Terminal Hold Room Expansion
Closed State & local contract opportunity
- Solicitation number
- 2026-ITB-085
- State
- Florida
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- Linda Alspaugh linda.alspaugh@lakelandgov.net (863) 834-8787
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Lakeland, Florida is requesting sealed bids for design and construction of a Terminal Hold Room Expansion at Lakeland Linder International Airport under ITB #2026-ITB-085, with bids due August 24, 2026 at 10:00 a.m. and a mandatory pre-bid meeting August 5, 2026 at 10:00 a.m. A local vendor preference applies to bidders located within Lakeland Electric's service territory with twelve consecutive months of business operation and proof of valid local business tax receipt.
Bidders must hold a valid Florida State Certified License (General Contractor or Building Contractor) and attend the mandatory pre-bid meeting; failure to satisfy either requirement results in disqualification. The scope encompasses full design and construction of a modular hold room expansion (approximately 5,370 square feet) including a 3,958 square foot departure lounge, separate men's and women's restrooms, family restroom, SARA room, janitor closet, storage area, electrical closet, and corridors; a children's play area; a pet relief area; airline agent check-in podiums; designated boarding lanes; and all mechanical, plumbing, electrical, fire protection, technology, security, signage, wayfinding, and furnishings. The facility connects to the existing terminal post-screening area via a corridor with airside ramps. The modular building design places final design, engineering, fabrication, and construction responsibility on the selected manufacturer. The project timeline spans 210 calendar days (60-day mobilization plus 150-day construction). The construction site is subject to the 2023 Florida Building Code, Risk Category II classification, 150 MPH wind load design criteria, and FAA General Provisions and Federal Contract Provisions. The contractor must obtain all permits, conduct geotechnical testing, maintain airport security protocols including AOA badging, and verify existing utilities.
Bidders submit a single firm price line item with no itemized breakdown. A bid bond equal to five percent of the bid price is required. The successful bidder must furnish a Public Construction Bond equal to the full contract price within ten days of award per Florida Statute 255.05. Required insurance includes Commercial General Liability and Business Automobile Liability at $2,000,000 single limit per occurrence; Workers' Compensation at statutory limits with employer's liability of $100,000 per accident and $500,000 disease policy limits; and Excess Liability of $5,000,000. Builder's Risk or Installation Floater coverage at replacement cost value is required. Written questions are due August 17, 2026 at 5:00 p.m. The successful bidder enters into a written contract within ten days of award.
Opportunity text
The purpose of this project is to expand the existing passenger terminal by adding hold room and associated restroom facilities, in order to increase passenger waiting capacity. The hold rooms will accommodate seated and standing passenger areas, airline agent check‑in podiums, Children's Play Area, Pet Relief Area and designated boarding lane space. This hold room expansion will be connected to the existing terminal post screening area by a corridor and accessed by ramps on the airside for arriving and departing passengers.
Please be sure and submit your pricing proposal, and also the bid form attachment (H)
Files
Show all 29
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity