This is an approved mechanical plans document for a Stage II Invitation to Bid issued by the State of Utah's Division of Facilities Construction and Management (DFCM) for HVAC upgrades at the Utah State Fairpark Zion Building located at 155 N 1000 W, Salt Lake City, UT. The project, designated DFCM #27071370, involves the removal and replacement of one existing air handler and one existing heat pump with a 20-ton indoor split system unit and a 20-ton outdoor heat pump unit. Additional work includes modifications to existing electrical accommodations, removal of a duct heater furnace, installation of a new duct-mounted furnace with natural gas piping, replacement of fire/smoke dampers, new refrigerant piping with R-454B refrigerant, new condensate piping, and new return ductwork with auto-dampers. The mechanical plans comply with 2024 International Building Code (IBC), International Mechanical Code (IMC), International Plumbing Code (IPC), and 2023 National Electrical Code (NEC) standards with Utah annotations. Only contractors prequalified under a Stage I Prequalification and currently listed on the DFCM Prequalified Contractors list are eligible to bid on this project.
The construction cost estimate for this project is $95,000.00. The plans specify that contractors must coordinate with a design-build electrical contractor for all electrical design and construction, including new fused disconnects, conduits, raceways, wiring, and circuit breakers. The mechanical work must include a complete test and balance report by a licensed and approved test and balance contractor, and all roofing modifications must be performed by the warranty-holding roofing contractor and approved by the DFCM roofing director. Contractors are required to field-verify all existing mechanical and architectural conditions, coordinate with the hazmat abatement contractor prior to demolition, and assume responsibility for the proper handling and disposal of refrigerants, oils, and other materials in accordance with all federal, state, and local laws. All piping, materials, and equipment must be new and domestic-made unless specifically authorized in writing prior to bid.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEF
O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
North: ______ South: ______ East: ______ West: ______
d) Unlimited Area Building: Yes ______ No ______ Code Section: ______ a a
3) Three Story: A (3)______
2) Two Story: A (2)______
1) One Story: ______
c) Total Allowable Area for:
1_< Allowable Area
Actual Area
b) Sum of the Ratio Calculations for Mixed Occupancies:
a) 0.25I = 100f
F
P 30
WstA I
100100 fIA t taA = A + +
Official for Complex Buildings. Including, but not limited to:
g) Fire Stopping, Including Tested Design Number.
f) Exterior and Interior Accessibility Route.
e) Fire Assembly Locator Sheet.
a) High Rise Requirements.
b) Atriums.
c) Performance Based Criteria.
d) Means or Egress Analysis.
2) Additional Code Information shall be provided at the discretion of the Building
Code Accessibility Chapters, the more restrictive requirement shall govern.
through - ADA Guidelines and specific reference to the International Building
1) In case of conflict with the U.S. Department of Justice Federal Registers Parts
FOOTNOTES:
d) Drinking Fountains: ______ Service Sinks: ______
c) Bath Tubs or Showers: ______
b) Lavatories - Required (m) ______ (f) ______ Provided (m) ______ (f) ______
a) Water Closets - Required (m) ______ (f) ______ Provided (m) ______ (f) _____
M. Minimum Number of Required Plumbing Facilities:
Exit Width Required: ______ Exit Width Provided: ______
Element Hours Assembly ListingListing
Element AssemblyHours
Smoke Partitions
Fire Partitions
Exterior Bearing Walls
Interior Bearing Walls
Exterior Non-Bearing Walls
Structural Frame Partitions - Permanent
Fire Barriers
Floors - Ceiling Floors
Roofs - Ceiling Roofs
Exterior Doors and Windows
Shaft Enclosures
Fire Walls
BAHTBABABA
L. Design Occupant Load: ______
K. Fire Resistance Rating Requirements for Building Elements (hours).
Area Modifications:J:
____________________________________________Tabular Area:I:
per Floor (square feet): __________________________Actual AreaH:
Number of Stories: ______ Building Height: ______G:
Required: ______ Provided: ______ Type of Sprinkler System: ____________
Sprinklers:F:
Mixed Occupancies: ______ Nonseparated Uses: ______E.
separation distance (in hours):
Requirements for the Exterior Walls based on the fireFire Resistance RatingD.
Special Use and Occupancy (e.g. High Rise, Covered Mall): __________________
Design Wind Speed: ______ mphB. Seismic Design Category: ______
C. Type of Construction (circle one):
Change in Use: Yes ______ No ______ Mixed Occupancy: Yes ______ No ______
A. Occupancy and Group: ________ ________ ________ ________ ________
CODE ANALYSIS
Guidelines
ADA Accessibility Building Conservation
Uniform Code for
National Electrical Code
Conservation Code
International Energy International Fire Code
International Plumbing Code
International Mechanical Code
International Building Code
YearYear
APPLICABLE CODES
UTAH STATE FAIR PARK
ZION BUILDING UPGRADES
DFCM #27071370
155 N 1000 W, Salt Lake City, UT 84116
GENERAL:
G001 - TITLE SHEET
G002 - SPECIAL INSTRUCTIONS AND TESTING
MECHANICAL:
MG001 - MECHANICAL LEGEND AND GENERAL NOTES
MD101 - MECHANICAL DEMOLITION FLOOR PLAN
ME101 - MECHANICAL FLOOR PLAN
ME501 - MECHANICAL DETAILS
ME502 - MECHANICAL DETAILS
ME503 - MECHANICAL DETAILS
ME601 - MECHANICAL SCHEDULES
DRAWING INDEX:
DEFERRED SUBMITTALS: SEISMIC
SPECIAL INSPECTIONS:
1. SEE SHEET DRAWING G002.
DESIGN CRITERIA:
THESE DOCUMENTS - DRAWINGS AND
SPECIFICATIONS COMPLY WITH ALL THE
REQUIREMENTS OF THE DFCM STANDARDS FOR
MECHANICAL UPGRADES OF EXISTING BUILDING.
CODE INSPECTION REQUIREMENTS:
1. BEFORE A FINAL ACCEPTANCE CAN BE ISSUED,
THE STATE APPOINTED CODE INSPECTOR SHALL
PROVIDE A FINAL REPORT RECOMMENDING THAT
THE NEW MECHANICAL WORK IS IN COMPLIANCE
WITH THE DRAWINGS, SPECIFICATIONS AND
APPLICABLE CODES ESPECIALLY FOR THE
FOLLOWING ITEMS.
2. SEE ALSO SHEET G002.
SCOPE:
THIS PROJECT SHALL INCLUDE THE
REMOVAL AND REPLACEMENT OF ONE
EXISTING AIR HANDLER AND ONE EXISTING
HEAT PUMP. THIS SHALL ALSO INCLUDE
MODIFICATIONS TO THE EXISTING
ELECTRICAL ACCOMMODATIONS AS
NEEDED.
CODE REVIEW STAMP
N/A
N/A
N/A
X X
N/A N/A
N/A N/A N/A N/A
N/A N/A
N/A N/A
1 40'
9,500 SF
A2
G001
20232024
PROJECT SITE
08/24/26
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
THOMAS PETERSON
10/06/2026
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
G002
SPECIAL INSPECTIONS
AND TESTING
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
M
M
MECHANICAL LEGEND
SYMBOL ABR, DESCRIPTION
GENERAL TERMINOLOGY
A
ME101
SECTION LETTER DESIGNATION
SECTION DRAWN ON THIS SHEET
A2
AH
DETAIL NUMBER DESIGNATION
CORRESPONDING WITH GRID
LOCATION
MECHANICAL EQUIPMENT DESIGNATION
EQUIPMENT ITEM DESIGNATION
REGISTER, GRILLE OR DIFFUSER
DESIGNATION WITH BALANCING CFM
LISTED BELOW
D-1
CFM
GRILLE OR LOUVER DESIGNATION
WHERE BALANCING NOT REQUIREDR-1
REVISION DESIGNATOR AND NUMBER
KEY NOTE DESIGNATOR AND NUMBER
POINT OF CONNECTION
POINT OF REMOVAL
ABOVE FINISHED FLOOR
ACCESS PANEL
CENTERLINE ELEVATION
GENERAL CONTRACTOR
AFF
AP
POC
POR
C EL.
GC
MECHANICAL CONTRACTORMC
CONTROLS CONTRACTORATC
ELECTRICAL CONTRACTOREC
FIRE PROTECTION CONTRACTORFPC
NOT IN CONTRACTNIC
NOT TO SCALENTS
VITRIFIED CLAY PIPEVCP
NORMALLY CLOSEDNC
COMMONC
NORMALLY OPENNO
SYMBOL ABR, DESCRIPTION
AIR SIDE
EXISTING AIR DUCT TO BE REMOVED
EXISTING AIR DUCT TO REMAIN
NEW AIR DUCT
RECT TO RECT AIR DUCT TAKE-OFF
RECT TO RND AIR DUCT TAKE-OFF
RND TO RND AIR DUCT TAKE-OFF
MEDIUM PRESSURE TAKE-OFF
FLEXIBLE AIR DUCT
SYMBOL ABR, DESCRIPTION
WET SIDE
PUMP
REGULATOR
UNION
MANUAL ACTUATOR
PNUEMATIC DIAPHRAM ACTUATOR
ELECTRIC MOTOR ACTUATOR
SOLENOID ACTUATOR
BUTTERFLY VALVE
GATE VALVE
GLOBE VALVE - STRAIGHT PATTERN
GLOBE VALVE - ANGLE PATTERN
MOTORIZED 2-WAY CONTROL VALVE
MOTORIZED 3-WAY CONTROL VALVE
CHECK VALVE
CIRCUIT BALANCING VALVE
BALL VALVE
PITCH DOWN
ELBOW UP/DN
TEE UP/DN
EXISTING PIPING TO BE REMOVED
EXISTING PIPING TO REMAIN
NEW PIPING
PIPE CAP OR PLUG
REDUCER - CONCENTRIC / ECCENTRIC
EXPANSION JOINT
FLEXIBLE CONNECTION
ANCHOR POINT
CONDENSATE DRAIN
NATURAL GAS PIPING
CHEMICAL FEED LINE
MAKE-UP WATER LINE
CULINARY COLD WATER
CULINARY HOT WATER
CULINARY HOT WATER RECIRC
CD
G
CF
MU
CW
HW
HWREC
GLYCOL FILL LINEGF
R
M
S
PRESSURE REDUCING VALVEPRV
REFRIGERANT LIQUIDL
VENT LINEV
SANITARY SEWERSS
REFRIGERANT SUCTIONS
RADIUS ELBOW
ECCENTRIC DUCT TRANSITION
CONCENTRIC DUCT TRANSITION
VOLUME DAMPER
SUPPLY AIR DIFFUSER
RETURN & TRANSFER AIR GRILLE
EXHAUST GRILLE OR CEILING EXH. FAN
RETURN & OUTSIDE AIR DUCT UP/DN
RETURN & OA ROUND DUCT UP/DN
SUPPLY AIR DUCT UP/DN
SUPPLY AIR ROUND DUCT UP/DN
EXHAUST AIR DUCT UP/DN
EXHAUST AIR ROUND DUCT UP/DN
ACCESS PANELAP
EXISTING EQUIPMENT TO BE REMOVED
EXISTING EQUIPMENT TO REMAIN
NEW EQUIPMENT
SUPPLY AIR
RETURN AIRRA
SA
EXHAUST AIREA
OUTSIDE AIROA
MIXED AIRMA
RELIEF AIRRF
FLAT OVALFO
MOTORIZED VOLUME DAMPER
BACKDRAFT DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE & SMOKE DAMPER
WALL MOUNTED THERMOSTAT
WALL MOUNTED TEMP. SENSOR
WALL MOUNTED HUMIDISTAT
WALL MOUNTED FIRESTAT
M
BD
F
S
FS
T
S
H
F
MVD
BD
FD
SD
FS
T-STAT
H-STAT
F-STAT
GENERAL NOTES
G-1 - MECHANICAL INFORMATION IS NOT LIMITED TO THE
MECHANICAL DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE
FOR INFORMATION OF THE EXISTING BUILDING AND SITE
CONDITIONS, EXISTING PIPING, EXISTING ELECTRICAL, AND
EXISTING SUPPORTS.
A - EACH DRAWING SHEET AND THE SPECIFICATIONS HAVE BEEN
PREPARED TO SUPPLEMENT EACH OTHER AND THEY SHALL BE
INTERPRETED AS AN INTEGRAL UNIT WITH ITEMS SHOWN AND
NOTED ON ONE AND NOT THE OTHER BEING FURNISHED AND
INSTALLED AS THOUGH SHOWN AND CALLED OUT IN ALL PLACES.
ITEMS IN SPECIFICATIONS OR DRAWINGS LISTED WHICH ARE
DIFFERING IN EFFICIENCY OR QUALITY SHALL BE HELD TO THE
GREATEST OF: EFFICIENCY, QUALITY OR GOVERNING CODE.
B - THE CONTRACTOR WILL BE HELD RESPONSIBLE FOR THE
INSTALLATION OF THE SYSTEMS ACCORDING TO THE TRUE INTENT
AND MEANING OF THE CONTRACT DOCUMENTS.
C - THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT WITH PROPER
SERVICE ACCESS AND CLEARANCES ACCORDING TO
MANUFACTURERS RECOMMENDATIONS. THE CONTRACTOR SHALL
REVIEW SUPPLIERS BID PACKAGES FOR COMPLETENESS AND
COMPLIANCE TO THE SPECIFICATIONS, SCHEDULES, AND DESIGN
INTENT (ALL EQUIPMENT AND METHODS). THE CONTRACTOR SHALL
REMOVE AND REINSTALL CORRECTLY AT HIS OWN EXPENSE ANY
EQUIPMENT NOT IN COMPLIANCE.
D - THE CONTRACTOR SHALL CONSULT MANUFACTURERS
INSTALLATION INSTRUCTIONS FOR SIZES, METHODS, ACCESSORIES,
AND CLEARANCES IN SPACE AVAILABLE PRIOR TO BIDDING
PROJECT.
E - ANYTHING NOT CLEAR OR IN CONFLICT WILL BE EXPLAINED BY
MAKING APPLICATION TO THE ENGINEER IN WRITING.
G-2 - ANY AND ALL ALTERATIONS TO THE SYSTEM SHOWN SHALL BE
SUBMITTED TO THE ENGINEER PRIOR TO CHANGES FOR APPROVAL.
CONTRACTOR SHALL NOT START ANY CHANGES UNTIL NOTIFIED IN
WRITING. IF CHANGES ARE MADE PRIOR TO APPROVAL
CONTRACTOR SHALL TAKE ALL RESPONSIBILITY FOR THE CHANGES
MADE AND ALL COSTS RELATING TO FAILURE OR REPLACEMENT OF
ALTERATIONS.
G-3 - CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND
LOCATIONS.
G-4 - THE WORKING DRAWINGS ARE DIAGRAMMATIC. THEY DO NOT
SHOW EVERY OFFSET, BEND, OR ELBOW NECESSARY FOR THE
COMPLETE INSTALLATION IN THE SPACE PROVIDED. ALL LOCATIONS
FOR MECHANICAL EQUIPMENT SHALL BE FIELD VERIFIED AND
COORDINATED WITH ALL DRAWINGS. THE CONTRACTOR SHALL
PROVIDE OR COORDINATE WITH THE GENERAL CONTRACTOR
PROVISIONS FOR BLOCKOUTS OR CORE DRILLS THROUGH
STRUCTURE.
G-5 - THE INSTRUCTION TO "PROVIDE" ALSO INCLUDES
INSTALLATION.
G-6 - MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL
SMOKE AND FIRE DAMPERS AS REQUIRED BY LOCAL CODES AND
AUTHORITIES.
G-7 - SHEET METAL DUCT SIZES SHOWN ON DRAWINGS ARE FREE
AREA DIMENSIONS.
G-8 - PROVIDE AND INSTALL BALANCING DAMPERS IN ALL SUPPLY
AND EXHAUST AIR BRANCH DUCTS. BALANCE TO CFM SHOWN ON
PLAN.
G-9 - SEE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT
LOCATION OF DIFFUSERS AND GRILLES.
G-10 - PROVIDE TURNING VANES IN ALL ELBOWS OF RECTANGULAR
DUCT.
G-11 - THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY IN
HANDLING AND DISPOSING OF REFRIGERANTS, OILS, ETC. ALL SUCH
MATERIALS SHALL BE HANDLED, DISPOSED, AND USED IN
ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL LAWS.
G-12 - THE MECHANICAL CONTRACTOR SHALL VERIFY MOTOR
VOLTAGES WITH THE ELECTRICAL DRAWING BEFORE ORDERING
MOTORIZED EQUIPMENT AND CONTROLS.
G-13 - C.F.M. LISTED IS ACTUAL AIR.
G-14 - SUPPLIERS SHALL REVIEW ALL DRAWINGS AND THE
SPECIFICATIONS PRIOR TO SUBMITTING PRICES TO THE
CONTRACTOR. ALL QUESTIONS AND DISCREPANCIES SHALL BE
BROUGHT TO THE ENGINEERS ATTENTION PRIOR TO BIDDING.
G-15 - CONTRACTOR SHALL THOROUGHLY REVIEW AND SIGN
SUBMITTALS FOR COMPLETENESS AND COMPLIANCE TO THE
SPECIFICATIONS PRIOR TO ENGINEERS REVIEW. SUPPLIERS SHALL
HIGHLIGHT OR MARK ALL INFORMATION REQUIRED TO SHOW
COMPLIANCE TO THE SPECIFICATIONS. ALL REQUESTED
EXCEPTIONS TO THE SPECIFICATIONS, OR SCHEDULES SHALL BE
CLEARLY NOTED AND EXPLAINED. SUBMITTAL REVIEW AND
ACCEPTANCE IS FOR DESIGN CONCEPT ONLY, AND DOES NOT AT
ANY TIME RELIEVE THE CONTRACTOR OF RESPONSIBILITY TO MEET
SPECIFICATIONS, CAPACITIES, OR DESIGN INTENT.
G-16 - ALL MECHANICAL SHALL BE INSTALLED AND CONFORM TO THE
2024 EDITION OF THE IMC AND IPC WITH UTAH ANNOTATIONS AND
LOCAL AUTHORITY REQUIREMENTS.
G-17 - THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE
DRAINING DOWN AND RE-FILLING OF ALL SYSTEMS NECESSARY TO
COMPLETE THE WORK OUTLINED BY THIS PROJECT. THIS INCLUDES
PROVIDING THE REQUIRED CHEMICAL TREATMENT WHEN RE-
FILLING THE SYSTEM.
G-18 - ALL PIPING, MATERIALS, ETC. SHALL BE NEW AND DOMESTIC
MADE UNLESS SPECIFICALLY AUTHORIZED IN WRITING PRIOR TO
BID.
G-19 - THIS CONTRACTOR SHALL CONTRACT WITH A DESIGN BUILD
ELECTRICAL CONTRACTOR FOR THE DESIGN AND CONSTRUCTION
OF THE ELECTRICAL PORTION OF THIS PROJECT. ELECTRICAL
INSTALLATION AND DESIGN SHALL BE PER 2023 NEC.
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
MG001
MECHANICAL LEGEND &
GENERAL NOTES
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
8 8
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL AND ARCHITECTURAL CONDITIONS,
INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING
AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,
AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL
FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW
MECHANICAL ELEMENTS AND EXISTING CONDITIONS
PRIOR TO BEGINNING FABRICATION OR ORDERING
EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS
AND FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL
BE BROKEN DOWN TO FIT THROUGH DESIGNATED
PATHWAYS. FIELD VERIFY EXACT SCOPE OF
DEMOLITION AND REMOVAL PATH. CONTRACTOR
SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE TO
BUILDING DURING REMOVAL OF EQUIPMENT AND
MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK
NOT SHOWN ON THIS SHEET FOR CLARIFICATION.
FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID.
5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT
AND ABATEMENT CONTRACTOR PRIOR TO ANY
DEMOLITION.
6. CONTRACTOR SHALL MAKE PROVISIONS WITH A
DESIGN BUILD ELECTRICIAN TO VERIFY ELECTRICAL
CONDITIONS. DESIGN BUILD CONTRACTOR SHALL
PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,
PANELS, SWITCH GEAR, AND ALL NECESSARY
ELECTRICAL ACCOMMODATIONS FOR ANY NEW OR
RE-LOCATED MECHANICAL EQUIPMENT. CONTRACTOR
SHALL COORDINATE THE DEMOLITION AND REMOVAL
OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH
EXISTING MECHANICAL EQUIPMENT BEING REMOVED.
ALL ABANDONED PIPING AND WIRING SHALL BE
REMOVED BACK TO PANEL UNLESS OTHERWISE
APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND
CONFIRM ELECTRICAL SCOPE AND EXISTING
CONDITIONS PRIOR TO ANY DEMOLITION WORK AND
ORDERING ANY NEW MECHANICAL EQUIPMENT.
7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING
FOR ALL NEW AND EXISTING TEMPERATURE
CONTROLS AND MOTORIZED DAMPERS.
8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED
TEST AND BALANCE CONTRACTOR.
9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED
BY WARRANTY HOLDING ROOFING CONTRACTOR AND
APPROVED BY DFCM ROOFING DIRECTOR.
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
MD101
MECHANICAL DEMOLITION
FLOOR PLAN
SHEET NOTES
1 REMOVE EXISTING HEAT PUMP AND ALL ASSOCIATED
ITEMS IN THIS APPROXIMATE LOCATION. REMOVE
EXISTING REFRIGERANT PIPING BACK TO INDOOR
AIR HANDLER. FIELD VERIFY EXISTING ROUTING AND
POINTS OF REMOVAL. REMOVE EXISTING
HOUSEKEEPING PAD.
2 REMOVE EXISTING NATURAL GAS PIPING BACK TO
THIS APPROXIMATE LOCATION. FIELD VERIFY
EXISTING ROUTING AND POINTS OF REMOVAL.
3 REMOVE EXISTING DUCT HEATER FURNACE, FLUE,
COMBUSTION AIR AND ALL ASSOCIATED ITEMS IN
THIS APPROXIMATE LOCATION. COORDINATE WITH
DESIGN BUILD ELECTRICIAN TO REMOVE EXISTING
ELECTRICAL BACK TO PANEL.
4 REMOVE EXISTING SUPPLY FAN AND ALL
ASSOCIATED ITEMS IN THIS APPROXIMATE
LOCATION. COORDINATE WITH DESIGN BUILD
ELECTRICIAN TO REMOVE EXISTING ELECTRICAL
BACK TO PANEL.
5 REMOVE EXISTING FLUE AND COMBUSTION AIR
PIPING BACK TO PENETRATION. PATCH AND REPAIR
EXISTING PENETRATION WEATHER TIGHT. FIELD
VERIFY EXACT ROUTING.
6 REMOVE EXISTING COOLING COIL IN THIS
APPROXIMATE LOCATION. REMOVE EXISTING
REFRIGERANT PIPING BACK TO OUTDOOR HEAT
PUMP. FIELD VERIFY EXISTING ROUTING AND POINTS
OF REMOVAL.
7 TEMPORARILY REMOVE EXISTING OUTSIDE AIR
LOUVER IN THIS APPROXIMATE LOCATION. PROVIDE
STORAGE AND SAFEKEEPING AND RE-INSTALL AFTER
NEW EQUIPMENT IS INSTALLED IN MECHANICAL
ROOM.
8 EXISTING DUCTWORK IN THIS APPROXIMATE
LOCATION SHALL REMAIN.
9 REMOVE AND REPLACE EXISTING FIRE SMOKE
DAMPER IN THIS APPROXIMATE LOCATION. FIELD
VERIFY.
10 REMOVE AND REPLACE EXISTING REFRIGERANT
PIPING SHEET METAL COVER IN THIS APPROXIMATE
LOCATION. FIELD VERIFY.
11 EXISTING FIRE SPRINKLER PIPING IN THIS
APPROXIMATE LOCATION SHALL REMAIN.
12 REMOVE AND REPLACE EXISTING THERMOSTAT IN
THIS APPROXIMATE LOCATION. FIELD VERIFY.
13 EXISTING RELIEF AIR LOUVER/AUTO DAMPER AND
ALL ASSOCIATED ITEMS IN THIS APPROXIMATE
LOCATION SHALL REMAIN.
14 COORDINATE WITH DESIGN BUILD ELECTRICIAN TO
REMOVE AND REPLACE EXISTING LIGHT FIXTURE IN
THIS APPROXIMATE LOCATION. FIELD VERIFY.
15 TEMPORARILY REMOVE EXISTING FLOOR GRATING IN
THIS APPROXIMATE LOCATION. PROVIDE STORAGE
AND SAFEKEEPING AND RE-INSTALL AFTER NEW
EQUIPMENT IS INSTALLED IN MECHANICAL ROOM.
FIELD VERIFY.
16 EXISTING MECHANICAL EQUIPMENT IN THIS
APPROXIMATE LOCATION SHALL REMAIN.
17 REMOVE AIR HANDLER WALLS IN THIS APPROXIMATE
LOCATION. FIELD VERIFY.
0'
SCALE : 1/8" = 1'-0"
8'4' 24'16'
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
IDU
ODU
EXIST
TYP. 20
12F
40"x19" SA
55"x16" SA
44"x20" RA
F S
D
A D
1"ø NG (E)
AD
AD
GENERAL NOTES
1. CONTRACTOR SHALL FIELD VERIFY EXISTING
MECHANICAL AND ARCHITECTURAL CONDITIONS,
INCLUDING, BUT NOT LIMITED TO: EXISTING ROUTING
AND LOCATION OF DUCTWORK, PIPING, ELECTRICAL,
AND STRUCTURAL ELEMENTS. CONTRACTOR SHALL
FIELD VERIFY POTENTIAL CONFLICTS BETWEEN NEW
MECHANICAL ELEMENTS AND EXISTING CONDITIONS
PRIOR TO BEGINNING FABRICATION OR ORDERING
EQUIPMENT.
2. PRIME CONTRACTOR SHALL PROVIDE ALL
COORDINATION BETWEEN SUB-TIER CONTRACTORS.
THIS SHALL INCLUDE THE COORDINATION BETWEEN
SUB-TIER CONTRACTORS, SUB-TIER CONTRACTORS
AND FACILITIES, SUB-TIER CONTRACTORS AND
ARCHITECT/ENGINEER.
3. ALL DEMOLISHED EQUIPMENT AND MATERIAL SHALL
BE BROKEN DOWN TO FIT THROUGH DESIGNATED
PATHWAYS. FIELD VERIFY EXACT SCOPE OF
DEMOLITION AND REMOVAL PATH. CONTRACTOR
SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGE TO
BUILDING DURING REMOVAL OF EQUIPMENT AND
MATERIAL.
4. SOME EXISTING PIPING AND EXISTING DUCTWORK
NOT SHOWN ON THIS SHEET FOR CLARIFICATION.
FIELD VERIFY EXISTING CONDITIONS PRIOR TO BID.
5. COORDINATE WITH DFCM PROVIDED HAZMAT REPORT
AND ABATEMENT CONTRACTOR PRIOR TO ANY
DEMOLITION.
6. CONTRACTOR SHALL MAKE PROVISIONS WITH A
DESIGN BUILD ELECTRICIAN TO VERIFY ELECTRICAL
CONDITIONS. DESIGN BUILD CONTRACTOR SHALL
PROVIDE ANY NEW WIRING, CIRCUIT BREAKERS,
PANELS, SWITCH GEAR, AND ALL NECESSARY
ELECTRICAL ACCOMMODATIONS FOR ANY NEW OR
RE-LOCATED MECHANICAL EQUIPMENT. CONTRACTOR
SHALL COORDINATE THE DEMOLITION AND REMOVAL
OF ANY ELECTRICAL ELEMENTS ASSOCIATED WITH
EXISTING MECHANICAL EQUIPMENT BEING REMOVED.
ALL ABANDONED PIPING AND WIRING SHALL BE
REMOVED BACK TO PANEL UNLESS OTHERWISE
APPROVED. ELECTRICIAN SHALL FIELD VERIFY AND
CONFIRM ELECTRICAL SCOPE AND EXISTING
CONDITIONS PRIOR TO ANY DEMOLITION WORK AND
ORDERING ANY NEW MECHANICAL EQUIPMENT.
7. PROVIDE UPDATED GRAPHICS AND PROGRAMMING
FOR ALL NEW AND EXISTING TEMPERATURE
CONTROLS AND MOTORIZED DAMPERS.
8. PROVIDE FULL TEST AND BALANCE REPORT OF ALL
IMPACTED SYSTEMS BY LICENSED AND APPROVED
TEST AND BALANCE CONTRACTOR.
9. ALL ROOFING MODIFICATIONS SHALL BE PERFORMED
BY WARRANTY HOLDING ROOFING CONTRACTOR AND
APPROVED BY DFCM ROOFING DIRECTOR.
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
ME101
MECHANICAL FLOOR PLAN
0'
SCALE : 1/8" = 1'-0"
8'4' 24'16'
SHEET NOTES
1 PROVIDE NEW 20 TON INDOOR SPLIT SYSTEM UNIT IN
THIS APPROXIMATE LOCATION. COORDINATE WITH
MANUFACTURER FOR CLEARANCES AND
INSTALLATION REQUIREMENTS. PROVIDE ALL NEW
REFRIGERANT PIPING FROM INDOOR UNIT TO
OUTDOOR HEAT PUMP. FIELD VERIFY EXACT
ROUTING AND POINTS OF CONNECTION. PROVIDE
WITH FACTORY FURNISHED LEAK DETECTION
SYSTEM AND ALARMS. PROVIDE NEW CONDENSATE
PIPING FROM AIR HANDLER TO NEAREST FLOOR
DRAIN OR MOP SINK. COORDINATE WITH DESIGN
BUILD ELECTRICIAN FOR ALL NEW ELECTRICAL
ACCOMMODATIONS INCLUDING: NEW FUSED
DISCONNECT, NEW CONDUIT AND RACEWAYS, NEW
WIRING, AND NEW BREAKERS. COORDINATE WITH
MANUFACTURER FOR CLEARANCES AND
INSTALLATION REQUIREMENTS.
2 PROVIDE NEW 20 TON OUTDOOR HEAT PUMP IN THIS
APPROXIMATE LOCATION. PROVIDE ALL NEW
REFRIGERANT PIPING FROM HEAT PUMP TO INDOOR
UNIT. FIELD VERIFY EXACT ROUTING AND POINTS OF
CONNECTION. COORDINATE WITH DESIGN BUILD
ELECTRICIAN FOR ALL NEW ELECTRICAL
ACCOMMODATIONS INCLUDING: NEW FUSED
DISCONNECT, NEW CONDUIT AND RACEWAYS, NEW
WIRING, AND NEW BREAKERS. PROVIDE NEW
HOUSEKEEPING PAD. AND ELEVATED SUPPORT
STRUCTURE. SEE DETAILS. COORDINATE WITH
MANUFACTURER FOR CLEARANCES AND
INSTALLATION REQUIREMENTS.
3 RE-INSTALL EXISTING LOUVER AND ALL ASSOCIATED
ITEMS IN THIS APPROXIMATE LOCATION. FIELD
VERIFY. SEAL PENETRATION WEATHER TIGHT. PATCH
AND PAINT TO MATCH EXISTING.
4 PROVIDE NEW REFRIGERANT PIPING SHEET METAL
COVER IN THIS APPROXIMATE LOCATION. PROVIDE
WITH UV AND CORROSION RESISTANT PAINT.
COORDINATE WITH FACILITY FOR COLOR.
5 BALANCE EXISTING DIFFUSER TO CFM AS SHOWN.
6 PROVIDE NEW OUTSIDE AIR AUTODAMPERS IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. INTERLOCK
CONTROLS WITH EXISTING RELIEF AIR DAMPERS
AND NEW RETURN AIR DAMPERS.
7 INTERLOCK EXISTING RELIEF AIR DAMPER IN THIS
APPROXIMATE LOCATION WITH NEW RETURN
DAMPER AND NEW OSA DAMPERS.
8 DIFFUSER AT THIS APPROXIMATE LOCATION IS
CAPPED AND DOES NOT REQUIRE BALANCING.
9 RE-INSTALL EXISTING FLOOR GRATING IN THIS
APPROXIMATE LOCATION. FIELD VERIFY.
10 PROVIDE NEW RETURN DUCTWORK AND NEW
AUTO-DAMPER IN THIS APPROXIMATE LOCATION. TIE
INTO EXISTING BUILDING MANAGEMENT SYSTEM.
INTERLOCK NEW RETURN AIR DAMPER WITH NEW
OSA AND RELIEF DAMPERS. PROVIDE UPDATED
CONTROLS PROGRAMMING AS NEEDED. FIELD
VERIFY.
11 PROVIDE NEW FULL LENGTH AND FULL HEIGHT
GALVANIZED SHEET METAL PARTITION IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. SEE
DETAILS.
12 PROVIDE NEW ACCESS DOOR IN THIS APPROXIMATE
LOCATION. FIELD VERIFY. SEE DETAILS.
13 PROVIDE NEW DUCT MOUNTED FURNACE IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. PROVIDE
NEW FLUE AND COMBUSTION AIR PIPING. FIELD
VERIFY EXACT ROUTING. USE EXISTING
PENETRATIONS AS NEEDED. SEAL PENETRATIONS
WEATHER TIGHT. PROVIDE NEW GAS PIPING AND
GAS VALVE TRAIN. SEE DETAILS. COORDINATE WITH
DESIGN BUILD ELECTRICIAN FOR COORDINATE WITH
DESIGN BUILD ELECTRICIAN FOR ALL NEW
ELECTRICAL ACCOMMODATIONS INCLUDING: NEW
FUSED DISCONNECT, NEW CONDUIT AND RACEWAYS,
NEW WIRING, AND NEW BREAKERS.
14 COORDINATE WITH DESIGN BUILD ELECTRICIAN TO
PROVIDE NEW LED LIGHT FIXTURE IN THIS
APPROXIMATE LOCATION. FIELD VERIFY. PROVIDE
SINGLE POLE SWITCH, NEW CONDUIT, RACEWAYS,
AND NEW WIRING.
15 TIE INTO EXISTING NATURAL GAS PIPING IN THIS
APPROXIMATE LOCATION. FIELD VERIFY EXACT
ROUTING AND POINTS OF CONNECTION.
16 PROVIDE NEW FIRE SMOKE DAMPER IN THIS
APPROXIMATE LOCATION. FIELD VERIFY.
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
F
4"
MIN.
4"
MIN.
3'-0" 2"
2"
12"C .C
.M
AX.
2"
12"C.C.MAX.
1/
2" W
ID
E
R U N N
ER
LARGE CAPACITY
REFRIGERANT PIPING DIAGRAM
C2
DUCT STRAP HANGER DETAIL
C1
TYPICAL REFRIGERANT SCHEME
B2
DUCT LINER DETAIL
B1
SINGLE THICKNESS TURNING VANE DETAIL
C4
OUTDOOR EQUIPMENT PAD DETAIL
A1
PIPE HANGER DETAIL
C4
B4
FLUE THRU ROOF DETAIL
L
S
LS
F
LS
L S
HEAT PUMP
AIR HANDLER
SCALE: NONE
SUCTION LINE
ACCUMULATOR
DOUBLE OPENING
SIGHT GLASS (TYP.)
DOUBLE SUCTION RISER SIZE PER
CONDENSING UNIT MANUFACTURER'S
RECOMMENDATIONS
REFRIGERANT
SUCTION
HOT GAS SOLENOID
VALVE
HOT GAS DISCHARGE
BY-PASS VALVE
REFRIGERANT
SOLENOID VALVE
REFRIGERANT
EXPANSION VALVE
THERMAL BULB @
45° BELOW HORIZ.
SIDE CONNECTION
DISTRIBUTOR OR ASC
EXTERNAL
EQUALIZER
REFRIGERANT TYPE
VALVE (TYPICAL)
FLEXIBLE
CONNECTIONS
REFRIGERANT TYPE
STRAINER
REFRIGERANT LIQUID
REPLACEABLE
CARTRIDGE DRIER
CHARGING VALVE
PROVIDE FLEXIBLE
CONNECTION IN
PIPING AT UNIT
#10 x 3/4" SELF
TAPPING CADMIUM PLATED
SHEET METAL SCREWS TO
ANCHOR STRAPS TO DUCT.
ALL STRAPS TO BE TIGHT
AGAINST DUCT AND SUPPORT
MEMBERS. (TYPICAL)
SCALE: NONE
1"
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
1" x 18 GAUGE STRAP
HANGERS AT 8'-0"
SPACING.
NO POP RIVETS
ALLOWED
NOTES:
1. SEE SPECIFICATIONS FOR
SEISMIC RESTRAINT
REQUIREMENTS.
ATTACH SECURELY TO
STRUCTURE.
SCALE: NONE
SL
AIR
FLOW
SLEEVE THROUGH WALL
VIBRATION ISOLATORS
UNDERNEATH UNITS.
(ONE EACH CORNER)
FLEXIBLE
CONNECTION
(TYP)
SIGHT GLASS
FILTER DRIER
CONTINUOUS SLOPE
BACK TO CONDENSING
UNIT.
PROVIDE 20 GAUGE SHEET METAL PAN
AROUND REFRIGERANT PIPING. PAINT PAN
TO MATCH BUILDING COLOR WITH PRIMER
AND TWO COATS OF OIL BASED PAINT.
COLOR TO BE SELECTED BY ARCHITECT.
GRIP NAILS SHALL BE
INSTALLED BY AIR
HAMMER OR BY
AUTOMATIC FASTENER
EQUIPMENT.
INSULATED PINS, FASTENERS
OR GRIP NAILS.
SCALE: NONE
METAL FASTENERS
ENDS OF LINER SHALL BE
BUTTED FIRMLY TOGETHER.
ALL JOINTS, SEAMS, AND
TEARS SHALL BE COATED W/
ADHESIVE DURING
INSTALLATION.
MINIMUM OF 1-1/2" LINER.
SEE SPECIFICATION FOR
INSULATION REQUIREMENT
SHEET METAL
DUCT
TOP AND BOTTOM
SECTIONS OF LINER
SHALL OVERLAP THE
SIDES
DUCTLINER
ONE INCH THICK 1-1/2 LB
DENSITY FIBERGLASS.ALL ENDS OF LINER TO
BE COATED W/ ADHESIVE
NOT MORE THAN 2"
FROM EDGE OF LINER.
F L O
W
A
IR
SCALE: NONE
LEADING AND
TRAILING
EDGE TO BE PARALLEL
WITH SIDE OF DUCT.
SINGLE THICKNESS
TURNING VANES
1" LONG MINIMUM
TRAILING EDGE
DETAIL NOTES:
PROVIDE 12" OF COMPACTED STRUCTURAL FILL MINIMUM. COMPACTED LIFTS TO AT LEAST 95% OF THE DRY DENSITY IN
ACCORDANCE WITH ASTM D-1557.
4" COMPACTED LAYER OF COMPACTED GRAVEL. GRAVEL MAY CONSIST OF TYPE I OR TYPE II AGGREGATE BASE, OR PIT RUN
GRAVEL WITH A 2-INCH MAXIMUM PARTICLE SIZE AND NO MORE THAN 12% FINES PASSING THE NO. 200 SIEVE.
4" THICK REINFORCED CONCRETE PAD.
#4 @16 BOTHWAYS
12"4"
See Plan
SCALE: NONE
4"
2 3
HANGER ROD
PIPE
HANGER
SUPPORT NUT
LOCKING NUT
CALCIUM SILICATE BLOCK
16 GA. ZINC COATED SHEET
STEEL SHEILD AT LEAST 12" LONG
(TYP)
MOUNT PIPING TO UNISTRUT
PROVIDE PIPE CLAMPS
WITH BOLTS AND NUTS
CALCIUM SILICATE
BLOCK
CALCIUM SILICATE
BLOCK
BOLT UNISTRUT TO EXISTING
WALL AND CONCRETE USING
EXPANSION ANCHOR BOLTS
ATTACH TO ROOM
OVERHEAD STRUCTURE
SPRING TYPE ISOLATOR
FOR INSTALLATION
NEAR HOT WATER
PUMPS
CLEVIS HANGER
INSULATION
16 GAGE ZINC
COATED SHEET
STEEL SHIELD AT
LEAST 12" LONG.
HEAVY DUTY
CLEVIS HANGER
HANGER ROD
SUPPORT NUT
LOCKING NUT
HEAVY DUTY
CLEVIS HANGER
PIPE
SINGLE HORIZONTAL RUN
WITHOUT INSULATION
CLEVIS HANGER
ATTACH TO EXISTING
CEILING
INSULATION WITH OR WITHOUT
VAPOR BARRIER
NOTE:
PROVIDE WITH VAPOR BARRIER
ON CHILLED WATER AND
DOMESTIC COLD WATER PIPING
SCALE: NONE
BACK-DRAFT
PREVENTER
NON-HARDENING
CAULK
FLASHING
SHEATHING
DOUBLE
WALL FLUE
2" MIN. CLEAR
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
ME501
MECHANICAL DETAILS
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
1. R-454 REFRIGERANT.
2. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
3. PROVIDE WITH INDIVIDUAL ZONE THERMOSTAT.
4. PROVIDE NEW PHASE AND VOLTAGE MONITORS.
5. PROVIDE WITH NEW SUPPLY AIR DUCT DETECTOR AND RETURN AIR DUCT DETECTORS.
6. PROVIDE WITH BACNET CAPABILITY AND TIE INTO EXISTING BMS.
7. PROVIDE WITH FACTORY FURNISHED LEAK DETECTION SYSTEM.
8. PROVIDE NEW REFRIGERANT PIPING FROM INDOOR UNIT TO OUTDOOR UNIT PER MANUFACTURERS RECOMMENDATIONS.
9. PROVIDE WITH INTEGRAL FILTER SECTION.
10. COORDINATE WITH MANUFACTURER FOR FLUE AND COMBUSTION AIR REQUIREMENTS.
11. PROVIDE WITH DUAL CIRCUITS.
12. PROVIDE WITH DUAL FANS.
13. PROVIDE WITH FACTORY FURNISHED 2-SPEED VFD.
14. PROVIDE WITH SINGLE POINT POWER.
1. R-454 REFRIGERANT.
2. SEE SPECIFICATIONS FOR OTHER APPROVED MANUFACTURERS.
3. PROVIDE NEW PHASE AND VOLTAGE MONITORS.
4. PROVIDE WITH HAIL GUARDS.
5. PROVIDE WITH NEW FUSED DISCONNECT.
6. PROVIDE NEW HOUSEKEEPING.
7. PROVIDE WITH BACNET CAPABILITY AND TIE INTO EXISTING BMS.
8. PROVIDE WITH FACTORY FURNISHED LEAK DETECTION SYSTEM.
9. PROVIDE WITH LOW AMBIENT KIT.
10. PROVIDE NEW REFRIGERANT PIPING FROM INDOOR UNIT TO OUTDOOR UNIT PER MANUFACTURERS RECOMMENDATIONS.
11. PROVIDE WITH CRANKCASE HEATER FOR EACH COMPRESSOR.
12. PROVIDE WITH DUAL COMPRESSORS AND DUAL CIRCUITS.
13. PROVIDE WITH FACTORY FURNISHED LEAK DETECTION SYSTEM.
1. PROVIDE WITH HIGH ALTITUDE KIT.
2. PROVIDE WITH LOW AMBIENT KIT.
3. #409 STAINLESS STEEL HEAT EXCHANGER.
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
ME601
MECHANICAL SCHEDULES
SPLIT SYSTEM - INDOOR UNIT SCHEDULE
TAG
SUPPLY
AIR CFM
OUTSIDE AIR
CFM
ESP
COOLING HEATING ELECTRICAL DIMENSIONS
MANUF. AND MODEL
SCHEDULE
NOTESTYPE #
TOTAL CLG
LOAD
EAT DB EAT WB LAT
TOTAL HTG
LOAD @47°F
TOTAL HTG
LOAD @5°F
EAT DB LAT V PH HZ MCA MOP IEER COP L W H WT
IDU 1 8,000 CFM 1,600 CFM 1.00 in-wg 243,160 Btu/h 80 °F 62 °F 52 °F 229,440 Btu/h 114,530 Btu/h 70 °F 103 °F 208 V 3 60 Hz 29 A 50 A 12.5 3.2 32 in 93 in 72 in 904 lb
TRANE
TWE240K3BAA
1, 2, 3, 4, 5, 6, 7, 8
9, 10, 11, 12, 13, 14
SPLIT SYSTEM - OUTDOOR UNIT SCHEDULE
TAG CAPACITY
REFRIGERANT
TYPE
ELECTRICAL DIMENSIONS
MANUF. AND MODEL
SCHEDULE
NOTESTYPE #
COOLING LOAD
TOTAL
HEATING LOAD
TOTAL
V PH HZ MCA MOP L W H WT
ODU 1 243,160 Btu/h 232,000 Btu/h R-454B 208 V 3 60 Hz 93 A 125 A 46" 96" 45" 914 lb
TRANE
TWA240K3DAB
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13
FURNACE SCHEDULE
TAG
HEATING
ELECTRICAL
DIMENSI
ONS MANUF. AND MODEL
SCHEDULE
NOTES
TYPE NUMBER HTG INPUT HTG OUTPUT TYPE V PH HZ WT
F 1 300,000 Btu/h 294,000 Btu/h
NATURAL
GAS
115 V 1 60 Hz 312 lb TRANE GIXC 1, 2, 3
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
DX COIL
S
L
THERMOSTATIC BULB
TO BE AS CLOSE TO
COIL AS POSSIBLE NOT
ALLOWED ON VERTICAL
LINES.
SCALE: NONE
45°THERMOSTATIC
BULB
4" MINIMUM
TRAP
TRAP
EQUALIZING
LINE
THERMOSTATIC
EXPANSION VALVE
CLAMP
SUCTION
LINE
THERMAL BULB
LOCATION
V E
R T
IC
A
L
MIN 10
PIPE
DIAMETERS
M
IN
2" MIN
VARIES
2" MIN
2" MIN 2" MIN
PIPE AND CONDUIT FLASHING DETAIL
A1 A3
GAS LINE CONNECTION DETAIL
B3
FURNACE SUPPORT DETAIL #1
SINGLE REFRIGERANT COIL
CONNECTION DETAIL
D3
TYPICAL
TYPICAL
PIPE / CONDUIT
FLASHING MEMBRANE AND
SEALANT
STAINLESS STEEL CLAMPING
RING
SPM MEMBRANE PRE-FABRICATED
BOOT WITH MINIMUM 1" TURN-UP
CONTINUOUS WELDHEAT WELDED FLASHING
ROOFING MEMBRANE -
VARIES BY PROJECT
RIGID INSULATION -
VARIES BY PROJECT
ROOF DECK VARIES
BY PROJECT
PLUMBING VENT / STACK
FLASHING MEMBRANE
AND SEALANT
STAINLESS STEEL
CLAMPING RING
ADHERED FIELD
FLASHED MEMBRANE
HEAT WELDED
FLASHING
ROOFING MEMBRANE
- VARIES BY PROJECT
RIGID INSULATION -
VARIES BY PROJECT
ROOF DECK VARIES
BY PROJECT
NOTE THAT PITCH POCKETS
ARE NOT AN ACCEPTABLE
METHOD OF WATER-PROOFING
BASE OF PIPES
NOTE:
IF THE TOP OF THE EXISTING VENT IS
LESS THAN 12" ABOVE THE NEW
FINISHED ROOF SURFACE, THE VENT
MUST BE EXTENDED
NOTE THAT WHERE A PIPE IS CAPABLE OF
BEING FLASHED USING A ROOFING
MANUFACTURERS PRE-FABRICATED BOOT
(SUCH AS SHOWN ABOVE), THAT OPTION IS
REQUIRED AND SHOULD BE USED OVER A FIELD
FLASHED DETAIL (SUCH AS SHOWN BELOW)
SCALE: NONE
GAS
SUPPLY.
MANUAL
SHUT-OFF
VALVE.
GAS
PRESSURE
REGULATOR
(2 PSI TO 4 OZ).
DRIP LEG.
SCALE: NONE
GROUND
JOINT
UNION.
EQUIPMENT
CONNECTION.
FLEXIBLE GAS
CONNECTOR
18" MAX.
CAP.
SCALE: NONE
FURNACE ONLY
AIR FLOW
WIDE RADIUS
ELBOW (TYPICAL)
FLEX CONNECTION
VENT 7" ABOVE
TRAP LEVEL
DRAIN PAN 2" BEYOND
EQUIPMENT HUNG FROM
SUPPORT FRAMING.
FURNACE CONDENSATE
TRAP & DRAIN
NOTE: ALL CHANNELS
FOR SUPPORT ARE
1-5/8" UNISTRUT P1000
PIPE TO FLOOR DRAIN
12" MINIMUM HORIZONTAL
OFFSET ON BOTH PIPES
MAINTAIN FURNACE OUTLET
PIPE SIZE TO THIS POINT
SEE UPPER ATTACHMENT
DETAILS ?/M??? AND ?/M???.
VIBRATION ISOLATOR
TYPICAL
FILTER FRAME EXTERNAL OF
FURNACE. SEE DETAIL ?/M???.
DO NOT BLOCK FILTER
ACCESS PANEL OR
FURNACE ACCESS DOORS
WITH HANGER RODS.
FLEX CONNECTION
CHANNEL CROSS MEMBER
SUPPORT. TYP. OF 2.
CHANNEL CONTINUOUS SUPPORT
UNDER ENTIRE LENGTH OF FURNACE.
TYPICAL OF 2.
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
ME502
MECHANICAL DETAILS
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE
2- 1/
2" Ø
X S
C H
E D
U
LE
P
IP
E
OUTDOOR VRF UNIT SUPPORT DETAIL
A1
SUSPENDED REFRIGERANT
PIPE SUPPORT AT CEILING
A4
UNISTRUT
4"X3"X1/4" STEEL ANGLE
1/4
TYP
4"X3"X1/4" STEEL ANGLE
STRUCTURE
FRONT OF UNIT
SCALE: NONE
SIDE OF UNIT
SPRING ISOLATORS.
TYPICAL
8"X8"X3/8"
STEEL PLATE 1/2"ANCHORS
X 3" EMBED
DRILL 1" EXPANSION
HOLE FOR
GALVANIZING
ALL STEEL ABOVE
ROOF TO BE
GALVANIZED
VIBRATION
ELIMINATOR RISER
SEISMIC / VIBRATION
ISOLATOR. TYPICAL.
UPPER RAIL
MOUNT REFRIGERANT
PIPING UNDER. UNITS.
NOTE:
TYPICAL CEILING SPACE. ADAPT
TO SITE CONDITIONS IN A
PROFESSIONAL MANNER.
SCALE: NONE
3/8" X 3" LAG
SCREW WITH
WASHER.
HANGER RODS
ROOF OR
CEILING JOIST
TYPICAL PIPE IN MECHANICAL
ROOM OR CEILING SPACE. WRAP
UNINSULATED PIPE WITH 2 LAYERS
SCOTCH #33 TAPE FOR 3" EITHER
SIDE AND THROUGH CLAMP.
GYPSUM BOARD
1" CHANNEL
"UNISTRUT" OR
EQUAL
RUN INSULATION THRU
CLAMP ASSEMBLY
SECURE PIPING TO
SUPPORTS WITH "UNISTRUT"
PIPE CLAMP OR EQUAL.
1-5/8" P-1001
"UNISTRUT" CHANNEL
OR EQUAL. (TYPICAL)
S E
F O
R P
H
ATUFOETAT
S
R E
E
NI
GNELANOIS
WINWARD M.
PACKER
No. 375080
A
LL
ID
E
A S
D
E S
IG
N
S , A
R R
A N
G E
M E
N T
S A
N D
P
LA
N S
IN
D
IC
A
T E
D O
R R
E P
R E
S E
N T
E D
B Y
T H
IS
D
R A
W
IN
G A
R E
O W
N E
D B
Y A
N D
T H
E P
R O
P E
R T
Y O
F W
H W
E N
G
IN
E E
R
IN
G
IN
C . A
N D
W E
R E
C R
E A
T E
D , E
V O
LV
E
D , A
N D
D E
V E
LO
P
E D
F O
R U
S E
O N
A N
D
IN
C O
N N
E C
T
IO
N W
IT
H
T H
E S
P E
C
IF
IE
D
P R
O
JE
C T
N
O N
E O
F T
H E
ID
E
A S
,D E
S
IG
N S
, A R
R A
N G
E M
E N
T S
O R
P
LA
N S
S H
A
LL
B E
U S
E D
B Y
O R
D
IS
C
LO
S E
D T
O A
N Y
P E
R S
O N
, F
IR
M
O R
C O
R P
O R
A T
IO
N
F O
R A
N Y
P U
R P
O S
E W
H A
T S
O E
V E
R W
IT
H
O U
T W
R
IT
T E
N C
O N
S E
N T
O F
W H
W E
N G
IN
E
E R
IN
G
IN
C
W
R
IT
T E
N D
IM
E
N S
IO
N
S O
N T
H E
S E
D R
A W
IN
G
S S
H A
LL
H
A V
E P
R E
C E
D E
N C
E O
V E
R S
C A
LE
D
IM
E
N S
IO
N
S
C O
N T
R A
C T
O R
S S
H A
LL
V
E R
IF
Y
A N
D B
E R
E S
P O
N S
IB
LE
F O
R A
LL
D
IM
E
N S
IO
N
S A
N D
C O
N D
IT
IO
N S
O N
T H
E J
O B
A N
D T
H
IS
O F
FI
C
E M
U S
T B
E N
O T
IF
IE
D O
F A
N Y
V A
R
IA
T
IO
N F
R O
M T
H E
D
IM
E N
S
IO
N S
A N
D C
O N
D
IT
IO
N
S S
H O
W N
B Y
T H
E S
E D
R A
W
IN
G S
W
A R
N
IN
G : R
E P
R O
D U
C T
IO
N
H E
R E
O F
IS
A
C R
IM
IN
A L
O
FF
E N
S E
U N
D E
R
U
.S .C
. S E
C . 5
. U
N A
U
TH
O R
IZ
E
D D
IS
C
LO
S
U R
E M
A Y
C O
N S
T
IT
U
TE
T R
A D
E S
E C
R E
T M
IS
A
P P
R O
P R
IA
T
IO
N
IN
V
IO
LA
TI
O
N O
F I.
C .2
4- 2-
-1
E T.
S E
Q . A
N D
O T
H E
R L
A W
S
CONSULTANTS
PROJECT NAME & ADDRESS
CODE REVIEW STAMP
SHEET NO.
PROJECT MANAGER:
DATE:
CHECKED BY:
DRAWN BY:
REVISIONDATEMARK
08/24/2026
WHW JOB NO.:
26059
A
B
C
D
1 2 3
1 2 3
A
B
C
D
SHEET TITLE
CL
UTAH STATE FAIR
PARK ZION BUILDING
HVAC UPGRADES
DFCM # 27071370
155 N 1000 W, Salt Lake City, UT 84116
MO 08/24/26
ME503
MECHANICAL DETAILS
DIVISION OF FACILITIES
CONSTRUCTION AND
MANAGEMENT
REVIEWED FOR
CODE COMPLIANCE