Bid Form 07-2024 Revised.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- East Boulder Ditch Fish Passage Construction Project State and local contract opportunity
- Solicitation number
- 07-2024
- Issued by
- Boulder County, Colorado
About this file
The document is a Bid Form (07-2024) for the City of Boulder Open Space and Mountain Parks (OSMP) Department's East Boulder Ditch Fish Passage Construction Project, located in Boulder County, Colorado. The bid solicits a comprehensive construction project involving fish passage improvements on South Boulder Creek, with the project site situated east of Boulder, south of Baseline Road. The bid form includes 27 distinct line items covering site preparation, structures, in-stream work, and post-project restoration, with estimated quantities for activities such as mobilization, construction stake-out, dewatering, structure removal, stream excavation, riffle construction, log placement, bank stabilization, and path and fence replacement.
The bid form requires contractors to submit unit pricing for each listed item, with the City reserving the right to accept the lowest responsible and best bid while maintaining flexibility to reject any or all submissions. The project seeks contractors with demonstrated experience in fish passage, irrigation infrastructure, and stream improvement projects. The total project scope involves approximately 480 linear feet of pipe arch installation, 350 cubic yards of stream excavation and fill, 5 buried rock vanes, 14 base logs, 14 root wad logs, and restoration of 200 square feet of concrete path and 3,000 square feet of dirt path. No specific budget or funding source is explicitly detailed in the provided documents, but the comprehensive bid form suggests a complex environmental and infrastructure improvement initiative.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Form 07-2024.xlsx | XLSX spreadsheet | |
| City of Boulder NZMS Decontamination Protocol - FINAL (1).pdf | ||
| EBDC drawings.pdf | ||
| required bid forms.pdf | ||
| Copy of Bid Form 07-2024 Revised 2_21_24.xlsx | XLSX spreadsheet | |
| RFB Packet - East Boulder Ditch Fish Passage.pdf | ||
| RFB addendum 2_21_24.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST ESTIMATE
| CITY OF BOULDER OSMP DEPARTMENT |
| East Boulder Ditch Fish Passage |
Construction Project
| BID PROPOSAL | |
| 07-2024 | ONLY THOSE CELLS HIGHLIGHTED IN YELLOW SHALL BE FILLED IN. DO NOT ALTER ANY OTHER CELLS. |
| The lowest responsible and best bid will be accepted; provided, however that the City shall have the right to reject any and all bids and to waive any informalities or irregularities contained in said bid. The following quantities are an estimate only and may be altered to meet the City of Boulder requirements. |
| Submit firm unit prices for the type of construction listed below. Overhead shall not be priced separately, but shall be included in each bid item as required. All prices are for removing or installing the described items unless noted otherwise. |
COMPANY NAME:
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE |
| Site Preparation | |||||
| 1 | Mobilization / Demobilization / Bonding / Insurance | LS | 1 | $ - 0 | |
| 2 | Construction Stake Out | LS | 1 | $ - 0 | |
| 3 | Weltland Mats | LS | 1 | $ | |
| 4 | Clearing and Grubbing | ACRE | 1 | $ - 0 | |
| 5 | Dewatering / Care of Water | LS | 1 | $ - 0 | |
| 6 | Erosion Control | LS | 1 | $ - 0 | |
| 7 | Temporary Fencing | LF | 450 | $ - 0 | |
| Structures | $ - 0 | ||||
| 8 | Existing Structure Removal | LS | 1 | $ - 0 | |
| 9 | Regrading Ditch | CY | 100 | $ - 0 | |
| 10 | New Headgate Structure and Headgates | LS | 1 | $ - 0 | |
| 11 | New Gauging Station and Stilling Well | LS | 1 | $ - 0 | |
| 12 | Manholes | EA | 2 | $ | |
| 13 | New Pipe Arch Installation | LF | 480 | $ - 0 | |
| In-stream Work | $ - 0 | ||||
| 14 | Stream Excavation/Regrading - Includes Riffles/Pool Construction | CY | 350 | $ - 0 | |
| 15 | Stream Fill/Regrading - Includes Riffles/Pool Construction | CY | 350 | $ - 0 | |
| 16 | Select Materials for Constructed Riffle | CY | 125 | ||
| 17 | Buried Rock Vanes | EA | 5 | ||
| 18 | Log Jam Removal | LS | 1 | $ - 0 | |
| 19 | New Diversion Structure | EA | 1 | $ - 0 | |
| 20 | Base Logs | EA | 14 | $ - 0 | |
| 21 | Root Wad Logs | EA | 14 | ||
| 22 | Small Branches | CY | 30 | ||
| 23 | Coir Matting/Geotextile | SY | 400 | ||
| 24 | Buried Riprap for Bank Stabilization | CY | 75 | $ - 0 | |
| Post Project Work | $ - 0 | ||||
| 25 | Concrete Path Replacement | SQFT | 200 | $ - 0 | |
| 26 | Dirt Path Replacement | SQFT | 3000 | $ - 0 | |
| 27 | Wooden Fence Replacement | LF | 300 | $ - 0 | |
| Total | TOTAL BID | $ - 0 |