Answers.pdf
PDF 68 KB Posted
- Attached to
- Reconfiguration of the Vibration Environmental Chamber Box, Duct Work, and Support Structure
- Solicitation number
- 18-233-SOL-00167
About this file
This contains the responses to the questions received. The prior upload was incorrect.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A.docx | DOCX document | |
| Technical_Requirement_DRD_2637.docx | DOCX document | |
| InitialQuestions.pdf | ||
| UCF_-_Vibration_Chambers_(updated).pdf | ||
| Vibration_Environmental_Box.docx | DOCX document | |
| Vibration_Chamber_Air_Ducting_Verification.docx | DOCX document | |
| Answers.pdf | ||
| Return_Air-Vibration_Chamber.docx | DOCX document | |
| Vibration_Environmental_Box.docx | DOCX document | |
| Vibration_Chamber_Air_Ducting_Verification.docx | DOCX document | |
| Return_Air-Vibration_Chamber.docx | DOCX document | |
| Appendix_A-Doc1(Head_Expander).pdf | ||
| UCF_-_Vibration_Chambers_(Updated03-01-2018).pdf | ||
| Appendix_C-Doc2_(Over_View).pdf | ||
| Appendix_B-Doc1_(Layout_Horizontal).pdf | ||
| Appendix_B-Doc2_(Layout_Vertical).pdf | ||
| 18-233-SOL-00167_SF1449.pdf | ||
| UCF_-_Vibration_Chambers.pdf | ||
| Attachment_B_-_Picture.docx | DOCX document | |
| Attachment_A_-_Picture.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DPG Vibration Chamber RFP Questions/Request for Clarifications Solicitation No. 18-233-SOL-00167
Question Section Number
Reference Response
1 L.7 INQUIRES/SUBMISSIONS You will not need to submit a paper copy of the file. An online submission will be acceptable.
2 L.10.1 BUSINESS PROPOSAL
INSTRUCTIONS
After discussions, we will not make offerors include the standard form 1449.
3 L.10.3 Business Proposal
Instructions Yes. This refers to the “CLIN” table that is in section B.5.
Contractors will need to put in the expected price for each task and then the total price of all tasks added together.
4 L.11 Past Performance
Information The questionnaire will be sent to the contractors.
5 B.1 Description Has been Uploaded in the attachments 6 B.5 Consideration and
Payment The only testing required is that the chamber boxes have the required air flow.
7 C.1.5 Program Description and Background
No, this is not required.
8 C.2.8.1.3 Security and Safety Yes 9 C.2.8.1.5 Security and Safety Yes
10 C.2.8.2 Security and Safety No, Security clearance is required for this contract. Yes this work is restricted to US citizens only.
11 E.1.2 Inspection and Acceptance
If providing 3-D models, provide in PTC Creo and generic formats such as IGES. For 2-D designs, AutoCad Version 16 is our preferred format.
12 G.3 Advance Understanding This will not be applicable. The following contract is FFP
Question 12: Can we install a diverting valve on the CO2 line after the control valve and use it to select either the old shaker or new shaker?
Answer - Yes they can add the valve.