Attachment_F_McIntosh_Underground-_Old_Admin_Area.pdf

PDF 44 KB Posted

Attached to
McIntosh Power Plant Site Stormwater Modifications
Solicitation number
2026-RFP-049
Issued by
Polk County, Florida

About this file

This is an underground utility exhibit document related to the McIntosh Power Plant Site Stormwater Modifications project in Florida. The exhibit provides detailed mapping and identification of existing underground infrastructure within the Old Admin Area of the McIntosh Power Plant site. The document serves as a reference for contractors undertaking the stormwater management system modifications, which include the construction of two retention ponds (West Pond and Admin Pond) in areas previously occupied by Units 1, 2, and 3, and the Coal Yard. The exhibit identifies the locations and types of underground utilities, pipes, and infrastructure that exist within the project area, essential information for safe excavation, site preparation, and construction activities. This reference material enables bidders and contractors to understand existing site conditions and plan accordingly for removal of pavement and infrastructure, site grading, and installation of new stormwater management features including outfalls and riprap revetments.

The underground utility exhibit is critical for risk assessment and cost estimation during the bidding process, as contractors must account for the identification, potential relocation, or protection of existing underground infrastructure during construction. The document provides visual and spatial information that contractors must review during site assessment phases to ensure compliance with safety requirements and proper project planning. No specific pricing, set-asides, or funding information is contained within this exhibit; it functions as a technical reference document supporting the overall project scope and enabling contractors to develop accurate proposals for the stormwater modifications at the McIntosh Power Plant site.

View the file

Other files

File Type Posted
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#4_Revision).pdf PDF
Addendum_4_-_Dewatering_and_Discharge_Considerations.pdf PDF
Addendum_3_CAD_Access_Instructions_FTP_FILE_ACCESS.pdf PDF
Revised_Attachment_L_Current_Project_Phase_Area.pdf PDF
GL-878_U2_Cooling_Tower_Well_Water_System.pdf PDF
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#2_Revision).pdf PDF
McIntosh_Power_Plant_Site_Stormwater_Modifications_(Addendum_#1_Revision).pdf PDF
2026_City_of_Lakeland_Standard_Contract_Form.pdf PDF
Attachement_E_McIntosh_Power_Plant_Demo_(FW8287)_IFC_Signed.pdf PDF
Attachment_G_McIntosh_ACOE_NWP7_Relevant_Sections.pdf PDF
Attachment_D_Current_Project_Phase_Area_for_bid.pdf PDF
Attachment_H_Bid_Pricing_Sheet_Stromwater_Pond_Construction.xlsx XLSX spreadsheet
Attachment_C_Pond_Construction_RFP.pdf PDF
PSM_-_Contractor_Annual_Audit_Form.pdf PDF
Contractor_Safety_Evaluation_Form.pdf PDF
Indemnification_2026_Consultant.doc DOC document
Indemnification_2026_Vendor.doc DOC document
Indemnification_2026_Consultant_-_FDOT.docx DOCX document
Indemnification_2026_Contractor.doc DOC document
Human_Trafficking_Affidavit.docx DOCX document
Indemnification_2026_Contractor_-_FDOT.docx DOCX document
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .