Att 16- Site Visit Questions and Answers_0001.pdf

PDF 105 KB Posted

Attached to
REMEDIATION AND SITE CLEAN UP AT SANTA MONICA MOUN
Solicitation number
140P8421R0003
Issued by

About this file

This document includes a solicitation for remediation and site clean up services at Santa Monica Mountains National Recreation Area. The National Park Service requires a contractor to provide supervision, labor, materials and equipment to complete soil remediation and site clean up at nine locations within the recreation area. Work includes loading, hauling and disposing of contaminated soils, returning sites to finish grade, installing fencing and mulch, and removing asphalt and steel structures. The contractor must obtain necessary permits and perform all work in compliance with applicable laws. The estimated value of the contract is between $500,000 and $1,000,000. The solicitation is set aside for Service Disabled Veteran Owned Small Businesses. Site visits are by appointment only between the dates specified in Section L.

View the file

Other files

File Type Posted
Att 01- Revised Price Schedule_0002.pdf PDF
Sol_140P8421R0003_Amd_0002.pdf PDF
Att 20- RFI Questions and Answers 2_0002.pdf PDF
Att 13- Revised SAP 5-27-20_0001.pdf PDF
Sol_140P8421R0003_Amd_0001.pdf PDF
Att 02- Revised Specifications_0001.pdf PDF
Att 18- Time Critical Removal Action Report_0001.pdf PDF
Att 17- RFI Questions and Answers_0001.pdf PDF
Att 15- Site Visit Sign In Sheet_0001.pdf PDF
Att 19- Time Critical Removal Action Report Tables and Attachments_0001.pdf PDF
Att 02- Specifications.pdf PDF
Att 05- Technical Information Form.pdf PDF
Att 11- Debris Removal Operations Plan (DROP).pdf PDF
Att 06- Key Personnel Form.pdf PDF
Att 10- Standard Specifications-State Of California Business-Transportation And Housing Agency Department Of Transportation .pdf PDF
Att 12- Storm Water Pollution Prevention Plan (SWPPP).pdf PDF
Att 13- Sampling and Analysis Plan (SAP).pdf PDF
Att 04- Wage Determination Los Angeles.pdf PDF
Att 01- Price Schedule.pdf PDF
Att 09- Information Advisory Clean Imported Fill Material.pdf PDF
Sol_140P8421R0003.pdf PDF
Att 07- PP Questionnaire.pdf PDF
Att 14- Quality Control Clean Imported Fill Material.pdf PDF
Att 03- Wage Determination Ventura.pdf PDF
Att 08- Standard Form-24 Bid Bond.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140P8421R0003 Attachment 16‐ Site Visit Questions and Answers Project Tittle: Remediation and Soil Clean Up at Santa Monica Mountains National Recreation Area Date: April 23, 2021 Company Name

Q: Will the Paramount Ranch’s burned and buried transformer need to be removed?

A: No, please reference statement of work for work to be accomplished.

Q: Once the Paramount Ranch Race Track Bridge is removed do you want contractor to slope sides?

A: Not necessary. Please reference statement of work for work to be accomplished.

Q: The broken concrete pile (approx. 10 yards) next to Peter Strauss restroom, is that to be removed?

A: Please reference statement of work, If not in statement of work then park will remove.

Q: The travertine floor, rock wall and cement walkways at Peter Strauss will those need to be removed?

A: No, only dirt footprint of residence, please reference statement of work.

Q: Will the contractors have full accessibility to Peter Strauss during bridge construction?

A: Yes, However, other contractors will have access to their permitted area too.

Q: Will utility pole at Rocky Oaks residence need to be removed?

A: No, please reference statement of work for work to be accomplished.

Q: How much of the asphalt driveway will be removed from Rocky Oaks residence?

A: All of it down to Kanan Rd transition line including broken stock pile at top.

Q: R03 Rocky Oaks TH diagram shows remediation zone, will work need to done there?

A: No the park has cleaned up this area and installed replacement vault toilet.

Q: Can contractor or park remove 2 dead hazard trees at Dragon property for safety?

A: The park will remove the hazard trees.

Q: Does septic tank come out at Arroyo Sequit?

A: No the park has chosen to leave tanks as it. Please refer to statement of work.

Q: Are there remediation numbers for Circle X?

A: Yes these numbers were inadvertently left off attachment. Will provide.

Q: Will the park provide Native American monitors and Archeological monitors?

A: Yes, please refer to statement of work.