, PURCHASE, AND
INSTALLATION OF WORK.
6. COMPLETION OF WORK SHALL BE EXECUTED IN
ACCORDANCE WITH THE PROJECT SCHEDULE.
SCHEDULE INSTALLATION WITH OTHER TRADES TO
ENSURE PROJECT MILESTONES ARE MET.
7. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW
ALL COMPONENTS REQUIRED FOR A COMPLETE
INSTALLATION. PROVIDE COMPONENTS REQUIRED
FOR COMPLETE AND OPERATIONAL SYSTEMS
INCLUDING RACEWAYS, CONDUCTORS, BOXES,
SUPPORTS AND SIMILAR ITEMS.
8. BRANCH CIRCUIT HOMERUNS ARE SHOWN TO
INDICATE CIRCUIT PROPERTIES AND
CONFIGURATION. SINGLE-CIRCUIT HOMERUNS
SERVED FROM THE SAME PANELBOARD MAY BE
COMBINED IN ACCORDANCE WITH THE DIVISION 26
SPECIFICATIONS, UNLESS INDICATED OTHERWISE.
EXTEND AND CONNECT BRANCH CIRCUIT RACEWAY
AND WIRING FROM HOMERUN TO DEVICES AND
EQUIPMENT WITH CIRCUIT NUMBERS INDICATED.
CONDUCTOR QUANTITIES AND SIZES ARE INDICATED
AT HOMERUNS ONLY. SHOW ACTUAL RACEWAY
ROUTING AND CIRCUITING ON RECORD DRAWINGS.
MINIMUM CONDUCTOR SIZE #12 AWG.
9. LOCATIONS OF RACEWAY, PATHWAY AND SIMILAR
ITEMS ARE SHOWN SCHEMATICALLY. COORDINATE
INSTALLATION, INCLUDING BUT NOT LIMITED TO
CABLING, TELECOMMUNICATION PATHWAYS AND
SPACES, AND EXACT LOCATION OF HORIZONTAL AND
BACKBONE CABLING WITH LOCATIONS OF FIXED
CASEWORK AND BUILDING CONDITIONS AFFECTING
THE WORK OF THIS CONTRACT.
10. COORDINATE SECURITY WORK WITH THAT OF OTHER
TRADES. REFER TO ELECTRICAL AND CIVIL
DRAWINGS AND SPECIFICATIONS. COORDINATION
SHALL OCCUR PRIOR TO FABRICATION, PURCHASE,
AND INSTALLATION OF WORK.
11. NEW CABLING INSTALLATIONS SHALL BE CONCEALED
IN WALL, CEILINGS, AND BELOW RAISED FLOOR
SPACES UNLESS OTHERWISE NOTED ON THE
DRAWINGS. CABLING IN ACCESSIBLE CEILING
SPACES SHALL BE INSTALLED AS OPEN CABLING
NEAR STRUCTURES AND WALLS OR AS
SPECIFICALLY NOTED ON DRAWINGS. SEE
SPECIFICATIONS FOR SUPPORT REQUIREMENTS.
12. PROVIDE FIRESTOPPING SYSTEMS FOR CONDUIT
AND RACEWAY SYSTEMS AT PENETRATIONS,
SLEEVES AND SLOTS OF FIRE RATED CONSTRUCTION
FOR HORIZONTAL AND INTRABUILDING PATHWAYS
AND SPACES.
13. CATEGORY 6 CABLING: MAINTAIN A MINIMUM
SPACING OF 12" FROM ELECTRICAL FEEDERS AND
BRANCH CIRCUIT WIRING AND 12" FROM AUXILIARY
SYSTEM CABLING.
14. MINIMUM SPACING FROM ELECTRICAL APPARATUS
SUCH AS MOTOR DRIVEN EQUIPMENT AND
TRANSFORMERS SHALL BE 6'-0". SPACING
REQUIREMENTS SHALL APPLY TO OPEN CABLING
PATHWAYS WHERE EQUIPMENT IS LOCATED ON THE
SAME FLOOR, FLOOR ABOVE, FLOOR BELOW, OR IN
ROOMS ADJACENT TO SUCH EQUIPMENT AS THOUGH
WALLS AND FLOORS DID NOT EXIST. EXCEPTION:
BUILDING CONSTRUCTION THAT RESULTS IN
CONTINUOUS METALLIC BARRIER BETWEEN
ELECTRICAL APPARATUS AND CABLE PATHWAYS
SHALL BE CONSIDERED AS SUITABLE SEPARATION.
15. PRIOR TO STARTING SECURITY INSTALLATION,
CAREFULLY INSPECT INSTALLED WORK OF OTHER
TRADES AND VERIFY THAT SUCH WORK IS
COMPLETE TO THE POINT WHERE WORK MAY
PROPERLY COMMENCE. NOTIFY THE ARCHITECT
AND ENGINEER IN WRITING OF CONDITIONS
DETRIMENTAL TO THE PROPER AND TIMELY
COMPLETION OF THE WORK.
16. DO NOT BEGIN SECURITY INSTALLATION UNTIL ALL
UNSATISFACTORY CONDITIONS ARE RESOLVED.
BEGINNING WORK CONSTITUTES ACCEPTANCE OF
CONDITIONS AS SATISFACTORY.
17. THE CONTRACTOR SHALL PROVIDE ALL CONDUIT,
OUTLET BOXES, JUNCTION BOXES, RACEWAY
SYSTEMS, ETC. FOR A COMPLETE AND OPERATIONAL
PATHWAY SYSTEM FOR ALL SECURITY SYSTEMS PER
THE SCOPE OF WORK INDICATED ON THE
CONSTRUCTION DRAWINGS AND BID
SPECIFICATIONS.
18. ELECTRIC VEHICLE CHARGING STATIONS WILL BE
OWNER FURNISHED AND CONTRACTOR INSTALLED
(OFCI). FOR THE LEVEL 3 EVCS INSTALLATION PIERCE
COUNTY HAS CONTRACTED WITH A
MANUFACTURER'S SUPERVISOR/COMMISSIONER TO
BE ON-SITE TO SUPPORT/OVERSEE THE
CONTRACTOR'S INSTALLATION OF THE SYSTEM.
M METER
MAN METROPOLITAN AREA NETWORK
MAX MAXIMUM
MC MAIN CROSS CONNECT; METAL CLAD (CABLE)
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDF MAIN DISTRIBUTION FRAME
MDP MAIN DISTRIBUTION PANEL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MLO MAIN LUGS ONLY
MM MULTIMODE
MPOE MAIN POINT OF ENTRY
MPOP MAIN POINT OF PRESENCE
MTD MOUNTED
MTS MANUAL TRANSFER SWITCH
MV MEDIUM-VOLTAGE
(N) NEW
N NEUTRAL
NAC NOTIFICATION APPLIANCE CIRCUIT
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS
ASSOCIATION
NF NON-FUSED
NIC NOT IN CONTRACT
NL NIGHT LIGHT
OFC OPTICAL FIBER CABLE
OHL OVERHEAD LINE
OL OVERLOAD
OS OCCUPANCY SENSOR
OSP OUTSIDE PLANT
P POLE
PBX PRIVATE BRANCH EXCHANGE
PF POWER FACTOR
PH PHASE
PIR PASSIVE INFRARED
PIV POST INDICATING VALVE
PNL PANEL
PP PATCH PANEL
PT POTENTIAL TRANSFORMER
PVC POLYVINYL CHLORIDE
RC ROOM CONTROLLER
RCP REFLECTED CEILING PLAN
REC RECEPTACLE
REF REFER TO
REV REVISION
RM ROOM
RTRC REINFORCED THERMORESETTING RESIN
CONDUIT
RU RACK UNIT
SB STANDBY
SHT SHEET
SLC SIGNALING LINE CIRCUIT
SM SINGLEMODE
SMFC SURFACE-MOUNTED OPTICAL FIBER CABINET
SMR SURFACE METAL RACEWAY
SONET SYNCHRONOUS OPTICAL NETWORK
SP SERVICE PROVIDER
SPD SURGE PROTECTIVE DEVICE
SPEC SPECIFICATIONS
SPST SINGLE POLE SINGLE THROW
ST SHUNT TRIP
STP SHIELDED TWISTED PAIR
SVGA SUPER VIDEO GRAPHICS ARRAY
SW SWITCH
SWBD SWITCHBOARD
TBB TELECOMMUNICATIONS BONDING BACKBONE
TEL TELEPHONE
TELCO TELEPHONE COMPANY
TGB TELECOMMUNICATIONS GROUNDING BUSBAR
TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION
TMGB TELECOMMUNICATIONS MAIN GROUNDING
BUSBAR
TP TAMPERPROOF
TR TELECOMMUNICATIONS ROOM
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION
TYP TYPICAL
UG UNDERGROUND
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
USB UNIVERSAL SERIAL BUS
UTP UNSHIELDED TWISTED PAIR
UV UNIT VENTILATOR
V VOLTS
VA VOLT AMPERES
VFD VARIABLE FREQUENCY DRIVE
W WATT; WIRE
W/ WITH
W/O WITHOUT
WA WORKSTATION AREA
WAN WIDE AREA NETWORK
WG WIRE GUARD
WH WATT HOUR METER
WP WEATHERPROOF
XFMR TRANSFORMER
Y WYE
Z IMPEDANCE
A AMPERE
AC AIR CONDITIONING; ALTERNATING CURRENT;
ABOVE COUNTER
AF AMP FUSE; AMP FRAME
AFC AVAILABLE FAULT CURRENT
AFF ABOVE FINISHED FLOOR
AG ABOVE GRADE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
AIC AMPERE INTERRUPTING CURRENT
AL ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AS AMP SWITCH
AT AMP TRIP
ATM ASYNCHRONOUS TRANSFER MODE
ATS AUTOMATIC TRANSFER SWITCH
AV AUDIO VISUAL
AWG AMERICAN WIRE GAUGE
BAS BUILDING AUTOMATION SYSTEM
BATT BATTERIES
BIL BASIC IMPULSE INSULATION LEVEL
BKBD BACKBOARD
BKR BREAKER
BLDG BUILDING
C CONDUIT; DEGREES CELSIUS
CAB CABINET
CAT CATEGORY
CATV COMMUNITY ANTENNA TELEVISION
CB CIRCUIT BREAKER
CCTV CLOSED CIRCUIT TELEVISION
CLG CEILING
CM CEILING-MOUNTED
CO CONDUIT ONLY
COW COMPUTER ON WHEELS
CR CONTROLLED RECEPTACLE
CT CURRENT TRANSFORMER
CU COPPER
D DEDICATED
DDC DIRECT DIGITAL CONTROL
DEMARC DEMARCATION POINT
DISC DISCONNECT
DIST DISTRIBUTION
DSL DIGITAL SUBSCRIBER LINE
DWG DRAWING
(E) EXISTING
EA EACH
EF EXHAUST FAN
EIA ELECTRONIC INDUSTRIES ASSOCIATION
ELEV ELEVATION
EM EMERGENCY
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPM ELECTRONIC POWER METER
EPO EMERGENCY POWER OFF
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EVCS ELECTRIC VEHICLE CHARGING STATION
EVSE ELECTRIC VEHICLE SERVICE EQUIPMENT
EWC ELECTRIC WATER COOLER
F FUSE; DEGREES FAHRENHEIT
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FBO FURNISHED BY OWNER
FC FOOT-CANDLE
FOIC FURNISHED BY OWNER INSTALLED BY
CONTRACTOR
FOIO FURNISHED BY OWNER INSTALLED BY OWNER
FSD FIRE SMOKE DAMPER
G GROUND
GB GROUND FAULT CIRCUIT BREAKER
GF GROUND FAULT CIRCUIT INTERRUPTER
GFP GROUND FAULT PROTECTION
GND GROUND
GRS GALVANIZED RIGID STEEL
HC HORIZONTAL CROSS CONNECT
HID HIGH INTENSITY DISCHARGE
HP HORSEPOWER
HTR HEATER
Hz HERTZ
IBC INTERNATIONAL BUILDING CODE
IC INTERMEDIATE CROSS CONNECT
IDF INTERMEDIATE DISTRIBUTION FRAME
IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC
ENGINEERS
IG ISOLATED GROUND
IMC INTERMEDIATE METALLIC CONDUIT
ISDN INTEGRATED SERVICES DIGITAL NETWORK
J JUNCTION
K KIRK KEY
KCMIL THOUSAND CIRCULAR MILS
kVA KILOVOLT AMPERE
KVAR KILOVOLT AMPERE REACTIVE
kW KILOWATT
LAN LOCAL AREA NETWORK
LCP LIGHTING CONTROL PANEL
LEC LOCAL EXCHANGE CARRIER
LT LIGHT
LTG LIGHTING
M METER
MAN METROPOLITAN AREA NETWORK
S
(FRONT)
PAD MOUNTED TRANSFORMER
PAD MOUNTED MEDIUM VOLTAGE SWITCH
ELECTRIC VEHICLE CHARGING STATION
ACCESS CONTROL SYSTEM
ACCESS CONTROL PANEL
CREDENTIAL/ CARD READER
(CR = CARD READER, WALL MOUNTED)
(CR/P = CARD READER W/PIN, WALL MOUNTED)
(CR/M = CARD READER, MULLION MOUNTED)
ELECTRIFIED HARDWARE
(EL = ELECTRIFIED LOCKSET/EXIT DEVICE)
DOOR POSITION SWITCH
ACP
S
CR
EL
SECURITY VIDEO SYSTEM
CAMERA, POLE-MOUNTED
VIDEO SECURITY CAMERA MOUNTING TYPES
(P = PENDANT MOUNTED)
(R = ROOF PARAPET MOUNTED)
(W = WALL MOUNTED W/ BRACKET)
C Y
VIDEO SECURITY CAMERA ID
(WHERE APPLICABLE REPRESENTS THE CAMERA # OR TYPE)
C
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
ZT
MM
DS
PL
O
T D
AT
E/
TI
M
E:
.1 8.
:3
AM
U
SE
R : Z
AC
H
.T H
O R
SO
N
FI
LE
N
AM
E
AN
D P
AT
H
: M :\J
O
BS
\2 4\
5\
A nn ex E
V In fra st ru ct ur e\
C
AD
\A ut oC
AD
\E 0.
LE
G
EN
D
, A
BB
R
EV
N
O
TE
S.
dw g
ELECTRICAL LEGEND,
ABBREVIATIONS, AND
GENERAL NOTES
E0.01
4.17.2026
LIGHT FIXTURE SCHEDULE
TYPE DESCRIPTION MANUFACTURER MODEL SERIES
LIGHT COLOR DELIVERED INPUT
FINISH NOTESSOURCE TEMP LUMENS WATTS
E1 EXTERIOR POLE-MOUNT LED FIXTURE WITH TYPE 3 MEDIUM DISTRIBUTION; SQUARE POLE
MOUNTING. LITHONIA DSX1 FIXTURE LED 4000K 16,032 125 -
P1 5" DIAMETER STRAIGHT SQUARE STEEL POLE; DUAL CHANNELS FOR CLASS 1 AND CLASS 2
CABLING LITHONIA SSS POLE - - - - - 1
NOTES:
1. MATCH POLE HEIGHT TO EXISTING POLES ON SITE, APPROXIMATELY 20'-0" AFG. ADJUST AS NECESSARY TO ACCOMMODATE POLE BASE. SEE SHEET E8.03 FOR POLE BASE DETAIL.
VAULT/HANDHOLE SCHEDULE
VAULT TYPE MANUFACTURER VAULT MODEL COVER MODEL COVER RATING COVER LABEL VAULT INNER DIMENSIONS NOTES
(L X W X D)
V1 OLDCASTLE 774-LA 77-8-T-1860 MEDIUM DUTY: H-20 OFF STREET ELECTRIC 6'-4" X 6'-4" X 3'-1" 1,2,3
V2 OLDCASTLE 575-PCORP 84/112-2-33F-1660 MEDIUM DUTY: H-20 OFF STREET ELECTRIC 4'-2" X 6'-6" X 4'-0" 1,2,3
V3 OLDCASTLE 444-LA 44-332P MEDIUM DUTY: H-20 OFF STREET ELECTRIC 3'-6" X 3'-6" X 3'-2" 1,2,3
HH3 PENCELL PM121224GSY PM1212CLH00065 MEDIUM DUTY: H-20 OFF STREET ILLUMINATION 1'-0" X 1'-0" X 2'-0" 4,5
T1 OLDCASTLE 233-LA 23-2436P MEDIUM DUTY: H-20 OFF STREET COMMUNICATIONS 3'-8" X 2'-8" X 3'-6" 1,2,3
HH1 JENSEN PRECAST HT1730-12B HT1730 MEDIUM DUTY: H-20 OFF STREET COMMUNICATIONS 1'-5" X 2'-6" X 1'-0" 1,2,3,5
HH2 PENCELL PM121224GSY PM1212CLH00012 MEDIUM DUTY: H-20 OFF STREET COMMUNICATIONS 1'-0" X 1'-0" X 2'-0" 4,5
NOTES:
1. PROVIDE CABLE RACKING
2. COVER TO BE PROVIDED WITH RECESSED PADLOCK HASP
3. COORDINATE VAULT PLACEMENT WITH CIVIL DRAWINGS
4. PROVIDE BOLT DOWN COVER.
5. PROVIDE A MINIMUM OF 6" OF CRUSHED GRAVEL BELOW THE BASE OF THE HAND HOLE.
ELECTRIC VEHICLE CHARGING EQUIPMENT SCHEDULE - LEVEL 3
EQUIPMENT
TAG DESCRIPTION VOLTAGE PHASE KW CONNECTION TYPE
BRANCH CIRCUIT
NOTES
RACEWAY PHASE N G
LV3-0 KEMPOWER - POWER UNIT 480 3 400 HARDWIRED SEE ONE-LINE DIAGRAM 1,5
LV3-1
KEMPOWER - LEVEL 3 EV CHARGER 480 3 200 HARDWIRED SEE ONE-LINE DIAGRAM 1,2
KEMPOWER - COMMUNICATIONS CONDUIT - - - - 1"CO - - - 3
LV3-2
KEMPOWER - LEVEL 3 EV CHARGER 480 3 200 HARDWIRED SEE ONE-LINE DIAGRAM 1,2
KEMPOWER - COMMUNICATIONS CONDUIT - - - - 1"CO - - - 3
LV3-3
(FUTURE)
KEMPOWER - LEVEL 3 EV CHARGER - - - - 3"CO - - -
KEMPOWER - COMMUNICATIONS CONDUIT - - - - 1"CO - - - 3,4
NOTES:
1. COORDINATE FINAL CONNECTIONS AND LOCATION WITH OWNER PRIOR TO ROUGH-IN.
2. UNIT PROVIDED WITH INTERNAL DISCONNECTING MEANS.
3. PROVIDE CONDUIT FROM POWER UNIT TO LEVEL 3 CHARGER SATELLITE FOR TELECOM CONNECTION BY OWNER.
4. PROVIDE CONDUIT TO FUTURE EV STATION. TURN UP AND CAP CONDUIT AT FUTURE EV LOCATION.
5. POWER UNIT SUPPLIES POWER TO THE EV CHARGER SATELITES VIA DC CABLES. KW SHOWN IN TABLE IS THE MAXIMUM FOR THE LV3 EV SYSTEM.
ELECTRIC VEHICLE CHARGING EQUIPMENT SCHEDULE - LEVEL 2
EQUIPMENT
TAG DESCRIPTION VOLTAGE PHASE KW CONNECTION TYPE
BRANCH CIRCUIT
NOTES
RACEWAY PHASE N G
LV2-1 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-2 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-3 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1,2
LV2-4 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1,2
LV2-5 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1,2
LV2-6 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1,2
LV2-7 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-8 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-9 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-10 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-11 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
LV2-12 G9 - 40A LEVEL 2 EV CHARGER 208 1 8.3 HARDWIRED 1" 2#6 - 1#10 1
NOTES:
1. COORDINATE FINAL CONNECTIONS AND LOCATION WITH OWNER PRIOR TO ROUGH-IN.
2. SEE SHEET E1.02 FOR HOMERUN WITH SHARED CONDUIT FROM VAULT TO PANEL EV1.
IP SECURITY VIDEO CAMERA SCHEDULE
CAMERA NO. CAMERA
TYPE MANUFACTURER MODEL SHEET NO. ROOM / AREA MOUNTING
TYPE
NATIVE
RESOLUTION
STREAMING
PROTOCAL
RECORDING
RESOLUTION
RECORDING FRAMES
PER SECOND
VIEWING
RESOLUTION
VIEWING FRAMES
PER SECOND FIELD OF VIEW NOTES
C01 8MP AXIS P1488-LE E1.03 SITE POLE 8MP H.265 8MP 15 FPS 8MP 15 FPS EV CHARGING 1
C02 8MP AXIS P1488-LE E1.03 SITE POLE 8MP H.265 8MP 15 FPS 8MP 15 FPS EV CHARGING 1
C03 8MP AXIS P1488-LE E1.03 SITE POLE 8MP H.265 8MP 15 FPS 8MP 15 FPS PEDESTRIAN GATE 1
C04 8MP AXIS P1488-LE E1.03 SITE POLE 8MP H.265 8MP 15 FPS 8MP 15 FPS PARKING LOT 1
C05 8MP AXIS P1488-LE E1.03 SITE POLE 8MP H.265 8MP 15 FPS 8MP 15 FPS VEHICLE GATE 1
GENERAL NOTES:
A. CAMERAS SHALL BE PROGRAMMED PER MANUFACTURER RECOMMENDATIONS UNLESS NOTED OTHERWISE, SEE SECTION 282300 FOR ADDITIONAL INFORMATION.
B. CAMERAS AND MOUNTS SHALL BE PART OF BID ALTERNATE #1.
NOTES:
1. COORDINATE FINAL INSTALLATION HEIGHT WITH OWNER PRIOR TO INSTALLATION
IP SECURITY VIDEO ROUGH-IN SCHEDULE
SYMBOL MOUNTING HEIGHT DEVICE NAME BOX CONDUIT MUD RING DETAIL NOTESQTY SIZE QTY SIZE TERM LOCATION
SEE NOTE CAMERA
POLE MOUNT 1 NEMA 4X
ENCLOSURE 1 SEE SITE
PLAN SEE SITE PLAN - 1/E8.04 1,2
NOTES:
1. PROVIDE CAMERA AND MOUNTS AS PART OF BID ALTERNATE #1.
2. COORDINATE FINAL CAMERA MOUNTING HEIGHT WITH OWNER PRIOR TO INSTALLATION.
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
ZT
MM
DS
PL
O
T D
AT
E/
TI
M
E:
.1 8.
:3
AM
U
SE
R : Z
AC
H
.T H
O R
SO
N
FI
LE
N
AM
E
AN
D P
AT
H
: M :\J
O
BS
\2 4\
5\
A nn ex E
V In fra st ru ct ur e\
C
AD
\A ut oC
AD
\E 0.
LE
G
EN
D
, A
BB
R
EV
N
O
TE
S.
dw g
ELECTRICAL
SCHEDULES
E0.02
E1.03
E1.02
E6.01
E3.01
SHEET NOTES
1. COORDINATE PLACEMENT OF VAULTS AND RACEWAY WITH DIVISION
31, CIVIL, CONTRACTORS. COORDINATE WITH TREE PROTECTION
AND AVOID CRITICAL ROOT ZONES OR EXISTING TREES. CONFLICTS
SHALL BE COMMUNICATED TO ARCHITECT FOR RESOLUTION PRIOR
TO COMMENCEMENT OF SITE WORK.
2. INSTALLATION OF CONDUITS AND VAULTS SHALL INCLUDE BUT NOT
LIMITED TO TRENCHING, BACKFILL, TAMPING OF EARTH,
DETECTABLE MARKER TAPE AND WHERE INDICATED CONCRETE
ENCASEMENT.
3. CONDUITS SHALL BE ENCASED WITH CONCRETE WHERE PASSING
UNDER BUILDING FOUNDATIONS AND AT STREET/ PARKING LOT
CROSSINGS. EXTEND ENCASEMENT 60" ON EACH SIDE OF
CROSSING.
4. WATERTIGHT SEAL SHALL BE PROVIDED FOR EACH CONDUIT INSIDE
THE VAULT AND WITHIN THE BUILDING AFTER BACKBONE/ DEMARC
CABLING HAS BEEN INSTALLED. SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
5. EXISTING DEVICES SHOWN ARE DIAGRAMMATIC BASED ON
AVAILABLE RECORD DRAWINGS AND SITE WALKS DURING THE
DESIGN PERIOD. FIELD VERIFY DEVICE LOCATIONS AND QUANTITIES
PRIOR TO COMMENCING WORK.
PI
ER
C E
C O
U N
TY
AN
N
EX
E
VS
E
SE
R
VI
C E
S . 3
5T H
S T
TA
C
O M
A, W
A
APPROVED BY
PROJECT NO.
CHECKED BY
DRAWN BY
HARGIS PROJECT NO.
SHEET TITLE
SHEET NUMBER
REV. RELEASE DATE
CD SET 04/17/26
24-00003 24095.03
ZT
MM
DS
PL
O
T D
AT
E/
TI
M
E:
.1 8.
:3
AM
U
SE
R : Z
AC
H
.T H
O R
SO
N
FI
LE
N
AM
E
AN
D P
AT
H
: M :\J
O
BS
\2 4\
5\
A nn ex E
V In fra st ru ct ur e\
C
AD
\A ut oC
AD
\E 1.
Si te
P la n.
dw g
N
SITE PLAN
SCALE: 1" = 20'-0"
E1.01
SITE PLAN
E1.01
PLANNED TPU SERVICE
POLE LOCATION
PANEL EV1-1
E1 & P1
(E) LIGHT FIXTURE
MOTORIZED GATE
PANEL Z1-12,14,16
SEE E3.01 FOR
CONTINUATION
V3
1"C - 2#8, 1#10G1"C - 3#10, 1#10G
E8.03
E8.01
HH
PANEL M-25
E8.02
EV EVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEV
LV3-1
EQUIPMENT YARD
EV1-1 - 9,11 EV1-1 - 6,8 EV1-1 - 2,4 EV1-1 - 1,3 EV1 - 10,12 EV1 - 9,11 EV1 - 6,8 EV1 - 2,4 EV1 - 1,3
SWBD-
EVSEEV1 - 5,7
SWBD-
EVSEEV1-1 - 5,7
3 3 3 3 3 3 3 3 3
LV2-4
3 3 3 2 2
LV3-2
LV3-3
EV1-1 - 10,12
LV2-1LV2-2LV2-3LV2-5LV2-6LV2-7LV2-8LV2-9LV2-10LV2-11LV2-12
FUTURE
V3V3
1-1/2"C - 8#6, 1#10G 2-1/2"C - 4#4/0, 1#2G
2-1/2"CO
2-1/2"C - 4#4/0, 1#2G
2-1/2"CO
2-1/2"C - 4#4/0, 1#2G
E7.01
4"CO
TO PANEL EV1
TO EV3-0
TO TPU UTILITY XFMR
HH3
E8.01
E8.01
E8.01
PANEL EV1-1-42
FLAG NOTES
SHEET NOTES
1. REFER TO CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
2. COORDINATE PLACEMENT VAULTS AND RACEWAY WITH DIVISION 31
(CIVIL) CONTRACTORS. SEE CIVIL SHEETS FOR TRENCH PATHWAYS.
3. COORDINATE ELECTRICAL UTILITY SERVICE WITH UTILITY PRIOR TO
COMMENCING WORK. COMPLY WITH UTILITY INSTALLATION
REQUIREMENTS.
4. REFER TO ONE-LINE DIAGRAM ON SHEET E9.01 FOR ADDITIONAL
INFORMATION.
5. PROVIDE UNDERGROUND CONDUIT PER TRENCHING…