Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project
Closed State & local contract opportunity Posted
- Solicitation number
- 26-07
- State
- Utah
- Responses due
Opportunity facts
- NIGP codes
- 790 Seed, Sod, Soil, And Inoculants
- 760 Road And Highway Equipment: Earth Handling, Grading, Moving, Packing, Etc.
- 150 Builder's Supplies
- 98852 Landscaping (Including Design, Fertilizing, Planting, Etc., But Not Grounds Maintenance Or Tree Trimming Services)
- 90922 Building Construction, Non-Residential (Office Bldg., Etc.)
- 913 Construction Services, Heavy, Including Maintenance And Repair Services
- 91240 Demolition Services
- UNSPSC codes
- 22100000 Heavy construction machinery and equipment
- 11110000 Earth and stone
- 72120000 Nonresidential building construction services
- 30110000 Concrete and cement and plaster
- 70130000 Land and soil preparation and management and protection
- 72140000 Heavy construction services
- 72141508 Blasting service except building demolition
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The City of Moab, Utah is requesting bids on the Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project under a unit-price IFB, with bids due September 1, 2026 at 2:00 p.m. MST via the Utah State Procurement Portal (Bonfire), and a mandatory in-person pre-bid meeting and site visit on August 4, 2026 at 2:00 p.m. MST at Moab City Council Chambers.
The scope encompasses removal of sediment and debris in the vicinity of the pedestrian bridge; excavation of sediment deposits within main and tributary channels and overbank areas; installation of a concrete apron on the channel bottom and banks to protect bridge abutments from erosion; riprap installation on the downstream side of three existing culverts; and erosion protection along the Pack Creek channel. The project includes 17 line items ranging from mobilization and survey work to dewatering, multiple classes of riprap installation, turf reinforcement matting, concrete work, tree removal, culvert cleaning, demolition, installation of a prefabricated steel truss pedestrian bridge, and trail restoration. Pricing is submitted on a unit-price basis with estimated quantities established by the City; final payment is determined by actual quantities constructed.
The contractor must achieve substantial completion within 60 calendar days of the Notice to Proceed and full completion within 90 calendar days, with liquidated damages assessed at $1,000 per day for failure to meet substantial completion. Bid security of 5 percent of total bid price, performance and payment bonds at 100 percent of contract price, and a one-year warranty period are required. The contractor must comply with E-Verify requirements and maintain all required licenses and permits. Required insurance includes comprehensive general liability ($1,000,000 per occurrence), worker's compensation per Utah law, and automobile liability ($1,000,000). The bid acceptance period is 60 days after opening, extendable by mutual written agreement.
Opportunity text
The scope of this project is to provide all the labor, materials, tools and equipment necessary to construct the Pack Creek Pedestrian Bridge Replacement and Channel Restoration Project, complete as described in the plans and specifications. The project generally includes the following: to remove sediment and debris in the vicinity of this pedestrian bridge, excavate sediment deposits within the main and tributary channels and in the overbank areas to protect the pedestrian bridge and existing trail from erosion hazards, install a concrete apron on the channel bottom and banks to protect the bridge abutments of the proposed bridge from erosion hazards, install riprap on the downstream side of the three existing culverts, and provide erosion protection along the Pack Creek channel in the area
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity