2-BPM006951 Attachment 09 - Proposed Subcontractors.docx
DOCX document 47 KB Posted
- Attached to
- Master Agreement AZ|CTR077821
- Contract number
- CTR077821
- Issued by
- Arizona
About this file
This document is an attachment to a Request for Proposal (RFP) for solicitation number BPM00006951 issued by the Arizona Department of Emergency & Military Affairs (DEMA) for Emergency Management Training. The document specifically outlines proposed subcontractors for ICS Consultants LLC, detailing potential instructors, facilitators, and evaluators who will support the contract.
The proposed subcontractor list includes 13 individuals, with each planned to perform instructor, facilitator, and evaluator roles at 10% of the total contract work. Three subcontractors (Don Weaver, Alan Sinclair, and Susan Taylor-Hall) are designated as small businesses. All proposed subcontractors will be responsible for coordination, preparation, oversight, and potentially co-instructing training activities. The document indicates that these individuals will provide comprehensive support for emergency management training services, with potential future instructors also included in the lineup.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 09 – Proposed Subcontractors
Contractor Name: ICS Consultants LLC
Check “NO” if you WILL NOT subcontract any portion of the Work and will therefore be performing all of the Work with your own personnel.
| ☐ |
| NO, the Offeror will not subcontract any portion of the Work. |
If you WILL subcontract any portion of the Work, check “YES” below and list the name(s) of persons or companies you propose to use as Subcontractors.
1. Fill in the information for each significant Subcontractor – indicate the type of work the Subcontractor will perform under the Contract and their approximate percentage of the total Contract work;
2. Provide copies of relevant certifications each person or firm possesses attached to this form; AND
3. Provide a description of quality assurance (QA) and quality control (QC) measures that you will use to ensure that Subcontractor’s work meets the Contract requirements.
State may demand additional information about proposed Subcontractors as a precondition of Award.
| x |
| YES, the Offeror will use the Subcontractors listed below: |
Request for Proposal
Solicitation No. BPM00006951
DEMA Emergency Management Training Arizona Department of Emergency & Military Affairs
Solicitation Attachment – Proposed Subcontractors | Revision No. 1 | Revised 11-22
| No. |
| Name and contact information |
| Small business |
| Work to be performed and QA/QC measures |
| % |
| 1. |
| Don Weaver |
Don.weaverco@outlook.com Yes
Instructor/ Facilitator/ Evaluator Coordination, preparation, and oversight and/or co-instructor
| 2. |
| Bob Orill |
Boborrill@gmail.com
No
Instructor/ Facilitator/ Evaluator Coordination, preparation, and oversight and/or co-instructor
| 3. |
| Alan Sinclair |
A13sinclair@gmail.com
Yes
Instructor/ Facilitator/ Evaluator Coordination, preparation, and oversight and/or co-instructor
| 4. |
| Allen Clark |
Aclark@asu.edu
No Instructor/ Facilitator/ Evaluator Coordination, preparation, and oversight and/or co-instructor
| 5. |
| Katie Brown |
Katieallanbrown@gmail.com
| No |
| Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
| 6. |
| Vicki Clay |
Vclay01@gmail.com
| No |
| Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
7.
Aaron Glass azbombero@gmail.com
No
Instructor/ Facilitator/ Evaluator Coordination, preparation, and oversight and/or co-instructor
| 8. |
| Brian Lauber |
Azfire2@gmail.com
| No |
| Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
| 9. |
| Aaron Graeser |
Crew52076@yahoo.com
| No |
| Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
| 10. |
| Kenny Barnes |
KBarnes3115 @gmail.com
| No |
| Future Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
| 11. |
| John Gillis |
1304johng@gmail.com
| No |
| Future Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
| 12. |
| Shane Clark |
SGclark15@yahoo.com
| No |
| Future Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
| 13. |
| Susan Taylor-Hall |
etcassociate@gmail.com
| Yes |
| Future Instructor/ Facilitator/ Evaluator |
Coordination, preparation, and oversight and/or co-instructor
Solicitation Attachment – Method of Approach | Revision No. 1 | Revised 11-22 image1.jpg
File details come from the government source that posted it. Updated .