Attachment_2_CDRL_B4156_Hood_Air_Sup-Ret_Systems_set_3_.pdf

PDF 719 KB Posted

Attached to
FUME HOOD CCTF UPGRADE DUGWAY PROVING GROUND
Solicitation number
17-233-SOL-00311
Issued by

About this file

CDRL

View the file

Other files

File Type Posted
P1010259.JPG JPG image
P1010256.JPG JPG image
P1010254.JPG JPG image
P1010255.JPG JPG image
P1010249.JPG JPG image
P1010226.JPG JPG image
P1010260.JPG JPG image
P1010258.JPG JPG image
17-233-SOL-00311_Amendment_0001.pdf PDF
01-PhoenixLaboratory.pdf PDF
08_BBTdetail.pdf PDF
03-Celeris_Users_Guide.pdf PDF
08-LonWorks_Router.pdf PDF
Questions_and_Answers_for_17-233-SOL-00311.pdf PDF
pics_from_Site_Visit.docx DOCX document
17-233-P-00311_corrected_June_1_2017.docx DOCX document
17-233-P-00311_merger_of_RFP_TEMPLATE_FINAL.docx DOCX document
1449_17-233-P-00311_RFP.docx.pdf PDF
-_Attachment_7_Past_Performance_Questionnaire_.doc DOC document
Attachement_4_B4156_Appendies_final_Hoods_Air__Supply_Exhaust__Systems_Upgrades_R2_02015017.docx DOCX document
Attachment_5_PWS_B4156_Hoods_Air__Supply_Exhaust_Systems_Upgrades_05102017_.docx DOCX document
Attachment_1,2,3_CDRL'S_B4156_Hood_Air_Sup-Ret_Systems_signed_5102017_.pdf PDF
Attachement_5_B4156_Appendies_final_Hoods_Air__Supply_Exhaust__Systems_Upgrades_R2_02015017.docx DOCX document
downloadForm.pdf PDF
Attachment_1_CDRL_B4156_Hood_Air_Sup-Ret_Systems_set_2_.pdf PDF
Attachment_6_PWS_B4156_Hoods_Air__Supply_Exhaust_Systems_Upgrades_05102017_.docx DOCX document
Attachemnet_3_CDRL_B4156_Hood_Air_Sup-Ret_Systems_set_1.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423, AUG 96

CONTRACT DATA REQUIREMENTS LIST

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER _________________________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page ____ of ____ Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref.

DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13;

Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423 (BACK), AUG 96

addr1_1: PCO
draft1_1:
reg1_1: 1
repro1_1:
addr1_2: TEDT TSD/TSE DPG
draft1_2:
reg1_2: 1
repro1_2:
addr1_3: TEDT CTD//CTB
draft1_3:
reg1_3: 1
repro1_3:
draft2_1: 1
addr2_1: PCO
addr2_2: TEDT TSD/TSE DPG
reg2_1: 1
repro2_1:
addr2_3: TEDT CTD//CTB
draft2_3: 1
reg2_3: 1
repro2_3:
addr3_1: PCO
addr3_2: TEDT TSD/TSE
addr3_3: TEDT CTD/CTB
draft3_1: 1
reg3_1: 1
repro3_1:
draft3_2: 1
reg3_2: 1
repro3_2:
draft3_3: 1
reg3_3: 1
repro3_3:
addr4_1: PCO
draft4_1: 1
reg4_1: 1
repro4_1:
addr4_2: TEDT TSD/TSE
draft4_2: 1
reg4_2: 1
repro4_2:
addr4_3: TEDT CTD/CTB
draft4_3: 1
reg4_3: 1
repro4_3:
draft2_2: 1
repro2_2:
reg2_2: 1
line_item: A012
exhibit:
xtdp: Yes
xtm: Yes
othercat: reports
system: B4156 Hood Air Sup/Ret Systems
ctr_no:
contr:
data_item1: A012
title1: Installation Control Drawings
sub1: As-installed red-line
auth1: DRPR-81242
ref1:
req_ofc1: WDTC TSD/TSE
dd250_1: L/T
appcode1: A
dist1: D
freq1: 1TIME
asof1: AWARD
firstsub1: 240 DAC
subsub1: TBD
group1: NSP
totalprice1:
rmks1: DID paragraph 10.1, 10.2, & 10.3 apply. Use Times-Roman 12 font. Content shall address as-installed configuration approved changes.

Contractor format and Electronic submittal acceptable

totaldraft1: 0
totalreq1: 3
totalrepro1: 0
data_item2: A017
title2: Design Data and Calculations
sub2: Design Review calculations
auth2: GDRQ-80650
ref2:
req_ofc2: WDTC TSD/TSE
dd250_2: L/T
appcode2: A
dist2: D
freq2: 1TIME
asof2: AWARD
firstsub2: 120 DAC
subsub2: 150 DAC
rmks2: DID paragraph 10.1, 10.2, & 10.3 apply. Use Times-Roman 12 font. Content shall address layout and ceiling flange interfaces and micro-processor sizing.

Contractor format and Electronic submittal acceptable

group2: NSP
totalprice2:
totaldraft2: 3
totalreg2: 3
totalrepro2: 0
data_item3: A023
title3: System/Subsystem Specification
sub3: Mechanical, electrical, & electronic hardware
auth3: IPSC-81431A
ref3:
req_ofc3: WDTC TSD/TSE
dd250_3: L/T
appcode3: A
dist3: D
freq3: 1TIME
asof3: AWARD
firstsub3: 120 DAC
subsub3: 150 DAC
rmks3: DID paragraph 10.1, 10.2, & 10.3 apply. Use Times-Roman 12 font. Content shall address layout and ceiling flange interfaces and micro-processor sizing.

Contractor format and Electronic submittal acceptable

group3: NSP
totalprice3:
totaldraft3: 3
totalreg3: 3
totalrepro3: 0
data_item4: A026
title4: Software Design Description
sub4: Firmware & Software description
auth4: IPSC-81435A
ref4:
req_ofc4: WDTC TSD/TSE
dd250_4: L/T
appcode4: A
dist4: D
freq4: 1TIME
asof4: AWARD
firstsub4: 120 DAC
subsub4: 150 DAC
rmks4: DID paragraph 10.1, 10.2, & 10.3 apply. Use Times-Roman 12 font. Content shall address micro-processor firmware and software and compatibility w/ existing BMS bacnet protocol.

Contractor format and Electronic submittal acceptable

group4: NSP
totalprice4:
totaldraft4: 3
totalreg4: 3
totalrepro4: 0
prep_by:
prep_sign: EUGENE A. RONDASH
prep_date: 30 Jan 2017
app_by:
app_sign:
app_date:
Page: 1
pages: 3
app: Adobe Professional 7.0
Reset:

File details come from the government source that posted it. Updated .