East Boulder Ditch Fish Passage Construction Project

Solicitation # 072024
Posted 2/7/24, 2:00 AM
No Updates
Due 2/26/24, 6:00 PM
Source
No public source available
Similar Opportunities
The City of Boulder's Transportation department is seeking bids for a pedestrian bridge replacement project located on Arapahoe Avenue over South Boulder Creek. The procurement involves removing the existing 75-foot pedestrian bridge and constructing a new steel truss bridge with longer span capabilities. Key project deliverables include structure excavation, backfill, new bridge erection, concrete abutment construction, concrete path approaches, and minor site restoration. A non-mandatory...
The state of Colorado has issued a contract opportunity for the Breem Ditch Instream Flow Gage and Washington Gulch Bypass project, with a posting date of July 23, 2025, and a proposal submission deadline of September 2, 2025. This procurement appears to be focused on water infrastructure and measurement systems, specifically related to ditch and gulch water management. The contract opportunity suggests a comprehensive engineering and infrastructure project that likely requires detailed...
The City of Northglenn is seeking a consultant to conduct a comprehensive Berthoud Pass Maintenance and Repair Feasibility Report through a Request for Proposal (RFP 2025-019). The project involves a detailed condition assessment, alternatives analysis, and feasibility study of the Berthoud Pass Ditch, with the primary objective of evaluating potential renovation and improvement options. Key deliverables include an alternatives analysis exploring options to reestablish ditch capacity,...
The Town of Estes Park in Larimer County, Colorado, is seeking a design-build contractor for the Performance Park Bridge Replacement project, a comprehensive infrastructure improvement initiative to construct a new 10-foot wide, 40-foot long pedestrian bridge across Fall River near the Performance Park Amphitheater. The project requires a contractor to provide complete design and construction services, including soil investigation, site planning, construction surveying, removal of existing...

The City of Boulder Open Space and Mountain Parks (OSMP) Department is seeking a qualified contractor to construct a fish passage project on the East Boulder Ditch (EBD) along South Boulder Creek in Boulder County, Colorado. The project aims to improve fish passage, maintain water delivery rights, and enhance the ecological functioning of the stream and riparian area. Specific deliverables include installing a 470-foot-long 40"x31" aluminized steel pipe arch, constructing a new headgate structure, creating a diversion structure with removable flashboards, and implementing stream restoration elements such as regrading, constructed riffles, rock vanes, and bank protection. Contractors must demonstrate experience in fish passage projects, irrigation infrastructure improvements, and stream enhancement work. The solicitation requires electronic bid submissions through BidNet Direct, with a mandatory pre-bid meeting scheduled for February 13, 2024, at 1:00 PM. Bids are due electronically by 2:00 PM MST on February 26, 2024, with contractor selection anticipated by March 5, 2024, and a Notice to Proceed expected on March 11, 2024.

The procurement does not specify explicit set-aside designations for disadvantaged enterprises, but the City of Boulder does give preference to labor, materials, and services produced in Colorado. Bidders are required to submit a 5% bid bond, completed qualification forms, and a 1-2 page resume demonstrating relevant experience. The project site involves sensitive habitat with federally threatened species and regulated wetlands, requiring contractors to limit disturbance to a small corridor between South Boulder Creek and existing multi-use trails. While no specific budget is explicitly stated, the comprehensive bid form suggests a complex environmental and infrastructure improvement initiative. The project includes multiple critical constraints, such as working within water rights periods (April 1-October 31) and adhering to strict New Zealand Mudsnail decontamination protocols to prevent invasive species spread. The City has already obtained several permits, including a USACOE Section 404 permit and USFWS Section 7 clearance, with the selected contractor responsible for additional required permits.

Generated 7/24/25, 12:45 PM