DFCM Construction - Prequalified Mechanical Stage II - Capitol Preservation Board - Capitol Complex Utility Plant Boiler Replacement - 25255050
Closed State & local contract opportunity Posted
- Solicitation number
- DA27006
- State
- Utah
- Responses due
Opportunity facts
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids for boiler replacement at the Capitol Complex Central Utility Plant under Stage II Invitation to Bid 25255050, with bids due August 19, 2026. Only contractors prequalified under the Stage I Prequalification for Contractors process and currently listed on the DFCM Prequalified Contractors list as of the solicitation date are eligible to bid—this is a mandatory eligibility gate.
The scope is replacement of the existing failed 2,000 MBH condensing boiler (CPB-5) with a new 4,000 MBH condensing boiler manufactured by Lochinvar (Model Crest FCB4000), re-piping of branches serving CPB-3, CPB-4, and CPB-5 to support a 20-degree temperature rise and future CPB-4 replacement, electrical work to support demolition and reinstallation, and related mechanical systems including natural gas piping, condensate neutralization, and seismic restraint provisions. All work must comply with the DFCM High Performance Building Standard. The site is the lower-level basement boiler room at 20 East 500 North, Salt Lake City, with access via freight elevator (4,500-pound capacity, 4-foot by 7-foot door). Work is restricted to normal business hours, Monday through Friday, 7:00 a.m. to 4:00 p.m. The University must receive one week's advance notice of any activities affecting operations or utility interruptions.
The construction cost estimate is $351,000. Substantial completion is required by November 18, 2026, with liquidated damages set at $300 per day. A mandatory pre-bid meeting is scheduled for August 5, 2026 at 1:00 p.m. at the Capitol Complex Central Utility Plant Entrance. Questions are due August 11, 2026 at 3:00 p.m., with addenda issuable by August 13. Subcontractor lists (covering all first-tier subs with bid amounts of $20,000 or more) are due by August 20, 2026 at 3:00 p.m. All bids must be accompanied by a 5% bid bond on AIA Document A310-2010 form or equivalent. Addendum No. 1, issued July 21, 2026, modifies flue vent system details on mechanical drawings and must be acknowledged in all bid submissions. The contract will be awarded to the lowest responsive and responsible bidder. Upon completion, contractors must maintain a performance rating of 4.0 or greater to retain prequalified status.
Opportunity text
**Stage II Invitation to Bid** **Only contractors who have been prequalified under a Stage I Prequalification for Contractors and are currently on the respective DFCM Prequalified Contractors list as of the date of this solicitation are eligible to bid on this project.** The State of Utah - Division of Facilities Construction and Management (DFCM) is requesting bids for the referenced project: **Project Description:** Replace the boiler in the Central Utility Plant. **Construction Cost Estimate:** $351,000.00