About this file

This contains the responses to the questions received. The prior upload was incorrect.

View the file

Other files

File Type Posted
Q&A.docx DOCX document
Technical_Requirement_DRD_2637.docx DOCX document
InitialQuestions.pdf PDF
UCF_-_Vibration_Chambers_(updated).pdf PDF
Vibration_Environmental_Box.docx DOCX document
Vibration_Chamber_Air_Ducting_Verification.docx DOCX document
Answers.pdf PDF
Return_Air-Vibration_Chamber.docx DOCX document
Vibration_Environmental_Box.docx DOCX document
Vibration_Chamber_Air_Ducting_Verification.docx DOCX document
Return_Air-Vibration_Chamber.docx DOCX document
Appendix_A-Doc1(Head_Expander).pdf PDF
UCF_-_Vibration_Chambers_(Updated03-01-2018).pdf PDF
Appendix_C-Doc2_(Over_View).pdf PDF
Appendix_B-Doc1_(Layout_Horizontal).pdf PDF
Appendix_B-Doc2_(Layout_Vertical).pdf PDF
18-233-SOL-00167_SF1449.pdf PDF
UCF_-_Vibration_Chambers.pdf PDF
Attachment_B_-_Picture.docx DOCX document
Attachment_A_-_Picture.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DPG Vibration Chamber RFP Questions/Request for Clarifications Solicitation No. 18-233-SOL-00167

Question Section Number

Reference Response

1 L.7 INQUIRES/SUBMISSIONS You will not need to submit a paper copy of the file. An online submission will be acceptable.

2 L.10.1 BUSINESS PROPOSAL

INSTRUCTIONS

After discussions, we will not make offerors include the standard form 1449.

3 L.10.3 Business Proposal

Instructions Yes. This refers to the “CLIN” table that is in section B.5.

Contractors will need to put in the expected price for each task and then the total price of all tasks added together.

4 L.11 Past Performance

Information The questionnaire will be sent to the contractors.

5 B.1 Description Has been Uploaded in the attachments 6 B.5 Consideration and

Payment The only testing required is that the chamber boxes have the required air flow.

7 C.1.5 Program Description and Background

No, this is not required.

8 C.2.8.1.3 Security and Safety Yes 9 C.2.8.1.5 Security and Safety Yes

10 C.2.8.2 Security and Safety No, Security clearance is required for this contract. Yes this work is restricted to US citizens only.

11 E.1.2 Inspection and Acceptance

If providing 3-D models, provide in PTC Creo and generic formats such as IGES. For 2-D designs, AutoCad Version 16 is our preferred format.

12 G.3 Advance Understanding This will not be applicable. The following contract is FFP

Question 12: Can we install a diverting valve on the CO2 line after the control valve and use it to select either the old shaker or new shaker?

Answer - Yes they can add the valve.