Bid Form 07-2024.xlsx
XLSX spreadsheet 27 KB Posted
- Attached to
- East Boulder Ditch Fish Passage Construction Project State and local contract opportunity
- Solicitation number
- 07-2024
- Issued by
- Boulder County, Colorado
About this file
The document is a Bid Form for the City of Boulder Utilities Department's Traffic Control Device Installation project, specifically related to the East Boulder Ditch Fish Passage Construction Project. The bid form outlines a comprehensive scope of work for a construction project involving stream and infrastructure improvements, including site preparation, structure removal, in-stream work, and post-project restoration. The bid form provides a detailed itemized list of 20 potential work items, ranging from mobilization and construction staking to stream excavation, regrading, and path replacement, with units of measurement including lump sum (LS), linear feet (LF), cubic yards (CY), and square feet (SF).
The bid form is designed for contractors to submit unit prices for each listed item, with the understanding that the City reserves the right to reject any or all bids and adjust quantities as needed. The project is located on City of Boulder owned property east of the city, south of Baseline Road, and focuses on fish passage improvements on South Boulder Creek. The City is specifically seeking contractors with demonstrated experience in fish passage projects, irrigation infrastructure improvements, and stream enhancement work. While specific pricing details are not completed in the provided document, the form allows for comprehensive cost estimation across multiple project components, with a total bid calculation mechanism built into the spreadsheet.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| City of Boulder NZMS Decontamination Protocol - FINAL (1).pdf | ||
| EBDC drawings.pdf | ||
| required bid forms.pdf | ||
| Bid Form 07-2024 Revised.xlsx | XLSX spreadsheet | |
| Copy of Bid Form 07-2024 Revised 2_21_24.xlsx | XLSX spreadsheet | |
| RFB Packet - East Boulder Ditch Fish Passage.pdf | ||
| RFB addendum 2_21_24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST ESTIMATE
| CITY OF BOULDER UTILITIES DEPARTMENT |
| TRAFFIC CONTROL DEVICE INSTALLATION |
| BID PROPOSAL | |
| ONLY THOSE CELLS HIGHLIGHTED IN YELLOW SHALL BE FILLED IN. DO NOT ALTER ANY OTHER CELLS. |
| The lowest responsible and best bid will be accepted; provided, however that the City shall have the right to reject any and all bids and to waive any informalities or irregularities contained in said bid. The following quantities are an estimate only and may be altered to meet the City of Boulder requirements. |
| Submit firm unit prices for the type of construction listed below. Overhead shall not be priced separately, but shall be included in each bid item as required. All prices are for removing or installing the described items unless noted otherwise. |
COMPANY NAME:
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE |
| Site Preparation | |||||
| 1 | Mobilization / Demobilization / Bonding / Insurance | LS | $ - 0 | ||
| 2 | Construction Stake Out | LS | $ - 0 | ||
| 3 | Clearing and Grubbing | ACRE | $ - 0 | ||
| 4 | Dewatering / Care of Water | LS | $ - 0 | ||
| 5 | Erosion Control | LS | $ - 0 | ||
| 6 | Temporary Fencing | LF | $ - 0 | ||
| Structures | $ - 0 | ||||
| 7 | Existing Structure Removal | LS | $ - 0 | ||
| 8 | Regrading Ditch | CY | $ - 0 | ||
| 9 | New Headgate Structure and Headgates | LS | $ - 0 | ||
| 10 | New Gauging Station and Stilling Well | LS | $ - 0 | ||
| 11 | New Pipe Arch Installation | LF | $ - 0 | ||
| In-stream Work | $ - 0 | ||||
| 12 | Stream Excavation/Regrading - Includes Riffles/Pool Construction | CY | $ - 0 | ||
| 13 | Stream Fill/Regrading - Includes Riffles/Pool Construction | CY | $ - 0 | ||
| 14 | Log Jam Removal | LS | $ - 0 | ||
| 15 | New Diversion Structure | EA | $ - 0 | ||
| 16 | Coir matting/Geotextile | SF | $ - 0 | ||
| 17 | Riprap for Bank Stabilization | CY | $ - 0 | ||
| Post Project Work | $ - 0 | ||||
| 18 | Concrete Path Replacement | SQFT | $ - 0 | ||
| 19 | Dirt Path Replacement | SQFT | $ - 0 | ||
| 20 | Wooden Fence Replacement | LF | $ - 0 | ||
| Total | TOTAL BID | $ - 0 |