This document is Addendum 1 for Solicitation S-29100-00014106, issued by the Oregon Department of Corrections Purchasing Section for a Warehouse Cooler/Freezer Upgrade at the TRCI (Transportation Reception Center Interface) facility. The addendum provides key revisions and clarifications for potential contractors, including requirements to demolish the existing concrete pad and construct a new pad extending at least 36 inches on all sides of compressor racks, replace the existing fence surrounding the new pad, and modify cooling equipment infrastructure. The owner will provide temporary cooling equipment during the replacement phase, and contractors are advised that food racking can be temporarily removed to facilitate evaporator coil replacement.
The addendum modifies several contract terms, including reducing the liquidated damages amount to $2,066.00 and providing detailed specifications for fencing materials. The fence must be constructed using hot-dipped zinc-coated steel components, with No. 9 gauge two-inch woven diamond mesh fabric, eight feet tall, and installed according to the Chain Link Fence Manufacturers' Institute requirements. Additional specifications cover concrete pad construction, with a requirement that concrete develop a minimum compressive strength of 3,000 PSI in 28 days. Contact information for equipment-related inquiries, including Omni Team equipment and Schulz Associates, is also provided to support potential bidders in their project preparation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PW25022_LaneCounty_AdvertisementForBid_WMD Short Mountain Landfill Truck Scale.pdf | ||
| 14106 Plan Holder List .pdf | ||
| 7034 NOIA.pdf | ||
| 14106 Bid Tab.pdf | ||
| 14106 Specs.pdf | ||
| 14106 Drawings.pdf | ||
| 14106 ITB TCS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Oregon
Department of Corrections Purchasing Section
3723 Fairview Industrial Dr SE Salem, OR 97302
(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov
8/20/25
ADDENDUM 1
For S-29100-00014106
TRCI Warehouse Cooler/Freezer Upgrade
Below you will find Revisions, clarifications, deletions and/or additions to the bid specifications.
This addendum modifies the related Invitation to Bid only to the extent specifically indicated herein. All other areas not specifically mentioned or affected by this addendum shall remain in full force and effect.
This addendum shall be added to and become part of the original Invitation to Bid.
1. Revision: Contractor to demo existing pad and construct new pad that extends a min. of 36” on all sides of compressor racks. Coordinate exact position with ODOC staff.
2. Clarifications: What gauge should the new fence be that we’ll be installing in lieu of the one being removed?
Answer: Contactor to demo existing fence and replace with new surrounding the new pad. Specifications attached.
3. Clarification: Do we need to provide temporary cooling during the equipment replacement phase?
Answer: Owner will provide temporary cooling equipment during the replacement phase.
4. Clarifications: Contact information for Omni Team equipment:
Answer: www.omniteaminc.com
Jeffrey Schulz | Schulz Associates PO Box 3256 | Kirkland WA 98083 M: 206.947.2165 | O: 425.828.4557 www.SchulzAssociates.com
5. Revision: Liquidated damages amount deleted entirety and replaced with $2,066.00.
6. Clarification: Will the food racking remain in place, or would it be possible to temporarily remove the existing racking to replace the evaporator coils?
Answer: It can be temporarily removed and replaced by the contractor.
7 Clarification: I believe this was talked about at the first meeting, but is there any more details about the construction of the new concrete pad or the chain link fence? Looking for things like thickness, rebar requirements, and height and materials of the fence.
Answer: Attached is a detail for the concrete slab.
Oregon
Department of Corrections Purchasing Section
3723 Fairview Industrial Dr SE Salem, OR 97302
(971)707-0238 Ryan.N.Kirtley@doc.oregon.gov
This addendum represents a material change to the ITB and is required to be signed and returned by the Bid Closing Date and Time. Failure to do so may result in bid rejection.
Company Name: __________________________________________________________
Authorized Signature: ______________________________________________________
Date:_______________________________________
FENCING
1. THE MOST CURRENT EDITION OF THE "PRODUCT MANUAL" AS PUBLISHED BY THE CHAIN LINK FENCE
MANUFACTURERS' INSTITUTE
APPLIES TO THIS WORK.
2. MATERIALS SHALL BE NEW AND PRODUCTS OF RECOGNIZED MANUFACTURERS. MATERIALS SHALL
CARRY A LABEL IDENTIFYING THE
MANUFACTURER AND CLASS OF ZINC COATING ON THE FABRIC AND CONCERTINA WIRE.
3. ALL COMPONENTS SHALL BE HOT_DIPPED ZINC COATED STEEL IN ACCORDANCE WITH ASTM A120
AND A123 AS APPLICABLE.
4. FENCE FABRIC SHALL BE TWO INCH WOVEN DIAMOND MESH, OF STANDARD COMMERCIAL GRADE
STEEL WIRE. WIRE SIZE SHALL BE
NO. 9 GAUGE. THE TOP AND BOTTOM SELVAGES OF THE FABRIC SHALL HAVE A TWISTED AND BARBED
FINISH. THE WIRE SHALL BE
BARBED BY CUTTING THE WIRE AT AN ANGLE, PRODUCING SHARP POINTS. THE TOTAL HEIGHT OF THE
FABRIC SHALL BE EIGHT FEET, PLUS OR MINUS ONE INCH.
5. CONTACTOR CAN UTILIZE THE EXSITING GATES.
6. TERMINAL AND GATE POSTS SHALL BE STANDARD COMMERCIAL GRADE STEEL PIPE.
7. GATE POSTS SHALL BE FITTED WITH AN OUTRIGGER FOR BARB WIRE.
8. TENSION WIRE SHALL BE NO. 7 GAUGE, HOT_DIP GALVANIZED, STANDARD COMMERCIAL GRADE
STEEL.
9. HORIZONTAL STEEL PIPE BRACES FOR, CORNERS, AND TERMINAL POSTS SHALL BE STANDARD
COMMERCIAL GRADE STEEL
PIPE 1.66 INCH OD WEIGHING 1.806 POUNDS PER LINEAL FOOT.
10. DIAGONAL TRUSS BRACING FOR, CORNER, AND TERMINAL POSTS SHALL BE STEEL RODS 3/8 INCH
DIAMETER WITH
TURNBUCKLES.
11. FENCE FABRIC SHALL BE FASTENED TO THE LINE POSTS WITH MINIMUM 9 GAUGE WIRE TIES AND TO
TENSION WIRES WITH MINIMUM
11 GAUGE WIRE TIES. WIRE TIES MAY BE EITHER ALUMINUM OR GALVANIZED STEEL WIRE.
12. MISCELLANEOUS FITTINGS USED IN THE CONSTRUCTION OF THE FENCE SHALL BE MALLEABLE IRON, CAST IRON, OR PRESSED STEEL
AND SHALL BE HOT_DIP GALVANIZED.
13. ALL POSTS SHALL BE SET IN CONCRETE, PLUMB AND TRUE TO LINE.
14. ALL CONCRETE USED FOR THE FENCE CONSTRUCTION SHALL DEVELOP A MINIMUM COMPRESSIVE
STRENGTH OF 3,000 PSI IN 28
DAYS. ALL POSTS SHALL BE FIRMLY SUPPORTED TO PREVENT MOVEMENT OR DEFLECTION UNTIL THE
CONCRETE HAS THOROUGHLY
SET (24 HOURS MINIMUM).
15. THE FENCE SHALL BE INSTALLED TRUE TO LINE AND GRADE, AROUND THE NEWPAD IN ACCORDANCE
WITH
THESE NOTES AND THE CHAIN LINK MANUFACTURERS' INSTITUTE REQUIREMENTS.
16. STRETCHER BARS SHALL BE THREADED THROUGH END LOOPS OF EACH SECTION OF FABRIC WITH
STRETCHER BAR BANDS SPACED
NOT MORE THAN 15 INCHES ON CENTER.
17. THE FABRIC SHALL BE FASTENED TO THE LINE POSTS WITH TIES SPACED NOT MORE THAN 15 INCHES
ON CENTER. THE TOP MOST
TIES SHALL BE AS NEAR THE TOP OF THE FABRIC AS POSSIBLE. THE LOWEST TIE SHALL BE AS NEAR THE
BOTTOM OF THE FABRIC AS
POSSIBLE.
THE FABRIC SHALL BE TIED TO THE TOP RAIL AND BOTTOM TENSION WIRE WITH TIES SPACED NOT MORE
THAN 24 INCHES ON
CENTER.
19. THE FABRIC WIRE SHALL BE STRETCHED TAUT. THE BOTTOM OF THE FABRIC SHALL EXTEND TO
WITHIN 2 INCHES OF THE FINISHED