Attachment_D_Current_Project_Phase_Area_for_bid.pdf

PDF 2 MB Posted

Attached to
McIntosh Power Plant Site Stormwater Modifications
Solicitation number
2026-RFP-049
Issued by
Polk County, Florida

About this file

This file is an attachment document related to the McIntosh Power Plant Site Stormwater Modifications project in Florida. The attachment delineates the current project phase area designated for bidding and provides visual representation of the specific geographic scope encompassing the site modifications. The project involves the removal of existing pavement and infrastructure, site grading, and construction of two new stormwater retention ponds designated as the "West Pond" and "Admin Pond" to serve areas that previously contained Units 1, 2, and 3 and the Coal Yard at the McIntosh Power Plant. The scope includes alterations to existing surface water ponds within the project area, installation of new outfalls, and installation of riprap revetments to prevent scouring and erosion.

The attachment document itself functions as a reference guide for bidders to understand the physical boundaries and current conditions of the area subject to the stormwater modifications contract. This visual delineation is essential for accurate bid preparation and ensures that all respondents have a consistent understanding of the project footprint and the specific site conditions that will be addressed during construction. The document does not contain pricing information, specific timelines, or award details, but rather serves as a foundational reference document to support the bidding process for this stormwater infrastructure project.

View the file

Other files

File Type Posted
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#4_Revision).pdf PDF
Addendum_4_-_Dewatering_and_Discharge_Considerations.pdf PDF
Addendum_3_CAD_Access_Instructions_FTP_FILE_ACCESS.pdf PDF
Revised_Attachment_L_Current_Project_Phase_Area.pdf PDF
GL-878_U2_Cooling_Tower_Well_Water_System.pdf PDF
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#2_Revision).pdf PDF
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#1_Revision).pdf PDF
2026_City_of_Lakeland_Standard_Contract_Form.pdf PDF
Attachement_E_McIntosh_Power_Plant_Demo_(FW8287)_IFC_Signed.pdf PDF
Attachment_G_McIntosh_ACOE_NWP7_Relevant_Sections.pdf PDF
Attachment_F_McIntosh_Underground-_Old_Admin_Area.pdf PDF
Attachment_H_Bid_Pricing_Sheet_Stromwater_Pond_Construction.xlsx XLSX spreadsheet
Attachment_C_Pond_Construction_RFP.pdf PDF
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment D Current Project Phase Area for bid Attachment D2 Current Project Phase Area for bid

File details come from the government source that posted it. Updated .