Appendix_C-Doc2_(Over_View).pdf
PDF 172 KB Posted
- Attached to
- Reconfiguration of the Vibration Environmental Chamber Box, Duct Work, and Support Structure
- Solicitation number
- 18-233-SOL-00167
About this file
Full Overview specifications and measurements
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A.docx | DOCX document | |
| Technical_Requirement_DRD_2637.docx | DOCX document | |
| Answers.pdf | ||
| InitialQuestions.pdf | ||
| UCF_-_Vibration_Chambers_(updated).pdf | ||
| Vibration_Environmental_Box.docx | DOCX document | |
| Vibration_Chamber_Air_Ducting_Verification.docx | DOCX document | |
| Answers.pdf | ||
| Return_Air-Vibration_Chamber.docx | DOCX document | |
| Vibration_Environmental_Box.docx | DOCX document | |
| Vibration_Chamber_Air_Ducting_Verification.docx | DOCX document | |
| Return_Air-Vibration_Chamber.docx | DOCX document | |
| Appendix_A-Doc1(Head_Expander).pdf | ||
| UCF_-_Vibration_Chambers_(Updated03-01-2018).pdf | ||
| Appendix_B-Doc1_(Layout_Horizontal).pdf | ||
| Appendix_B-Doc2_(Layout_Vertical).pdf | ||
| 18-233-SOL-00167_SF1449.pdf | ||
| UCF_-_Vibration_Chambers.pdf | ||
| Attachment_B_-_Picture.docx | DOCX document | |
| Attachment_A_-_Picture.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOVABLE SLIP TABLE ASSEMBLY
(REQUIRES 80 PSI SHOP AIR, BOLTED
IN PLACE WITH 8 EA FASTENERS)
60" MAGNESIUM GUIDED SLIP
PLATE (W/ 7 EA GUIDE BEARINGS
ON A GRANITE/OIL FILM SLIP
SURFACE)
CONCRETE FILLED
STEEL ISOLATED PLATFORM
AIR FILLED VIBRATION
ISOLATORS
2X
MAGNESIUM
DRIVE ADAPTORS
(1X SHOWN)
STEEL SUPPORT
STRUCTURE FOR
VERTICAL GUIDANCE
SYSTEMS (W/ THRU
HOLES ON FEET FOR
BOLTING TO SEISMIC MASS)
58" DUAL SHAKER GUIDED
MAGNESIUM HEAD
EXPANDER8X
3" STROKE
LAMINATED
FLEXURES
4X
THRU/TAPPED
HOLES FOR
LIFTING
4X
5000 LB CAPACITY
HOIST RINGS
GUIDE/SAFETY
RAILS TO AID
IN MOVEMENT
OF SLIP TABLE
WHEN ON AIR
2X
MECHANICAL
STROKE
LIMIT STOPS
2X
HEAD EXPANDER
MID-POSITIONS
QUICK RELEASE
LOCK-OUT PINS
(W/ INTEGRATED
SHAKER SHUT-OFF
SWITCH)
4X
AIRBAGS FOR
VERTICAL RE-CENTERING
AND LOAD SUPPORT
(NOT SHOWN:
MANIFOLDS, AIR LINES, AIR REGULATORS
AND GAUGES)
2X
STEEL BEAMS FOR
RIGID ATTACHMENT
OF ISOLATED PLATFORM
TO SHAKER TRUNNIONS
2X
EXISTING SD-26400LS3 SHAKERS
NOT SHOWN:
LOW PRESSURE OIL PUMP
& AND SHAKER CUT-OFF SWITCH
SINGLE SHAKER 58" GUIDED HEAD EXPANDER ASSEMBLY
ASSEMBLY LAYOUT
B3066-CA4-001D
5/29/14
D
C
B
A A
B
C
D
SCALE
SIZE
CAD FILE:
DWG. NO.
D
SHEET 1 OF 1
REV.
DRAWN
CHECKED
UNLESS OTHERWISE SPECIFIED
DIMENSIONS ARE IN INCHES
FINISH:
ITEM
NO.
PART OR
IDENTIFYING NO.
NOMENCLATURE
OR DESCRIPTION
MATERIAL
SPECIFICATION
QTY
REQD
PARTS LIST
12345678
8 7 6 5 4 3 2 1
REVISIONS
REV. DESCRIPTION DATE APPROVED
E
F
E
F
TOLERANCES
ENG
CUST APPR
HEAT TREAT:
.X .1
.XX
.03
.XXX
.010
ANGLE
BAUGHN
ENGINEERING
LA VERNE
CALIFORNIA
91750
TITLE
PROPRIETARY NOTE
THIS DOCUMENT IS A CONFIDENTIAL DISCLOSURE,
LOANED SUBJECT TO THE CONDITION THAT IT
OR ANY INFORMATION CONTAINED THEREIN WILL
NOT BE REVEALED TO ANY UNAUTHORIZED
PERSON, OR USED IN ANY WAY DETRIMENTAL TO
THE INTEREST OF BAUGHN ENGINEERING AND
THAT ALL COPIES WILL RETURNED IMMEDIATELY
ON DEMAND.
M. BAUGHN
M. BAUGHN
| Sheet1 |
| Drawing View2 |
| Drawing View5 |
File details come from the government source that posted it.