This document includes a solicitation for remediation and site clean up services at Santa Monica Mountains National Recreation Area. The National Park Service requires a contractor to provide supervision, labor, materials and equipment to complete soil remediation and site clean up at nine locations within the recreation area. Work includes loading, hauling and disposing of contaminated soils, returning sites to finish grade, installing fencing and mulch, and removing asphalt and steel structures. The contractor must obtain necessary permits and perform all work in compliance with applicable laws. The estimated value of the contract is between $500,000 and $1,000,000. The solicitation is set aside for Service Disabled Veteran Owned Small Businesses. Site visits are by appointment only between the dates specified in Section L.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140P8421R0003 Attachment 16‐ Site Visit Questions and Answers Project Tittle: Remediation and Soil Clean Up at Santa Monica Mountains National Recreation Area Date: April 23, 2021 Company Name
Q: Will the Paramount Ranch’s burned and buried transformer need to be removed?
A: No, please reference statement of work for work to be accomplished.
Q: Once the Paramount Ranch Race Track Bridge is removed do you want contractor to slope sides?
A: Not necessary. Please reference statement of work for work to be accomplished.
Q: The broken concrete pile (approx. 10 yards) next to Peter Strauss restroom, is that to be removed?
A: Please reference statement of work, If not in statement of work then park will remove.
Q: The travertine floor, rock wall and cement walkways at Peter Strauss will those need to be removed?
A: No, only dirt footprint of residence, please reference statement of work.
Q: Will the contractors have full accessibility to Peter Strauss during bridge construction?
A: Yes, However, other contractors will have access to their permitted area too.
Q: Will utility pole at Rocky Oaks residence need to be removed?
A: No, please reference statement of work for work to be accomplished.
Q: How much of the asphalt driveway will be removed from Rocky Oaks residence?
A: All of it down to Kanan Rd transition line including broken stock pile at top.
Q: R03 Rocky Oaks TH diagram shows remediation zone, will work need to done there?
A: No the park has cleaned up this area and installed replacement vault toilet.
Q: Can contractor or park remove 2 dead hazard trees at Dragon property for safety?
A: The park will remove the hazard trees.
Q: Does septic tank come out at Arroyo Sequit?
A: No the park has chosen to leave tanks as it. Please refer to statement of work.
Q: Are there remediation numbers for Circle X?
A: Yes these numbers were inadvertently left off attachment. Will provide.
Q: Will the park provide Native American monitors and Archeological monitors?
A: Yes, please refer to statement of work.