McIntosh Power Plant Site Stormwater Modifications

Closed State & local contract opportunity Posted

Solicitation number
2026-RFP-049
State
Florida
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Lakeland, Florida is requesting proposals for stormwater modifications at the McIntosh Power Plant site, with sealed proposals due electronically June 19, 2026 at 3:30 PM and a mandatory pre-proposal meeting on May 27, 2026 at 2:00 PM. A local vendor preference applies to qualifying businesses maintaining a physical location within Lakeland Electric's service territory for at least twelve consecutive months and holding a valid Local Business Tax Receipt.

The scope encompasses removal of existing pavement and infrastructure, site grading, and construction of two new stormwater retention ponds (West Pond and Admin Pond) replacing areas previously occupied by Units 1, 2, 3, and the Coal Yard at 3030 East Lake Parker Drive. Work includes alteration of existing surface water ponds, installation of new outfalls, riprap revetments, concrete flumes, erosion and sediment control measures, and site sodding. The project spans approximately 91.9 acres across three demolition zones. Contractors must comply with Army Corps of Engineers Nationwide Permit 7 conditions, including Eastern Indigo Snake protection measures with 30-day advance notice to USFWS and 60-day post-completion monitoring. All work must follow the Construction Stormwater Pollution Prevention Plan and OSHA standards, with special attention to Process Safety Management requirements due to Anhydrous Ammonia use on site.

Evaluation is weighted: project cost (25 points), quality of construction plans (25 points), project implementation schedule (15 points), safety performance record (10 points), strength and relevance of references (10 points), conformance with contract requirements (10 points), and team qualifications (5 points). Contractors must hold a valid Florida state-certified General Contractor or Building Contractor license, provide three references from similar projects completed within the past five years, and demonstrate insurance including Commercial General Liability of $2 million per occurrence, Business Automobile Liability of $2 million per occurrence, Excess Liability of $5 million, and Contractors Pollution Liability or Environmental Impairment Liability of $1 million. A bid bond or certified check equal to five percent of proposal price is required. Work is anticipated to commence June 31, 2026 or 30 days after purchase order issuance, whichever is sooner, with completion targeted by March 14, 2027. A lump sum pricing structure applies with fixed-price submission required. Questions are due June 11, 2026 at 5:00 PM.

Opportunity text

The purpose of this project is for modifications and removal of existing site conditions and construction of a new storm water management system McIntosh Power Plant. The project includes removal of pavement and infrastructure, site grading, and construction of two new stormwater retention ponds for areas that previously held Units 1, 2, and 3 and the Coal Yard at the McIntosh Power Plant. These two ponds are referred to as the "West Pond" and "Admin Pond" for the purposes of this project. Existing surface waters ponds within the project area will be altered, new outfalls will be installed, and riprap revetments will be installed to ensure no scouring or erosion will occur.

Files

File Type Posted
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#4_Revision).pdf PDF
Addendum_4_-_Dewatering_and_Discharge_Considerations.pdf PDF
Addendum_3_CAD_Access_Instructions_FTP_FILE_ACCESS.pdf PDF
Revised_Attachment_L_Current_Project_Phase_Area.pdf PDF
Revised_Attachment_L_Current_Project_Phase_Area.pdf PDF
GL-878_U2_Cooling_Tower_Well_Water_System.pdf PDF
GL-878_U2_Cooling_Tower_Well_Water_System.pdf PDF
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#2_Revision).pdf PDF
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#1_Revision).pdf PDF
2026_City_of_Lakeland_Standard_Contract_Form.pdf PDF
Attachement_E_McIntosh_Power_Plant_Demo_(FW8287)_IFC_Signed.pdf PDF
Attachment_F_McIntosh_Underground-_Old_Admin_Area.pdf PDF
Attachment_D_Current_Project_Phase_Area_for_bid.pdf PDF
Attachment_G_McIntosh_ACOE_NWP7_Relevant_Sections.pdf PDF
Attachment_C_Pond_Construction_RFP.pdf PDF
Attachment_H_Bid_Pricing_Sheet_Stromwater_Pond_Construction.xlsx XLSX spreadsheet
Indemnification_2026_Contractor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Vendor.doc DOC document
Contractor_Safety_Evaluation_Form.pdf PDF
Human_Trafficking_Affidavit.docx DOCX document
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Show all 24

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity