11-tabulation sheet SLCC HTC CNA-MA Project.xlsx
XLSX spreadsheet 9 KB Posted
- Attached to
- SLCC HTC CNA/MA Project State and local contract opportunity
- Solicitation number
- SLCC2025-W1006
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
The document is a tabulation sheet for the Salt Lake Community College (SLCC) HTC CNA/MA Project, a state and local contract opportunity in Utah. The solicitation seeks to enter into a contract with a qualified vendor to provide specific products and/or services for the college, with the possibility of not proceeding with the procurement after reviewing submitted responses. The project involves construction services, with four contractors submitting bids for the base project and an alternate option.
The tabulation sheet reveals detailed pricing information from four general contractors: Total Crew General Contractors, Inc. ($379,020.00), Jacobsen Construction Company ($392,284.00), Patriot Construction, LLC ($322,228.00), and Slider Construction, Inc. ($370,905.00). The document indicates an intent to award the contract to Patriot Construction, which submitted the lowest total bid combining the base project cost ($311,259.00) and Alternate #1 cost ($10,969.00). The pricing breakdown shows each contractor's cost to complete the base project and an additional alternate project, with total costs ranging from approximately $322,000 to $392,000.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 2-Certificate-of-Substantial-Completion (1).docx | DOCX document | |
| 7-2025.06.27 SLCC CNA MA Remodel Permit Set.pdf | ||
| 8-20250714 130335.pdf | ||
| 10-2025.07.22 SLCC CNA MA Remodel Revised Permit Set.pdf | ||
| 6-SLCC Jordan CNA-MA Project Manual.pdf | ||
| 9-SLCC Jordan Campus Remodel Bid Addendum One 2025-07-22.pdf | ||
| 1-SALT LAKE COMMUNITY COLLEGE GENERAL BID PROVISIONS.pdf | ||
| 3-Contractors-Agreement (1).docx | DOCX document | |
| 4-Subcontractors+List (1).docx | DOCX document | |
| 5-Invitation for Bid - SLCC HTC CNA-MA Project F25015.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Worksheet
| Supplier | Cost to complete base project on time | Cost to complete ALTERNATE #1 | Total |
| Crew General Contractors, Inc, | $ 363,000.00 | $ 16,020.00 | $ 379,020.00 |
| Jacobsen Construction Company | $ 387,032.00 | $ 5,252.00 | $ 392,284.00 |
| Patriot Construction, LLC | $ 311,259.00 | $ 10,969.00 | $ 322,228.00 |
| Slider Construction, Inc. | $ 364,055.00 | $ 6,850.00 | $ 370,905.00 |
| Intend to Award to Patriot Construction |
File details come from the government source that posted it. Updated .