This is a Major Subcontractors Listing form for the Middleton Wash Trail construction project (Reference No. 26-255) administered by the City of St. George, Utah. The document serves as a template for general contractors to identify and list major subcontractors whose proposals will be used and who will perform work throughout the project duration. The form requires contractors to designate subcontractors across eleven distinct work categories: SWPPP, earthwork, storm drain, asphalt paving, site concrete, trail safety rail, concrete block retaining wall, rock retaining wall, concrete retaining wall, pedestrian bridge installation, and concrete abutments. Each subcontractor entry must include the company name, address, and contract amount. The document notes that general contractors self-performing work must list the responsible employee who will serve as foreman, and the completed listing will become a schedule of values used to verify monthly progress payments.
The City of St. George requires all bids to be accompanied by a bid bond in the amount of 5% of the total bid amount, issued by a surety company licensed to conduct business in Utah. A 100% performance bond covering labor and materials is mandatory upon contract award. Bidders must submit proposals that address the full scope of work including traffic control, removals, earthwork, storm drain installation, asphalt paving, concrete flatwork, trail safety rail, retaining walls of various types, signage, pedestrian bridge construction, and related work items. The City reserves the right to reject any or all submissions or waive any formality or technicality in the interest of the municipality.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Major Subcontractors Listing Page 1 of 2 Middleton Wash Trail, 26-255
Project Name: Middleton Wash Trail
Reference No.: 26-255
Major Subcontractors Listing Mark amount "NA" if not applicable. Copy and Paste if additional sub-contractors are needed.
Provide only the subcontractor's name whose PROPOSAL was used and who will be doing the work for each area of work at the time proposal is due. Supplement also will become a schedule of values to check each monthly progress payment. General Contractor's listing themselves to self-perform work shall list the employee of their firm who will act as foreman for said work.
GENERAL CONTRACTOR:
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________
SUB-CONTRACTOR: SWPPP
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $
SUB-CONTRACTOR: EARTHWORK
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $
SUB-CONTRACTOR: STORM DRAIN
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $
SUB-CONTRACTOR: ASPHALT PAVING
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $
SUB-CONTRACTOR: SITE CONCRETE
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________
SUB-CONTRACTOR: TRAIL SAFETY RAIL
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $
Major Subcontractors Listing Page 2 of 2 Middleton Wash Trail, 26-255
SUB-CONTRACTOR: CONCRETE BLOCK RETAINING WALL
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________
SUB-CONTRACTOR: ROCK RETAINING WALL
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________
SUB-CONTRACTOR: CONCRETE RETAINING WALL
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________
SUB-CONTRACTOR: PEDESTRIAN BRIDGE INSTALLATION
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________
SUB-CONTRACTOR: CONCRETE ABUTMENTS
Subcontractor Name: ____________________________________________________________ Subcontractor Address: __________________________________________________________ Amount: $________________________