LAL_Holdroom_Prebid_Meeting.pptx
PPTX presentation 2 MB Posted
- Attached to
- Terminal Hold Room Expansion
- Solicitation number
- 2026-ITB-085
- Issued by
- Polk County, Florida
About this file
This is a pre-bid meeting presentation for the City of Lakeland, Florida's Terminal Hold Room Expansion project at Lakeland Linder International Airport (ITB #2026-ITB-085). The project scope encompasses design and construction of approximately 5,370 square feet of modular hold room expansion, including a 3,958 square foot departure lounge, restroom facilities (men's, women's, and family), children's play area, pet relief area, airline agent check-in podiums, designated boarding lanes, and all associated mechanical, plumbing, electrical, fire protection, technology, security, and furnishings. The facility will connect to the existing terminal post-screening area via a corridor with airside ramps for arriving and departing passengers. The modular construction comprises eight modules: four units measuring 12 feet by 60 feet, three units measuring 12 feet by 50 feet, and one unit measuring 12 feet by 12 feet. The mandatory pre-bid meeting is scheduled for August 5, 2026 at 10:00 a.m., with written questions due August 17, 2026 at 5:00 p.m., and sealed bids due August 24, 2026 at 10:00 a.m. The project timeline spans 210 calendar days, including a 60-day mobilization period and 150-day construction phase.
Bidders must hold a valid Florida State Certified License (General Contractor or Building Contractor) and attendance at the mandatory pre-bid meeting is required for bid acceptance. A local vendor preference applies to bidders located within Lakeland Electric's service territory with twelve consecutive months of business operation and proof of valid local business tax receipt. Pricing is submitted as a single firm price line item with no itemized breakdown, and a bid bond equal to five percent of the bid price is required. The successful bidder must furnish a Public Construction Bond equal to the full contract price within ten days of award per Florida Statute 255.05. Required insurance includes Commercial General Liability and Business Automobile Liability at $2,000,000 single limit per occurrence, Workers' Compensation at statutory limits with employer's liability of $100,000 per accident and $500,000 disease policy limits, and Excess Liability of $5,000,000. The project is subject to the 2023 Florida Building Code with Risk Category II classification and 150 MPH wind load design criteria. Builder's Risk or Installation Floater coverage at replacement cost value is required, and the contractor must obtain all permits, conduct geotechnical testing, and maintain airport security protocols including AOA badging.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hold Room Expansion Lakeland Linder International Airport
Prebid Meeting August 5, 2026
Purpose & Goals Expand existing passenger terminal to increase passenger waiting capacity 4,950 SF hold room Modular building construction (delegated design)
Connected to the existing terminal post screening area by a corridor Accessed by ramp on the airside for arriving and departing passengers.
The hold rooms will accommodate:
Seated and standing passenger areas Airline agent check‑in podium Designated boarding lane space Restrooms Other support space Project Description
Demolition / Site Work / Utilities
Demolition Building expansion on existing pavement Remove existing ramp/handrail, fence, electrical cable/conduit
Site Work New Fencing and Pedestrian Gate Miscellaneous concrete
Electrical Service fed for existing building panel Relocate light pole
Water and Sewer New domestic water and sewer connection Fire protection from existing building
Modules – Total of (8)
(4) 12 FT x 60 FT
(3) 12 FT x 50 FT
(1) 12 FT x 12 FT
Program Hold Room / Waiting Area 165 Approximate Seating Capacity Children Play Area Support / Services Restrooms (M/F) Family Restroom Pet Relief Area
Hold Room
Building Floor Plan
12 FT X 60 FT
12 FT X 50 FT
12 FT X 12 FT
South Building Elevation Building Section
Phasing and Site Access
Mobilization- 60 days Permit drawings / approvals Install temporary fence
Phase 1- 150 days Site work during procurement Install modular building Connections and Finishing Work in Existing Terminal at night / off-peak hours
Staging and Access Temporary Fence Staging Contractor access
Questions image1.png image2.svg image75.png image3.png image76.png image77.jpg image78.jpg image79.jpg image80.png image4.png image5.svg