This is a Questions and Answers amendment (Amendment 0001) for RFQ #140P5125Q0002 regarding a boiler replacement project at Kennesaw Mountain National Battlefield Park Visitor Center.
The Q&A clarifies that the existing boiler uses electrical power and natural gas fuel, and the new boiler should be high efficiency with Low NOx emissions, preferably made in America. Key technical specifications include the requirement for stainless steel piping due to outdoor installation. The circulation pump can be replaced if required by the new boiler, and the existing electrical feeds are properly sized and reusable. No specific thermostat manufacturer is preferred, and no Building Automation System work is required. The project adds an optional thermostat installation to replace the existing monitor in the visitor center, detailed in revised attachments 0009 (Statement of Work) and 0010 (Price Schedule). The project is not tax exempt, and contractors are not required to submit specific QA/QC or Safety Plans. One superintendent can fulfill supervision, safety, and QA/QC roles.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001; RFQ #140P5125Q0002 Attachment 0008
Provide Boiler Replacement - KEMO Solicitation # 140P5125Q0002
Questions and Answers
Question 1. What is the power / fuel source of the existing unit? Propane, Natural Gas, Oil, or Electrical?
Answer: Power source is electrical, and the fuel source is natural gas.
Question 2. Are there any specific requirements needed for the new unit like Low NOx, High Efficiency rating, Made in America, etc.?
Answer: The park would prefer a high efficiency rating boiler with Low NOx preferably made in America.
Question 3. Shall the new piping and components be constructed of stainless steel or carbon steel?
Answer: Stainless steel pipe is required due to boiler being installed outdoors.
Question 4. Are there any pictures or detailed model/ serial number of existing outdoor boiler?
Answer: See attachments.
Question 5. In executing this project, can one superintendent fulfill the supervision, safety, and QA/QC roles?
Answer: Yes.
Question 6. Are contractors required to issue a contract specific QA/QC Plan?
Answer: No.
Question 7. Are contractors required to issue a contract specific Safety Plan?
Answer: No.
Question 8. Is this project tax exempt?
Answer: No.
Question 9. Will the hydronic hot water circulation pump be replaced when replacing the boiler? Please advise.
Answer: The Circulation pump can be changed if the new boiler requires a new pump for operation.
Question 10. Is there a preferred manufacturer for the thermostat?
Answer: No.
Question 11. It is assumed there is no work associated with a Building Automation System (BAS); please confirm.
Answer: No work is associated with a Building Automation System.
Question 12. If the new boiler electrical requirements are the same as the existing boiler, it is assumed that the existing electrical feeds to the boiler are sized properly, in good working condition, and can be reused. Please confirm.
Answer: The Electricity to boiler is sized correctly and in good working condition.
Question 13. Heating loop circulation pump is not to be replaced in the project. Can you obtain the flow rate and feet of head listed on the pump, or pump manufacturer/model#? This helps in properly sizing the boiler and ensuring the two pieces of equipment are compatible.
Answer: See attachments.
Question 14. Also, do you know when an addendum will be released regarding the decision to replace the thermostats in the visitor center?
Answer: The visitor center currently has a monitor not a thermostat, but would like to add a thermostat if price is fair and affordable to the government. The thermostat has been added as an additive to the revised statement of work (As attachment 0009) and revised price schedule (As attachment 0010) respectively.