Other files
| File |
Type |
Posted |
| McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#4_Revision).pdf |
PDF |
|
| Addendum_4_-_Dewatering_and_Discharge_Considerations.pdf |
PDF |
|
| Addendum_3_CAD_Access_Instructions_FTP_FILE_ACCESS.pdf |
PDF |
|
| Revised_Attachment_L_Current_Project_Phase_Area.pdf |
PDF |
|
| McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#2_Revision).pdf |
PDF |
|
| McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#1_Revision).pdf |
PDF |
|
| 2026_City_of_Lakeland_Standard_Contract_Form.pdf |
PDF |
|
| Attachement_E_McIntosh_Power_Plant_Demo_(FW8287)_IFC_Signed.pdf |
PDF |
|
| Attachment_G_McIntosh_ACOE_NWP7_Relevant_Sections.pdf |
PDF |
|
| Attachment_F_McIntosh_Underground-_Old_Admin_Area.pdf |
PDF |
|
| Attachment_D_Current_Project_Phase_Area_for_bid.pdf |
PDF |
|
| Attachment_H_Bid_Pricing_Sheet_Stromwater_Pond_Construction.xlsx |
XLSX spreadsheet |
|
| Attachment_C_Pond_Construction_RFP.pdf |
PDF |
|
| PSM_-_Contractor_Annual_Audit_Form.pdf |
PDF |
|
| Contractor_Safety_Evaluation_Form.pdf |
PDF |
|
| Indemnification_2026_Consultant.doc |
DOC document |
|
| Indemnification_2026_Vendor.doc |
DOC document |
|
| Indemnification_2026_Consultant_-_FDOT.docx |
DOCX document |
|
| Indemnification_2026_Contractor.doc |
DOC document |
|
| Human_Trafficking_Affidavit.docx |
DOCX document |
|
| Indemnification_2026_Contractor_-_FDOT.docx |
DOCX document |
|
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .