Copy of Bid Form 07-2024 Revised 2_21_24.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- East Boulder Ditch Fish Passage Construction Project State and local contract opportunity
- Solicitation number
- 07-2024
- Issued by
- Boulder County, Colorado
About this file
This is a Bid Form (07-2024) from the City of Boulder Open Space and Mountain Parks (OSMP) Department for the East Boulder Ditch Fish Passage Project. The bid solicits a comprehensive construction project to improve fish passage on South Boulder Creek, located in Boulder County, Colorado. The project involves multiple construction phases including site preparation, structure removal and installation, in-stream work, and post-project restoration. Key bid items include mobilization, construction stake out, dewatering, erosion control, structure removal, pipe arch installation, stream excavation and regrading, log and branch placement, bank stabilization, and path and fence replacement. The bid covers approximately 480 linear feet of pipe installation, 500 cubic yards of stream excavation, and includes specialized elements like buried rock vanes, diversion structures, and riprap bank stabilization.
The bid form is structured as a unit price contract with quantities estimated by the City of Boulder, allowing flexibility in final project execution. Bidders are required to provide unit pricing for each listed item, with overhead costs to be integrated into individual line items rather than priced separately. The project seeks contractors with demonstrated experience in fish passage construction, irrigation infrastructure improvement, and stream enhancement projects. While no specific bid deadline is listed on the form, the document indicates that the City will select the lowest responsible and best bid, reserving the right to reject any or all submissions. The total project scope suggests a complex environmental restoration and infrastructure improvement initiative focused on enhancing aquatic habitat and stream functionality in the South Boulder Creek area.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Form 07-2024 Revised.xlsx | XLSX spreadsheet | |
| RFB Packet - East Boulder Ditch Fish Passage.pdf | ||
| RFB addendum 2_21_24.pdf | ||
| Bid Form 07-2024.xlsx | XLSX spreadsheet | |
| City of Boulder NZMS Decontamination Protocol - FINAL (1).pdf | ||
| EBDC drawings.pdf | ||
| required bid forms.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COST ESTIMATE
| CITY OF BOULDER OSMP DEPARTMENT |
| East Boulder Ditch Fish Passage Project |
| BID PROPOSAL | |
| 07-2024 | ONLY THOSE CELLS HIGHLIGHTED IN YELLOW SHALL BE FILLED IN. DO NOT ALTER ANY OTHER CELLS. |
| The lowest responsible and best bid will be accepted; provided, however that the City shall have the right to reject any and all bids and to waive any informalities or irregularities contained in said bid. The following quantities are an estimate only and may be altered to meet the City of Boulder requirements. |
| Submit firm unit prices for the type of construction listed below. Overhead shall not be priced separately, but shall be included in each bid item as required. All prices are for removing or installing the described items unless noted otherwise. |
COMPANY NAME:
| ITEM | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL PRICE |
| Site Preparation | |||||
| 1 | Mobilization / Demobilization / Bonding / Insurance | LS | 1 | $ - 0 | |
| 2 | Construction Stake Out | LS | 1 | $ - 0 | |
| 3 | Weltland Mats | LS | 1 | $ | |
| 4 | Clearing and Grubbing | ACRE | 1 | $ - 0 | |
| 5 | Dewatering / Care of Water | LS | 1 | $ - 0 | |
| 6 | Erosion Control | LS | 1 | $ - 0 | |
| 7 | Temporary Fencing | LF | 450 | $ - 0 | |
| Structures | $ - 0 | ||||
| 8 | Existing Structure Removal | LS | 1 | $ - 0 | |
| 9 | Regrading Ditch | CY | 100 | $ - 0 | |
| 10 | New Headgate Structure and Headgates | LS | 1 | $ - 0 | |
| 11 | New Gauging Station and Stilling Well | LS | 1 | $ - 0 | |
| 12 | Manholes | EA | 1 | $ | |
| 13 | New Pipe Arch Installation | LF | 480 | $ - 0 | |
| In-stream Work | $ - 0 | ||||
| 14 | Stream Excavation/Regrading - Includes Riffles/Pool Construction | CY | 500 | $ - 0 | |
| 15 | Stream Fill/Regrading - Includes Riffles/Pool Construction | CY | 500 | $ - 0 | |
| 16 | Select Materials for Constructed Riffle | CY | 200 | $ - 0 | |
| 17 | Buried Rock Vanes/Measurement Weir | EA | 5 | $ - 0 | |
| 18 | Log Jam Removal | LS | 1 | $ - 0 | |
| 19 | New Diversion Structure | EA | 1 | $ - 0 | |
| 20 | Base Logs | EA | 11 | $ - 0 | |
| 21 | Root Wad Logs | EA | 11 | $ - 0 | |
| 22 | Small Branches | CY | 30 | $ - 0 | |
| 23 | Coir Matting/Geotextile | SY | 3000 | $ - 0 | |
| 24 | Buried Riprap for Bank Stabilization | CY | 75 | $ - 0 | |
| Post Project Work | $ - 0 | ||||
| 25 | Concrete Path Replacement | SQFT | 200 | $ - 0 | |
| 26 | Dirt Path Replacement | SQFT | 3000 | $ - 0 | |
| 27 | Wooden Fence Replacement | LF | 300 | $ - 0 | |
| Total | TOTAL BID | $ - 0 |