This document is a Request for Proposal (RFP) for the 26-08063-P-AW Electrical Switchgear Bundle project by Arlington Public Schools (APS), utilizing a Construction Manager at Risk (CM at Risk) procurement method. The solicitation invites qualified contractors to submit online proposals for an electrical switchgear bundle project through the Bonfire online platform, with all submissions required to be made electronically by the specified due date. Proposals must comprehensively address company qualifications, project methodology, approach, and include mandatory documentation such as No Influence and Non-Collusion Affidavit, E-Verify Affidavit, and a general contractor's license.
The evaluation process is structured in two phases, with a total of 100 possible points distributed across company qualifications (35 points), methodology and approach (45 points), and percentage of fees (20 points). Phase 1 involves an initial screening of proposals, with top-rated submissions potentially advancing to Phase 2, which includes presentations and interviews. The final selection will be based on factors including project history, construction approach, project management team qualifications, minority subcontractor outreach, project schedule, and current workload. APS reserves the right to negotiate terms, request best and final offers (BAFOs), and conduct concurrent or exclusive negotiations with selected vendors to meet the district's needs.
View the file
Other files for this state and local contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
26-08063-P-AW Electrical Switchgear Bundle (CM at Risk)
SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA
1.0 SUBMISSION REQUIREMENTS
1.1 Proposal shall be submitted online via the following link:
https://aps.bonfirehub.com/opportunities/202522.
1.2 ALL forms listed on the OFFEROR’S AFFIRMATION page MUST be completed.
Failure to answer all questions or submit all forms as listed in section 6 of the Offer’s Affirmation will result in your proposal being deemed non-responsive.
1.3 APS will not consider any proposal received online after the due date. APS will only accept online submissions for this RFP. Proposals can be submitted online at:
https://aps.bonfirehub.com/opportunities/202522 . Proposals submitted after the proposal close date will not be accepted. Note: Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
1.4 Proposals cannot be withdrawn after they have been submitted online unless the offeror requests in writing to the Executive Director of Procurement Services prior to the time set for receiving bids, or unless the Executive Director of Procurement Services fails to accept or reject the bids within one hundred and twenty (120) days after the date fixed for receiving said proposals.
1.5 Proposals that contain irregularities of any kind and/or do not comply fully with the requirements stated in the solicitation documents may be rejected at the discretion of the Executive Director of Procurement Services. APS shall not be liable for any costs associated with or incurred by the offeror in conjunction with the preparation of solicitation responses.
1.6 APS reserves the right to waive any minor informality or error in the solicitation or offeror’s proposal which will not adversely affect competition.
1.7 By submitting a response the offeror certifies that this proposal is made without prior understanding, agreement, or connection with any corporation, company, or person submitting a bid for the same service and is in all respects fair and without collusion or fraud; that collusive pricing is understood to be a violation of state and federal law and can result in fines, prison sentences, and civil damage awards.
1.8 It is further agreed that the offeror agrees to abide by all conditions of the solicitation, notice of award, and/or purchase order(s) of APS and that the person signing this bid is duly authorized to bid on behalf of the offeror.
https://aps.bonfirehub.com/opportunities/202522 https://aps.bonfirehub.com/opportunities/202522
1.9 Failure to provide an online submission with the correct information listed may result in the rejection of the proposal. If further information is required to demonstrate responsibility such as providing copies of licenses or permits, APS reserves the right to notify the offeror in writing and give five (5) days from notification to supply such information.
1.10 The offeror shall submit an online proposal with a response that fully answers each question listed on the online submission. Failure to answer all questions may result in the proposal being deemed non-responsive. The offeror must reference each section as listed below.
2.0 Proposal Requirements
2.1 Company History, Qualifications, and Experience
2.1.1 Please provide your firm’s history of completing renovation and addition projects with similar scopes, schedules, and costs on schedule, within the budget, and with the quality specified.
2.1.2 Please present your firm’s current workload, proposed manpower, and potential ability to satisfactorily complete the project.
2.1.3 Please provide your firm’s history and potential ability to close out a project and quality response to warranty requests.
2.1.4 Please provide your firm’s provisions for quality control and approach to controlling and correcting deficiencies.
2.2 Methodology and Approach
2.2.1 Please provide your suitability of the proposed project team including the
Site Superintendent including availability.
2.2.2 Please provide your firm’s approach to the project based on the APS schedule including design completion, permitting, construction phasing, etc.
2.2.3 Please provide your proposed CPM schedule for the project broken down by phases including design, permitting, construction, furnishing and close out, etc.
2.2.4 Please provide your plan for minority subcontractor outreach and prequalification.
2.2.5 Please provide your proposed efforts to obtain comprehensive bid coverage.
3.0 Percentage of Fees
3.1 Submit the Percentage of Fees and GCs on the bid table attached in Bonfire under public documents. The Fee sheet is for informational purposes when formulating the percentage Fees and GCs. submit percentages.
4.0 Mandatory Submittals
4.1 Proposals MUST include the signed:
4.1.1 No Influence and Non-Collusion Affidavit,
4.1.2 E-Verify Affidavit.
4.1.3 Submit a copy or other proof of your general contractor's license.
5.0 PAYMENT AND PERFORMANCE BONDS; INSURANCE
5.1 If the proposal or any part of the proposal is accepted and a contract awarded, the contractor shall within the required time enter into a written contract and furnish Payment and performance bond(s) as required by the contract and specifications, or the call for proposals, or by law, in the amount of at least the total amount payable by the terms of the contract with a surety acceptable to Owner.
5.2 If the proposal or any part of the proposal is accepted and a contract awarded, the contractor shall furnish current insurance certificates for the coverage and on the terms and conditions required by the contract. The insurance certificates shall be provided to APS within five (5) days of the contractor’s receipt of the Intent to Award.
6.0 EVALUATION
6.1 To be eligible for consideration, proposals shall be presented in accordance with the instructions of this solicitation and within the timeframe specified. It shall be the responsibility of the awarded vendor to meet all specifications and guidelines set forth herein.
6.2 An APS evaluation committee will evaluate each proposal that is deemed responsive. APS, at its sole discretion, determines the criteria and process whereby proposals are evaluated and awarded. No damages shall be recoverable by any challenger as a result of the determinations or decisions by APS.
6.3 APS reserves the right during the evaluation process to contact offerors who submit Proposals and request additional information or clarification necessary to complete the evaluation.
6.4 After the closing date and time, Procurement Services will conduct an administrative review of all proposals received to determine responsiveness.
Proposals that are deemed to be responsive will be submitted to the evaluation committee for review. Proposals that are deemed to be non-responsive will not be evaluated or considered for the award.
6.5 APS will evaluate all proposals and reserves the right to develop a competitive range for consideration. The competitive range is defined as a group for competitive negotiation, as determined during the evaluation process, composed of only those proposals with higher point scores that are considered to have a reasonable chance of being selected for an award and who are, therefore, chosen for additional discussions and negotiations. Proposals not in the competitive range are given no further consideration.
6.6 Proposals will be evaluated on the following criteria:
Criteria for Phase I Points Possible
Company Qualification and
Experience
The firm’s history of completing similar complex renovation projects on schedule, within budget, and with the quality specified
The firm’s current workload with APS and others proposed manpower, and potential ability to complete the project
The firm’s ability to close out a project and respond to warranty requests
The firm’s provisions for quality control and approach to controlling and correcting deficiencies
Methodology and Approach 45
Suitability of the proposed project team including the Site
Superintendent and availability
The proposed approach to the project includes a phasing plan, potential impacts, proposed solutions, logistics plan, temporary facilities, security, and project completion
The proposed CPM schedule for the project is broken down into phases including design, permitting, construction, furnishing, close-out, etc.
Your plan for MWBE subcontractor outreach and pre-qualification
Proposed efforts to obtain comprehensive bid coverage
Percentage of Fees (Fees and GCs) 20
TOTAL 100
6.7 The formula for evaluating fees is as follows:
Lowest sum of fee percentage and general conditions percentage / the sum of the fee percentage and general conditions percentage of the proposal being evaluated = pricing/fee score.
6.8 It is anticipated that the top evaluated proposals submitted in Phase 1 will be shortlisted and may be asked to participate in presentations/interviews as a part of Phase 2 of the evaluation process. APS, at its sole discretion, will determine which/how many proposals will move forward into Phase 2
6.9 APS reserves the right to NOT hold a Phase 2 presentation/interview.
7.0 PHASE 2
Should a Phase 2 presentation be deemed necessary, the following shall apply:
7.1 Offerors who have been shortlisted will be invited to participate in the presentation/interview Phase of the RFP process.
7.2 The shortlisted offerors will be sent an email outlining the date/time/agenda of their scheduled invitations.
7.3 Offerors who chose not to participate in the presentation/interview process will be removed from consideration for an award.
7.4 Phase 1 scores will not be considered as part of Phase 2 scoring. Phase 2 will be the final score of the evaluation process.
7.5 Phase 2 Presentation/interviews will be evaluated on the following criteria:
Criteria for Phase II Points Possible
Presentation 80
Company history in completing complex renovations, additions, and new construction projects on schedule, within budget, and with the quality specified.
Project approach, including design completion, permitting, construction phasing, etc., and potential to satisfactorily complete the project.
Qualification of the proposed Project Management Team and potential to satisfactorily complete the project.
Your plan for MWBE subcontractor outreach and pre-qualification
Project Schedule and potential to satisfactorily complete 10
The firm’s current workload with APS and other proposed manpower, and potential ability to complete the project (Discuss Current and Future Workload Form)
Fee 20
Percentage of Fees (Fees and GCs) 20
TOTAL 100
Except for Pricing/Cost, Phase 1 scores will not be considered as part of Phase 2 scoring. Phase 2 will be the final score of the evaluation process. Unless BAFOs are requested, the points allocated to Pricing/Cost in Phase 1 will carry over to Phase 2.
7.6 APS reserves the right to request a best and final offer (BAFO) from offerors during either Phase 1 or Phase 2 of the evaluation process.
7.7 APS reserves the right to negotiate terms and conditions, scope of work, price, and/or non-price terms and conditions with selected vendor(s) to meet the needs of the district.
7.8 Negotiations may be:
7.8.1 Concurrent which may be conducted concurrently with multiple offerors.
7.8.2 Exclusive which may be conducted with the offeror whose proposal is the highest rated overall.