Q&A.docx

DOCX document 14 KB Posted

Attached to
Reconfiguration of the Vibration Environmental Chamber Box, Duct Work, and Support Structure
Solicitation number
18-233-SOL-00167
Issued by

About this file

Last Q&A

View the file

Other files

File Type Posted
Technical_Requirement_DRD_2637.docx DOCX document
Answers.pdf PDF
InitialQuestions.pdf PDF
UCF_-_Vibration_Chambers_(updated).pdf PDF
Vibration_Environmental_Box.docx DOCX document
Vibration_Chamber_Air_Ducting_Verification.docx DOCX document
Answers.pdf PDF
Return_Air-Vibration_Chamber.docx DOCX document
Vibration_Environmental_Box.docx DOCX document
Vibration_Chamber_Air_Ducting_Verification.docx DOCX document
Return_Air-Vibration_Chamber.docx DOCX document
Appendix_A-Doc1(Head_Expander).pdf PDF
UCF_-_Vibration_Chambers_(Updated03-01-2018).pdf PDF
Appendix_C-Doc2_(Over_View).pdf PDF
Appendix_B-Doc1_(Layout_Horizontal).pdf PDF
Appendix_B-Doc2_(Layout_Vertical).pdf PDF
18-233-SOL-00167_SF1449.pdf PDF
UCF_-_Vibration_Chambers.pdf PDF
Attachment_B_-_Picture.docx DOCX document
Attachment_A_-_Picture.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions -- What is the cycle time between temperatures of -60 degrees and +160 degrees?

Is the cycle time from an extreme to room temperature, or from one extreme to the other

Answers -- To address the temperature question the contractor must understand that the two different temperatures i.e. high and low, is not a cycle they are the high temperature that the system must be able to hold. The system would be started the day before and run all night to get to the temperature for testing the next day. It is the same for the low temperature, with an exception that we can use CO2 to run the temperature down faster and then hold with the system. I don't know of any requirement that they have to get the temperature down or up within a set time. If they build the system to provide the required air flow and be able to retain the temperature our system is what will drive the time to get to that temperature of high or low. What they are to provide is the box, duct work, and the other listed deliverables as stated in the requirements. Is this contractor attempting to build a complete new system? If so they do not understand what we are asking for. The MIL-STD-810 states that the max temperature change is no more than 5 deg. F per min. when going from room temperature to high or low temperature.