B12_Proposal_Schedule_0001.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- WA-ABERNATHY FTC REHAB INTAKE STRUCTURE Federal contract opportunity
- Solicitation number
- 140F0322R0013
About this file
This document contains a proposal schedule for construction services related to federal contract opportunity number 140F0322R0013 from the Department of the Interior Fish and Wildlife Service. The proposal schedule outlines ten base tasks and two option tasks for improvements to the Abernathy Fish Technology Center intake and fish ladder structures. Base tasks include site visits, permitting, mobilization and demobilization, dewatering system installation, erosion control, demolition, site restoration, electrical work, inspections, and miscellaneous work. Option tasks cover fish ladder and intake structure modifications. Offerors are instructed to provide pricing for all items and backups for labor, materials, equipment, and tools. The schedule requires contractors to assume material quantities in their proposals. Incomplete bids will not be considered.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form Schedule
| ABERNATHY FISH TECHNOLOGY CENTER |
| Construct and Install Intake Structure Improvements, Fish Ladder Structure |
| Improvements, and All Associated Appurtenances |
PROPOSAL SCHEDULE
| INSTRUCTIONS: |
| The Offeror shall edit this Proposal Schedule and may provide a detailed breakdown of their |
| Proposal (including support documentation) and all associated line item pricing. It is the |
| responsibility of the Offeror to ensure all requirements are met and all support documentation |
| is provided. The purpose of the Proposal Schedule Document is to organize Base Bid Tasks |
| and Option Bid Tasks for U.S. Fish and Wildlife Service Price Evaluation. Contractor |
| shall show pricing for items. Failure to provide pricing for all items may result in bid not being |
| considered for award. |
Services - Base and Option Tasks:
TASK
(Base or
| Option) | Description | Amount |
| 1 | ||
| (Base) | Field Verification Site Visit. Review of Existing Site Features and Existing Site Conditions. Document Review, Planning, Development, Preparation, and Submittal of Project Documents. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 2 | |
| (Base) | Permitting. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 3 | |
| (Base) | Mobilization and De-Mobilization. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 4 | |
| (Base) | Construct and Install De-watering System and determine locations for Construction Staging Areas. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 5 | |
| (Base) | Provide and Install Site, Sediment, and Erosion Control Measures. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 6 | |
| (Base) | Perform Selective Demolition and Protect Existing Site Features and Structures. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| A | |
| (Option) | Construct and Install Fish Ladder Structure Construction Modifications. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| B | |
| (Option) | Construct and Install Intake Structure and Screen Structure Construction Modifications. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 7 | |
| (Base) | Perform Site Restoration. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 8 | |
| (Base) | Construct and Install Electrical Service Connections for Controls Cabling, Power Cabling, and New Flow Meter. |
To include but not be limited to:
All Associated Electrical Equipment and Appurtenances for a Complete and Fully Functional Electrical System.
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 9 | |
| (Base) | Perform Special Inspections and Testing for the Full Duration of the Project / Contract. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
| 10 | |
| (Base) | All Other Necessary Work for a Complete and Operable Project In Accordance With All The Requirements of the PE's Stamped and Signed Bid Documents (Drawings and Specifications) and Contractor's Manufacturer's Design Drawings and Specifications developed under this Ancillary Design and Build Contract. |
To include but not be limited to:
Incidentals.
All Associated Electronic and Hard Copy Deliverables.
Total (Base TASKS 1 - 10) $0.00
Total (Base TASKS 1 - 10, and Option TASKS A and B) $0.00
| The Offeror may provide a detailed breakdown of their bid and all associated line item pricing. |
| The above Proposal Schedule Description column is not intended to be comprehensive. |
| It is the responsiblilty of the Offeror to ensure all requirements are met. |
| As part of the Proposal Schedule, and at the Offeror's discretion, Prepare and |
| Submit Back-Up Documents for the Proposal Schedule including Number of Labor Categories, |
| Labor Rates, Number of Labor Hours, Material Quantities, Equipment Quantities, |
| Equipment Rates, and Required Tools. Include All Items Required and Anticipated |
| to successfully deliver the Project. |
| As the Contractor is preparing their Proposal, Material Quantities require Contractor assumptions. |
| The Contractor may submit their assumptions about Material Quantities as part of their Offer. |
| Whether the Contractor chooses to submit their assumptions about Material Quantities to USFWS |
| for review and as part of their Offer is at the discretion of the Contractor. |
Incomplete Bids Will Not Be Considered.
Name of Bidder and Company:
Address (Include Zip Code):