The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids for mechanical HVAC upgrades at the Utah State Fairpark Zion Building under Stage II IFB Project #27071370, with bids due November 6, 2026, and a mandatory site meeting on October 22, 2026. Only contractors prequalified under DFCM Stage I Prequalification and currently listed on the DFCM Prequalified Contractors list are eligible to bid — this is a restrictive eligibility gate.
The scope involves removing and replacing one of two existing LG heat pumps with a 20-ton indoor split system and 20-ton outdoor heat pump unit; removal of an existing duct heater furnace and installation of a new duct-mounted furnace with natural gas piping; replacement of fire/smoke dampers; new refrigerant piping with R-454B refrigerant; and new return ductwork with auto-dampers. All piping, materials, and equipment must be new and domestic-made unless specifically authorized in writing prior to bid. Work must comply with 2024 IBC, IMC, IPC standards and 2023 NEC with Utah annotations. The contractor must coordinate with a design-build electrical contractor for electrical work and with the warranty-holding roofing contractor for all roofing modifications. A licensed test and balance contractor must complete a full test and balance report. The place of performance is 155 N 1000 W, Salt Lake City, Utah. Substantial completion is April 30, 2027. Work is limited to normal business hours (8:00 a.m. to 5:00 p.m., Monday through Friday) with 72 hours' notice for operations-affecting activities.
The construction cost estimate is $95,000. Liquidated damages are $200 per day. A bid bond equal to 5% of the bid amount (AIA Document A310-2010 or equivalent) must accompany each bid. Contractors are responsible for obtaining permits, including fugitive dust plans and stormwater pollution prevention plans. A mandatory Health Insurance Statement of Compliance Form and subcontractors list (for first-tier subcontractors of $20,000 or more) must be submitted within 24 hours of bid opening. Questions are due October 27, 2026, at 3:00 p.m., with addenda posted by October 29, 2026, at 3:00 p.m. Bids must be submitted via the U3P website by November 5, 2026, at 3:00 p.m., with subcontractor lists due November 6, 2026, at 3:00 p.m. Award goes to the lowest responsive and responsible bidder.
Opportunity text
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: **Project Description:** Replacing one of the two LG heat pumps with a more reliable system. **Construction Cost Estimate:** $95,000.00