Amendment3_RevisedSheetA700.pdf
PDF 391 KB Posted
- Solicitation number
- 12034320R0001
- Issued by
-
Department of Agriculture Forest Service
About this file
This solicitation is for the construction of a new 15,000 square foot office building, foundation work for two smaller buildings, and relocation of the two smaller buildings for the Nez Perce-Clearwater National Forests in Kamiah, Idaho. Work will include site preparation, grading, road and utility infrastructure development, and construction of the new office building along with interior finishing. The new office building design utilizes wood construction methods including cross-laminated timber roofing and exposed wood beams. Additional requirements include a standing seam metal roof, high ceilings, variable refrigerant HVAC systems, and an elevator. The project has a total estimated price range of $5 million to $10 million and will be awarded on a best value basis. A pre-proposal meeting will be held on February 20, 2020, with award planned for April 2020. Construction will be phased with foundations and relocation of the smaller buildings completed first to allow for occupancy during new office development work. The total contract performance period is 475 calendar days from notice to proceed to substantial completion.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
1. IF FINISHES ARE NOT CLEARLY INDICATED FOR AN AREA, CLARIFY INTENT WITH C.O..
2. PROVIDE APPROPRIATE TRANSITION TRIM AT ALL MATERIAL CHANGES.
3. TEST ALL SUBSTRATES TO VERIFY COMPLIANCE WITH FINISH MANUFACTURE'S
SPECIFICATIONS PRIOR TO FLOORING INSTALLATION.
4. PATCH, REPAIR, AND/OR GRIND ALL SUBSTRATES TO ACCEPTABLE LEVEL OF
SMOOTHNESS/LEVELNESS PRIOR TO FLOORING INSTALLATION.
5. FLOORING CHANGES FROM ROOM TO ROOM TO OCCUR DIRECTLY UNDER THE DOOR
LOCATION.
6. SAMPLES FOR ALL FINISHES MUST BE SUBMITTED TO AND APPROVED BY C.O. PRIOR TO
ORDERING.
7. CONCRETE SUB-SUBSTRATES MUST BE TESTED TO MEET FLOORING MANUFACTURER'S
REQUIREMENTS PRIOR TO FLOORING INSTALLATION. CONTRACTOR MUST PROVIDE RECORD
OF TESTING TO OWNER.
FLOOR FINISH NOTES:
1. IF FINISHES ARE NOT CLEARLY INDICATED FOR AN AREA, CLARIFY INTENT WITH C.O..
2. PROVIDE APPROPRIATE TRANSITION TRIM AT ALL MATERIAL CHANGES.
3. PROVIDE CLEAN, CONSISTENT CAULK JOINTS AT ABUTMENTS OF DISSIMILAR MATERIALS.
4. PROVIDE DIAGONAL AND VERTICAL SEISMIC BRACING AT ALL SUSPENDED CEILING SYSTEMS IN
COMPLIANCE WITH CURRENT BUILDING CODES.
5. PROVIDE 2 INCH EDGE METAL AT ALL LAY-IN SUSPENDED CEILING SYSTEMS OR OTHER CODE
APPROVED SEISMIC RETENTION SYSTEM.
6. WHERE PAINTED, EXPOSED CEILING IS INDICATED, ALL COMPONENTS TO BE PAINTED UNLESS
SPECIFICALLY NOTED OTHERWISE. THIS INCLUDES PAINTING DECK, STRUCTURAL FRAMING,
BRACING, MECHANICAL EQUIPMENT, SPRINKLER PIPING, NON-GALVANIZED ELECTRICAL
CONDUIT, NON-GALVANIZED PIPING.
CEILING FINISH NOTES:
1. ALL PAINTING, WALLCOVERING AND GYPSUM WALLBOARD FINISHING PER
"ARCHITECTURAL SPECIFICATION MANUAL" PAINTING AND DECORATING
CONTRACTORS OF AMERICA.
2. PROVIDE SAMPLES OF SPECIFIED FINISHES TO C.O. FOR APPROVAL PRIOR
TO APPLICATION
3. PROVIDE TO OWNER APPROXIMATELY 3% OF ADDITIONAL FINISH MATERIAL
FOR FUTURE REPAIR AND MAINTENANCE. (DIE. - PAINT, VINYL FLOORING,
RUBBER BASE, ETC.)
GENERAL FINISH NOTES:
1. IF FINISHES ARE NOT CLEARLY INDICATED FOR AN AREA, CLARIFY
INTENT WITH C.O..
2. PROVIDE APPROPRIATE TRANSITION TRIM AT ALL MATERIAL CHANGES.
3. PROVIDE CLEAN, CONSISTENT CAULK JOINTS AT ABUTMENTS OF
DISSIMILAR MATERIALS.
4. PROVIDE METAL EDGING AT ALL GYPSUM BOARD EDGES THAT ABUT
DISSIMILAR MATERIALS.
WALL FINISH NOTES:
CT1
CT2 CT2 CT2
CT2
CT1
CT2
CT2
CT2
CT4 LVT1
CT1
CT1
LVT1
LVT1
CT3
LVT1
CT4
LVT1
LVT1
CT3 LVT1
FT1
FT1
SDF1
FS OFFICE
CIRCULATION
MECH
DS OFFICE
HUDDLE
HUDDLE
HUDDLE
OFFICE
HUDDLE
VEST B
HUDDLE
MAIN STAIR
COMM
CONF ROOM A
CONF ROOM B
LOBBY
CIRCULATION
HALLWAY
UNISEX
JNTR RM
AV/CONF STORAGE
UNISEX
OPEN WORK AREA
VEST A
RECEPTION DESK
OPEN WORK AREA
MAIL RM
RESOURCE / STORAGE
LVT1
VF1
VF1
SS1
SS1
QTZ-1
SS1
LVT1
FT1
FT1
FT1
FT1
VF1
CT2
CT2
CT4
CT1
CT2
CT2
CT2
CT2
CT2
CT2
CT2
LVT1
CAFE
JNTR RM
WOMEN
MAIN STAIR
OPEN WORK AREA
SM. MTG
VEST C
FOCUS
CLOSET
OFFICE
MED. MEETING
HD STORAGE
PRINTING
HUDDLE
FOCUS
FOCUS
CAFE VENDING
CIRC. LOWER
LOCKERS
LAB
SHOWER M
SHOWER W
MEN
ARTIFACTS
VF1
CT2
CT2
QTZ1
QTZ1
QTZ1
SS1
SS1
SS1
SS1
WF1
LICENSED
ARCHITECT
AR-986501
STATE OF IDAHO
JEFFERY R. DOWNHOUR
DATE:
SHEET:
428 N. Last Chance Gulch Helena, Montana 59601 406.449.2013phone 406.449.2036fax www.mosaicarch.com
D
AT
E
ST
AM
P:
a r c h i t e c t u r e - p l a n n i n g - d e s i g n
3/
/2
:2 6:
A
M
DEC 4TH 2019
A700
INTERIOR FINISH PLANS &
FINISH SCHEDULE
KAMIAH, ID 83536
KAMIAH SUPERVISOR'S
OFFICE
0%
C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
ROOM FINISH SCHEDULE
NO. Name Area Floor Finish Base Finish North Wall East Wall South Wall West Wall Ceiling Finish Comments
101 CAFE 485 SF LVT1 B1 P1/M1 P1 P1 P1/WT2 AWD1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
102 JNTR RM 63 SF VF1 B2 FRP1 FRP1 P1 FRP1 ACT1 USE FULL HEIGHT FRP PANELS
103 WOMEN 156 SF FT1 WT1 WT1/P1 WT1/P1 WT1/P1 WT1/P1 P1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
104 SHOWER W 47 SF FT1 WT1 P1 P1 P1 - P1 SHOWER INSERT SEE INT. ELEVATIONS
105 MEN 183 SF FT1 WT1 WT1/P1 WT1/P1 WT1/P1 WT1/P1 P1
106 SHOWER M 47 SF FT1 WT1 P1 P1 P1 - P1 SHOWER INSERT SEE INT. ELEVATIONS
107 LAB 269 SF VF1 B1 P1 P1 P1 P1 ACT1
108 ARTIFACTS 110 SF CT2 B2 P1 P1 P1 P1 ACT1
109 HD STORAGE 759 SF CT2 B2 P1 P1 P1 P1 ACT1
110 LOCKERS 17 SF LVT1 B1 P1 P1 P1 - P1
111 CIRC. LOWER 325 SF LVT1 B1 P1 - P1 P1 P1/ACT1
112 CAFE VENDING 33 SF LVT1 B1 P1 P1 P1 P1 P1
113 FOCUS 52 SF CT2 B2 P1 P1 P1 P1/AS2 ACT1
114 FOCUS 53 SF CT2 B2 P1 P1 P1 P1/AS2 ACT1
115 HUDDLE 99 SF CT2 B2 P1 P1 P1 P1/AS2 ACT1
116 PRINTING 117 SF CT2 B2 P1 P1 P1 P1 ACT1
118 MED. MEETING 291 SF CT2 B1 P1/AS2 P1 P1/AS2 M3 ACT2
119 OFFICE 84 SF CT2 B2 P1 P1 P1 P1 ACT1
120 CLOSET 27 SF CT2 B2 P1 P1 P1 P1 P1
121 FOCUS 61 SF CT2 B2 P1 P1 P1 P1 ACT1
122 OPEN WORK AREA 5685 SF CT1 B1 P1 P1 P1/AS2 P1/AS2 CLT1/AS1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
123 SM. MTG 189 SF CT2 B1 P1 P1 P1 P1/AS2 ACT1
124 VEST C 61 SF CT4 B1 P1 P1 P1/M2 - P1
201 VEST A 83 SF CT4 B1 WD1 - - - WD1
202 LOBBY 345 SF LVT1 B1 WD1 P2 - - WD1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
203 COMM 164 SF SDT1 B2 P1 P1 P1 P1 -
204 MECH 348 SF VF1 B2 P1 P1 P1 P1 -
205 ELEVATOR 52 SF MFR MFR MFR MFR MFR MFR MFR SEE MANUF. FOR FINISHES
206 ELEV LANDING 51 SF LVT1 B1 P1 PTG1 CLT1 - -
207 OPEN WORK AREA 513 SF CT1 B1 P1/M4 P1 P1 P1 ACT1
208 RECEPTION DESK 101 SF LVT1 B1 P1 P1 - P1 WD1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION 209 CIRCULATION 163 SF LVT1 B1-ST P1 P1 P1 P1 P1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION 210 UNISEX 57 SF FT1 WT1 WT1/P1 WT1/P1 WT1/P1 P1 P1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION 211 UNISEX 56 SF FT1 WT1 P1 WT1/P1 WT1/P1 WT1/P1 P1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
212 HALLWAY 177 SF LVT1 B1-ST P1 P1 P1 P1 ACT1
213 CONF ROOM B 860 SF CT3/LVT1 B1 - P1/AS2 P1/AS2 P1/WF2 P1/WD2
214 CONF ROOM A 450 SF CT3/LVT1 B1 P1/AS2 P1/AS2 - P1 P1/WD2
215 AV/CONF STORAGE 89 SF LVT1 B2 P1 P1 P1 P1 ACT1
216 JNTR RM 38 SF VF1 B2 FRP1 FRP1 P1 FRP1 ACT1 USE FULL HEIGHT FRP PANELS
217 MAIL RM 89 SF LVT1 B1 P1 P1 P1 P1 ACT1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION 218 CIRCULATION 389 SF LVT1 B1 WD1 - P1 - ACT1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION 219 RESOURCE / STORAGE 41 SF - B1 P1 - - - ACT1 SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
220 VEST B 79 SF CT4 B1 WD1 - P1/M3 - P1
221 OPEN WORK AREA 516 SF CT1 B1 P1 P1 WD1 P1 ACT1
222 HUDDLE 97 SF CT2 B2 P1 P1 P1 P1 ACT1
223 OFFICE 128 SF CT2 B2 P1 P1 P1 P1 ACT1
224 HUDDLE 102 SF CT2 B2 P1 P1 P1 P1 ACT1
225 HUDDLE 102 SF CT2 B2 P1 P1 P1 P1 ACT1
226 HUDDLE 102 SF CT2 B2 P1 P1 P1 P1 ACT1
227 DS OFFICE 101 SF CT2 B2 P1 P1 P1 P1 ACT1
228 FS OFFICE 197 SF CT2 B1 P1 P1 P1 P1 ACT1
229 HUDDLE 105 SF CT3 B1 P1 P1 WD1 P1 ACT1
230 MAIN STAIR 140 SF CLT1 WF2 WD1 - WD1/P1 - - SEE INT. ELEVATIONS FOR ADDITIONAL INFORMATION
Grand total: 53 14949 SF
FINISH CODE LIST
CODE STYLE / COLOR MANUFACTURER NOTES
BASE
B1 RUBBER BASE "MILLWORK" MW - MOONROCK TARKETT
B2 RUBBER BASE "TIGHTLOCK WALL BASE" - MOONROCK TARKETT
B3 RUBBER BASE "TIGHTLOCK WALL BASE RESILIENT" - MOONROCK TARKETT
ST BARE PLATE STEEL, 4" x 12 GA., SEALED AND ADHERED TO WALL CUSTOM WB1 WOOD BASE MILLWORK MATCH ADJACENT WOOD WALL FINISH, SEE ELEVATIONS FOR ADDITIONAL INFORMATION
CEILING
ACT1 ACOUSTIC TILE "CALLA" / WHITE ARMSTRONG 24" X 24" TILES, SQUARE TEGULAR, ALL EDGE MOLDING TO BE SHADOW MOULDING ACT2 COMPOSITE ACOUSTIC CEILING ASSEMBLY - SEE GENERAL ASSEMBLIES AND DETAILS FOR ACOUSTIC ASSEMBLY
AS1 TECTUM 2" FINALE PANELS ARMSTRONG FIELD PAINTED
AWD1 ACOUSTIC WOOD CEILING - SEE ASSEMBLY DETAILS FOR ADDITIONAL INFORMATION
GWB PAINTED GWB CEILING - SEE PAINT CODE FOR COLOR
GWB2 ACOUSTIC PAINTED GWB CEILING - SEE GENERAL ASSEMBLIES AND DETAILS FOR ACOUSTIC ASSEMBLY WD1 PRE-FINISHED CEDAR SIDING - COLOR: RANCHWOOD ARTISAN HAYSTACK MONTANA TIMBER PRODUCTS SHIPLAP SEE DETAILS FOR ADDITIONAL INFORMATION WD2 6" DIAMETER DELIMBED LODGEPOLES / "RUSTIC" - SEE MAIN CONFERENCE ROOM RCP FOR ADDITIONAL INFORMATION
COUNTERTOP
QTZ-1 QUARTZ COUNTERTOP - WILSONART CHILLKAT Q1013 WILSONART
SS1 SOLID SURFACE - SPECKLED GREY CORIAN FINAL COLOR TO BE SELECTED FROM MANUFACTURERS ENTIRE LINE
FLOORING
CT1 CARPET TILE: ICEBREAKER- #1473002500 / 105784 WARM ROCK INTERFACE MONOLITHIC
CT2 CARPET TILE: ICEBREAKER- #1473002500 / 106198 SILICA INTERFACE MONOLITHIC
CT3 CARPET TILE: DRIFTWOOD- #138940AK00 / 104847 PINE INTERFACE ASHLAR PLANK
CT4 CARPET TILE: CHARGE - SURFACE (82361) MANNINGTON ASHLAR
FT1 GOTHAM POCELAIN STONE TILE - AV324 "MAINLINE" CROSSVILLE STACKED BOND, ALIGN FLOOR AND WALL GROUT JOINTS LVT1 RESILIENT TILE FLOORING: LOOK BOTH WAYS - #A012 / A01201 WARM ASH INTERFACE ASHLAR SDT1 STATIC DISSIPATIVE RESILIENT FLOORING: EXCELON SDT / 51957 RIDGE ARMSTRONG MONOLITHIC
VF1 VINYL SHEET FLOORING / OTTER GRAY ARMSTRONG
P. LAM
PL-1 PLASTIC LAMINATE - WILSONART PHANTOM ECRU 8212k-2B WILSONART PL-2 PLASTIC LAMINATE - WILSONART COLOR TO BE DETERMINED WILSONART COLOR TO BE SELECTED FROM WILSONART FULL LINE OF COLORS
PAINT
P1 PAINT EGGSHELL-SW 7004 - "SNOWBOUND" SHERWIN-WILLIAMS
P2 PAINT EGGSHELL- SW 6424 - "RYEGRASS" SHERWIN-WILLIAMS
WALL
AS2 TACKABLE ACOUSTIC PANEL 25MM ECOUSTIC / DOVE UNIKA VAEV USE MFR. PFM BLACK TRIMS FOR EXPOSED BOARDER LOCATIONS
FRP1 FIBER REINFORCED PLASTIC (FRP) / P430N MED GREY MARLITE
M1 MURAL - LOCATIONS AND SIZES TO BE VERIFIED WITH OWNER
M2 MURAL - LOCATIONS AND SIZES TO BE VERIFIED WITH OWNER
M3 MURAL - LOCATIONS AND SIZES TO BE VERIFIED WITH OWNER
M4 MURAL - LOCATIONS AND SIZES TO BE VERIFIED WITH OWNER
PTG1 PATTERN GLASS DESIGNTEX ELEVATOR AREA GLASS RAILING
WD1 PRE-FINISHED CEDAR SIDING - COLOR: RANCHWOOD ARTISAN HAYSTACK MONTANA TIMBER PRODUCTS SHIPLAP
WF1 VERTICAL GRAIN FIR MILLWORK
WF2 POPLAR BARK WALL COVERING / SANDED AND STAINED BARKHOUSE
WT1 GOTHAM POCELAIN STONE TILE - AV321 "LAMP POST" CROSSVILLE STACKED BOND, ALIGN FLOOR AND WALL GROUT JOINTS
WT2 CERAMIC WALL TILE - BISCUIT - 4100608-PEAK AND 4100612-PLAIN / BIANCO (MATTE
WHITE)
STONE SOURCE KITCHEN BACKSPLASH WITH MIXED PEAK AND PLAIN TILES
3/32" = 1'-0"
MAIN FLOOR - FINISH PLAN1
3/32" = 1'-0"
LOWER FLOOR - FINISH PLAN2
# DATE REVISION
2 3/06/20 Amendment 2
| Sheets |
| A700 - INTERIOR FINISH PLANS & FINISH SCHEDULE |
File details come from the government source that posted it. Updated .